April 2011 - Control Global
April 2011 - Control Global
April 2011 - Control Global
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
S C A D A<br />
Remote Wind Energy<br />
SCADA <strong>Control</strong> System<br />
Like old-fashioned farming, tending a wind farm is a 24/7/365 job.<br />
At Iberdrola Renewables, the new SCADA system is a key “farm hand.”<br />
By Harm Toren<br />
At Iberdrola Renewables (www.iberdrolarenewables.us/),<br />
our National <strong>Control</strong> Center is professionally staffed<br />
24/7/365, performing operations, energy management,<br />
scheduling and generation dispatch functions. This<br />
helps us to better manage risks and uncertainty while<br />
fulfilling energy requirements with sustainable and<br />
clean power. Originally called PPM Energy and part of<br />
Scottish Power, our company began operating in Oregon<br />
in 2001 with 12 employees. As of 2010, more than 850<br />
workers throughout the United States maintain, develop,<br />
build and operate nearly 5000 megawatts of wind power<br />
and other power plants.<br />
Our recent addition to the Iberdrola Renewables fleet is the<br />
National <strong>Control</strong> Center located in Portland, Ore., the nerve<br />
center of the Iberdrola Renewables generation portfolio. In<br />
a room that looks a little like NASA’s Mission <strong>Control</strong>, our<br />
A P R I L / 2 0 1 1 www.controlglobal.com 47