26.10.2014 Views

THE NEWS OF AL HABTOOR LEIGHTON GROUP Dubai - UAE ...

THE NEWS OF AL HABTOOR LEIGHTON GROUP Dubai - UAE ...

THE NEWS OF AL HABTOOR LEIGHTON GROUP Dubai - UAE ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ve<br />

NEW Perspective<br />

vehicles and machinery to the projects. Some projects<br />

have their own tools and machines which are charged<br />

for any mechanical or repairing services.<br />

ii. Purchase: The department is also responsible of issuing<br />

LPO’s from accounts, supplying spare parts and external<br />

hiring for tools and machines.<br />

The new facility at Al Quoz Yard No. 2<br />

The new plant facility, constructed at Al Quoz yard No.2, is a<br />

bigger and more sophisticated. The construction has recently<br />

been concluded as a result minor works are still in progress.<br />

Shifting from the current location will commence in January.<br />

The total area is 22,630m2 including the open areas; the<br />

shaded area is 9,771m2. The offices area is 1,230m2. This<br />

consists of 40 new offices. Mr. Nachaat Issa showed us the<br />

art work and layout of the new office and area design. The<br />

place looks massive, well organized and well designed. The new<br />

sections added include:<br />

1. Fuel Station, with a system of electronic cards for each<br />

vehicle to trace the cost and number of times filled.<br />

2. A sand blast machine that has been imported from<br />

Holland and follows the environmental rules.<br />

3. Modern washing system: All vehicles from now on will be<br />

washed and cleaned from dust and concrete internally<br />

by using modern equipments. The washing area will<br />

include a Hydraulic Jack which will be able to lift a 25<br />

tons car for under cleaning purpose.<br />

4. Modern painting system has also been implemented.<br />

5. Upholstery work room<br />

6. Net air pressure<br />

7. Massive service area<br />

8. Main store, for storing all needed spare parts with big<br />

quantities and different sizes.<br />

The Plant Department Team<br />

The team is a group of 1293 dedicated professionals who work<br />

round the clock. They keep track of each and every vehicle and<br />

have developed very efficient systems to keep check and control.<br />

Nachat Issa, in a discussion with the Akhbar team, shared all<br />

his memories and fulfillments during the last 20 years of his<br />

tenure with HEE. He explained in details about the function<br />

of each division related to the Plant<br />

department and how proud he was of<br />

the efforts and great lengths that his<br />

team goes to for the achievement of<br />

excellent results.<br />

Jawdat Shawwa, Deputy Plant<br />

Manager, assists and manages all<br />

the Plant activities such as, tower<br />

cranes supply mobilization of new<br />

projects and lift hoist; he provides the<br />

sites with all machinery requirements.<br />

He spoke about the challenges the<br />

plant department faces, “the most<br />

challenging projects were the JBR<br />

and Business Bay Projects. The<br />

company wasn’t used to such massive<br />

projects, but we succeeded with our<br />

limited resources because of proper<br />

management”. We are implementing<br />

international standard facilities and<br />

manpower to be able to give better<br />

support to the future projects.<br />

Moeen Maarouf, Transport Supervisor<br />

is responsible for the daily schedule<br />

of the buses and trucks (logistics<br />

in transport), he takes care of all<br />

the drivers, their work hours, their<br />

problems, overtime, and he controls<br />

their tasks. He mentioned some<br />

statistics within five years as detailed<br />

in the chart below.<br />

Bedros Bederjikian, Assistant<br />

Transport Manager, heading<br />

transport department for all its<br />

activity, reports directly to the Plant<br />

Manager. He organizes all the<br />

Labourers and staff transport from<br />

camps accommodation to different<br />

sites and vice versa. He is responsible<br />

Jawdat Shawwa<br />

Moeen Maarouf<br />

Bedros Bederjikian<br />

Emad Sabti<br />

Ahmad Issa<br />

Transportation Statistics in the last 5 years<br />

Light Duty<br />

Drivers<br />

Pickups<br />

Mini Buses<br />

Heavy Buses<br />

0<br />

100 200 300 400 500<br />

Year<br />

2002<br />

2007<br />

Heavy Buses<br />

43<br />

166<br />

Mini Buses<br />

4<br />

38<br />

Pickups<br />

60<br />

123<br />

Light Duty<br />

Drivers<br />

165<br />

443<br />

AKHBAR <strong>AL</strong>DAR - NOVEMBER / DECEMBER 2007<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!