Erbil BOQ FOR RFP - UNOPS

unops.org

Erbil BOQ FOR RFP - UNOPS

Bills of Quantity to Construct Thrid floor /Erbil Business Information Center

Item Description Unit Qty. Unit Cost Total Cost

1- Civil Works

A- Site Works

1.1

Demolish the existing roof slab of lift and remove the demolished

material off site in a proper manner at the direction of the site

ls 1.0

engineer

B- Concrete Works

1.2

Supplying materials & casting reinforced concrete (Grade 30),

30N/mm2 at 28 days for slabs 15 cm thickness, beams, lintel and

parapet all dimensions shown in drawings according to drawings

using ordinary cement, tested sand & gravel, the work shall include

wooden forms installing for the slab, as shown in drawings and

engineer's instructions

M3 10.0

Supplying materials & casting concrete reinforced with BRC (Grade

1.3

20),20N/mm2 at 28 days for w/c area the price includes back filling

with clean soil as shown in drawings and engineer's instructions.

C- Clay Brick

Supplying materials and labor to build with brick and cement mortor

1.4 (1:3) using ordinary cement as shown in drawings and engineer's

instructions. Width of wall 24 cm X 12.5 cm

D- Steel Structure

Supplying materials and labor to install a steel structure with clading

using sadwich pannel with all detail (10" I beam, 8" & 6" C

channels, 2" & 3" angles, sandwich pannel for wall and slab ,base

1.5 plate, bolt bresing as shown in drawings and as directed and approved

by the engineer.Price includes all necessary welding ,fiting ,supports,

connections and all accessories required to make it functional (that

not show in drawing). All steel shall be painted with red anti-rust

paint and 3 layer of oil paint according to the engineer instructions.

Total cost for civil work

2- Architectural Works

A- Tiling Works

Supplying material and executing ceramic floor tiles (30*30*0.6 cm )

first quality, bedding and jointing in cement and sand(1:3), joints

2.1

3mm wide using spacers, according to drawings, specifications and

Engineer's approval.

M2 20.0

M3 28.0

M2 350.0

M2 350.0

2.2

2.3

2.4

2.5

Supply and install suspended ceiling, with tracks/grids. All suspended

ceilings shall have mineral fiber acoustic panels installed in a

60x60cm grid. Scored tiles and galvanized metal tees shall be

manufacturer's standard white color. Tees shall not be attached to the

underside of the exterior skin of the building.

Supply and install suspended plastic or metal ceiling strips with

tracks/grids in w/c. All suspended ceilings shall have mineral fiber

stripsgrid. galvanized metal tees shall be manufacturer's standard

white color. Tees shall not be attached to the underside of the

exterior skin of the building.

Supply and install roof per the approved design. Includes insulation,

earthen fill shaped for drainage, 0.8m x 0.8m stiegers and mastic

sealant in joints.

Supplying material and executing ceramic colored wall tiles in plain

and decorative colors , fixed with cement and sand mortar bed (1:3),

including pointing in imported acrylic colored grout and special

covered ceramics pieces for skirting , joints 3mm wide using spacers,

according to drawings, specifications and Engineer's approval. price

includes two coats of cement and sand plastering Size

(300x300x6)mm

M2 330.0

M2 20.0

M2 30.0

M2 50.0

1 - 3


Bills of Quantity to Construct Thrid floor /Erbil Business Information Center

Item Description Unit Qty. Unit Cost Total Cost

2.6

Supply materials and plaster interior ceiling and walls with smooth

cement plastering(1:3) / gypsum , then painting with primer,and two

coats of high aquality plastic paint for lift area., prepare and apply

resin base water proofing acrylic textured decorative coating (the

binder shall be pure acrylic) pigments and binders are resistant to

NO 280.0

weather pollution…etc to be applied in accordance with

manufacturers instructions. According to drawings and engineer's

instructions

2.7

Supply materail , plastering and rendering the external walls with

cement mortar (1:3 )According to drawings and engineer's

instructions

M2 130.0

2.8

Supply material, aluminum and glass to make the new building

façade suitable with the existing building façade.

Total cost for architectural works

3 Plumbing & Mechanical Works

Supply material and install a rainwater roof drainage system using

heavy duty UPVC pipes. Diameter 4", including all necessary fitting ,

3.1

connections, all adhesive as shown on drawings and according to

engineers instructions.

Supply & install aluminum doors (1 x 2.1)m with Italian or Turkish

3.2 doors switch lock and 6mm glass according drawings according to

the engineer instructions.

Supply & install aluminum doors (2 x 2.1)m with Italian or Turkish

3.3 doors switch lock and 6mm glass according drawings according to

the engineer instructions.

Supply and install aluminum or upvc window with frame,hardware,

3.4 6mm glasses and bug screens. Windows shall be able to open and

close.

