<strong>INTEGRATED</strong> <strong>WATER</strong><br />

<strong>RESOURCE</strong> <strong>MANAGEMENT</strong> <strong>II</strong><br />

QUARTERLY REPORT<br />

YEAR 3, 3 RD QUARTER<br />

(JULY – SEPTEMBER 2011)<br />

REPORT NO. 25<br />

October 2011<br />

This report is made possible by the support of the American People through the United States Agency for<br />

International Development (USAID). It was prepared by International Resources Group (IRG).<br />

title 1


<strong>INTEGRATED</strong> <strong>WATER</strong><br />

<strong>RESOURCE</strong> <strong>MANAGEMENT</strong> <strong>II</strong><br />

QUARTERLY REPORT<br />

YEAR 3, 3 RD QUARTER<br />

(JULY– SEPTEMBER 2011)<br />

REPORT NO. 25<br />

Contract No. EPP-I-00-04-00024-00 Task Order No. 06<br />

October 2011<br />

DISCLAIMER<br />

The author’s views expressed in this publication do not necessarily reflect the views of the United<br />

States Agency for International Development or the United States Government.


TABLE OF CONTENTS<br />

TABLE OF CONTENTS<br />

i<br />

ACRONYMS<br />

ii<br />

1. SUMMARY 1<br />

2. ACCOMPLISHMENTS DURING THE REPORT PERIOD 6<br />

3. ACTIVITIES PLANNED FOR NEXT QUARTER 14<br />

4. PROBLEMS AND ISSUES 18<br />

5. STAFF LEVEL OF EFFORT 21<br />

6. STATUS OF FINANCES AND EXPENDITURES 22<br />

7. LIST OF REPORTS 24<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011)<br />

i


ACRONYMS<br />

AUC American University Cairo<br />

APRP Agricultural Policy Reform Program<br />

ARC Ministry of Agriculture and Land Reclamation Agriculture Research Center<br />

BCWUA Branch Canal Water User Association<br />

CTO Cognizant Technical Officer<br />

DWAT District Water Advisory Team<br />

EEAA Egyptian Environmental Affairs Agency<br />

EIA Environmental Impact Assessment<br />

EPADP Egyptian Public Authority for Drainage Projects<br />

EPIQ Environmental Policy and Institutional Governance (Indefinite Quantity Contract)<br />

GDA Global Development Alliance<br />

GIS Geographic Information System<br />

GOE Government of Egypt<br />

GPS Global Positioning System<br />

GTZ Gesellschaft für Technische Zusammenarbeit (the German International Development<br />

Agency)<br />

HCWW The Holding Company for Water and Wastewater<br />

IAS Irrigation Advisory Service<br />

<strong>II</strong>IMP Integrated Irrigation Improvement and Management Project<br />

<strong>II</strong>P Irrigation Improvement Project<br />

IQC Indefinite Quantity Contract<br />

IRG International Resource Group<br />

IRU Institutional Reform Unit of MWRI<br />

IWMD Integrated Water Management District<br />

IWMU Integrated Water Management Unit<br />

IWRM I USAID/Egypt funded <strong>LIFE</strong> Integrated Water Resource Management Project (2004-<br />

2008)<br />

IWRM <strong>II</strong> USAID/Egypt funded Integrated Water Resources Management <strong>II</strong> (2009-2012)<br />

JICA Japan International Cooperation Agency<br />

<strong>LIFE</strong> Livelihoods and Income from the Environment<br />

LOE Level of Effort<br />

LOP Life of Project<br />

M&E Monitoring and Evaluation<br />

MALR Ministry of Agriculture and Land Reclamation<br />

MISD Matching Irrigation Supply and Demand Program<br />

MOH Ministry of Housing<br />

MSEA Ministry of State for Environmental Affairs<br />

MWRI Ministry of Water Resources and Irrigation<br />

O&M Operation And Maintenance<br />

OJT On-the-job training<br />

PMP Performance Monitoring Plan<br />

PPP Private–public partnership<br />

PSD Office of Productive Sector Development<br />

RFTOP Request for Task Order Proposal<br />

RWMO Regional Water Management Organization<br />

SWERI Soil, Water and Environment Research Institute<br />

TA Technical Assistance<br />

TNA Training Needs Assessment<br />

US United States<br />

USAID United States Agency for International Development<br />

WADA Water & Development Alliance<br />

WCU Water Communication Unit<br />

WQU Water Quality Unit<br />

WUA Water User Associations<br />

ii Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


1. SUMMARY<br />

Under the USAID/Egypt Integrated Water Resources Management <strong>II</strong> Project (IWRM <strong>II</strong>), Contract<br />

No.: EPP-I-00-04-00024-00, Task Order No. 06, International Resource Group (IRG) is responsible<br />

for assisting the Government of Egypt (GOE) to promote integrated water resources management.<br />

The period of performance of the project is from January 25, 2009 to September 30, 2012.<br />

The purpose of this report is to present the status and performance of IWRM <strong>II</strong> for the 3 rd quarter<br />

of Year 3, covering the period from July to September 2011. It has the following content: summary<br />

of project activities, accomplishments for this quarter, planned activities for the following quarter,<br />

problems and issues, staff level of effort, status of finance and expenditures, and list of reports.<br />

A summary of the activities for the quarter follows:<br />

H.E. Dr. Hussein El-Atfy, MWRI Minister, resigned. Dr. Hesham Kandil, MWRI Head of the Nile<br />

Sector, was appointed as the new Minister on 18 July.<br />

A ministerial decree was issued on 9 August to include Dr. Khaled Toubar on the IWRM <strong>II</strong> Steering<br />

Committee. Another decree was issued on 16 August to assign Dr. Toubar as the Project<br />

Coordinator in addition to his position as General Director for Design and Barrage Safety under the<br />

Reservoir and Grand Barrage Sector.<br />

Dr. Tom Sheng completed his STTA assignment (21 July to 5 August).<br />

Dr. Mark Svendsen completed his STTA assignment (13-29 July).<br />

A monthly project coordination meeting was held on 5 July with Eng. Wafaa (USAID COTR), Dr.<br />

Mohamed Motaleb (Project Coordinator) and Andrew Tczap (IRG COP) and Eng. Mohamed El<br />

Fetyani in attendance. Main topics discussed included: potential FARA for canal maintenance,<br />

disposition of MALR staff on LWOP, possible use of the MWRI training center, upcoming study<br />

tours, and the July training schedule.<br />

USAID and IRG met on 5 July to discuss the results of the coordination meeting. Eng. Wafaa<br />

(USAID), Eng. Tczap (IRG), Eng. Nabil Fawzi (IRG), and Dr. Wadie (IRG) attended this meeting.<br />

MWRI and IRG met on 28 July to be briefed on Dr. Svendsen’s activities during his mission,<br />

including his conclusions and future plans. Also discussed were Dr. Sheng’s preliminary conclusions<br />

based on review of the project’s MIS activities and his visits to Mansoura RO and to the West<br />

Belbeis and Eltollombat IWMDs (as well as to Abo Kebeer, an IWMD supported in IWRM I). Dr.<br />

Sheng’s planned activities during the remainder of his assignment were discussed as well. Dr.<br />

Motaleb, Eng. Tczap, Eng. El Fetyani, Eng. Nabil, Dr. Wadie, and Dr. Moamen, attended the<br />

meeting, together with Drs. Svendsen and Sheng.<br />

Staff coordination meetings were held on 31 July, 9 and 18 August. The RO staff attended the 31<br />

July and 18 August meetings.<br />

Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady, local Institutional/ Organizational<br />

Development Specialists on LWOP from MWRI, completed their assignments in support of Task<br />

