1<br />

REQUEST FOR INFORMATION (<str<strong>on</strong>g>RFI</str<strong>on</strong>g>) FOR CONSTRUCTION OF<br />

ONE TRAINING SHIP<br />

1. The Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g> Defence, Government <str<strong>on</strong>g>of</str<strong>on</strong>g> India, intends to acquire<br />

One <str<strong>on</strong>g>Training</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> the Indian Coast Guard.<br />

2. This Request <str<strong>on</strong>g>for</str<strong>on</strong>g> In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> (<str<strong>on</strong>g>RFI</str<strong>on</strong>g>) c<strong>on</strong>sists <str<strong>on</strong>g>of</str<strong>on</strong>g> two parts as indicated<br />

below:-<br />

(a) Part I. The first part <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>RFI</str<strong>on</strong>g> incorporates operati<strong>on</strong>al<br />

characteristics and features that should be met by the <str<strong>on</strong>g>Training</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g>.<br />

Few important technical parameters <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>Training</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g><br />

are also menti<strong>on</strong>ed.<br />

(b) Part II. The sec<strong>on</strong>d part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>RFI</str<strong>on</strong>g> states the methodology <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

seeking resp<strong>on</strong>se <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g>yards.<br />

PART –I<br />

3. The Intended Use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Training</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g> (Operati<strong>on</strong>al Requirements).<br />

These are specified in the Broad Parameters placed at Appendix A to this<br />

document.<br />

4. Important Technical Parameters. These are specified in the Broad<br />

Parameters placed at Appendix A to this document.<br />

PART-II<br />

5. Procedure <str<strong>on</strong>g>for</str<strong>on</strong>g> Resp<strong>on</strong>se<br />

(a) <str<strong>on</strong>g>Ship</str<strong>on</strong>g>yard must fill the <str<strong>on</strong>g>for</str<strong>on</strong>g>m <str<strong>on</strong>g>of</str<strong>on</strong>g> resp<strong>on</strong>se as given in Appendix B,<br />

Appendix C (Appendix E <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter I <str<strong>on</strong>g>of</str<strong>on</strong>g> DPP-08), and Appendix D <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

this document. Apart from filling details about <str<strong>on</strong>g>Ship</str<strong>on</strong>g>yards, details about the<br />

exact vessel meeting our generic technical specificati<strong>on</strong>s should also be<br />

carefully filled. Additi<strong>on</strong>al literature <strong>on</strong> the vessel can also be attached<br />

with the <str<strong>on</strong>g>for</str<strong>on</strong>g>m. Further following details are to be submitted:-<br />

(i) Feasibility to build the <str<strong>on</strong>g>Training</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g> with the enclosed<br />

specificati<strong>on</strong>s.<br />

(ii)<br />

Build Period.<br />

(iii) Experience in Building similar Vessel al<strong>on</strong>g with client<br />

details.<br />

(iv)<br />

(v)<br />

MOU, if any, with respect to design aspects.<br />

Budgetary quote


2<br />

(b)<br />

The filled <str<strong>on</strong>g>for</str<strong>on</strong>g>m should be despatched at under menti<strong>on</strong>ed address:-<br />

The Director (<str<strong>on</strong>g>Ship</str<strong>on</strong>g> <str<strong>on</strong>g>Acquisiti<strong>on</strong></str<strong>on</strong>g>)<br />

Directorate <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g> acquisiti<strong>on</strong><br />

Indian Coast Guard Headquarters<br />

<str<strong>on</strong>g>Nati<strong>on</strong>al</str<strong>on</strong>g> Stadium Complex,<br />

New Delhi, India – 1100<str<strong>on</strong>g>01</str<strong>on</strong>g><br />

E-mail- dsa@bol.net.in<br />

Teleph<strong>on</strong>e <str<strong>on</strong>g>01</str<strong>on</strong>g>1- 23074125<br />

(c) Last date <str<strong>on</strong>g>of</str<strong>on</strong>g> acceptance <str<strong>on</strong>g>of</str<strong>on</strong>g> filled <str<strong>on</strong>g>for</str<strong>on</strong>g>m is 23 Oct 10.<br />

