Software Project Management Part 1: Organization - Chair for ...
Software Project Management Part 1: Organization - Chair for ...
Software Project Management Part 1: Organization - Chair for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Work package, Product, Deliverable,<br />
Baseline<br />
• Work Package:<br />
• A description (specification) <strong>for</strong> the work to be<br />
accomplished in an activity or task<br />
• Work Product:<br />
• Any tangible item that results from a project function,<br />
activity or task.<br />
• Deliverable:<br />
• A work product to be delivered to the customer<br />
• Baseline:<br />
• A work product that has been <strong>for</strong>mally reviewed and<br />
agreed upon<br />
• A project baseline can only be changed through a<br />
change request and a <strong>for</strong>mal change procedure.<br />
© 2007 Bernd Bruegge Introduction into <strong>Software</strong> Engineering Summer 2007<br />
23