1.1, Formation and Development of BCWUAs and related cross-cutting components on 14 July.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 1


They started new assignment also on LWOP from MWRI, beginning 14 August in support of Task<br />

1.1 and related cross-cutting components.<br />

Eng. Ayman Shedid, Water Management Specialist, and Eng. Soha Mostafa, Water Information<br />

Specialist, both on LWOP from MWRI, completed their assignments in support of the Zagazig<br />

Regional Office on 14 July. Eng. Shedid started a new assignment for the same purpose, again on<br />

LWOP from MWRI, status on 14 August. The duration of this assignment is 3 months.<br />

Eng. Elbayoumi Ali Ez Eldeen, Water Management Specialist, and Eng. Akmal Badie Henein, Water<br />

Information Specialist, both on LWOP from MWRI completed their assignments in support of the<br />

Mansura Regional Office on 14 July. Eng. Henein started a new 3 month assignment on 14 August<br />

for the same purpose, again on LWOP from MWRI<br />

MWRI/CDIAS and IRG personnel met on 3 and 7 July to continue investigating the potential for<br />

cooperation between the <strong>LIFE</strong> IWRM <strong>II</strong> project and MWRI Central Directorate of Irrigation<br />

Advisory Service (CDIAS). Eng. Tczap (IRG), Eng. Nabil (IRG), Eng. Mohamed Elfetyani (Planning<br />

Sector), Dr. Moamen (IRG) and Eng. Atef Elkashef (CDIAS) attended these meetings.<br />

MWRI(CDIAS) commenced visiting a sample of IWRM districts to conduct a training needs<br />

assessment (TNA). Project staff from the regional offices attended most of these sessions. The<br />

CDIAS visits were completed on 4 August.<br />

MWRI(CDIAS) and IRG met on 10 and 17 August to discuss the findings of their trips concerning<br />

the TNA for the IWRM <strong>II</strong> WA Teams and the potential for cooperation between the <strong>LIFE</strong> IWRM <strong>II</strong><br />

project and MWRI’s Central Directorate of Irrigation Advisory Service (CDIAS). Eng. Tczap (IRG),<br />

Eng. Nabil (IRG), Eng. Mohamed Elfetyani (Planning Sector), Dr. Moamen (IRG), Eng. Nagwa<br />

(who replaced Eng. Atef Elkashef), Eng. Ahmed and Eng. Ezzat (CDIAS) attended both meetings.<br />

Eng. Wafaa (USAID) attended the August 17 th meeting.<br />

MWRI and IRG staff met on 4 August to discuss the status of the IWMD digital maps (11 layers)<br />

and the possibility of developing a course to demonstrate how GIS technology can integrate<br />

information from different sources and perform geospatial analysis to support water management<br />

decision making at the district and directorate levels. Engs. Tczap, Nabil, Hesham (Irrigation<br />

Department), Tarek (Planning Sector), and Dr. Sheng attended the meeting.<br />

Mr. Tczap and Eng. Nabil made an inspection visit to Shoubra IWMD on 15 August.<br />

MWRI and IRG staff met on 21 August to discuss project status. Dr. Khaled Toubar (MWRI<br />

Coordinator), Mr. Tczap, and Eng. Nabil attended this meeting.<br />

The IWRM <strong>II</strong> COP, Mr. Tczap, departed on leave on 22 August and returned to the office on 4<br />

September.<br />

An IRG staff coordination meeting was held on 4 September to begin preparing for the Year 4 work<br />

plan workshop.<br />

A meeting was held on 6 September to brief Dr. Khaled Tobar (the new IWRM <strong>II</strong> Project<br />

Coordinator), on the project’s various activities. Eng. Tczap, Eng. Nabil, Dr. Wadie and Dr. Moamen<br />

attended the meeting.<br />

A USAID/MWRI/IRG coordination meeting was held on 11 September. Eng. Wafaa Faltaous,<br />

USAID (COTR), Dr. Khaled Toubar (Project Coordinator), Mr. Andrew Tczap (COP), Eng. Nabila<br />

Bahaa (ID), Eng. Tarek Awwad (IS), Eng. Nabil and Dr. Wadie attended the meeting.<br />

2 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


MWRI (Groundwater Sector) and IRG staff met on 15 September to discuss conducting a<br />

groundwater (GW) database training course (Directorate Vision). Dr. Madeha (Head of GW), Eng.<br />

Ahmed Abd Elmaksoud (GW), Dr. Hanan (GW), Eng. Tczap and Eng. Nabil attended the meeting.<br />

An MWRI (Planning Sector) project coordination meeting was held on 18 September. Dr. Mohamed<br />

Motaleb (Head of Planning Sector), Dr. Khaled Toubar (Project Coordinator), Mr. Tczap, Eng.<br />

Nabil, Dr. Wadie and Eng. Elfetyani (PS) attended the meeting.<br />

A coordination meeting for USAID and IRG staff was held on 22 September. Eng. Wafaa Faltaous,<br />

USAID (COTR), Mr. Andrew Tczap (COP) and Eng. Nabil attended the meeting.<br />

The project initiated negotiations with El Zanaty & Associates on 18 September to conduct a<br />

farmers’ survey in the project area. Negotiations were completed and a fixed price purchase order<br />

was issued on 29 September.<br />

Eng. Wafaa Faltaous, USAID (COTR), and Mr. Foaad Ellathy (USAID planning section) visited<br />

Elmataria IWMD on 29 September. They attended a meeting with the district staff and with the<br />

BCWUAs in the Elmataria BCWUA No. (1) office. They also visited a bridge located at Km 1.50 on<br />

branch canal No. 1 and a feeder to that canal from the Elganabia Elkhamsa canal, constructed by<br />

the BCWUA with IWMD supervision. Eng. Zenab Elraies, the head of the Central Directorate for<br />

Water Resources & Irrigation, Eng. Saad Elsaied Elsalam, General Director, Eng. Nabil, Eng.<br />

Elsaied Nagy and Eng. Akmal joined the trip.<br />

MWRI agreed to give both Eng. Tamer Gomaa and Eng. Mohamed Bakry LWOP to work on the<br />

IWRM <strong>II</strong> project. A request was sent to USAID to hire them.<br />

Under Task 1.1: Formation and Development of BCWUAs, 622 BCWUAs have been established<br />

covering all of the branch canals in the 45 districts in the East Nile Delta. The BCWUA activation<br />

process is ongoing in all of the associations. Memorandums of Understanding (MOU) and internal<br />

regulations (IR) have been signed by the BCWUA chairpersons and board members. IWMD and<br />

BCWUA participatory maintenance needs assessments have been completed for all of the BCWUAs<br />

and maintenance priorities have been established for each of them. BCWUA Chairpersons’ IDs have<br />

been completed for 613 of the 622 associations, and action plans have been completed for 618 of<br />

them. BCWUAs women board members were trained by IWMD water advisory women staff on<br />

their roles and responsibilities, with a focus on water quality related awareness activities. Participatory<br />

water management Phase I training to introduce and initiate participatory water management<br />

activities at the district level was conducted during the quarter.<br />

For Task 1.2: Sustainable Local Financing for Canal and Drain Maintenance, In response to a<br />

recommendation of the USAID mid-term evaluation and concurrence of MWRI, the project has<br />

ceased further activity under this Task.<br />

Under Task 1.3: Improvements in Water Productivity and Efficiency, the activities in the two<br />

pilot demo sites – a BCWUA in Abu Kebeer IWMD (West Sharkia Directorate); and another in W.<br />

