IDIQ Webinar Presentation
IDIQ Webinar Presentation
IDIQ Webinar Presentation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Welcome<br />
• We will be with you shortly<br />
• Please mute your phones and background noise<br />
• Questions will be allowed at the end of the presentation<br />
1
Presenters<br />
Greetings – Marcia Tucker,<br />
Group Leader Infrastructure Systems Group<br />
WSSC SR3 <strong>IDIQ</strong> Program Overview, Mark Behe,<br />
Unit Coordinator Sewer Rehabilitation Unit<br />
Specific <strong>IDIQ</strong> Contracts to bid, Angela Essner,<br />
WSSC Program Manager via Greeley and Hansen, LLC<br />
Doing Business with WSSC, Jessica Wright,<br />
Acquisition Consultant Acquisition Office<br />
SLMBE & MBE requirements, Mike Turner,<br />
Unit Coordinator SLMBE Office<br />
Closing, Marcia Tucker,<br />
Group Leader Infrastructure Systems Group<br />
2
Who We Are: WSSC<br />
• Service area/population 1.8 million residents in Montgomery<br />
and Prince George’s Counties, Maryland;<br />
• 8th largest water/wastewater utility;<br />
• Two water supply sources – Potomac and Patuxent Rivers;<br />
• More than 5,500 miles of water pipes;<br />
• Nearly 5,400 miles of sewer pipeline;<br />
Have always met or exceeded federal drinking water standards<br />
3
Who We Are: WSSC<br />
• Two (2) Water Filtration Plants; six (6) Wastewater Treatment Plants;<br />
• Three (3) Water Storage Reservoirs; 54 Water Storage Tanks;<br />
• 14 Water Pumping Stations; 41 Wastewater Pumping Stations;<br />
• Five (5) Maintenance Service Centers;<br />
• 170 MGD water production; and approximately 1500 Employees.<br />
Committed to provide safe, reliable water<br />
And return clean water to our environment<br />
4
Overview of WSSC’s Sewer Repair, Replacement<br />
and Rehabilitation Program<br />
January 18, 2012<br />
5
Program Overview<br />
• Background<br />
‣ Article 6 – Sewer Repair, Replacement and<br />
Rehabilitation Program (SR3)<br />
‣ SR3 Program to meet a Federal Consent Decree<br />
‣ Projects to restore assets must be completed on<br />
schedule<br />
‣ Priority 1 Assets must be completed by December 7,<br />
2015<br />
6
WSSC Sewer Service Area<br />
‣WSSC Service Area has 29 major<br />
sewer drainage basins within<br />
Montgomery and Prince George’s<br />
Counties.<br />
‣Our task is to rehabilitate sewer assets<br />
within 24 of those basins.<br />
‣ Recent studies of the basins have<br />
shown that pipe rehabilitation is<br />
necessary to avoid failure of the sewer<br />
lines that could create environmental<br />
emergencies in streams tributary to the<br />
Potomac River and the Chesapeake<br />
Bay.<br />
7
Overview of <strong>IDIQ</strong> Contracts<br />
• Estimated 60% of the existing sewer<br />
assets will be rehabilitated using<br />
trenchless technologies<br />
• Pipe bursting, open cut, and manhole<br />
replacement will also be required<br />
• Work will be assigned by means of task<br />
orders against master contracts<br />
8
Important Schedule Milestones<br />
• May 2011 – 2015: Construction in-progress<br />
• June 2015: Construction Complete.<br />
All Priority 1 SR 3 construction completed<br />
9
• Many of these sewer pipes/manholes are<br />
approaching the end of their useful life and<br />
are exposed due to stream erosion.<br />
10
Example of Exposed<br />
Sewer from Stream<br />
Erosion<br />
11
Exposed sewer<br />
12
Program Approach<br />
• Indefinite Delivery and Indefinite Quantity<br />
(<strong>IDIQ</strong>) Contracts<br />
– Roads (Public Streets and Thoroughfares)<br />
– Laterals (Mainline to Property or ROW line)<br />
– Environmentally Sensitive Areas (ESAs)<br />
14
Our Needs<br />
• 23 <strong>IDIQ</strong> contracts to bid<br />
• The next series of bids for three <strong>IDIQ</strong><br />
contracts will be posted on or before<br />
February 29, 2012.<br />
• In 2011 there has been six <strong>IDIQ</strong> Contracts<br />
awarded. It is anticipated that an additional<br />