6. The Government <str<strong>on</strong>g>of</str<strong>on</strong>g> India invites resp<strong>on</strong>ses to this <str<strong>on</strong>g>RFI</str<strong>on</strong>g> <strong>on</strong>ly from capable<br />

<str<strong>on</strong>g>Ship</str<strong>on</strong>g>yards. The end user <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Training</str<strong>on</strong>g> <str<strong>on</strong>g>Ship</str<strong>on</strong>g> is the Indian Coast Guard.<br />

7. This in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> is being issued with no financial commitment and the<br />

Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g> Defence reserves the right to change or vary any part there <str<strong>on</strong>g>of</str<strong>on</strong>g> at any<br />

stage. The Government <str<strong>on</strong>g>of</str<strong>on</strong>g> India also reserves the right to withdraw it should it be<br />

so necessary at any stage. The acquisiti<strong>on</strong> process would be carried out under<br />

the provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> DPP- 2008.


3<br />

Appendix- A<br />

(Refer to para 3 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>RFI</str<strong>on</strong>g>)<br />

OPERATIONAL/TECHNICAL SPECIFICATIONS FOR<br />

ONE TRAINING SHIP FOR INDIAN COAST GUARD<br />

1. Primary Role. To provide basic sea training to Coast Guard Officer<br />

Cadets.<br />

2. Sec<strong>on</strong>dary Role. Search and Rescue. To detect and prosecute hostile<br />

craft in area <str<strong>on</strong>g>of</str<strong>on</strong>g> operati<strong>on</strong>s<br />

3. Length. To commensurate to t<strong>on</strong>nage and draught .<br />

4. Displacement. Not more than 3500 T<strong>on</strong>s.<br />

5. Draught. Hull draught not exceeding 4 mtrs in fully laden state.<br />

6. Speed.<br />

(a) Maximum speed at full load displacement to be not less than<br />

20 knots at 92% MCR.<br />

(b)<br />

Cruising Speed (<strong>on</strong> single shaft) – 15 knots.<br />

7. Endurance. Not less than 5000 NM at cruising speed.<br />

8. Missi<strong>on</strong> Durati<strong>on</strong>. 60 days<br />

9. Sea worthiness. Sea worthy <str<strong>on</strong>g>for</str<strong>on</strong>g> transit <strong>on</strong> all headings upto sea state 7<br />

and survivability in all weather c<strong>on</strong>diti<strong>on</strong>s.<br />

10. Complement. About 281 pers<strong>on</strong>nel<br />

11. Expected Life 25 years @ 3000 hrs <str<strong>on</strong>g>of</str<strong>on</strong>g> annual exploitati<strong>on</strong>.<br />

12. Rules and Regulati<strong>on</strong>s Classificati<strong>on</strong> society rules, Internati<strong>on</strong>al load<br />

line regulati<strong>on</strong>, IMO/MARPOL-73/78, COLREG 72, Internati<strong>on</strong>al t<strong>on</strong>nage 1969,<br />

SOLAS 1992, Naval Magazine Explosive Regulati<strong>on</strong>s (NMER), Helo deck<br />

Regulati<strong>on</strong> as per warship standards.<br />

13. Noise and Vibrati<strong>on</strong> C<strong>on</strong>trol Noise criteria laid down by IMO<br />

resoluti<strong>on</strong> A 468(XII).<br />

14. Hull Structure. Built to appropriate Class notati<strong>on</strong>.<br />

15. Material <str<strong>on</strong>g>of</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong>. Class approved shipbuilding steel <str<strong>on</strong>g>for</str<strong>on</strong>g> a life<br />

span <str<strong>on</strong>g>of</str<strong>on</strong>g> 25 years.


