Awards of Excellence - ACEC|Manitoba
Awards of Excellence - ACEC|Manitoba
Awards of Excellence - ACEC|Manitoba
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2012 <strong>Awards</strong> <strong>of</strong> <strong>Excellence</strong><br />
Award <strong>of</strong> <strong>Excellence</strong> – Environmental<br />
Project Name: Pointe du Bois Spillway Replacement<br />
– Environmental Assessment<br />
Firm:<br />
MMM Group Limited<br />
Client: Manitoba Hydro<br />
The Pointe du Bois Spillway Replacement<br />
project involves modernizing<br />
a 100 year-old generating station<br />
within the confines <strong>of</strong> a sensitive ecological<br />
environment. The oldest power plant<br />
still in operation along the Winnipeg River,<br />
the Pointe du Bois generating station does<br />
not currently meet Canadian Dam Safety<br />
Guidelines, as it has significant safety and<br />
operational concerns due to its aging<br />
infrastructure. In 2010, to maintain public<br />
and dam safety and ensure a safe working<br />
environment for employees, its owner<br />
Manitoba Hydro decided to proceed with<br />
the construction <strong>of</strong> a new primary and<br />
secondary spillway, transition structures,<br />
wing walls, and earthfill dams. The existing<br />
spillway and dams need to be replaced<br />
in a cost-efficient manner while avoiding,<br />
or minimizing, any potential adverse environmental<br />
effects.<br />
This complex project encompasses<br />
many notable challenges, including the<br />
need to protect and maintain the endangered<br />
lake sturgeon and its spawning<br />
habitat, a tight project schedule, and the<br />
involvement <strong>of</strong> numerous sub-consultants<br />
and disciplines, which required extensive<br />
management and coordination. Opportunities<br />
for adaptive management must<br />
be exploited on the project, and design<br />
and construction work need to take into<br />
account environmental sensitivities and<br />
requirements, including avoidance <strong>of</strong><br />
in-water work in known lake sturgeon<br />
spawning areas; preserving turbulent flow<br />
on the east side; and maintaining water<br />
flow over known spawning areas. All these<br />
factors influence and contribute to the<br />
costs and schedule on the project.<br />
MMM Group Limited (MMM) was<br />
selected by Manitoba Hydro to lead the<br />
environmental component <strong>of</strong> the Pointe<br />
du Bois Spillway Replacement project,<br />
responsible for providing an environmental<br />
assessment, an Environmental Impact<br />
Statement (EIS), project management<br />
Northern Lights<br />
Heritage Services Inc.<br />
Specializing in<br />
Archaeological Surveys,<br />
Cultural & Heritage Resource<br />
Management, Geophysical<br />
Surveying & Education.<br />
Virginia Petch, Ph.D., RPA, EP<br />
President<br />
Northern Lights Heritage Services Inc.<br />
2739 Pembina Hwy, Winnipeg, MB R3T 2H5<br />
Tel: 204-231-8190 Fax: 204-269-8716<br />
vpetch@northernlightsheritageservices.ca<br />
www.northernlightsheritageservices.ca<br />
page 34 | Manitoba Consulting Engineer<br />
Click Here to return to Table <strong>of</strong> Contents