<strong>Legislative</strong> <strong>Meeting</strong> Minutes September 13, 2010<br />

alone POE switches for wireless, required programming, and install of access points as well as the<br />

testing and configuration of hardware/software per COSTARS pricing.<br />

Wireless Configuration Infrastructure<br />

Qty Part Brand Unit Price Ext. Price<br />

11 Procurve 24 G PoE Switch HP $ 1,917.00 $ 21,087.00<br />

10 Procurve Gigabit Mini-GBIC HP $ 226.00 $ 2,260.00<br />

20 Fiber Patch Integra $ 35.00 $ 700.00<br />

1 5508 Wireless Controller Cisco $ 19,357.00 $ 19,357.00<br />

1 Smartnet 8X5X4 5508 Series Cisco $ 3,317.00 $ 3,317.00<br />

1 WSC License 100 Aps Cisco $ 2,901.00 $ 2,901.00<br />

1 PM2 License for 100 Aps Cisco $ 857.00 $ 857.00<br />

1 5500 Wirless Controller Additive 50 Aps Cisco $ 10,403.00 $ 10,403.00<br />

1 CON-SNTE-LC T50A Cisco $ 1,229.00 $ 1,229.00<br />

1 WSC License 50Aps Cisco $ 1,933.00 $ 1,933.00<br />

1 Base License 50Aps Cisco $ 571.00 $ 571.00<br />

4 1000BASE-T SFP Cisco $ 191.00 $ 764.00<br />

13 AIR-LAP 1142 Antennas Cisco $ 6,287.00 $ 81,731.00<br />

1 Gigabig Ethernet Blade Cisco $ 4,837.00 $ 4,837.00<br />

11 GBIC Transceiver Module Cisco $ 242.00 $ 2,662.00<br />

1 Configuration/Programming Integra $ 21,000.00 $ 21,000.00<br />

Total $ 175,609.00<br />

MOTION:<br />

On a motion by Mrs. Good seconded by Mrs. Barrett, motion #6 was approved as read.<br />

Motion carried by unanimous affirmative voice vote (Dr. Saddler absent).<br />

6. Approve the Purchase of 21 st Century Classroom Technologies for the New High<br />

School<br />

The Board approved the purchase of hardware, software and configuration services for an amount<br />

not to exceed $88,882.70. Upon substantial completion of the Phase II, 83 classrooms will require<br />

the purchase of equipment and installation to meet the needs of 21<br />

st century teaching. All existing<br />

interactive white boards will be removed and transferred to the new classrooms. Due to the<br />

capabilities of new network infrastructure, high school classrooms are capable of running projectors<br />

over IP addresses. All existing non-network projectors will be removed, cleaned and repurposed.<br />

The purchase of networked projectors, accompanying cabling, and software will afford classrooms<br />

with critical messaging notification capabilities that will force turn-on capacities to notify staff in<br />

the event of emergency. Additionally, the networking system will allow management of bulb-life<br />

and force shut-down. This solution includes all required IP programming, install and configuration<br />

of equipment per COSTARS pricing.<br />