4<br />

16. Special Features.<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(j)<br />

Modern integrated bridge <str<strong>on</strong>g>for</str<strong>on</strong>g> navigati<strong>on</strong><br />

Cadets training bridge below main bridge<br />

03 Class rooms with seating capacity 30 each<br />

Polluti<strong>on</strong> laboratory <str<strong>on</strong>g>for</str<strong>on</strong>g> testing water/oil samples.<br />

<str<strong>on</strong>g>Training</str<strong>on</strong>g> equipment viz. LCD Projector, Computers, Electr<strong>on</strong>ic<br />

White Board, etc.<br />

LAN System<br />

Astern & Abeam fuelling<br />

Replenishment At Sea (RAS) and Fuelling At Sea (FAS)<br />

Recreati<strong>on</strong> facilities<br />

(k) Sickbay with four single surgical beds and additi<strong>on</strong>al Quarantine<br />

cabin.<br />

(l) Integrated Plat<str<strong>on</strong>g>for</str<strong>on</strong>g>m Management System (IPMS) + <str<strong>on</strong>g>Training</str<strong>on</strong>g> module<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> IPMS.<br />

(m)<br />

(n)<br />

(p)<br />

(q)<br />

(r)<br />

(s)<br />

Automated Power Management System (APMS)<br />

Integrated Machinery C<strong>on</strong>trol System (IMCS)<br />

Auxiliary C<strong>on</strong>trol System (ACS)<br />

04 lane Weap<strong>on</strong> <str<strong>on</strong>g>Training</str<strong>on</strong>g> Simulator (WTS)<br />

A state - <str<strong>on</strong>g>of</str<strong>on</strong>g> - the - art C<strong>on</strong>ference Hall<br />

Modern <str<strong>on</strong>g>Ship</str<strong>on</strong>g> Laundry System<br />

17. Life Saving Equipment/Appliances. As per SOLAS requirement.<br />

18. Boats Two Inflatable Boats (Gemini’s), Three RIBs <str<strong>on</strong>g>of</str<strong>on</strong>g> 6.5 m (approx),<br />

Two enterprise class boats and <strong>on</strong>e 50 Kts Fast Speed motor boat.<br />

19. Davits. Dedicated single arm integrated boat/davit system with C<strong>on</strong>stant<br />

Tensi<strong>on</strong>, Anti Pendulati<strong>on</strong>, Anti Heave Compensati<strong>on</strong> system <str<strong>on</strong>g>for</str<strong>on</strong>g> handling boats.<br />

20. Main Propulsi<strong>on</strong> System. Twin diesel engines with two CPP systems.<br />

21. Ventilati<strong>on</strong> & Air-c<strong>on</strong>diti<strong>on</strong>ing Combinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> central air-c<strong>on</strong>diti<strong>on</strong>ing<br />

system and <str<strong>on</strong>g>for</str<strong>on</strong>g>ced ventilati<strong>on</strong> and mechanical exhaust arrangement.<br />

22. Bilge and De-flooding System. As per class.


5<br />

23. Fire Main and Fire Fighting System. Fire main system with sprinklers<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> magazine, helo hanger, helo deck and shipside, A Fire and Flood Alarm<br />

System. Suitable fire extinguishing system <str<strong>on</strong>g>for</str<strong>on</strong>g> machinery spaces as per<br />

classificati<strong>on</strong> rules.<br />

24. NBCD Headquarters. NBCD headquarters at an appropriate locati<strong>on</strong> +<br />

<strong>on</strong>e training DCHQ.<br />

25. Diesel Alternators (DAs). Four Diesel Alternators (DAs), each capable<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> being paralleled with others. Two DAs capable <str<strong>on</strong>g>of</str<strong>on</strong>g> meeting ship’s complete load<br />

under worst load c<strong>on</strong>diti<strong>on</strong> at max. 80-85% rating to enable 100% redundancy.<br />

One DA capable <str<strong>on</strong>g>of</str<strong>on</strong>g> meeting harbour load and normal cruising load.<br />

26. Power Supplies <str<strong>on</strong>g>of</str<strong>on</strong>g> 415 Volts, 3 phase 50 Hz & 240 Volts single phase<br />

50 Hz AC regulated to ± 0.5% and 24 volts DC.<br />

27. Galley/Dining Hall. Separate Galley/Dining hall <str<strong>on</strong>g>for</str<strong>on</strong>g> Officers, Officer<br />

