30.10.2014 Views

EC - Qualicoat

EC - Qualicoat

EC - Qualicoat

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Executive Committee (8 November 2012)<br />

Q U A L I C O A T<br />

Resolutions<br />

Resolution No. 1/<strong>EC</strong> 08.11.12<br />

<strong>EC</strong> approves the objectives proposed by the Accreditation WG (WP <strong>EC</strong>/08.11.12).<br />

Resolution No. 2/<strong>EC</strong> 08.11.12<br />

<strong>EC</strong> decides to merge the Accreditation and Objectives working groups. The joint WG will be<br />

called Accreditation and Strategy WG and will be chaired by the President.<br />

Resolution No. 3/<strong>EC</strong> 08.11.12<br />

<strong>EC</strong> asks the Extension WG to finish the projects that have been started and to consider joining<br />

the new Accreditation and Strategy WG.<br />

Resolution No. 4/<strong>EC</strong> 08.11.12<br />

<strong>EC</strong> rejects the amendments made by QUALISURFAL to the list of mandatory calibration tools<br />

and asks the Specifications WG to prepare an update sheet.<br />

Resolution No. 5/<strong>EC</strong> 08.11.12<br />

<strong>EC</strong> asks the Technical Director to prepare a final detailed proposal showing the scope of the<br />

investigation to be carried out on AASS and FFC tests. A decision about the budget will be<br />

taken at the next <strong>EC</strong> meeting.<br />

Resolution No. 6/<strong>EC</strong> 08.11.12<br />

<strong>EC</strong> stipulates that the change of references from EN ISO to ISO standards (Resolution No. 12/TC<br />

07.11.12) should be implemented in the next edition of the Specifications.<br />

9/9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!