Volume 2 Written Statement Full (PDF 4 MB) - Vattenfall
Volume 2 Written Statement Full (PDF 4 MB) - Vattenfall
Volume 2 Written Statement Full (PDF 4 MB) - Vattenfall
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Environmental Report<br />
Aberdeen Offshore Wind Farm<br />
Onshore Transmission Works<br />
December 2012<br />
Aberdeen City and Shire and its businesses play a major role in the energy<br />
revolution. AREG has been supported by the Energising Aberdeen Fund of<br />
Aberdeen City Council. The Fund represents a £22.25 million investment in<br />
the future of Aberdeen over five years by the Scottish Government.<br />
Technip<br />
17 Technip is a world leader in the fields of project management, engineering<br />
and construction offering innovative solutions to the global energy industry.<br />
18 With 23,000 employees, integrated capabilities and proven expertise in<br />
underwater infrastructure, offshore facilities and large processing units and<br />
plants on land, Technip is a key contributor to the development of sustainable<br />
solutions for the energy challenges of the 21st century.<br />
19 Through its Aberdeen based operating centre, Technip provides best-in-class<br />
subsea products and services to oil and gas companies operating offshore<br />
UK, Denmark, the Netherlands and West Coast of Ireland. Further to its<br />
established subsea business, Technip is rapidly developing capability to<br />
support the growing offshore wind sector.<br />
1.4 Project Team<br />
20 The environmental assessment has been managed, and this ER prepared, by<br />
SLR. SLR is a multi-disciplinary consultancy and a leading planning and EIA<br />
consultant to the renewable energy industry in the United Kingdom.<br />
21 SLR is a registered Environmental Impact Assessor and Member of the<br />
Institute of Environmental Management and Assessment (IEMA). The<br />
company has significant experience in the preparation of planning<br />
applications and undertaking environmental assessment and EIA for a wide<br />
variety of projects including renewable energy, minerals, waste, and<br />
infrastructure developments.<br />
22 SLR has drawn upon the expertise of a predominantly in-house team of<br />
appropriately qualified and experienced specialists comprising town planners,<br />
engineers, hydrogeologists, archaeologists, ecologists and other<br />
environmental specialists for the majority of the technical assessments<br />
presented in this ER.<br />
23 SLR has worked closely with LDA Design in respect of the landscape and<br />
visual assessment of the Proposed Development.<br />
1.5 Purpose of the Environmental Report<br />
24 The main aim of the ER is to ensure that Aberdeenshire Council is able to<br />
assess the accompanying planning application in the full knowledge of any<br />
likely significant effects on the environment, which are likely to arise as a<br />
result of the Proposed Development.<br />
25 The Proposed Development on its own does not constitute EIA development<br />
as it falls below the relevant thresholds set out in Schedules 1 and 2 of the<br />
Town and Country Planning (Environmental Impact Assessment) (Scotland)<br />
Regulations 2011 (‘EIA Regulations’).<br />
Chapter 1 INTRODUCTION Page 8 of 211