Cadets, Subordinate Officers and Enrolled Pers<strong>on</strong>nel. Hot plates with standard<br />

Fittings, oven and grill and standard galley equipment to cater <str<strong>on</strong>g>for</str<strong>on</strong>g> cooking<br />

requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> 282 pers<strong>on</strong>nel. Adequate Cold Room and Cool rooms with<br />

sufficient capacity.<br />

28. Radar & Nav Aids. Two COTS Radars, <str<strong>on</strong>g>01</str<strong>on</strong>g> <str<strong>on</strong>g>Training</str<strong>on</strong>g> Radar, 02 Laser/Fibre<br />

Optic Gyros with repeaters, Echo Sounder, EM Log, Magnetic Compass, DGPS,<br />

Auto Pilot, Integrated Bridge System (IBS) as per NIBS rule requirement, AIS.<br />

29. Communicati<strong>on</strong>. Composite communicati<strong>on</strong> system integrating all<br />

external and internal communicati<strong>on</strong> equipment.<br />

30. Fixed Radio Sets. 04 HF Transreceiver, 03 VLF/HF receiver, 03 V/UHF<br />

Transreceiver, 04 Portable HF Tx Rx PRC 6020 A, 02 Portable V/UHF Tx/Rx<br />

sets, 12 Nos Motorola GP 338 etc.<br />

31. Satellite Communicati<strong>on</strong> Mobile satellite system, SATCOM Terminal<br />

and INMARSAT Terminal.<br />

32. Gun Armament (CG Supply) Two 30/40 mm Gun (approx. weight<br />

2500 kgs) and Two nos. 12.7mm HMG with Optr<strong>on</strong>ic Fire C<strong>on</strong>trol System. .<br />

33. Helicopter Deck Vessel should be capable to operate integral helo AUW<br />

6.5 T<strong>on</strong>s and stage through helo upto AUW 10 T<strong>on</strong>s.<br />

34. Fresh Water RO and WHR plants <str<strong>on</strong>g>for</str<strong>on</strong>g> fresh water generati<strong>on</strong> from<br />

seawater. Tank capacity to commensurate to crew strength.


6<br />

Appendix B<br />

Ser Particulars Reply by the Company<br />

1. Name <str<strong>on</strong>g>of</str<strong>on</strong>g> the Vessel.<br />

2. Whether are you (vendor/ business<br />

organisati<strong>on</strong>) capable to meet Broad-based<br />

requirements (placed at Appendix-A).<br />

3. Whether do you have capability to supply the<br />

required number/ execute the project within<br />

the desired time?<br />

4. Approx. unit cost <str<strong>on</strong>g>for</str<strong>on</strong>g> similar vessel sold.<br />

5. Previous experience <str<strong>on</strong>g>of</str<strong>on</strong>g> supply <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

equipment with the same/ similar QRs?<br />

6. Whether such vessel has been supplied by<br />

you to any Army, AF or Navy <str<strong>on</strong>g>of</str<strong>on</strong>g> host/ any<br />

other nati<strong>on</strong>?<br />

7. Foreign nati<strong>on</strong>/ organisati<strong>on</strong> to which such<br />

vessel has been supplied/ planned to be<br />

supplied in next two years.<br />

8. Whether company has manufacturing/<br />

serving set up in the host country & India or is<br />

likely to set up in the host country & India in<br />

next <strong>on</strong>e year.<br />

9. Annual turn over during the preceding<br />

3 years.<br />

10. Would you require to upgrade your design/<br />

capabilities to match QRs?<br />

11. Would QRs necessitate more than 50% or<br />

70% import c<strong>on</strong>tent?<br />

12. Are any import restricti<strong>on</strong>s applicable in the<br />

host country? If so how much time is reqd to<br />

take clearance?<br />

13. Does the company/ <str<strong>on</strong>g>for</str<strong>on</strong>g>m have any JV or<br />

would like to have JV with Indian partner in<br />

India? If so with whom?<br />

14. Would the company be ready to part ToT/<br />

MToT to Indian DPSU/ Pvt Firm? If so to<br />

whom?<br />

15. Would the company like to invest in <str<strong>on</strong>g>of</str<strong>on</strong>g>fsets<br />

(banking)?<br />

16. Earliest date at which OEM is willing to give a<br />

presentati<strong>on</strong> at Service HQ/ MoD in which in<br />

New Delhi.<br />

17 17. Whether are you registered firm/ company<br />

with state and/ or any business organisati<strong>on</strong>?


