F412-1000.1<br />

Safe Work Method Statement<br />

Page: 5 of 5<br />

Date: 05/05/08<br />

Work Method Statement ( Part 2 )<br />

Personal Qualification <strong>and</strong> Experience : Personnel, Duties <strong>and</strong> responsibilities: Training required to complete Work :<br />

Accreditation as a <strong>Water</strong>/<strong>Waste</strong> <strong>Water</strong> Constructor or key<br />

personnel<br />

Accreditations, approved by WorkCover <strong>and</strong>/or Sydney<br />

<strong>Water</strong> (SWC)<br />

<strong>Water</strong>/<strong>Waste</strong> <strong>Water</strong> Pipe laying,<br />

<strong>Water</strong>/<strong>Waste</strong> <strong>Water</strong> access chamber construction<br />

OHS&R Awareness (Green Card)<br />

Confined Spaces training<br />

Observing all relevant Acts <strong>and</strong> associated Legislation<br />

Site Safety<br />

Where applicable, nominated representative according to<br />

AS 2865 (Confined Spaces).<br />

Ensure safe work place<br />

Ensure PPE used<br />

Notify incidents <strong>and</strong> near misses<br />

Ensure MSDS sheets available on site if applicable.<br />

Site Induction<br />

Drainers Certificates of SWC training Courses<br />

Relevant plant operating licenses.<br />

AS 2865 accreditation (or SWC CI 800 or GP001)<br />

Basic CPR <strong>and</strong> First Aid<br />

Install Junction <strong>and</strong> Sidelines course.<br />

WorkCover accreditation for equipment use.<br />

Engineering Details / Certificates / WorkCover Approvals : Codes of Practice, Legislation :<br />

EPA Section 17D approval if required<br />

Council approval for aboveground storm<strong>water</strong><br />

All designs to comply with SWC/WorkCover requirements<br />

WorkCover approval to commence work.<br />

All designs to current Australian St<strong>and</strong>ards.<br />

SWC E-guide, SWC Supplements, relevant Australian St<strong>and</strong>ards<br />

Current Plumbing & Drainage Codes WorkCover Guidelines.<br />

SWC Minor Works (<strong>Waste</strong> <strong>Water</strong>) Manual<br />

EPA requirements <strong>and</strong> legislation<br />

OH&S Act, Regulations & Codes<br />

CI 800/GP 001/AS 2865<br />

Plant / Equipment : (Plant & equipment need to comply with WorkCover requirements)<br />

Excavator, Trucks, Power Tools<br />

Maintenance Checks : (According to WorkCover & Manufacturers requirements)<br />

Machine maintenance log<br />

Electrical Tools monthly inspection tests<br />

Read & Signed by all Employees on Site :