20 more <strong>IDIQ</strong> Contracts will be solicited<br />
before April 2013.<br />
15
Previously Awarded <strong>IDIQ</strong> Contracts<br />
Contract No. Awarded Dollar Value<br />
PM5178A11 Jan-11 $34,316,681<br />
PM5239A11 Jun-11 $93,766,148<br />
PM5179A11 Jun-11 $25,000,000<br />
CI5180A11 Jun-11 $25,000,000<br />
PM5248A11 Oct-11 $30,000,000<br />
CI5181A11 Oct-11 $20,000,000<br />
CI5182A11 Anticipated January 2012 $15,000,000<br />
16
Overview of the Acquisition<br />
Process<br />
January 18, 2012<br />
17
Centralized Bidder Registration<br />
System<br />
Centralized Bidder Registration (CBR) System:<br />
‣Web-based tool for suppliers and bidders<br />
interested in receiving announcements of<br />
bidding opportunities. www.cbr-wssc.com<br />
‣ ALL vendors seeking to do business with WSSC must<br />
be registered in the CBR System.<br />
18
Solicitation Documents<br />
• Solicitation Cover Sheet<br />
• Part I – Instructions to Bidders<br />
• Part II – General Conditions<br />
• Part III – Special Conditions<br />
• Part IV – Technical Documents<br />
• Appendix A – Small, Local and Minority<br />
Business Enterprise (SLMBE) Requirements<br />
• Appendix B – Insurance and Bonding<br />
Requirements<br />
• Appendix C – Submission Forms<br />
19
How We Buy<br />
‣ Invitation For Bid (IFB)<br />
‣ Typically, used for purchases $25,000><br />
‣ E.g. inventory items, construction and construction-related<br />
services<br />
‣ Request For Proposal (RFP)<br />
‣ Typically, used for purchases $25,000><br />
‣ E.g. Professional Services/Specialized Services<br />
20
The <strong>IDIQ</strong> Bid & Construction Process<br />
ADVERTISEMENT<br />
Posted on CBR (www.cbr-wssc.com)<br />
OBTAIN BID DOCUMENTS<br />
REVIEW THE BID DOCUMENTS<br />
ATTEND PRE-PROPOSAL MEETING<br />
AND SITE VISIT (if applicable)<br />
SUBMIT PROPOSAL<br />
AWARD<br />
NOTICE TO PROCEED<br />
PRECONSTRUCTION MEETING AND<br />
SUBMITTALS<br />
ASSIGNMENT OF WORK<br />
SUBSTANTIAL COMPLETION AND<br />
FINAL INSPECTION<br />
FINAL RESTORATION<br />
FINAL PAYMENT AND<br />
ISSUANCE OF MAINTENANCE BOND<br />
21
Preparing for Success<br />
• Obtain a Security Clearance<br />
Contact the Acquisition Office at (301) 206-8866<br />
• Obtain a Sediment Control Card<br />
Call: 301-206-8077<br />
Obtain these WSSC Documents<br />
– General Conditions and Standard Specifications<br />
– Standard Details for Construction<br />
http://www.wsscwater.com/home/jsp/content/sect2011-spec.faces<br />
22
Preparing for Success<br />
• Obtain BID Documents<br />
– Specifications may be down loaded from Centralized<br />
Bidder Registration<br />
– Plans, if included in solicitation, are supplied by<br />
Acquisitions by CD or link to e-Builder.<br />
• Review BID Documents -<br />
– General Conditions and Standard Specifications<br />
– The Standard Details<br />
– Solicitation<br />
– Plans<br />
23
Preparing for Success<br />
• Pre-bid Meeting requirements<br />
– Ensure that the bid is based on the latest WSSC General<br />
Conditions and Standard Specifications guidelines.<br />
– All questions about the meaning or intent, discrepancies or<br />
omissions of the Contract Documents shall be submitted in<br />
writing and addressed to the Acquisitions Office. Questions<br />
received less than five days prior to bid opening will not be<br />
answered.<br />
– The submission of a Bid will constitute an incontrovertible<br />
representation by the Bidder that they have made a site visit and<br />
clearly understands the contract requirements for completing the<br />
work including permit compliance, local laws, and ground<br />
conditions or other impacts.<br />
24
• Submit Your BID<br />
– Due by the time and date noted in the Solicitation Cover Sheet<br />
– Submit Bid in sealed envelopes following instructions noted in<br />
the solicitation<br />
– Submit Bid to:<br />
Preparing for Success<br />
Acquisition Office, 8 th floor<br />
14501 Sweitzer Lane<br />
Laurel, Maryland 20707-5902<br />