Belbeis IWMD (Qualubia Directorate) -- for introducing high-value, low-water consuming crops<br />

continued during the summer season. Training of WAT and agricultural extension (MALR) staff in<br />

capacity building for high value crops (HVC) and water conservation practices and technologies<br />

(WCT) continued. Outreach to disseminate information to BCWUAs on HVCs and WCTs started.<br />

Mini libraries on good agricultural practices for HVCs were distributed to the BCWUAs. A<br />

newsletter on HVCs and marketing materials were developed and distributed. Possible future<br />

cooperation between IWRM <strong>II</strong> and MUCIA was discussed.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 3


For Task 1.4: Wastewater Reuse, In response to a recommendation of the USAID mid-term<br />

evaluation and concurrence of MWRI, the project has ceased further activity under this Task.<br />

Under Task 2.1: Regional Water Management Organizations, In response to a recommendation<br />

of the USAID mid-term evaluation and concurrence of MWRI, the project has ceased further activity<br />

under this Task.<br />

Under Task 2.2: Formation and Development of Integrated Water Management Districts,<br />

monthly coordination meetings were held with the eight Integrated Water Management Directorates<br />

and 45 IWM Districts. Preparation of IWMD business plan data sheets and integrated maintenance<br />

plans for 2011/2012 were completed by each district. ADSL lines for internet access have been<br />

installed in all eight directorate offices and 26 of the 45 IWMDs. Obtaining ADSL service in the<br />

directorates and districts requires payment of outstanding telephone invoices and many of the 19<br />

districts without service to date do not have budget to do so. Directorate IT teams continued to<br />

make visits to the districts as part of the computer maintenance follow-up program. IRG regional<br />

office staff also visited each of the 45 IWMDs to evaluate their performance and provide technical<br />

support and advice. IRG staff stopped making quarterly follow-up visits to the four IWRM I<br />

supported directorates as directed by MWRI.<br />

Under Task 2.3: Establishment of Information Management Systems for Sustainable Water<br />

Resource Management, the Matching Irrigation Supply and Demand (MISD) activity of collecting<br />

bi-weekly crop data for each branch canal is being carried out by MALR and transferred to the<br />

relevant IWMD office. The accuracy of the data is questionable in many cases. Water flow<br />

measurements continued at 105 inflow/outflow sites; 95 of which have been calibrated and are under<br />

review. Water quality monitoring is ongoing at 300 sites, and data are being entered into a water<br />

quality (WL) database. Water level data are being entered in the WL database in 42 of the 45<br />

IWMDs; and complaints are being entered in the complaints database in all of the 45 IWMDs.<br />

Review and consolidation of the canal and drain network digital maps is ongoing but is behind<br />

schedule. Thirty-one IWMDs have completed their maps consisting of 11 layers. Installation of 19<br />

additional data loggers procured in 2009 and 2010 was completed. Procurement of eight more was<br />

completed, all of which have been delivered and inspected. Surveys for installation of the 8 new data<br />

loggers were conducted and one of them has been installed. A total of 27 data loggers have now been<br />

procured for MWRI by the project, 20 of which have been installed.<br />

Under Task 2.4: Capacity Building of MWRI Personnel, seven persons are enrolled in the<br />

American University in Cairo Master of Science (MS) degree program and 12 persons are working<br />

towards the M.S. degree at other local universities. Two persons have already completed MS degree<br />

programs, both at local universities.<br />

USAID has agree to fund three Study Tours and has requested candidates for the tours. No<br />

candidates were provided at the close of the quarter.<br />

Under Monitoring and Evaluation, crop water requirement data from the MISD database for<br />

winter 2009/10 and summer 2010 for all IWMDs were compiled. Calibration equations for 95<br />

inflow/outflow locations to quantify water supply for the IWMDs have been developed.<br />

Organizational indicators to measure the growing capacity and performance of the IWMDs and<br />

BCWUAs, i.e. the organizations that are the key actors in the desired change process, have been<br />

developed. The second round of the field survey of farmers in the project area and the Delta Phase I<br />

directorates has been initiated.<br />

For Strategic Communication a 14-minute video on high-value, low-water consuming crops was<br />

finalized. An informational publication (English/Arabic) for farmers to support Task 1.3 work on<br />

4 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


introducing improved irrigation systems was initiated. The IWRM <strong>II</strong> website (http://iwrm2eg.org)<br />

was updated.<br />

Procurement during the reporting period was limited to a fixed price purchase order for performing<br />

a farmers survey and focus group discussions (El Zanaty & Associates) and supporting IWMDs with<br />

supplies and repair of project provided equipment.<br />

Training courses implemented during this quarter included: Participatory Water Management Phase<br />

I Workshops (7 events), Building Staff Capacity for HVCs (2 events), and Dissemination of<br />

Information on HVCs (4 events). During the reporting period 562 trainees, 21 percent of whom<br />

were women, participated in project training activities.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 5


2. ACCOMPLISHMENTS DURING<br />

THE REPORTING PERIOD<br />

GENERAL<br />

• H.E. MWRI Dr. Hussein El-Atfy resigned. Dr. Hesham Kandil, MWRI Head of The Nile<br />

Sector, was appointed as the new Minister of MWRI on 18 July.<br />

• A ministerial decree was issued on 9 August adding Dr. Khaled Toubar to the IWRM <strong>II</strong><br />

Steering Committee.<br />

• A ministerial decree was issued on 16 August naming Dr. Toubar as the Project Coordinator<br />

in addition to his position as General Director for Design and Barrage Safety under the<br />

Reservoir and Grand Barrage Sector.<br />

TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />

CANAL <strong>WATER</strong> USERS’ ASSOCIATIONS<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinator<br />

for this task. Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady, both Local<br />

Institutional/Organizational Development Specialists, are providing support on a short-term,<br />

consultant basis. Activities carried out during the reporting period include:<br />

• The BCWUAs activation process is ongoing.<br />

• BCWUA Chairpersons IDs have been completed for 613 of the 622 chairpersons and is<br />

ongoing. The remaining 9 IDs are lacking signatures by the Undersecretary.<br />

• IWMD and BCWUA participatory maintenance needs assessments and maintenance<br />

priorities have been updated for 2011/2012 by all of the 622 BCWUAs.<br />

• Action plans have been completed for all of the BCWUAs that require them.<br />

• BCWUA women board members attended meetings with IWMD water advisory women<br />

staff and received training in their roles and responsibilities and water quality related<br />

awareness activities. Within the 45 IWMDs and 622 BCWUAs, 199 meetings were held with<br />

BCWUA women board members. These were attended by 309 of 449 women board<br />

members. An additional 222 women attended those meetings from the BCWUAs residential<br />

areas. Most importantly, many BCWUAs conducted new elections for their Boards of<br />

Directors resulting in 78 women being elected to boards in 42 BCWUAs that did not have<br />

women board members previously.<br />

• Participatory Water Management Phase I training workshops were completed (seven events).<br />

• MWRI (CDIAS) conducted a training needs assessment (TNA) for the IWRM <strong>II</strong> Water<br />

Advisory Teams in the East Delta region.<br />

• Water Advisory Team coordination meetings were held (4 events).<br />

The status of the BCWUAs as of the end of the reporting period is provided below.<br />

