Environment<br />

Agency<br />

Thank you for the opportunity to provide comments on the draft development<br />

brief for the development proposals at Brook Road, Wimborne. We have<br />

reviewed this information and I would like to provide the following comments.<br />

2.3 - It is appropriate that you have noted the proximity of the sewage works and<br />

the household recycling centre to the proposal.<br />

2.2.16-2.20 - This section deals with Flooding and provides a summary of our<br />

comments to the Local Planning Authority over the last year or so, during the<br />

normal consultation process on the planning applications submitted for<br />

redevelopment of the site.<br />

2.21 - This paragraph summarises how our objection can be overcome. With this<br />

information to hand we anticipate any new planning application will address, in<br />

full, our previous comments in respect of the Sequential and Exception Test as<br />

detailed in PPS25.We are pleased to note that any future site layout will avoid the<br />

1 in 100 year (20% allowance for climate change) floodplain of the River Stour<br />

(paragraph 5.14). We shall be pleased to comment further on the redevelopment<br />

of this site at the pre-application stage, following the submission of a revised site<br />

layout and accompanying Flood Risk Assessment.<br />

Mr D Maidment I have no strong objections to a residential development at Brook Road and<br />

understand that Wimborne urgently needs additional social / affordable housing<br />

however I do have two main concerns:<br />

The access through Hardy Crescent is currently locked and is only for emergency<br />

purposes. I understand that this was previously a main access point for Flight<br />

Refuelling when the factory units were first built, however was closed to the<br />

access and traffic problems. I would be interested if there were there any<br />

planning restrictions in place for closing this access point?<br />

The Brook Road becomes very busy at peak times and also during the weekends<br />

when locals use the recycling and waste disposal site. If vehicles are unable to<br />

use the principal access point along Brook Road, then the amount of traffic along<br />

Hardy Crescent will become unbearable. You currently need to take this road<br />

with caution due to the number of cars that park on both sides and during the<br />

rugby season, the roads can become grid-locked on match days.<br />

The only solution that I could I could provide is making Brook Road into three<br />

lanes – there could be two lanes leading up Brook Road – one for the industrial<br />

units and one for the residential properties.<br />

2.26 - For the previous application we requested further site investigation, risk<br />

assessment and a remedial strategy. We are pleased to note this has been<br />

identified within the <strong>Development</strong> <strong>Brief</strong> and will be a pre-requisite for any future<br />

planning permission.<br />

4.36 - We would expect the development to strive for the highest code level<br />

possible within the Code for Sustainable Homes; a similarly sized development<br />

recently permitted in South Gloucestershire is looking to achieve Code Level 6.<br />

For water use we would expect development to meet Code Level 3 as a<br />

minimum which equates to 105 litres per person per day. This is the level the<br />

Environment Agency has been calling for within our responses to the Regional<br />

Spatial Strategy.<br />

4.37 - Wessex Water will need to confirm whether they can accept the additional<br />

discharge to their sewage treatment works within their existing discharge consent<br />

limits. I understand from section 6.8 that discussions have taken place which<br />

shows a requirement for a new pumping station but this does not address Wessex<br />

Water’s ability to receive the discharge within current consent limits.<br />

Chris Moglia,<br />

Synergy<br />

Housing<br />

I also have concerns how the local schools, hospitals, dentists, doctors etc and<br />

how they will cope with the additional homes in the area. Our son recently<br />

joined the local primary school and there was in excess of 60 children trying for<br />

approximately 30 school places. The situation will not improve and is not being<br />

address by developers or the Government!!<br />

In addition to Level 4 of the Code for Sustainable Homes being required as stated<br />

from 2010 (paragraph 4.32), you might usefully indicate that ''all housing<br />

benefiting from public funding will need to be built to 'Lifetime Homes' standard<br />

from 2011'' (www.lifetimehomes.org.uk).<br />

All affordable housing funded by the Homes and Communities Agency (HCA)<br />

need to meet the requirements of the HCA's 'Design and Quality Standards'<br />

(D&QS)<br />

http://www.housingcorp.gov.uk/upload/pdf/Design_quality_standards.pdf<br />

(a new version is apparently out soon)<br />

We have some better looking 'flush' solar thermal panels than the image shown<br />

on page 14 at Montrose Drive, Verwood, (off Vicarage Rd) being installed a few<br />

months back, the scheme has just finished.<br />

The indicative site layout is not entirely consistent with the requested perimeter<br />

block arrangement<br />

Presumably, a travel plan will be prepared for the site?<br />

35