25
Preparing for Success<br />
• AWARD<br />
– Proposals (Bids) are evaluated in a two-step process.<br />
• STEP 1: Evaluation of Technical Proposal<br />
• STEP 2: Selection of lowest, most responsive and<br />
responsible bidder based on Mock Project<br />
– Approval by WSSC Commissioners<br />
– Contract Execution<br />
• Issuance of NOTICE TO PROCEED<br />
26
• Pre-Construction Meeting and Submittals<br />
• Assignment of Work<br />
– The contractors will be assigned Task Orders to complete<br />
the rehabilitation of sewer assets located within the<br />
associated Basins.<br />
• Substantial Completion and Final Inspection<br />
• Final Restoration<br />
<strong>IDIQ</strong> Construction<br />
• Final Payment and Issuance of Maintenance Bond<br />
27
Need More Information on<br />
How to do Business with WSSC<br />
The Acquisition Office will conduct an education workshop on<br />
“How to do Business” with WSSC at WSSC Headquarters, 14501<br />
Sweitzer Lane, Laurel, MD 20707<br />
REGISTRATION REQUIRED: Visit www.wsscwater.com or call the<br />
Acquisition Office at (301) 206-8824.<br />
8:00 a.m. – 11:30 a.m.<br />
January 27, 2012<br />
28
Overview of the Small, Local and<br />
Minority Business Enterprise<br />
(SLMBE) Program<br />
“Diversity…just the way we do business!”<br />
January 18, 2012<br />
29
WSSC<br />
Business<br />
Community<br />
The Four Pillars of Excellence -<br />
Paving the Road to Supplier Diversity<br />
Supplier<br />
Advocacy<br />
Compliance<br />
Extensive<br />
Outreach<br />
Supplier<br />
Development<br />
30
In the Know<br />
• Completed Disparity Study – December 2010<br />
• Adopted New Minority Business Enterprise Program<br />
- Standard Procedure 11-01 – March 16, 2011<br />
• New MBE Program (SP MBE 11-01) Effective Date –<br />
May 1, 2011<br />
– Based upon the recently completed Disparity Study<br />
• New SLBE Program (SP SLBE 12-01) Effective Date –<br />
August 26, 2011<br />
31
Minority Business Enterprise (MBE) and the Small<br />
Local Business Enterprise (SLBE) Programs<br />
We encourage you to visit our website to view the<br />
new MBE Program<br />
(SP MBE 11-01)<br />
and the new SLBE Program<br />
(SP SLBE 12-01)<br />
at www.wsscwater.com<br />
32
MBE Program<br />
Designed to promote greater availability, capacity development, and<br />
contract participation by M/WBEs in WSSC contracts.<br />
WSSC Recognized MBE Certifying Agencies<br />
Maryland Department of Transportation (MDOT)<br />
http://www.mdot.maryland.gov/<br />
Prince George’s County Minority Business Development Division (PGMBDD)<br />
http://www.princegeorgescountymd.gov<br />
D.C. Department of Small and Local Business Development (DSLBD)<br />
http://dslbd.dc.gov/DC/DSLBD<br />
Maryland/District of Columbia Minority Supplier Development Council (MD/DC MSDC)<br />
http://affiliate.nmsdc.org/mddc/<br />
Women’s President Educational Organization (WPEO)<br />
http://www.womenpresidentsorg.com/<br />
33
SLBE Program<br />
‣ Designed to encourage the utilization of small<br />
local firms located in Prince George’s County<br />
and Montgomery County. The SLBE Program is<br />
a race-and-gender neutral program.<br />
‣ WSSC approves all SLBE firms<br />
‣There are five (5) criteria that a firm MUST<br />
meet to be approved as an SLBE with the<br />
Commission.<br />
34
Let’s Speak the Same Language<br />
• Subcontracting Requirement: Required to<br />
have a plan in place for subcontracting a<br />
percentage towards specific statistically underutilized<br />
business classifications and/or Small<br />
Local Businesses (Requirement). Regardless of<br />
the bidder/respondent/proposer business<br />
classification this requirement has to be<br />
addressed at the time of proposal or bid<br />
submission.<br />
35
Let’s Speak the Same Language<br />
• Other Certifying Agencies:<br />
• MBE firms that are not certified by one of the five recognized<br />
certifying bodies but with another certifying agency may request<br />
