28<br />

ACG Project has been developed in phases.<br />

The production has started from Chirag Field<br />

(the early oil project) in November 1997. The<br />

Phase-1 (Development of the Central Azeri<br />

Field) was put into production in 2005. The<br />

productions of the Phase-2 (Development<br />

of the West and East Azeri Fields) were<br />

commenced in 2006 and the production<br />

of Phase-3 (Development of Deep Water<br />

Guneshli Field) was started up in 2008.<br />

Chirag Oil Project (COP) which aims to<br />

produce oil from undepleted area between the<br />

existing platforms in Chirag and Deep Water<br />

Guneshli is on the execution phase and it is<br />

expected to be online at the end of 2013.<br />

Shah Deniz Project<br />

The project has been signed in 1997 and after<br />

the completion of the Minimum Obligatory<br />

Work Program of the Exploration and the<br />

Extended Exploration Periods in 2001,<br />

commerciality of natural gas and condensate<br />

has been declared.<br />

The Shah Deniz Structure is located in the<br />

offshore South Caspian Sea, 70 km southeast<br />

of Baku and 70 km southwest of the Azeri-<br />

Chirag-Guneshli Field. The concession has<br />

area coverage of approximately 860 km² with<br />

water depth varying between 150 and 600 m.<br />

According to the Sales and Purchasing<br />

Agreements (SPA), within the scope of<br />

Phase-1 in the project which had 625<br />

billion m³ natural gas and 750 million barrel<br />

condensate reserves, the produced gas has<br />

been exported to Turkey, Azerbaijan and<br />

Georgia.<br />

With the Shah Deniz Phase-1 Field<br />

Development and Construction Decision,<br />

the production has started on December<br />

2006 while the commercial production<br />

started in April 2007. The expected annual<br />

plateau production in Phase-1 is specified as<br />

8.6 billion m³ and 6.6 m³ of this amount is<br />

segregated to Turkey for 15-years period.<br />

By the end of 2011, the cumulative produced<br />

natural gas is 30.7 billion m³ and produced<br />

condensate is 63.8 million barrels. For 2011,<br />

the amount of them was 6.7 billion m³ and 14<br />

million barrels, respectively.<br />

The equity of <strong>TPAO</strong> through the project is 2.2<br />

billion m³ of natural gas and 4.7 million barrels<br />

of condensate. In 2011, these numbers<br />

are 467 million m³ for natural gas and 967<br />

thousand barrels for condensate.<br />

For Phase-2, it is estimated that construction<br />

decision will be taken in 2013 and first gas<br />

delivery will be realized in late 2017.<br />

Alov Project<br />

Turkish Petroleum Overseas Company<br />

(TPOC), a wholly owned subsidiary of <strong>TPAO</strong><br />

joined the Project after signing EDPSA, by<br />

an “Agreement on Participating Interest to be<br />

Vested” on July 29 th , 1998. As of December<br />

21 st , 2011 TPOC was assigned as the<br />

operator of the Alov Exploration Project.<br />

Alov Exploration Project covers three different<br />

prospective structures named Araz-Alov<br />

Sharg in the Middle of the Southern Caspian<br />

Sea. The license area is located 500 km<br />

south-east of Baku in water depths varying<br />

from 400 m to 1000 m.<br />

For the Alov Project, the minimum contractual<br />

commitments are 1,400 km² 3D seismic<br />

surveys and drilling of three exploration wells<br />

for the three-year exploration period. The<br />

legal status determination of Caspian Sea is<br />

waiting for the first exploration well drilling.<br />

Pipeline Projects of <strong>TPAO</strong><br />

Contributing to the Energy Corridor<br />

In Turkey, which resides at the intersection<br />

of Middle East and Caspian Regions having<br />

the major portion of the world oil reserves,<br />

the basis of the energy corridor to carry the<br />

energy resources to the world market was<br />

initiated by the constructions of BTC and SCP<br />

Pipeline Projects.