13.10.2014 Views

Water and Waste water reticulation

Water and Waste water reticulation

Water and Waste water reticulation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

F412-1000.1<br />

Safe Work Method Statement<br />

Page: 2 of 5<br />

Date: 05/05/08<br />

2. Prepare site to prevent<br />

accidents<br />

<br />

<br />

<br />

<br />

Inadequate access &<br />

egress<br />

Traffic – Vehicles, person<br />

watching, communication,<br />

traffic <strong>and</strong> machinery<br />

noise<br />

Spills of fuels to the<br />

environment<br />

Erosion of sediment<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Conduct brief site inspection<br />

Provide fencing, barricades, signals <strong>and</strong> danger flags as per regulations<br />

Supply personal protective equipment<br />

Fuels will be kept in a covered <strong>and</strong> bunded area in suitable containers<br />

No chemicals, fuels <strong>and</strong>/or waste will be stored or disposed in drainage lines or unsealed surfaces<br />

Bund volume will be 150% of chemicals stored<br />

A spill kit will be kept on site<br />

Sediment <strong>and</strong> Erosion control devices will be places around storm<strong>water</strong> drains, upslope of site to detour runoff<br />

around the site <strong>and</strong> down slope to prevent sediment-entering <strong>water</strong>ways.<br />

3. Prepare site to avoid<br />

environmental damage<br />

<br />

<br />

Excavation materials<br />

washed down in<br />

storm<strong>water</strong> drain<br />

Possible damage tree roots<br />

<strong>and</strong> subsequent damaging<br />

trees<br />

<br />

<br />

<br />

<br />

<br />

<br />

Bunding will be provided to stop materials washed down drainage.<br />

Liaise with Local authorities for specific environment issues where applicable (Local EPA, RTA <strong>and</strong> council etc)<br />

Fuels will be kept in a covered <strong>and</strong> bunded area in suitable containers<br />

No chemicals, fuels <strong>and</strong>/or waste will be stored or disposed in drainage lines or unsealed surfaces<br />

Bund volume will be 150% of chemicals stored<br />

A spill kit will be kept on site<br />

Spills of fuels to the<br />

environment<br />

Dust generated during<br />

excavation <strong>and</strong> work<br />

Emission from vehicles <strong>and</strong><br />

machinery<br />

Increase in noise<br />

Visual impacts on residents<br />

<strong>Waste</strong><br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Sediment <strong>and</strong> Erosion control devices will be placed around storm<strong>water</strong> drains, upslope of site to detour runoff<br />

around the site <strong>and</strong> downslope to prevent sediment entering <strong>water</strong>ways<br />

Trees <strong>and</strong> vegetation will be barricaded/fenced to prevent damage<br />

Stockpiles <strong>and</strong> exposed areas on the site will be <strong>water</strong>ed or coved to prevent dust generation<br />

Keep work site will be kept tidy<br />

Equipment will have a silencer installed to reduce noise<br />

Noisy equipment will be used as specified work hours<br />

<strong>Waste</strong> will be disposed at the appropriate EPA approved facility <strong>and</strong> documentation kept<br />

4. Prepare access <strong>and</strong><br />

egress for machinery<br />

<br />

<br />

<br />

Collision with vehicle <strong>and</strong><br />

/ or pedestrians<br />

Damage to property<br />

Damage to trees <strong>and</strong><br />

vegetation<br />

<br />

<br />

<br />

<br />

<br />

<br />

A traffic management plan will be implemented<br />

Every care will be taken to avoid any property damage.<br />

Be advised if large Tree roots are unearthed <strong>and</strong> a Tree preservation order application lodged.<br />

Vegetated/sensitive areas will be fenced<br />

All damaged property will be repaired by the end of the days work or as soon as possible<br />

Signs advising of traffic changes/increased traffic will be displayed for both vehicles <strong>and</strong> pedestrians

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!