14.10.2014 Views

Colorado Floodplain Rules and Regulations

Colorado Floodplain Rules and Regulations

Colorado Floodplain Rules and Regulations

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Summary Statement Rule #12<br />

RULE 12 EFFECTS OF FLOOD MITIGATION<br />

MEASURES AND STREAM ALTERATION<br />

ACTIVITIES ON REGULATORY FLOODPLAINS<br />

Intent: Provide floodplain regulation requirements for stream<br />

alteration activities.<br />

Modifications:<br />

Clarification of when a Letter of Map Revision (LOMR) is<br />

required (0.3 feet)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!