Bills of Quantity to Construct Thrid floor /<strong>Erbil</strong> Business Information Center<br />

Item Description Unit Qty. Unit Cost Total Cost<br />

1- Civil Works<br />

A- Site Works<br />

1.1<br />

Demolish the existing roof slab of lift and remove the demolished<br />

material off site in a proper manner at the direction of the site<br />

ls 1.0<br />

engineer<br />

B- Concrete Works<br />

1.2<br />

Supplying materials & casting reinforced concrete (Grade 30),<br />

30N/mm2 at 28 days for slabs 15 cm thickness, beams, lintel and<br />

parapet all dimensions shown in drawings according to drawings<br />

using ordinary cement, tested sand & gravel, the work shall include<br />

wooden forms installing for the slab, as shown in drawings and<br />

engineer's instructions<br />

M3 10.0<br />

Supplying materials & casting concrete reinforced with BRC (Grade<br />

1.3<br />

20),20N/mm2 at 28 days for w/c area the price includes back filling<br />

with clean soil as shown in drawings and engineer's instructions.<br />

C- Clay Brick<br />

Supplying materials and labor to build with brick and cement mortor<br />

1.4 (1:3) using ordinary cement as shown in drawings and engineer's<br />

instructions. Width of wall 24 cm X 12.5 cm<br />

D- Steel Structure<br />

Supplying materials and labor to install a steel structure with clading<br />

using sadwich pannel with all detail (10" I beam, 8" & 6" C<br />

channels, 2" & 3" angles, sandwich pannel for wall and slab ,base<br />

1.5 plate, bolt bresing as shown in drawings and as directed and approved<br />

by the engineer.Price includes all necessary welding ,fiting ,supports,<br />

connections and all accessories required to make it functional (that<br />

not show in drawing). All steel shall be painted with red anti-rust<br />

paint and 3 layer of oil paint according to the engineer instructions.<br />

Total cost for civil work<br />

2- Architectural Works<br />

A- Tiling Works<br />

Supplying material and executing ceramic floor tiles (30*30*0.6 cm )<br />

first quality, bedding and jointing in cement and sand(1:3), joints<br />

2.1<br />

3mm wide using spacers, according to drawings, specifications and<br />

Engineer's approval.<br />

M2 20.0<br />

M3 28.0<br />

M2 350.0<br />

M2 350.0<br />

2.2<br />

2.3<br />

2.4<br />

2.5<br />

Supply and install suspended ceiling, with tracks/grids. All suspended<br />

ceilings shall have mineral fiber acoustic panels installed in a<br />

60x60cm grid. Scored tiles and galvanized metal tees shall be<br />

manufacturer's standard white color. Tees shall not be attached to the<br />

underside of the exterior skin of the building.<br />

Supply and install suspended plastic or metal ceiling strips with<br />

tracks/grids in w/c. All suspended ceilings shall have mineral fiber<br />

stripsgrid. galvanized metal tees shall be manufacturer's standard<br />

white color. Tees shall not be attached to the underside of the<br />

exterior skin of the building.<br />

Supply and install roof per the approved design. Includes insulation,<br />

earthen fill shaped for drainage, 0.8m x 0.8m stiegers and mastic<br />

sealant in joints.<br />

Supplying material and executing ceramic colored wall tiles in plain<br />

and decorative colors , fixed with cement and sand mortar bed (1:3),<br />

including pointing in imported acrylic colored grout and special<br />

covered ceramics pieces for skirting , joints 3mm wide using spacers,<br />

according to drawings, specifications and Engineer's approval. price<br />

includes two coats of cement and sand plastering Size<br />

(300x300x6)mm<br />

M2 330.0<br />

M2 20.0<br />

M2 30.0<br />

M2 50.0<br />

1 - 3


Bills of Quantity to Construct Thrid floor /<strong>Erbil</strong> Business Information Center<br />

