01.11.2014 Views

FY 2007 - Town of Uxbridge

FY 2007 - Town of Uxbridge

FY 2007 - Town of Uxbridge

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

nels are for Public, Education and Government<br />

use. <strong>Uxbridge</strong> Community Access Television<br />

produces programming for approximately<br />

4,000 subscribers in the town.<br />

In the <strong>FY</strong> 07, UCAT requested a budget <strong>of</strong><br />

$125,040 that was voted and accepted by town<br />

meeting in the spring. The budget was use to<br />

purchase equipment for the three entities <strong>of</strong><br />

PEG Access.<br />

The equipment purchased will be utilized by<br />

volunteer producers, staff and students in the<br />

school district to produce programming for<br />

Public Access Television.<br />

Students at <strong>Uxbridge</strong> High School will be able<br />

to use this equipment to help produce morning<br />

announcements live to the school, help cover<br />

local sporting events and be able to incorporate<br />

into the curriculum through the Technology<br />

Department.<br />

The public is invited to participate in training<br />

workshops to learn about Public Access<br />

Television and be trained on the equipment. In<br />

the workshops volunteers will learn all aspects<br />

<strong>of</strong> television production including studio production,<br />

portable camera operation and nonlinear<br />

editing.<br />

<strong>Uxbridge</strong> Community Access Television is<br />

available to the residents <strong>of</strong> <strong>Uxbridge</strong> to help<br />

produce programming for the Public,<br />

Education or Government channels in<br />

<strong>Uxbridge</strong>. Classes are held throughout the year<br />

for training on the equipment that is available<br />

to the community. If you interested on learning<br />

more about Public Access Television in<br />

<strong>Uxbridge</strong> or you might have an idea for a<br />

program and you just need to know how to go<br />

about getting that program on UCAT, please<br />

contact the Program Coordinator at 508-278-<br />

0708 or email at cable.access@uxbridge-ma.gov.<br />

Respectfully submitted,<br />

Barry Giles, Program Coordinator<br />

<strong>Uxbridge</strong> Community Access Television<br />

Department <strong>of</strong> Public Works<br />

The Department <strong>of</strong> Public Works, operating<br />

under the <strong>Town</strong> Manager, is comprised <strong>of</strong><br />

the Superintendent, Assistant Superintendent,<br />

Water and Sewer Operations Manager, Highway<br />

Supervisor, 2 Administrative Staff and 17 Union<br />

Employees for <strong>FY</strong> 07.<br />

The Public Works Department is responsible<br />

for all highway construction and maintenance<br />

projects, winter snow & ice operations, maintenance<br />

<strong>of</strong> the commons, parks, playgrounds and<br />

recreation fields, school grounds maintenance,<br />

water and wastewater facility operations, and<br />

infrastructure maintenance, as well as landfill<br />

monitoring and maintenance. I am proud <strong>of</strong><br />

the Department and its accomplishments and<br />

we look forward to meeting the challenges that<br />

face our growing community however, I caution<br />

residents that further budget reductions<br />

will only defer much needed infrastructure<br />

maintenance resulting in long term higher<br />

costs for repairs and reconstruction.<br />

Frustration is beginning to set in with residents<br />

and the Department as a result <strong>of</strong> the<br />

absence <strong>of</strong> the Capital Improvement Program,<br />

the Bridge and Culvert Rehabilitation Program<br />

and most noticeably the $0 funding <strong>of</strong> the Road<br />

Improvement Program. The lack <strong>of</strong> these programs<br />

will directly result in escalating construction<br />

and replacement costs in the foreseeable<br />

future and our inability to maintain our infrastructure<br />

adequately.<br />

One can see by driving the community that<br />

stop gap safety measures (jersey barriers) to<br />

protect the motoring and pedestrian public are<br />

cropping up throughout the <strong>Town</strong> until funding<br />

becomes available for these necessary<br />

projects.<br />

The <strong>Town</strong>’s road improvement program dictates<br />

approximately $700,000 be spent annually<br />

to maintain the current level <strong>of</strong> service. In a<br />

typical year, Chapter 90 State Aid is in the range<br />

<strong>of</strong> $350,000 requiring the <strong>Town</strong> subsidize the<br />

balance <strong>of</strong> $350,000. Over the years, continuous<br />

cuts have been made and ultimately the budget<br />

was decimated to zero last year. As maintenance<br />

monies are deferred, road reconstruction costs<br />

skyrocket and simple maintenance projects<br />

become full-scale reconstruction projects. The<br />

DPW, with the use <strong>of</strong> only Chapter 90 Mass<br />

Highway funds, completed reconstruction <strong>of</strong><br />

Elm Street, Pleasant Street and portions <strong>of</strong> Cross<br />

Road.<br />

Capital improvement projects including the<br />

addition <strong>of</strong> a lime silo at the Waste Water<br />

Facility and the Low Service Water Tank<br />

Replacement Project and Rosenfeld Well Design<br />

Project are all ongoing and expected to be completed<br />

in <strong>FY</strong>07-08<br />

We invite the public to view all Division’s<br />

equipment and buildings at their convenience,<br />

and we take this opportunity to thank all <strong>Town</strong><br />

Departments that have assisted us in meeting<br />

our work schedules and goals for this year.<br />

WASTEWATER DIVISION<br />

The Wastewater Division as <strong>of</strong> July 1, <strong>2007</strong>, has<br />

2255 residential connections, 96 commercial<br />

connections, and no industrial connections.<br />

Treatment Plant Data<br />

Total gallons processed 341,500,000<br />

Gallons <strong>of</strong> septage processed 3,417,550<br />

Gallons <strong>of</strong> sludge to SYNAGRO 2,088,000<br />

Dry tons <strong>of</strong> sludge to SYNAGRO 309.0<br />

Cost <strong>of</strong> sludge disposal $125,096.02<br />

Extension to Sewerage System<br />

1,268 feet <strong>of</strong> 8 inch main<br />

WATER DIVISION<br />

The Water Division as <strong>of</strong> July 1, <strong>2007</strong> has 2984<br />

residential connections, 82 commercial connections,<br />

and 1 industrial connection and 64.4<br />

miles <strong>of</strong> water main.<br />

Plant Data<br />

Blackstone Wellfield Totals<br />

Total gallons pumped 120,213,349<br />

Average gallons per day 329,352<br />

Well #1 hours pumped 1,907.7<br />

Well #2 hours pumped 2,004.9<br />

Well #3 hours pumped 2,021.7<br />

Bernat Wellfield Totals<br />

Total Gallons pumped 113,800,700<br />

Average gallons per day 311,782<br />

Well #4 hours pumped 1,119.4<br />

Well #5 hours pumped 1,884.9<br />

Well #6 hours pumped 2,611.1<br />

Extension to Water System<br />

1,468 feet <strong>of</strong> 8 inch main<br />

PUBLIC WORKS REVENUE<br />

Water<br />

Usage/liens/interest/fees 888,244.81<br />

Water System Development 186,240.00<br />

SUB TOTAL $1,074,484.81<br />

Sewer<br />

Usage/liens/interest/fees 714,308.52<br />

Septage 193,885.00<br />

Sewer Betterments 8,049.71<br />

SUB TOTAL $916,243.23<br />

TOTAL $1,990,728.04<br />

Respectfully submitted,<br />

Lawrence E. Bombara<br />

DPW Superintendent<br />