Time estimates <strong>for</strong> establishing a WBS<br />

• Establishing an WBS in terms of percentage of<br />

total ef<strong>for</strong>t:<br />

• Small project (7 person-month): at least 7% or 0.5<br />

Person Months (PM)<br />

• Medium project (300 person-month): at least 1% or<br />

3 PMs<br />

• Large project (7000 person-month): at least 0.2 %<br />

or 15 PMs<br />

Source: Barry Boehm, <strong>Software</strong> Economics.<br />

© 2007 Bernd Bruegge Introduction into <strong>Software</strong> Engineering Summer 2007<br />

36