in writing the approval of WSSC’s SLMBE Office to participate in<br />
the Program.<br />
• Use of other certifying agency certifications must be preapproved<br />
prior to submitting a bid!<br />
• ALL Bidders and Subcontractors claiming to<br />
be a certified MBE and/or a WSSC-approved<br />
SLBE must be certified and/or approved at<br />
the time of bid in WSSC’s SLMBE Program.<br />
36
Solicitation Cover Sheet – Appendix A<br />
37
What is Appendix A<br />
• The SLMBE Office’s official notification that<br />
describes the following based on the eligible<br />
Project/Contract:<br />
‣ Contract-specific MBE, SLBE and/or SLMBE<br />
subcontracting participation Goal or Requirement<br />
‣ Price Preference<br />
‣ Evaluation Point Preference (or applicable SLMBE<br />
inclusive statement)<br />
38
Why is Appendix A Important<br />
• Includes information on possible subcontractor<br />
or sub-consultant opportunities (trades)<br />
relevant to the eligible Project/Contract and<br />
SLMBE program.<br />
• Contains all SLMBE forms (i.e., GFE Affidavit, subcontract<br />
certification, WSSC non-discrimination declaration, MBE/SLBE<br />
unavailability and summary of contacts).<br />
39
Why is the Good Faith Efforts Guide Important<br />
• Describes all submission requirements and includes<br />
the required participation and Good Faith Efforts<br />
forms.<br />
• Describes in detail the 13 Good Faith Efforts criteria.<br />
• Describes the new point system upon which your<br />
efforts will be evaluated based on the 13 criteria.<br />
40
Successful Supplier/Vendor Actions<br />
• Register in the (CBR) System.<br />
• Do your homework and read the<br />
Solicitation thoroughly.<br />
• Provide the requested information in a<br />
readable format.<br />
• Pay close attention to your pricing.<br />
41
Successful Supplier/Vendor Actions<br />
• Make sure your firm is in good financial<br />
health.<br />
• Ensure your firm has a positive performance<br />
history.<br />
• Make sure your firm is registered to do<br />
business in the State of Maryland and has, if<br />
applicable, all required licenses etc. For<br />
more information on how to register your<br />
business, visit:<br />
e-maryland marketplace or<br />
http://business.marylandtaxes.com/newbusiness/new.asp<br />
42
Successful Supplier/Vendor Actions<br />
• Understand WSSC’s bidding or proposal<br />
process.<br />
• Know what goes into a good bid or<br />
proposal.<br />
• Be sure to review, thoroughly, the<br />
Solicitation COVER SHEET to ensure you<br />
have addressed all items requested.<br />
43
Successful Supplier/Vendor Actions<br />
• Know that all projects are competitively<br />
bid.<br />
• Plan to attend Pre-Bid/Pre-Proposal<br />
meetings.<br />
• Be prepared to be successful.<br />
• Unsuccessful? Get a debriefing!<br />
44
SymTrac:<br />
‣ SymTrac is a web-based tool designed to<br />
monitor contract compliance requirements.<br />
The SLMBE Office:<br />
Staying Connected<br />
‣ Call, Click, or Email the SLMBE Office with your<br />
questions and concerns.<br />
Ph: 301-206-8800<br />
www.wsscwater.com/home/jsp/content/slmbe-program.faces<br />
45
Need More Information on Appendix A and<br />
Good Faith Efforts<br />
The SLMBE Office will conduct an informational workshop on the<br />
Appendix A and the Good Faith Efforts Guide at WSSC<br />
Headquarters. Registration is required: Visit<br />
www.wsscwater.com or call the SLMBE Office at (301) 206-8800.<br />
9:00 a.m. – 11:00 a.m.<br />
• February 14, 2012<br />
• March 13, 2012<br />
• April 12, 2012<br />
• May 8, 2012<br />
• June 12, 2012<br />
The SLMBE Office will be hosting special targeted outreach events<br />
to introduce larger firms to smaller firms<br />
46
• Please un-mute your phone,<br />
• One question at a time,<br />
• State your name, Company name and your<br />
question,<br />
• Please speak loudly and clearly.<br />
47
Marcia Tucker, Infrastructure<br />
Systems Group Leader<br />
48