Checking C COBie e fo f for c r com for co comp ... - BIM Task Group
Checking C COBie e fo f for c r com for co comp ... - BIM Task Group
Checking C COBie e fo f for c r com for co comp ... - BIM Task Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Checking</strong> <strong>COBie</strong> using the <strong>COBie</strong>-UK-2012 application<br />
Figure 2: Example<br />
file selection<br />
The <strong>fo</strong>llowing sectionss discuss the Compliance, Continuity and<br />
Completeness critieria.<br />
0.2 Quick reference<br />
Red<br />
Amber<br />
Green<br />
Compliance<br />
Broken<br />
In<strong><strong>co</strong>m</strong>plete<br />
Inadequate*<br />
Continuity<br />
Removed<br />
Changed<br />
Added<br />
Completeness<br />
Late<br />
Expected<br />
Early<br />
Note: Judgement<br />
is still required to evalayte the accuracy off the reports and the<br />
appropriate action.<br />
*A green cell may<br />
still require examination and <strong>co</strong>rrection.<br />
0.3 Out<strong><strong>co</strong>m</strong>es<br />
The out<strong><strong>co</strong>m</strong>es are available as<br />
<br />
<br />
Three marked up <strong>COBie</strong> datasets with red, amber and green issues highlighted.<br />
A detailed log of the same issues<br />
0.4 Uses<br />
The mark-up and log can be used to monitor …<br />
<br />
<br />
<br />
evolving supply side<br />
deliverables<br />
planned demand side deliveries<br />
third party<br />
<strong>COBie</strong> authoring and generation applications<br />
The Red/Amber/Green <strong>co</strong>loration may <strong>fo</strong>rm the basis of a s<strong>co</strong>ring mechanism, typically<br />
based on an estimated number of hours ef<strong>fo</strong>rt needed to resolve the issues.<br />
© 2013 AEC3 UK Ltd<br />
4<br />
February 2013