Supply and install walls with doors, latches and all associated

hardware.to build w/c room Price including all necessary ,fiting

3.5

,supports, connections and all accessories required to make it

functional (that are not shown in drawing).

M2 70.0

M 3.0

No 7.0

No 3.0

M2 23.0

No 4.0

3.6

3.7

Supply and connect third floor to extenal sewage collection network.

Work shall include all UPVC piping , valves, manholes, connections

and sewer service lines as necessary per the approved drawings to

service this floor with building then a sewer drainage requirement.

Price includes fittings, supports, connections and all accessories

required to make the pipes functional.

Supply, install and test appropriately sized interior PVC sewage pipes

in accordance with all technical requirements. Price includes fittings,

clean out , floor drain ,supports, connections and all accessories

required to make the pipes functional.

LS 1.0

LS 1.0

3.8 Supply install and test all exterior pipes, pumps, valves, fittings,

manhole with all accessories required to make the pipes functional.

Supply, install and test appropriately sized potable water pipes (cold

and hot) in accordance with all technical requirements. Price

3.9

includes fittings, supports, connections and all accessories required to

make pipes functional.

LS 1.0

LS 1.0

3.10

Supply and install eastern style commodes (WC) with fixing brackets

and concealed screws with 9 liter cistern in vitreous china or

enameled cast iron complete with connection to sewer pipe, cistern

supports painted. Per technical requirements, connections and all

accessories required to make it functional. The price also includes

supplying and fixing 150mm x 150mm toilet paper roll holder.

No 4.0

2 - 3


Bills of Quantity to Construct Thrid floor /Erbil Business Information Center

Item Description Unit Qty. Unit Cost Total Cost

Supply and install an appropriately sized ceramic wash basin

complete with short throw ball valve hot and cold water mixer and

provide water connections with valves and waste water connection

with P-trap, etc.Per technical requirements, connections and all

No 2.0

accessories required to make it functional The price shall also include

supplying and fixing 610mm x 460mm mirror above wash basin

3.11 fixture.

Furnish, install, and test electric water heater, storage type with

necessary thermostat control with all accessorized and capable of

delivering hot water with automatic temperature selector including

connection to cold water supply, complete with all safety devices for

single phase 220V operation. Water heater must include pressure

relief valve and check valve on supply side to prevent draining at low

3.12 water pressure.

No 1.0

Total Cost for Mechanical work

4 ELECTRICAL INSTALLATION WORKS

Supply and install (60X60) cm ,4 lamps ,72 W fluorescent lighting

fixture using suitable wires .The price shall include all materials and

4.1

labor to complete the job as per drawings, specification and

engineer's instructions.

Supply and install emergency light with battery backup using suitable

wires& embedded PVC conduits.The price shall include all material

4.2

and labor needed to complete the job as per drawings, specification

and engineer's instructions.

Supply double power outlet 13 Amp. shall be of 3 square pins, 250

volts and shall be from (MK) type , wires shall be single core PVC

4.3

insulated wire (Jordanian origin) ,Testing of the circuits shall be part

of the scope of work.

No 47.0

No 7.0

No 26.0

4.4

4.5

Supply 3phase power outlet 20 Amp. for Air conditioning

equipment. . Wiring shall be by using single core PVC insulated wire

(Jordanian origin) size (6 mm²) with earthing taking into account not

to connect more than one outlet for each power line coming from

S.D.B.and installing connectors box contains 3 copper points for

connection. Size ( 6 mm²) beside the A/C device and then connected

to A/C switch and covering the box with a heavy plastic cover,

Testing of the circuits shall be part of the scope of work .

Supply power outlet 32 Amp. Switch with pilot lamp for water heater

. The switch shall be of western origin type (MK or KSA) .Wiring

shall be through (25mm²) PVC conduits and galvanized boxes .

Wiring shall be by using single core PVC insulated wire (Jordanian

origin) size (6 mm²) , Testing of the circuits shall be part of the scope

of work .

No 7.0

No 1.0

4.6

Supply, install, connect wiring, testing and operating secondary

distribution board (circuit breaker) of Saudi Arabian origin contains 3 No 1.0

phase circuit isolator and 24 circuit breaker with capacities limited in

the drawings and engineer supervision

4.7 Supply & install 4x35mm2 CU/PVC cable + 1x16mm2 cable LM 1.0

4.8 Supply & install exhaust fan with shutter No 4.0

4.9

Supply, erect , connect & Operate Split Type Air condition cooling &

heating good origin of 4 ton cooling Capacity , The price includes

supplying electric supply Protection from irregular voltage or sudden

No 7.0

disconnection of Electricity

4.10

Supply and install a stand alone smoke detector operated using a 9V

bolt battery. Battery to be included with devices.

No 14.0

4.11 Supply 8Kg, ABC fire extinguisher No 2.0

4.12

Supply and install wireless communication cards for connection to

the communication grid.

No 12.0

Total cost for electrical work

Total Cost

3 - 3