Time estimates <strong>for</strong> establishing a WBS<br />
• Establishing an WBS in terms of percentage of<br />
total ef<strong>for</strong>t:<br />
• Small project (7 person-month): at least 7% or 0.5<br />
Person Months (PM)<br />
• Medium project (300 person-month): at least 1% or<br />
3 PMs<br />
• Large project (7000 person-month): at least 0.2 %<br />
or 15 PMs<br />
Source: Barry Boehm, <strong>Software</strong> Economics.<br />