6 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


Status of BCWUAs Yr 3, Qtr 3<br />

Directorate IWMDs<br />

MWRI<br />

Area (d) BCs<br />

BCWUA<br />

Users<br />

BCWU<br />

As<br />

Formed<br />

Board<br />

Members<br />

& Decrees MOU<br />

Internal<br />

Reg.<br />

Needs<br />

Assessment<br />

Maint.<br />

Priorities<br />

ID<br />

Cards<br />

Action<br />

Plan<br />

Damietta 2 59,243 61 24,567 27 27 27 27 27 27 27 27<br />

Elsalam 4 221,130, 97 17,598 56 56 56 56 56 56 56 56<br />

E. Dakahlia 8 355,124 329 137,328 141 141 141 141 141 141 138 139<br />

S. Dakahlia 5 198,795 127 299,302 88 88 88 88 88 88 88 88<br />

Ismailia 6 302,500 61 20,864 51 51 51 51 51 51 51 49<br />

Salhia 7 457,558 99 201,951 82 82 82 82 82 82 76 82<br />

E. Sharkia 5 211,233 187 72,542 83 83 83 83 83 83 83 83<br />

Qualubia 8 357,748 259 530,200 94 94 94 94 94 94 94 94<br />

Total 45 2,163,331 1220 1,304,352 622 622 622 622 622 622 613 620<br />

Elected<br />

The following table presents the status of the Performance Monitoring Plan (PMP) indicators.<br />

Task 1.1 PMP Indicators and Targets<br />

Task Indicator Units Baseline<br />

Year 1 Year 2 Year 3<br />

Target Actual Target Actual<br />

Yr 3<br />

Target<br />

Actual<br />

Qtr 3<br />

1.1 Formation and Development of Branch Canal Water Users’ Associations (BCWUAs)<br />

1.1.a<br />

1.1.b<br />

1.1.c<br />

1.1.d<br />

1.1.e<br />

Number of IWMDs with staffed Water<br />

Advisory Teams<br />

Number of GDs with staffed Water<br />

Advisory Teams<br />

Percent of planned BCWUAs<br />

established by ministerial decree<br />

Percent of BCWUAs with maintenance<br />

priorities and action plans<br />

Percent of BCWUAs monitoring and<br />

reporting on branch canal water<br />

supply<br />

Number 0 45 45 45 45 45 45<br />

Number 0 8 8 8 8 8 8<br />

Percent 0 50 0 100 100 100 100<br />

Percent 0 0 0 50 0 100 100<br />

Percent 0 0 0 50 0 100 0<br />

New indicators were suggested by USAID to qualitatively measure performance of BCWUAs. It was<br />

agreed by USAID and IRG to monitor this through the use of farmer surveys and focus group<br />

discussions after which IRG issued an addendum to the PMP. For BCWUAs, the indicators to be<br />

evaluated are: 1) Governance processes; 2) Accountability and participation; and 3) Operational<br />

performance. These will be reported on starting with the next quarterly progress report.<br />

TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />

DRAIN MAINTENANCE<br />

In compliance with a USAID mid-term evaluation recommendation and MWRI concurrence, the<br />

project has ceased further activity under this Task.<br />

TASK 1.3: IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND<br />

EFFICIENCY<br />

Dr. Wadie Fahim Mankarious (LTTA Senior Organization/Institutional Development Specialist) is<br />

the IRG coordinator for this task. He is supported by several local consultants including: Dr. Ahmed<br />

Behery, On Farm Irrigation Specialist; Dr. Walid Sallam, Agricultural Economist; and Dr. Abd El<br />

Wahab, Crops Agricultural Specialist. Activities carried out during the report period include:<br />

• Continued monitoring of the activities in the two pilot areas.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 7


• Continued distribution of MALR publications on High Value Crops (HVCs) and water<br />

conservation practices (WCT). The regional offices distributed the publications to the<br />

BCWUAs that attended the dissemination of information and orientation workshops.<br />

• Receipt and review of detailed summer cropping pattern information submitted by Abu<br />

Kebeer and West Belbeis IWMDs for the districts as a whole, and for the pilot branch canals.<br />

• Distribution of a newsletter on HVCs to the two Regional Offices for further distribution to<br />

the directorates and the districts.<br />

• Received an unsolicited request for a seminar on HVCs from El Maksar BCWUA. The<br />

seminar is scheduled to be conducted in October.<br />

• Continued training workshops for MWRI and MALR staffs in capacity building for high<br />

value crops (HVC) and water conservation practices and technologies.. Staff of MWRI and<br />

MALR in Damietta Directorate IWMDs (2 districts) and El Salam Directorate (4 districts)<br />

received training. The total number of trainees was 47 from the six IWMDs. Training was<br />

conducted also for the staff of the eight IWMDs of East Dakahlia, with, 47 trainees from all<br />

eight districts attending. Eng. Ibrahim El Gamasy, Undersecretary (US) Dakahlia, attended<br />

and discussed his experience and benefits of using the improved (drip) irrigation system He<br />

stated that productivity increased by 40 percent and saving on fertilizer use was more than 35<br />

percent.<br />

• At the workshops for BCWUAs, dissemination of information on HVCs and WCTs<br />

continued. During this quarter, 102 BCWUAs from eight IWMDs of Damietta, El Salam<br />

and East Dakahlia received this training. The table below shows the districts, the number of<br />

BCWUAs, number of farmers and MWRI/MALR staff who received this training.<br />

• Conduct of a one day training event for BCWUAs, MWRI/WATs and MALR/Ag<br />

Extension staffs of Port Saied and Materia IWMDs, El Salam Directorate on 28 September.<br />

Eng. Zienab El Raies, US Damietta and Eng. Saad Mousa, GD El Salam Directorate<br />

attended and answered farmers’ questions. Ms. Naglaa M. Hassan, Director of Technical<br />

Support of the MUCIA Project attended as an observer. Eng. Wafaa, COTR and Eng. Fouad<br />

Elleithy, Program Office, USAID, also attended.<br />

• Attended a USAID hosted meeting involving IWRM <strong>II</strong>/IRG and MUCIA to discuss the<br />

possibility of collaboration and reduction of duplication. Eng. Wafaa and Dr. Abu El Wafa<br />

from USAID, Mr. Andy Tczap and Dr. Wadie from IRG and Dr. Mohamed Samy, COP<br />

MUCIA, participated.<br />

Number of BCWUAs and Farmers attending the HVCs/WCTs Training this Quarter<br />

No. of<br />

Directorate District<br />

Total No. of No. of farmers<br />

MWRI/MALR staff<br />

BCWUAs in BCWUAs persons<br />

attending this Qtr.<br />

the District attending attending<br />

this Qtr.<br />

MWRI MALR<br />

Damietta Damietta 13 11 14 3 3<br />

Faraskour 14 11 19 4 3<br />

ElSalam Port Saied 15 15 30 6 1<br />

El Matariea 11 11 22 3 2<br />

San El Hagar 20 20 28 3 3<br />

8 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


W. El Kantara 10 10 14 5 3<br />

E. Dakahlia E. Manzala 23 13 19 3 3<br />

N. Mansoura 12 11 21 3 3<br />

Total in this Quarter 118 102 167 30 21<br />

Total to date 383 278 485<br />

1.3<br />

1.3.a<br />

TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />

PMP Indicators and Targets<br />

Year 1<br />

Task Indicator Units Baseline<br />

In compliance with a USAID mid-term evaluation recommendation and concurrence of MWRI,<br />

the project has ceased further activity under this task.<br />

TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />

ORGANIZATIONS (RWMO)<br />

Year 2<br />

Target Actual Target Actual<br />

Yr 3<br />

Target<br />

Year 3<br />

In compliance with a USAID mid-term evaluation recommendation and concurrence of MWRI,<br />

the project has ceased further activity under this task.<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />

<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />

Actual<br />

Qtr 3<br />

Improvements in Water Productivity and Efficiency<br />

Number of farmers receiving<br />

training on High-Value Crops and Number 0 100 0 300 502 500 987<br />

water saving technology<br />

Eng. Nabil Fawzi and Eng. Maher Khodary, both LTTA Senior Water Resource Management<br />

