05.11.2014 Views

Full Depth Cold-in-Place Recycling/Stabilization for Low Volume ...

Full Depth Cold-in-Place Recycling/Stabilization for Low Volume ...

Full Depth Cold-in-Place Recycling/Stabilization for Low Volume ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

c) Significantly reduce aggregate requirements, thereby reduc<strong>in</strong>g costly aggregate hauls and<br />

road damage while preserv<strong>in</strong>g scarce aggregate resources.<br />

d) Optimal use of exist<strong>in</strong>g materials already <strong>in</strong>-place and paid <strong>for</strong> by the taxpayer.<br />

e) Strengthen narrow TMS roads by “build<strong>in</strong>g down” where the geometry of the exist<strong>in</strong>g road is<br />

not sufficient to “build up” with conventional full pavement structures.<br />

f) Integrate the “build down” strengthen<strong>in</strong>g alternative <strong>in</strong> an overall strategic road management<br />

framework, <strong>in</strong>corporat<strong>in</strong>g strategic haul agreement partnerships and staged construction to<br />

mitigate road deterioration over the next decade, result<strong>in</strong>g <strong>in</strong> time to implement more<br />

permanent conventional road strengthen<strong>in</strong>g solutions.<br />

Figure 4: <strong>Cold</strong> In-<strong>Place</strong> Recycle Material<br />

2.3 Highway 19-06 Pilot Test Site Construction<br />

Dur<strong>in</strong>g the summer of 1999, SHT <strong>in</strong>itiated a pilot project us<strong>in</strong>g cold <strong>in</strong>-place recycl<strong>in</strong>g and<br />

subgrade strengthen<strong>in</strong>g. Road Warrior Inc., from Swift Current, Saskatchewan, provided<br />

rotomix<strong>in</strong>g services and SHT crews provided all support equipment to construct test sites on<br />

Highway 19-06 <strong>in</strong> the Loreburn area. Approximately 12.6 kilometers were strengthened us<strong>in</strong>g<br />

comb<strong>in</strong>ations of SHT conventional strengthen<strong>in</strong>g and cold <strong>in</strong>-place recycled systems. The goal<br />

of this research ef<strong>for</strong>t was to develop more cost-effective strengthen<strong>in</strong>g systems <strong>for</strong><br />

Saskatchewan TMS roads. The specific objectives of the Highway 19-06 project were to:<br />

a) Investigate alternative types of soil stabilizers that may be used <strong>in</strong> conjunction with cold <strong>in</strong>place<br />

recycl<strong>in</strong>g to improve the load carry<strong>in</strong>g capacity and environmental durability of<br />

typical Saskatchewan TMS road subgrades.<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!