7<br />

INFORMATIOIN PROFORMA<br />

Appendix C<br />

1. Name <str<strong>on</strong>g>of</str<strong>on</strong>g> the Vendor/Company/Firm/<str<strong>on</strong>g>Ship</str<strong>on</strong>g>yard _________________<br />

_____________________________________________________________<br />

_____________________________________________________________<br />

(Company pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile, in brief, to be attached).<br />

2. Type (Tick the relevant category)<br />

Original Equipment Manufacturer (OEM) - Yes/No<br />

Authorised Representatives <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g>eign Firm/ - Yes/No (attach<br />

Vendor details, if yes)<br />

Others (give specific details)<br />

________________________________________________________________<br />

________________________________________________________________<br />

3. C<strong>on</strong>tact Details<br />

Postal Address:<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

City: ________________<br />

Pin Code: ____________<br />

Fax: ________________<br />

State: _____________________<br />

Tele:______________________<br />

URL/Web Site:_______________<br />

4. Local Branch/Liais<strong>on</strong> Office in Delhi (if any)<br />

Name & Address<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

Pin Code: __________________ Tele: _______________ Fax: ____________<br />

5. Financial Details<br />

(a) Category <str<strong>on</strong>g>of</str<strong>on</strong>g> industry (Large /medium/small Scale): _________________<br />

(b) Annual turn over: ______________________________ (in INR)<br />

(c) Number <str<strong>on</strong>g>of</str<strong>on</strong>g> employees in firm: _________________________________<br />

(d) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> manufacturing infrastructure: _________________________<br />

______________________________________________________________<br />

(e)<br />

Earlier c<strong>on</strong>tracts with Indian Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g> Defence/Government agencies:-<br />

C<strong>on</strong>tract Number Equipment Quantity Cost


6. Certificati<strong>on</strong> by Quality Assurance Organisati<strong>on</strong><br />

8<br />

Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Agency Certificati<strong>on</strong> Applicable from<br />

(Date & Year)<br />

Valid till (Date &<br />

Year)<br />

7. Details <str<strong>on</strong>g>of</str<strong>on</strong>g> Registrati<strong>on</strong> (<str<strong>on</strong>g>for</str<strong>on</strong>g> Indian Vendors). Foreign vendors to<br />

indicate as applicable in their country.<br />

Agency<br />

DGS&D<br />

DGQA/DGAQA<br />

OFB<br />

DRDO<br />

Any other<br />

Government<br />

Agency<br />

Registrati<strong>on</strong><br />

No.<br />

Validity (Date)<br />

Equipment<br />

8. Membership <str<strong>on</strong>g>of</str<strong>on</strong>g> FICCI/ASSOCHAM/<str<strong>on</strong>g>CII</str<strong>on</strong>g> or other industrial<br />

Associati<strong>on</strong>s (<str<strong>on</strong>g>for</str<strong>on</strong>g> Indian Vendors). Foreign vendors to indicate as<br />

applicable in their country.<br />

Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Organisati<strong>on</strong><br />

Membership Number<br />

9. Equipment/Product Pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile (to be submitted <str<strong>on</strong>g>for</str<strong>on</strong>g> each product<br />

separately).<br />

(a) Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Product: _______________________________________<br />

(Should be given category wise <str<strong>on</strong>g>for</str<strong>on</strong>g> e.g. all products under night visi<strong>on</strong><br />

devices to be menti<strong>on</strong>ed together)<br />

(b) Descripti<strong>on</strong> (attach technical literature): ______________________<br />