Specialists, are the IRG coordinators for this Task. Eng. Ayman Shedid is providing technical<br />

support to the Zagazig Regional Office. Eng. Akmal Badie is doing the same for the Mansoura<br />

Regional Office. These two engineers are on LWOP from MWRI and two additional engineers<br />

MWRI engineers were identified by MWRI to be added to IRGs field staff to fully staff the two field<br />

offices. The two new engineers will start work with the project in October.<br />

Activities carried out during the report period include:<br />

• MWRI continued installing ADSL lines for internet access in IWMDs. A list of the 19<br />

IWMDs lacking ADSL service was sent to the Project Coordinator for information and<br />

action. The continuation of this service requires payment of overdue telephone invoices and<br />

some of the districts do not have budget for this.<br />

• Directorate IT teams continued to make regular visits to their respective IWMDs to provide<br />

computer maintenance support.<br />

• Directorate Under Secretary monthly meetings were held (15 events) attended by MWRI and<br />

MALR staffs. Dr. Khaled Toubar (MWRI Project Coordinator) and Eng. Nabil Fawzi<br />

attended the East Sharkia, Salhia and Ismailia monthly meetings on 26 and 27 September.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 9


• IRG Regional Office (RO) staff made quarterly visits to 9 of the 45 IWMDs. This was less<br />

than programmed due to the lack of staff in the ROs.<br />

Task 2.2 PMP Indicators and Targets<br />

Year 1 Year 2 Year 3<br />

Task Indicator Units<br />

Base<br />

line Target Actual Target Actual<br />

Yr 3<br />

Target<br />

Actual<br />

Qtr 3<br />

2.2 Formation and Development of Integrated Water Management Districts (IWMDs)<br />

2.2.a Number of IWMDs established with<br />

fully staffed senior positions<br />

Number 0 45 45 45 45 45 45<br />

2.1.b Number of IWMDs with completed<br />

integrated maintenance plans<br />

Number 0 0 0 45 45 45 45<br />

2.2.c Number of IWMDs with a training<br />

room established and equipped<br />

Number 0 20 0 45 45 45 45<br />

2.2.d Number of general directorates with a<br />

computer training center established Number 0 8 8 8 8 8 8<br />

and equipped<br />

2.2.e Number of IWRM I IWMDs<br />

participating in coordination meetings<br />

Number 27 27 27 27 27 27 27<br />

New indicators were suggested by USAID to qualitatively measure performance of IWMDs. It was<br />

agreed by USAID and IRG to monitor this through the use of farmer surveys and focus group<br />

discussions after which IRG issued an addendum to the PMP. For IWMDs, the indicators are: 1)<br />

General management; 2) Communications; 3) Water Distribution; and 4) System maintenance.<br />

These will be reported on starting with the next quarterly progress report.<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />

SYSTEMS FOR SUSTAINABLE <strong>WATER</strong><br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinator<br />

for this Task. Dr. Tom S. Sheng (CADI), Water Resources Information Specialist, is providing<br />

expatriate STTA support. Eng. Ayman Shedid is providing technical support in the Zagazig Regional<br />

Office, while Eng. Akmal Badie does the same in the Mansoura RO. These two engineers are on<br />

LWOP from MWRI. Activities carried out during the reporting period include:<br />

• Maintenance support for the data loggers installed at 11 telemetry sites. Installation of eight<br />

additional data loggers procured in 2010 was finished, and eight more were purchased. All<br />

were inspected, and inspection surveys for their installation were conducted. One has now<br />

been installed. A total of 27 data loggers have now been procured for MWRI.<br />

• Under the MISD activity, bi-weekly crop data for each branch canal were (and continue to<br />

be) collected by MALR and transferred to MWRI at all 45 IWMDs. Rice areas and BCs net<br />

areas are uncertain.<br />

• Water flow measurements continued at all 105 inflow/outflow sites; 95 of them have been<br />

calibrated, and the calibrations are being reviewed.<br />

• Water quality monitoring is ongoing at 300 sites. All IWMDs are collecting data.<br />

• Water levels are being entered in the water level database in all 45 IWMDs. The eight<br />

directorates are consolidating data. Only 21 of 45 IWMDs calculated water volume from the<br />

water level data base for summer 2009 and summer and winter 2010. Calibration equations<br />

are being entered into 42 IWMD sites and calculation of the IWMDs’ water volume is<br />

ongoing for 2011. Calibrating the I/O sites for the other 3 IWMDs is ongoing.<br />

• Complaints are being entered in the complaints databases in all 45 IWMDs. The directorates<br />

are consolidating the data.<br />

• Eng. Osama Mahmoud and Eng Mohamed Hassan from MWRI’s Information Center (MIC),<br />

visited the directorates and IWMDs to follow up on resolving software problems with the<br />

10 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


WL and Complaints databases, and to provide refresher training on the data bases during the<br />

8 – 22 August period.<br />

• Continued supporting the IWMDs to review and consolidate the canal and drain network<br />

digital maps. This is on-going. To date, 35 IWMDs have completed their maps consisting of<br />

11 layers. These are under review. The remaining 10 IWMDs are all working on their maps<br />

but progress is slow.<br />

• Project staff attended monthly Water Distribution Team coordination meetings (5 events).<br />

Dr. Khaled Toubar (project coordinator) and Eng. Nabil Fawzi attended the September<br />

meetings.<br />

Task 2.3 PMP Indicators and Targets<br />

Year 1 Year 2 Year 3<br />

Task Indicator Units<br />

Base<br />

line Target Actual Target Actual<br />

Yr 3<br />

Target<br />

Actual<br />

Qtr 3<br />

2.3 Establishment of information Management Systems for Sustainable Water Resources Management<br />

2.3.a Number of IWMDs with<br />

calibrations for all<br />

authorized inflow and<br />

Number 0 0 0 45 0 45 42<br />

outflow structures<br />

2.3.b Number of IWMDs with<br />

MISD installed and<br />

Number 0 0 0 45 0 45<br />

42<br />

operational<br />

2.3.c Number of IWMDs with<br />

completed and approved<br />

water resource<br />

Number 0 0 0 0 0 45 0<br />

management plan<br />

2.3.d Number of IWMDs with<br />

water resource information<br />

systems installed and<br />

Number 0 0 0 45 0 45 45 1<br />

operational<br />

2.3.e Number of branch canals<br />

with flows monitored by<br />

IWMD<br />

Number 0 0 0 0 1 2 1<br />

1. All systems the project is responsible for have been installed. The ADSL service that<br />

MWRI is responsible for is lacking at 19 of the 45 districts.<br />

TASK 2.4: CAPACITY BUILDING<br />

OF MWRI PERSONNEL<br />

Dahlia Hamdy (LTTA, Training Specialist) is coordinator for this task. The major activity carried out<br />

during the report period was continuing providing financial and logistical support to all M.S. degree<br />

program participants.<br />

• In the American University of Cairo M.S. degree program, seven persons are currently<br />

enrolled and being supported by the project: two in environmental engineering, four in the<br />

Master of Engineering program; and one in intensive English.<br />

• In other local universities, 2 out of 14 persons have completed their master degree program,<br />

the project continued supporting the remaining 12 persons.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 11


