08.09.2014 Views

A Test Setup for Probe Card Characterization under “Production-like”

A Test Setup for Probe Card Characterization under “Production-like”

A Test Setup for Probe Card Characterization under “Production-like”

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

• Contents<br />

A test-setup <strong>for</strong> probe card characterization<br />

<strong>under</strong> – Background „production-like“ / Motivation operating conditions<br />

• Third level 16pt<br />

– Fourth level 14pt<br />

Michael Horn, Stephan Fuchs<br />

» Fifth level 12pt<br />

Infineon Technologies - Munich / Germany<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 1<br />

Presentation <strong>for</strong> SWTW 2004


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

Outline<br />

‣Background / Motivation<br />

‣<strong>Test</strong> Concept Requirements<br />

‣<strong>Test</strong> <strong>Setup</strong><br />

‣<strong>Probe</strong>-<strong>Card</strong> Measurement Results<br />

‣Summary<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 2


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

Background<br />

• strong need <strong>for</strong> probe card evaluation process <strong>for</strong>:<br />

– new probing technologies ( pad arrangements, pitch, multi DUT)<br />

– new products: (materials, BEOL-stack)<br />

• short „time-to-market“ prohibits iterative improvement process<br />

– evaluation process needs to start earlier<br />

• missing links in the evaluation process:<br />

– reliable prediction of c res per<strong>for</strong>mance<br />

– c res stability <strong>under</strong> manufacturing conditions<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 3


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Probe</strong>-<strong>Card</strong> Evaluation - IDEAL flow<br />

New Wfr.<br />

Process or<br />

Product<br />

Requirements<br />

<strong>Test</strong>- <strong>Setup</strong><br />

blank wfr (alu...)<br />

<strong>Probe</strong>-<strong>Card</strong><br />

<strong>Test</strong>er<br />

<strong>Test</strong> Program<br />

<strong>Test</strong>-/Product Wfrs.<br />

<strong>Probe</strong>-<strong>Card</strong><br />

<strong>Test</strong>er<br />

<strong>Test</strong> Program<br />

Product Wfrs.<br />

<strong>Probe</strong>-<strong>Card</strong><br />

New Probing<br />

Requirements<br />

PC<br />

<strong>Characterization</strong><br />

Early Life<br />

Qualification<br />

Production<br />

Evaluation<br />

Production<br />

Release<br />

Specification<br />

Qual‘d<br />

Technologies<br />

Preferred<br />

Vendors<br />

Contact Stability<br />

Cleaning Recipe<br />

PC Planarity<br />

<strong>Probe</strong>r Alignment<br />

Measurement -<br />

Stability<br />

Scrub Analysis<br />

incoming QC<br />

Yield Stability<br />

Cleaning Freq.<br />

Handling Issues<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 4


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> Concept - Requirements<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

• test scenario as close as possible to real probing conditions<br />

– <strong>for</strong>ce current through contacts<br />

– probing parameter variation<br />

• temperature<br />

• overdrive<br />

• chuck-speed<br />

• high number of Touch-Downs<br />

– different contact materials<br />

• Evaluation should be possible w/o specific product or test-chip<br />

– amount of test-chip and/or product wfrs limited<br />

– product schedule can be shifted<br />

• low cost & flexible setup<br />

– use existing equipment & h/w (but no tester)<br />

– flexible channel assignment (Vcc, GND)<br />

0.05.04 Page 5


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> <strong>Setup</strong>- Overview 1/2<br />

Multimeter<br />

Pwr. Supply<br />

V<br />

Personal Computer<br />

Parallel Port<br />

GPIB<br />

Interface Board<br />

Pogo Tower<br />

<strong>Probe</strong> <strong>Card</strong><br />

<strong>Probe</strong>r<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 6


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> <strong>Setup</strong>- Overview 2/2<br />

Interface Board<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 7


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong>-<strong>Setup</strong> Main Features<br />

