5 - TPAO
5 - TPAO
5 - TPAO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
25<br />
Garzan Water Injection Project<br />
Garzan Field, which has 300 million barrels<br />
oil in place, is one of the biggest oil fields in<br />
Turkey.<br />
Within the scope of mentioned project, 28.8<br />
million barrels of oil in Garzan-B Field and<br />
13.2 million barrels in Garzan-C Field were<br />
produced by the end of 2011.<br />
Batı Kozluca Field Water Alternating<br />
Gas Injection (WAG) Project<br />
By the end of 2011, cumulative gas injection<br />
reached to 5,982 MMscf (169 million m³) and<br />
cumulative water injection reached to 831,383<br />
barrels. CO 2 and water injection still continue.<br />
As results of pilot polymer gel injection done<br />
in 7 wells to reduce water-cut values in 2007<br />
that were satisfying, gel injection operations<br />
were done in 75 wells throughout the year.<br />
Approximately 756,000 barrels of extra oil<br />
production was obtained from these 75 wells.<br />
Gross production rates of more than 20<br />
wells were changed gradually in 2011. 2<br />
abandoned wells were put into production<br />
after gel operation. As a result, approximately<br />
18,500 barrels of additional oil were produced<br />
by these operations in 2011.<br />
Being conscious of our country’s<br />
sustainable development and as a pioneer<br />
corporation in energy sector, we conduct<br />
our activities in the context of environmental<br />
harmony and social consciousness and<br />
we make no concession of our sensitivity<br />
to this subject.<br />
We all have the right to live in a healthy<br />
and balanced environment. To protect<br />
the environment is our most important<br />
responsibility. With the aim to bequeath<br />
a habitable environment to today’s youth<br />
tomorrow’s future, we actively take the<br />
necessary environmental precautions in<br />
our activities.