Task 2.4 PMP Indicators and Targets<br />

MONITORING AND EVALUATION<br />

Year 1 Year 2 Year 3<br />

Yr 3<br />

Target<br />

Task Indicator Units Baseline Target Actual Target Actual<br />

2.4 Capacity Building of MWRI Personnel<br />

2.4.a Candidates selected Number 0 20 20 50 36 350 36<br />

2.4.b Candidates accepted by<br />

American University Cairo and Number 0 20 15 50 20 50 20<br />

local universities<br />

2.4.c Candidates graduated with M.S.<br />

degrees<br />

Number 0 0 0 0 0 20 2<br />

Actual<br />

Qtr 3<br />

Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />

the coordinator for this Task. STTA is provided by Dr. Mark Svendsen, an expatriate. Activities<br />

carried out during the report period include:<br />

• Drs.Svendsen and Wadie and Andrew Tczap met twice with the USAID COTR and Ms.<br />

Amani Selim, USAID Senior M&E Specialist, to discuss the PMP indicators based on the<br />

comments of the mid- term evaluation team.<br />

• Dr. Abd El Motaleb, MWRI Coordinator, attended a debriefing by Dr. Svendsen. He<br />

supported the M&E activities, and requested that IWRM <strong>II</strong> draft a letter to be addressed to<br />

all IWMDs asking for support in obtaining requested data. Dr. Motaleb encouraged the<br />

project to continue introducing the concept of managing water resources based on volume<br />

instead of water level.<br />

• The M&E team discussed possible collaboration between IWRM <strong>II</strong> and CDIAS on M&E<br />

activities related to BCWUAs with Eng. Nagwa El Khashab, Chairperson of CDIAS.<br />

• IWRM <strong>II</strong> started to collect information on crop area, productivity and farm gate prices in<br />

each district from the MALR Information Center for the summer 2009 and winter<br />

2009/2010 seasons.Work on utilization of the checklist for evaluating IWMD performance<br />

continued.<br />

• An addendum to the project PMP setting out a set of indicators to measure the growing<br />

capacity and performance of BCWUAs and IWMDs was prepared by Dr. Svendsen and<br />

submitted to USAID. These two new indicators are discussed under Tasks 1.1 and 2.2 above.<br />

• A purchase order with EL Zanaty Associates was signed for conducting a field survey of<br />

farmers and for focus group meetings with BCWUA boards. These will cover the IWRM <strong>II</strong><br />

area and the two IWRM I-supported directorates in Lower Egypt.<br />

EDUCATION, COMMUNICATIONS, PUBLIC AWARENESS AND<br />

PARTICIPATION<br />

Cheryl Groff, Senior Communication Specialist, was coordinator for this task and was<br />

demobilized on 30 June 2011. The project works in collaboration with the Water<br />

Communication Unit (WCU) of the MWRI, local STTA consultants and private vendors. Mr.<br />

Abdel Bary Bakr, local Senior Communications Consultant, is providing support on a time basis<br />

since the demands are reducing as the project winds down. Activities carried out during the<br />

report period include:<br />

• “Alternative Crops an Alternative Solution,” a 14 minute video highlighting farmers’ success<br />

in cultivating high value, low water consuming crops is being screened during Task 1.3<br />

workshops. Duplication and distribution of the video will take place in October.<br />

12 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


• A publication on improved irrigation technologies is under preparation for distribution<br />

to farmers.<br />

TRAINING<br />

Dahlia Hamdy, LTTA Training Specialist, is IRG coordinator for this component.<br />

Training activities were suspended during July and August at the request of MWRI due to the heavy<br />

workload of staff during the summer irrigation season. Training commenced in September with the<br />

following activities being completed:<br />

• Participating in IWMD monthly meetings as well as water advisory and water distribution<br />

meetings.<br />

• Completion of Participatory Water Management, Phase I workshops.<br />

• Building staff capacity for HVC training (two training events).<br />

• Holding four training sessions for BCWUAs to disseminate information about HVCs.<br />

The following table shows the number of participants trained under the project through the end of<br />

the reporting period, excluding attendees at seasonal and monthly meetings.<br />

,<br />

Total to Date<br />

Current Quarter Total<br />

Total Male Female Total Male Female<br />

8802 6849 1953 562 442 120<br />

A summary of training provided during the reporting period is shown below:<br />

ID Course Title Task Events<br />

1.1.3.6<br />

1.3.3.1<br />

1.3.3.2<br />

Participatory Water<br />

Management Phase I<br />

Total<br />

Participants<br />

Female<br />

Participants<br />

1.1 7 263 94<br />

Building Staff Capacity for<br />

HVCs 1.3 2 94 13<br />

Training to disseminate<br />

Information on HVCs<br />

1.3 4 205 13<br />

Total 13 562 120<br />

Venue<br />

Each<br />

Directorate<br />

Damietta, El<br />

Salam &<br />

E.Dakahlia<br />

Damietta, El<br />

Salam &<br />

E.Dakahlia (2<br />

Districts only)<br />

PROCUREMENT<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) and Mrs. Amany<br />

Mahmoud (Office and Personnel Manager) are coordinators for this activity. They are assisted by<br />

Eng. Safaa Khodary (IT Specialist) and the regional offices. FirrasTraish, Procurement/Financial<br />

Specialist, is supporting the project as IRG home office backstop. Activities carried out during the<br />

report period include:<br />

• Continuation of procurement in accordance with the procurement plan.<br />

• Receipt of an additional eight data loggers for general directorates.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 13


3. ACTIVITIES PLANNED FOR<br />

NEXT QUARTER<br />

In this section, activities planned for the 4 th Quarter of Year 3 are summarized by project task.<br />

TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />

CANAL <strong>WATER</strong> USER ASSOCIATIONS<br />

• In response to the USAID mid-term evaluation recommendations, continue to develop<br />

institutional performance criteria and review the planned training program to assess whether<br />

it is adequate to address the need to strengthen BCWUA performance, making adjustments<br />

as needed.<br />

• Conduct participatory Water Management Phase <strong>II</strong> training course.<br />

• Continue meeting with women board members to assist with their activities<br />

• Continue assisting the general directorate and IWMD Water Advisory Teams in<br />

implementing participatory water management activities.<br />

• Support the IWMDs and BCWUAs in completing the Chairpersons Identification Cards<br />

(IDs) and Action Plans.<br />

• Participate in the WAT coordination meetings.<br />

TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />

DRAIN MAINTENANCE<br />

No activities are planned for the next quarter.<br />

TASK 1.3: IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND<br />

EFFICIENCY<br />

• Continue monitoring demonstration sites where HVCs crops are being grown.<br />

• Continue providing training to MWRI and MALR staff on HVCs and water conservation<br />

technologies.<br />

• Continue organizing workshops to disseminate information on HVCs to BCWUAs and their<br />

farmer members.<br />

• Prepare awareness materials focusing on technical and market information on water saving<br />

technologies for dissemination to the BCWUAs<br />

• Arrange and conduct a work shop for interested farmers on water conservation technologies.<br />

TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />

No activities are planned for the next quarter.<br />

14 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />

ORGANIZATIONS<br />

No activities are planned for next quarter.<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />

<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />

• Continue to engage the Egyptian Public Authority for Drainage Projects on transferring staff,<br />

equipment, facilities, budget, and responsibilities to the Irrigation Department.<br />

• Continue to work with MWRI to ensure adequate budget and staff resources are provided to<br />

the IWMDs. IWRM <strong>II</strong> will continue to work with MWRI to address issues of staff shortages,<br />

rapid staff turnover, and the practice of engaging engineers on a temporary basis, and at<br />

salaries that are lower than those of permanent staff of comparable capacity and experience.<br />

• In response to the USAID mid-term evaluation recommendations, continue to develop<br />

institutional performance criteria and review the planned training program to assess whether<br />

it is adequate to address the need to strengthen performance.<br />

• Assist the IWMDs to prepare/update maintenance plans for the fiscal year 2012/2013.<br />