(c)<br />

Whether OEM or Integrator: ______________________________<br />

(d) Name and address <str<strong>on</strong>g>of</str<strong>on</strong>g> Foreign collaborator (if any):-<br />

___________________________________________________________<br />

(e) Industrial Licence Number: ______________________________<br />

(f) Indigenous comp<strong>on</strong>ent <str<strong>on</strong>g>of</str<strong>on</strong>g> the product (in percentage):<br />

___________________________________________________________<br />

(g) Status (in service/design & development stage):<br />

_____________________________________________________<br />

(h) Producti<strong>on</strong> capacity per annum ____________________________<br />

(j) Countries/agencies where equipment supplied earlier (give details<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> quantity supplied) _________________________________________<br />

10. Any other relevant in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> :<br />

________________________________________________________________<br />

________________________________________________________________


9<br />

Appendix D<br />

ADDITIONAL INFORMATION PROFORMA<br />

1 YEAR ESTABLISHED<br />

2 TYPE OF ORGANISATION<br />

SIZE/CLASSIFICATION OF YARD<br />

3 ORGANISATION SETUP AND<br />

AVAILABILITY OF SKILLED<br />

MANPOWER<br />

4 DETAILS OF DESIGN, PLANNING<br />

AND PORODUCTION FACILITIES/<br />

INFRASTRUCTURE INCLUDING<br />

SLIPWAYS/DRYDOCKS AND WET<br />

BASIN/WATER FRONT (ATTACH<br />

BROCHURES, ETC)<br />

5 ANNUAL BUILD CAPACITY<br />

(IN TONNAGE)<br />

6 DETAILS OF FUTURE EXPANSION<br />

AND BUSINESS DEVELOPMENT<br />

PLANNED<br />

7 VESSEL DELIVERED IN LAST<br />

05 YEARS. (ATTACH PREVIOUS<br />

ORDER COPIES FOR SIMILAR<br />

VESSELS ONLY)<br />

YARD<br />

NO<br />

CUSTOMER<br />

TYPE OF<br />

VESSEL<br />

DWT<br />

GRT<br />

ORDER<br />

DATE<br />

START<br />

PRODUCTION<br />

CONTRAC-<br />

TUAL<br />

DELIVERY<br />

ACTUAL<br />

DELIVERY<br />

8 ORDERS IN HAND (ATTACH ORDER COPIES FOR SIMIALR VESSELS ONLY)<br />

YARD<br />

NO<br />

CUSTOMER TYPE OF<br />

VESSEL<br />

DWT<br />

GRT<br />

ORDER<br />

DATE<br />

START<br />

PRODUCTION<br />

%<br />

COMPLE-<br />

TED<br />

EXPE<br />

CTED<br />

DELI-<br />

VERY<br />

9 FINANCIAL INFORMATION (IN<br />

INR FOR INDIAN VENDORS AND<br />

IN US DOLLARS FOR FOREIGN<br />

VENDORS<br />

(A) ANNUAL TURNOVER IN THE LAST THREE<br />

FINANCIAL YEARS (YEAR WISE)<br />

(B) PROFITS MADE


10<br />

(C) NET WORTH = EQUITY+ RESERVE<br />

(D) DEBT/EQUITY RATIO<br />

(E) QUICK RATIO=(CURRENT ASSETS LONG<br />

TERM DEBTS)/CURRENT LIABILITES<br />

(F) ATTACH COPIES OF CERTIFIED PUBLISHED<br />

ANNUAL REPORT SHOWING TURNOVER AND<br />

FINANCIAL STATUS IN SUPPORT OF ABOVE<br />

INFORMATION.<br />

10 DETAILED SPECIFICATIONS OF THE VESSEL<br />

OFFERED TO MEET THE SPECIFIED<br />

REQUIREMENTS AND BUILD PERIOD FROM DATE<br />

OF ORDER<br />

11 DETAILED SPECIFICATIONS OF COMMERCIALY<br />

OFF THE SHELF (COTS) VESSEL AVAILABLE FOR<br />

OUTRIGHT PURCHASE, IF ANY.