Item Description Unit Qty. Unit Cost Total Cost<br />

2.6<br />

Supply materials and plaster interior ceiling and walls with smooth<br />

cement plastering(1:3) / gypsum , then painting with primer,and two<br />

coats of high aquality plastic paint for lift area., prepare and apply<br />

resin base water proofing acrylic textured decorative coating (the<br />

binder shall be pure acrylic) pigments and binders are resistant to<br />

NO 280.0<br />

weather pollution…etc to be applied in accordance with<br />

manufacturers instructions. According to drawings and engineer's<br />

instructions<br />

2.7<br />

Supply materail , plastering and rendering the external walls with<br />

cement mortar (1:3 )According to drawings and engineer's<br />

instructions<br />

M2 130.0<br />

2.8<br />

Supply material, aluminum and glass to make the new building<br />

façade suitable with the existing building façade.<br />

Total cost for architectural works<br />

3 Plumbing & Mechanical Works<br />

Supply material and install a rainwater roof drainage system using<br />

heavy duty UPVC pipes. Diameter 4", including all necessary fitting ,<br />

3.1<br />

connections, all adhesive as shown on drawings and according to<br />

engineers instructions.<br />

Supply & install aluminum doors (1 x 2.1)m with Italian or Turkish<br />

3.2 doors switch lock and 6mm glass according drawings according to<br />

the engineer instructions.<br />

Supply & install aluminum doors (2 x 2.1)m with Italian or Turkish<br />

3.3 doors switch lock and 6mm glass according drawings according to<br />

the engineer instructions.<br />

Supply and install aluminum or upvc window with frame,hardware,<br />

3.4 6mm glasses and bug screens. Windows shall be able to open and<br />

close.<br />

Supply and install walls with doors, latches and all associated<br />

hardware.to build w/c room Price including all necessary ,fiting<br />

3.5<br />

,supports, connections and all accessories required to make it<br />

functional (that are not shown in drawing).<br />

M2 70.0<br />

M 3.0<br />

No 7.0<br />

No 3.0<br />

M2 23.0<br />

No 4.0<br />

3.6<br />

3.7<br />

Supply and connect third floor to extenal sewage collection network.<br />

Work shall include all UPVC piping , valves, manholes, connections<br />

and sewer service lines as necessary per the approved drawings to<br />

service this floor with building then a sewer drainage requirement.<br />

Price includes fittings, supports, connections and all accessories<br />

required to make the pipes functional.<br />

Supply, install and test appropriately sized interior PVC sewage pipes<br />

in accordance with all technical requirements. Price includes fittings,<br />

clean out , floor drain ,supports, connections and all accessories<br />

required to make the pipes functional.<br />

LS 1.0<br />

LS 1.0<br />

3.8 Supply install and test all exterior pipes, pumps, valves, fittings,<br />

manhole with all accessories required to make the pipes functional.<br />

Supply, install and test appropriately sized potable water pipes (cold<br />

and hot) in accordance with all technical requirements. Price<br />

3.9<br />

includes fittings, supports, connections and all accessories required to<br />

make pipes functional.<br />

LS 1.0<br />

LS 1.0<br />

3.10<br />

Supply and install eastern style commodes (WC) with fixing brackets<br />

and concealed screws with 9 liter cistern in vitreous china or<br />

enameled cast iron complete with connection to sewer pipe, cistern<br />

supports painted. Per technical requirements, connections and all<br />

accessories required to make it functional. The price also includes<br />

supplying and fixing 150mm x 150mm toilet paper roll holder.<br />

No 4.0<br />

2 - 3


Bills of Quantity to Construct Thrid floor /<strong>Erbil</strong> Business Information Center<br />

Item Description Unit Qty. Unit Cost Total Cost<br />

Supply and install an appropriately sized ceramic wash basin<br />

complete with short throw ball valve hot and cold water mixer and<br />

provide water connections with valves and waste water connection<br />

with P-trap, etc.Per technical requirements, connections and all<br />

No 2.0<br />

accessories required to make it functional The price shall also include<br />

supplying and fixing 610mm x 460mm mirror above wash basin<br />

3.11 fixture.<br />

Furnish, install, and test electric water heater, storage type with<br />

necessary thermostat control with all accessorized and capable of<br />

delivering hot water with automatic temperature selector including<br />

connection to cold water supply, complete with all safety devices for<br />

single phase 220V operation. Water heater must include pressure<br />

relief valve and check valve on supply side to prevent draining at low<br />

3.12 water pressure.<br />

No 1.0<br />

Total Cost for Mechanical work<br />

4 ELECTRICAL INSTALLATION WORKS<br />

Supply and install (60X60) cm ,4 lamps ,72 W fluorescent lighting<br />

fixture using suitable wires .The price shall include all materials and<br />

4.1<br />

labor to complete the job as per drawings, specification and<br />

engineer's instructions.<br />

Supply and install emergency light with battery backup using suitable<br />

wires& embedded PVC conduits.The price shall include all material<br />

4.2<br />

and labor needed to complete the job as per drawings, specification<br />

and engineer's instructions.<br />

Supply double power outlet 13 Amp. shall be of 3 square pins, 250<br />

volts and shall be from (MK) type , wires shall be single core PVC<br />

4.3<br />

insulated wire (Jordanian origin) ,Testing of the circuits shall be part<br />

of the scope of work.<br />

No 47.0<br />

No 7.0<br />

No 26.0<br />

4.4<br />

4.5<br />

Supply 3phase power outlet 20 Amp. for Air conditioning<br />

equipment. . Wiring shall be by using single core PVC insulated wire<br />

(Jordanian origin) size (6 mm²) with earthing taking into account not<br />

to connect more than one outlet for each power line coming from<br />

S.D.B.and installing connectors box contains 3 copper points for<br />

connection. Size ( 6 mm²) beside the A/C device and then connected<br />

to A/C switch and covering the box with a heavy plastic cover,<br />

Testing of the circuits shall be part of the scope of work .<br />

Supply power outlet 32 Amp. Switch with pilot lamp for water heater<br />

. The switch shall be of western origin type (MK or KSA) .Wiring<br />

shall be through (25mm²) PVC conduits and galvanized boxes .<br />

Wiring shall be by using single core PVC insulated wire (Jordanian<br />

origin) size (6 mm²) , Testing of the circuits shall be part of the scope<br />

of work .<br />

No 7.0<br />

No 1.0<br />

4.6<br />

Supply, install, connect wiring, testing and operating secondary<br />

distribution board (circuit breaker) of Saudi Arabian origin contains 3 No 1.0<br />

phase circuit isolator and 24 circuit breaker with capacities limited in<br />

the drawings and engineer supervision<br />

4.7 Supply & install 4x35mm2 CU/PVC cable + 1x16mm2 cable LM 1.0<br />

4.8 Supply & install exhaust fan with shutter No 4.0<br />

4.9<br />

Supply, erect , connect & Operate Split Type Air condition cooling &<br />

heating good origin of 4 ton cooling Capacity , The price includes<br />

supplying electric supply Protection from irregular voltage or sudden<br />

No 7.0<br />

disconnection of Electricity<br />

4.10<br />

Supply and install a stand alone smoke detector operated using a 9V<br />

bolt battery. Battery to be included with devices.<br />

No 14.0<br />

4.11 Supply 8Kg, ABC fire extinguisher No 2.0<br />

4.12<br />

Supply and install wireless communication cards for connection to<br />

the communication grid.<br />

No 12.0<br />

Total cost for electrical work<br />

Total Cost<br />