No pipework (new or existing) to be buried under pump station footings.<br />
Up to three pumps. (Duty + Standby)<br />
Building height of approximately 4m.<br />
A buried flow meter and isolation valve outside of pump station footprint.<br />
Security systems and infrastructure.<br />
Roof mounted communications antenna.<br />
Heating, cooling and ventilation system.<br />
Off street parking for minimum x 2 maintenance vehicles. (4wd)<br />
Vehicles required to reverse into pump station building for loading/unloading<br />
of equipment using overhead crane.<br />
Minimum of two points of personnel entry/exit required.<br />
Switchroom entry point with 10mtr external clear space for installation and<br />
removal of switchboards and VSD cabinets.<br />
Operational by and fully commissioned by August 2012.<br />
Steve committed to reviewing the list of givens and to provide a complete list at the<br />
next meeting.<br />
Members of the reference group are invited to add ideas to the table at the next<br />
meeting.<br />
7. Next <strong>Meeting</strong><br />
Prior to closing, Gary Neave made the following points:<br />
Any ideas that may see a portion of the land developed for active recreational<br />
uses (ie: half court basketball, tennis court etc) would not be something that<br />
<strong>SA</strong> <strong>Water</strong> would look to maintain into the future. Post meeting note: upon<br />
reflection <strong>SA</strong> <strong>Water</strong> would not be in a position to construct an active<br />
recreational play space through this project. However, ideas for a passive<br />
space accessible to the community are encouraged.<br />
<strong>SA</strong> <strong>Water</strong> has included in its ongoing maintenance budget the ability to<br />
maintain landscaping (not active recreational facilities) on the site into the<br />
future.<br />
<strong>SA</strong> <strong>Water</strong> currently has an Option to Purchase Agreement in place with the<br />
landowners for the <strong>Park</strong> Terrace/Walkerville Terrace site. <strong>SA</strong> <strong>Water</strong> will need<br />
to have further discussions with the landowners regarding the status of this<br />
option in January/February. Dependant upon these discussions, <strong>SA</strong> <strong>Water</strong><br />
may need to make a decision about whether or not to purchase the land<br />
parcel prior to the completion of the design process. While <strong>SA</strong> <strong>Water</strong> is<br />
confident that the design process will result in a concept plan that meets the<br />
objectives of both the community and <strong>SA</strong> <strong>Water</strong>, any such decision will not<br />
take for granted the ability to achieve such an outcome. Any land purchase<br />
prior to the completion of the design process will be at <strong>SA</strong> <strong>Water</strong>’s risk.<br />
As the meeting was unable to address all of the agenda items the following items<br />
have been held over to the next meeting:<br />
Finalisation of the Site Narrative<br />
Finalisation of the Site Vision<br />
Design (building orientation & style, landscape)<br />
Technical (Noise, pumps, access, hardstand areas, power)<br />
The next meeting is to be held Tuesday 18 January 2011 at 7pm at the Hackney<br />
Hotel, loft and balcony room (95 Hackney Road, Hackney).<br />
<strong>SA</strong> <strong>Water</strong> Preferred Pump Station Site <strong>Park</strong> <strong>Tce</strong>/Walkerville <strong>Tce</strong> Page 4 of 4<br />
<strong>Residents</strong> Group <strong>Meeting</strong> 1– <strong>13</strong> January 2011