28.10.2014 Views

Diagram 2 - TwinHeat

Diagram 2 - TwinHeat

Diagram 2 - TwinHeat

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10<br />

<strong>Diagram</strong> 3 – Connection to the chimney<br />

* Prefabricated module chimneys should not be placed on top of the flue<br />

outlet, as this allows rainwater or possible condense water to run directly<br />

down into the heat exchanger of the boiler, where it will cause corrosion !<br />

Brick-build or block-build chimney<br />

Brick-build or block-build chimney<br />

Insulation<br />

Elbow with clean out hole<br />

Draft stabilizer mounted<br />

in chimney<br />

Clean out<br />

Draft stabilizer mounted<br />

on flue pipe<br />

Clean out<br />

*Module chimney with steel or ceramic liners<br />

Insulated tee module with<br />

draft stabilizer<br />

Insulated tee module with<br />

clean out<br />

Wall support<br />

*Module chimney with steel or ceramic liners<br />

Insulation<br />

Insulated tee module with<br />

clean out<br />

Elbow with clean out hole<br />

Draft stabilizer mounted<br />

on flue pipe<br />

Wall support<br />

DIAGRAM 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!