meeting agenda of the planning commission - City of Jurupa Valley
meeting agenda of the planning commission - City of Jurupa Valley
meeting agenda of the planning commission - City of Jurupa Valley
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Types <strong>of</strong>Eguipment and Commodities Stored on Site<br />
There will be large (30,000 gallon and up) LPG storage tanks permanently attached to <strong>the</strong> site. The rail siding<br />
has room for 8+ cars at one time. There will be approximately 20 delivery tlUcks and transports parked when not<br />
operating.<br />
Storage <strong>of</strong> <strong>the</strong> BBQ cylinders will be under a covered ro<strong>of</strong> to protect <strong>the</strong>m fi:om <strong>the</strong> wea<strong>the</strong>r and to screen<br />
operations fi'om o<strong>the</strong>r propeliies. Wooden and plastic pallets for <strong>the</strong> BBQ tanks and metal storage cages fol' <strong>the</strong><br />
tanks will be stored in <strong>the</strong> proposed steel building. There will be a minimalnumber <strong>of</strong> small 150 to 250 gallon<br />
LPG tanks when <strong>the</strong> Kamps Propane division is added to <strong>the</strong> sÍle at Phase 3.<br />
There will be aboye ground diesel tanks on site for <strong>the</strong> delivery tlUck refueling for all company vehicles only.<br />
Vehicle Maintenance<br />
Thel'e will be no heavy vehicle repair on site-only minor maintenance fol' company vehicles.<br />
Drawings and Photos<br />
Kiva Energy Rail Terminal in Riverbank, Califomia. Kiva Energy will be <strong>the</strong> primary user <strong>of</strong><br />
<strong>the</strong> rail siding on site.<br />
Site Plan-shows 3 possible raíl spurs and possible layout <strong>of</strong> multiple 30,000 and 60,000 gallon LPG tanks<br />
These drawings are very preliminary. The final layout will be detelmined by <strong>the</strong> design <strong>of</strong> <strong>the</strong> RR siding and <strong>the</strong><br />
grading plan that will be required for stonn water retention / treatmen!.