• Wafer handling:<br />

(w/ <strong>Probe</strong>r-Interface Docking Unit)<br />

TSK APM 90 (available prober)<br />

• Nr. of measurement channels: 128<br />

flexible channel assignment of probe contact to Vdd or Gnd via GUI<br />

• Current per needle:<br />

• Repeatability (σ):<br />

• Data Output:<br />

0,1-200 mA<br />

ca. 1,4 mΩ<br />

ASCII <strong>for</strong>mat<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 8<br />

number 1 2 3 4 5 6 7<br />

channel 7 6 5 2 3 1 68<br />

X-coordinate 0 0 0 0 0 0 0<br />

Y-coordinate 7931 7611 7291 6971 6651 6171 3371<br />

comment DAISYDAISYDAISYDAISYDAISYDAISYDAISY<br />

VCC / GND GND VCC GND VCC GND VCC GND<br />

touchdown X Y X_abs Y_abs<br />

2 3 5 166.245 346.0482 1.27 4.86 1.64 1.02 0.91 2.38 30<br />

4 5 5 147.74 346.0482 1.35 4.55 1.92 0.91 0.78 2.54 30<br />

6 7 5 129.235 346.0482 1.27 4.79 2.04 0.87 0.9 2.02 30<br />

8 9 5 110.73 346.0482 1.32 4.82 2.09 0.92 0.96 2.18 30<br />

10 11 5 92.2248 346.0482 1.42 5.68 2.49 0.9 1.02 2.58 30<br />

12 14 4 64.4648 370.2382 1.19 5.37 1.8 0.89 0.83 1.76 30<br />

14 12 4 82.9698 370.2382 1.25 4.76 1.59 0.77 0.91 1.65 30<br />

16 10 4 101.475 370.2382 1.11 4.95 1.69 0.75 0.88 1.7 30<br />

18 9 4 110.73 370.2382 1.4 4.67 1.83 0.74 0.82 1.99 30<br />

Example<br />

Result File


..<br />

A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> Sequence 1/2<br />

...<br />

1. Unactivated State<br />

...<br />

2. <strong>Probe</strong>-<strong>Card</strong> „Aging“<br />

State<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

0.05.04 Page 9<br />

3. Measurement State


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> Sequence 2/2<br />

Power Supply on<br />

off<br />

Chuck<br />

up<br />

down<br />

∆t<br />

Multimeter<br />

Needle# 1........................128<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

.05.04 Page 10


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> <strong>Setup</strong>- User Interface 1/2<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

.05.04 Page 11


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

<strong>Test</strong> <strong>Setup</strong>- User Interface 2/2<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

Mapping of Pins<br />

to Vdd and Gnd<br />

.05.04 Page 12


TW June-2004<br />

.Horn/ S.Fuchs<br />

.05.04 Page 13<br />

A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

Measurement Results 1/3<br />

cres<br />

[Ohm]<br />

Comparison of c Res <strong>for</strong> different Probing Technologies (@100mA, 90°C)<br />

6<br />

5<br />

<strong>Probe</strong>-<strong>Card</strong> A<br />

<strong>Probe</strong>-<strong>Card</strong> B<br />

<strong>Probe</strong>-<strong>Card</strong> C<br />

cres<br />

[Ohm]<br />

2.0<br />

4<br />

1.5<br />

3<br />

1.0<br />

2<br />

0.5<br />

1<br />

0<br />

1177<br />

2353<br />

3529<br />

4705<br />

5881<br />

7057<br />

8233<br />

9409<br />

10585<br />

11761<br />

12937<br />

14113<br />

15289<br />

16465<br />

17641<br />

18817<br />

19993<br />

Nr. Touch-Downs


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

Measurement Results 2/3<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

.05.04 Page 14


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

Measurement Results 3/3<br />

cres starts to increase<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

.05.04 Page 15


A <strong>Test</strong>-<strong>Setup</strong> <strong>for</strong> <strong>Probe</strong>-<strong>Card</strong> <strong>Characterization</strong><br />

Summary<br />

• test-setup can identify contact-resistance issues better than using<br />

a product (no interpretation of test-data required)<br />

• test setup enables us to assess per<strong>for</strong>mance trend of <strong>Probe</strong>-<strong>Card</strong>s<br />

in an early project phase<br />

• less resources required during evaluation phase (ATE resources<br />

and test code development resources)<br />

TW June-2004<br />

.Horn/ S.Fuchs<br />

.05.04 Page 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!