• Conduct an advanced computer skills training course.<br />

• Conduct a district performance data analysis training course.<br />

• Participate in monthly directorate meetings.<br />

• Participate in quarterly maintenance meetings.<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />

SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong><br />

<strong>MANAGEMENT</strong><br />

• Study the advisability and means of involving the BCWUAs in supporting the IWMDs in<br />

determining bi-weekly crop water requirements.<br />

• Work with the IWMDs in calculating their net irrigable areas.<br />

• Continue developing water resource databases.<br />

• Continue flow measurement program<br />

• Complete review of flow calibrations for the general directorates and IWMDs I/O sites.<br />

• Continue installation of new data loggers.<br />

• Conduct additional digital mapping training course.<br />

• Conduct ground water data base training course (directorate level).<br />

• Conduct water resources inventory training course.<br />

• Support district work in completing digital maps using AutoCAD Map with 11 layers (for the<br />

10 IWMDs that have not yet completed them).<br />

• Conduct quality checks on the digital maps as they are completed<br />

• Conduct monthly water distribution meetings.<br />

TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

• Provide financial and logistical support for trainees.<br />

• Monitor trainee progress.<br />

• Support Study Tours as requested by USAID and/or MWRI<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 15


MONITORING AND EVALUATION<br />

• Continue collection of MALR secondary agricultural data for East. Nile Delta.<br />

• Complete demand and water supply data for 2009 to 2011.<br />

• Complete the field survey of farmers and issue the report.<br />

• Begin consolidation of the data required for the M&E final report<br />

EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND<br />

PARTICIPATION<br />

• Prepare a communication product brief comprised of all materials required for Task 1-3<br />

• Visit field sites and attend workshops on HVCs and for training BCWUA chairpersons..<br />

• Pre-test, print, and disseminate the farmers’ newspaper on modern irrigation methods<br />

• Prepare additional success stories<br />

• Based upon findings of the Stakeholder Assessment, initiate communication training<br />

program.<br />

TRAINING<br />

• Identify trainers/training providers to conduct various training courses planned for next<br />

quarter.<br />

• Update TraiNet.<br />

• Update the Training Database for the 45 IWMDs.<br />

The following training courses are planned for the 4 th quarter:<br />

ID Course Title Task Events Venue<br />

1.1.3.7 BCWUA’s PWM Implementation 1.1 7 East Delta Region<br />

1.3.3.1 Building Staff Capacity 1.3 2 Ismailia & Salhiya<br />

1.3.3.2 Dissemination of Information on<br />

HVCs<br />

1.3 3 E.Dakahlia Directorate<br />

1.3.3.3 Irrigation Systems Workshop 1.3 1 West Belbis District<br />

2.2.3.5 Advanced Computer Skills 2.2 7 East Delta Region<br />

2.2.3.7 Water Resources Inventory 2.3 7 East Delta Region<br />

2.3.3.9 Ground Water Database<br />

(Directorate Version)<br />

2.3.3.11 Ground Water Monitoring Follow-<br />

Up<br />

2.3 5 East Delta Region<br />

2.3 5 East Delta Region<br />

2.3.3.15 Digital Mapping Refresher 2.3 7 East Delta Region<br />

2.3.3.13 District Performance Data<br />

Analysis<br />

2.3 8 East Delta Region<br />

x.x.3.1 Field Survey Data Collection M&E 2 East Delta Region<br />

16 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


PROCUREMENT<br />

• Continue procurement process. Purchase, deliver, and transfer equipment to IWMDs and<br />

IWM directorates in accordance with the procurement plan.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 17


4. PROBLEMS AND ISSUES<br />

GENERAL<br />

Several issues require attention by MWRI and the project as follows:<br />

1. It appears that there is some confusion among MWRI field staff regarding whether<br />

implementation of IWRM has the support of MWRI top management. As a result, some (a<br />

small minority) of field staff are not following through on activities that are critical to IWRM<br />

which causes delays and substandard outputs.<br />

2. Full integration is not taking place in some areas. EPADP still retains responsibility for<br />

larger drains and retains some staff and equipment.<br />

3. The newly formed IWMDs do not have adequate human and financial resources to function<br />

properly.<br />

4. Staff reassignments and other factors require refresher training and re-training in some cases.<br />

The project will focus on this issue in the remaining life-of-project.<br />

The major problem facing implementation is the lack of staff the project has been working under.<br />

After the Ministry’s Integrated Water Management Unit was disbanded in 2010 it was agreed that the<br />

project would hire MWRI staff on leave without pay (LWOP) to compensate. When such staff were<br />

available, results were good, however there was a time lapse in getting the staff hired initially (6 in all)<br />

and starting in July 2011 all 6 were lost. Only 4 out of the six had been replaced at the end of the<br />

reporting period. Identification of staff to work on the project team and issuing of LWOP decrees<br />

by MWRI has been slow. Approval of salary rates by USAID has been problematic and slow also.<br />

As a result, the project team has been short of staff for most of the quarter.<br />

TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />

CANAL <strong>WATER</strong> USER ASSOCIATIONS<br />

IWRM <strong>II</strong> has made good progress on this Task in many respects. Water Advisory Teams have been<br />

formed at each IWRM directorate and district and are functioning well. All 622 BCWUAs have been<br />

established and are becoming active. Training of the BCWUAs has been delayed somewhat but will<br />

be fully trained before the 2012 summer irrigation season starts. A farmer survey and focus group<br />

sessions with BCWUA board members will be completed in the next quarter and will provide<br />

information to allow further capacity building to be focused to achieve maximum results.<br />

TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />

DRAIN MAINTENANCE<br />

As previously indicated, the mid-term evaluation team’s recommendation to cease further Task 1.2<br />

activity has been accepted by all parties. Therefore, no further work will be performed on this task.<br />

This applies also to Tasks 1.4 and 2.1 and, in part, to 2.4.<br />

18 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


TASK 1.3: IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND<br />

EFFICIENCY<br />

There are no major issues affecting project operations at this time. However, it is important to note<br />

that the projects responsibility under this task was disseminating information on the cultivation of<br />

HVCs and the benefits/use of WCTs. IWRM <strong>II</strong> provided support in these important areas. But if<br />

there is to be success in increasing water efficiency on a national scale, continued efforts are needed<br />

to raise farmers awareness and to support them in transitioning to HVCs and adoption of WCTs.<br />

TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />

See note on Task 1.2 above.<br />

TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />

ORGANIZATIONS<br />

See note on Task 1.2 above.<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />

<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />

All 45 IWMDs have been formed, are operational; all are fully staffed at senior level. That said, there<br />

are issues. Among them, timely and adequate availability of financial resources is of particular<br />

importance. The new IWMDs have greater responsibilities than the irrigation districts they replaced.<br />

Therefore, their needs in terms of budget, facilities, and human resources are greater than before. But,<br />

to date MWRI financial and technical support has not been consistent or adequate to assure that the<br />

newly created integrated directorates and districts can function as intended. Among other things, this<br />

has adversely affected installation of ADSL lines, maintenance of equipment provided by the project<br />

and maintenance/repair of MWRIs equipment needed for canal and drain upkeep.<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />

SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>MANAGEMENT</strong><br />

The MISD is not being transmitted from MALR in some cases and the quality of the data<br />

delivered to the IWMDs on bi-weekly bases is suspect in general. This data is the key element of<br />

water management and a solution is needed. The systems developed under the project at the<br />

district and directorate level are suitable for decision making under the scenario of water<br />

distribution by volume. Although MWRI has water management based on volume as part of<br />

their strategy, they are not ready to implement it yet. It is important that staff be encouraged to<br />

continue using the systems developed so that the skills and procedures developed to date will still<br />

exist when the switch to management by volume takes place in future.<br />

TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

There are no major issues at this time.<br />

MONITORING AND EVALUATION<br />

A number of steps need to be taken to obtain reliable data to evaluate project outcomes. These are<br />

well known and efforts to collect the needed information are on-going. However, and unfortunately,<br />

reliable information on cultivated areas, water flows and cropping patterns is still spotty. MWRI<br />

reports that it cannot rely on agricultural data for planning and managing water deliveries. The<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 19


project is intensifying efforts to get reliable data for some pilot areas in order to compute the value of<br />

PMP outcome indicators.<br />

EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND<br />

PARTICIPATION<br />

There are no major issues at this time.<br />

TRAINING<br />

No formal training has been conducted during the months of July and August in compliance with an<br />

MWRI’s decision to postpone the training during the summer cultivation period. While the reasons<br />

for the postponement are understood, the effect has been to retard progress in implementing the<br />

training plan.<br />

Candidates for participation in the remaining three study tours have not been identified to date.<br />

Although the project is not responsible for implementing the study tours, it is mentioned here<br />

because the project has been tasked with supporting the implementation contractor.<br />

PROCUREMENT<br />

There are no issues at this time.<br />

U.S. Agency for International Development<br />

1300 Pennsylvania Avenue, NW<br />

Washington, DC 20523<br />

Tel: (202) 712-0000<br />

Fax: (202) 216-3524<br />

www.usaid.gov<br />

20 Quarterly Report Year 3: 3 rd Quarter (July - September 2011)


5. STAFF LEVEL OF EFFORT<br />

The IWRM <strong>II</strong> Long Term resident staff and Short Term professional, technical, and administrative<br />

support staff for the quarter are shown below:<br />

RESIDENT STAFF - EXPATRIATE<br />

NAME<br />

Mr. Andrew Tczap<br />

POSITION<br />

Chief of Party<br />

LOCAL EGYPTIAN<br />

NAME<br />

Eng. Nabil Fawzi<br />

Dr. Wadie Mankarious<br />

Eng. Maher Khodary<br />

Eng. El-Sayed Nagi<br />

Amany Mahmoud<br />

Dahlia Hamdy<br />

Sherihan Radi<br />

Ramy Ghaly<br />

Waleed El Rifaie<br />

POSITION<br />

Senior Water Resource Management Specialist<br />

Senior Organization/Institutional Development Specialist<br />

Senior Water Resource Management Specialist - Zagazig<br />

Senior Water Resource Management Specialist - Mansoura<br />

Office Manager – Cairo<br />

Training Specialist – Cairo<br />

Accountant – Cairo<br />

Regional Office – Zagazig<br />

Regional Office – Mansoura<br />

SHORT TERM STAFF DURING THE REPORTING PERIOD<br />

EXPATRIATE<br />

NAME<br />

Russell Misheloff (IRG)<br />

Dr. Mark Svendsen (IRG)<br />

Dr. Tom Sheng (CADI)<br />

LOCAL EGYPTIAN<br />

NAME<br />

Dr. Moamen El Sharkawy<br />

Eng. Amira Abdel Hady<br />

Eng. Ayman Shedid<br />

Eng. Soha Mostafa<br />

Eng. Elbayoumi Ali EzEldeen<br />

Eng. Akmal Badie Henein<br />

Dr. Walid Yehia Sallam<br />

Dr. Abd El Wahab<br />

Ahnmed Behery<br />

Abdel Bary Bakr<br />

POSITION<br />

IRG Home Office Project Manager<br />

Monitoring & Evaluation Specialist<br />

Management Information Systems Specialist<br />

POSITION (All part-time during the reporting period)<br />

Institutional/Organizational Development Specialist<br />

Institutional/Organizational Development Specialist<br />

Water Management Specialist (Zagazig RO)<br />

Water Information Specialist (Zagazig RO<br />

Water Management Specialist (Mansoura RO)<br />

Water Information Specialist (Mansoura RO)<br />

Agriculture Economist<br />

Crops Agricultural Specialist<br />

Water Management Specialist<br />

Public Awareness & Communication Specialist<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 21


6. STATUS OF FINANCES AND EXPENDITURES<br />

USD Budget<br />

Budget Line Item Budgeted Obligated Current<br />

Claim<br />

(July-Sept.)<br />

Claims to<br />

Date<br />

Projected<br />

Expenses for<br />

Next Quarter<br />

(Oct.-Dec.)<br />

Remaining<br />

Budget<br />

Balance<br />

% Budget<br />

Claimed<br />

Salaries 1,121,498 60,517 858,943 72,000 262,555 77<br />

Overhead and<br />

Fringes<br />

345,848 18,770 333,831 29,000 12,017 96<br />

Consultant Labor 267,212 8,545 83,670 18,500 183,542 31<br />

Other Direct<br />

Costs<br />

676,501 20,712 422,749 20,500 253,752 62<br />

Procurement 525,000 26 227,536 5,000 297,464 43<br />

G&A 611,710 26,600 472,049 35,500 139,661 77<br />

Subcontractors 188,487 38,508 169,250 33,000 19,237 90<br />

Subcontractor<br />

Handling<br />

7,539 1,733 7,293 1,500 246 97<br />

Subtotal 3,743,795 175,411 2,575,321 215,000 1,168,474 69<br />

Fixed Fee 187,190 8,770 128,766 10,750 58,424 69<br />

Adjustments 0 0 -37,471 0 37,471<br />

Total Cost Plus<br />

Fixed Fee<br />

Remaining<br />

Obligation<br />

Balance<br />

% Obligation<br />

Claimed<br />

3,930,985 3,930,986 184,181 2,666,616 225,750 1,264,369 68 1,264,369 68<br />

Source: IRG Invoices # 506101- 31; estimate of 32<br />

22 Quarterly Report Year 2: 1 st Quarter (January – March 2010)


LE Budget<br />

Budget Line Item Budgeted Obligated Current<br />

Claim<br />

(July-Sept.)<br />

Claims to<br />

Date<br />

Projected<br />

Expenses for<br />

Next Quarter<br />

(Oct.-Dec.)<br />

Remaining<br />

Budget<br />

Balance<br />

% Budget<br />

Claimed<br />

Salaries 1,121,498 60,517 858,943 72,000 262,555 77<br />

Overhead and<br />

Fringes<br />

345,848 18,770 333,831 29,000 12,017 96<br />

Consultant Labor 267,212 8,545 83,670 18,500 183,542 31<br />

Other Direct<br />

Costs<br />

676,501 20,712 422,749 20,500 253,752 62<br />

Procurement 525,000 26 227,536 5,000 297,464 43<br />

G&A 611,710 26,600 472,049 35,500 139,661 77<br />

Subcontractors 188,487 38,508 169,250 33,000 19,237 90<br />

Subcontractor<br />

Handling<br />

7,539 1,733 7,293 1,500 246 97<br />

Subtotal 3,743,795 175,411 2,575,321 215,000 1,168,474 69<br />

Fixed Fee 187,190 8,770 128,766 10,750 58,424 69<br />

Adjustments 0 0 -37,471 0 37,471<br />

Total Cost Plus<br />

Fixed Fee<br />

Remaining<br />

Obligation<br />

Balance<br />

% Obligation<br />

Claimed<br />

3,930,985 3,930,986 184,181 2,666,616 225,750 1,264,369 68 1,264,369 68<br />

Source: IRG Invoices # 506101- 29; estimate of 30<br />

Quarterly Report Year 2: 1 st Quarter (January – March 2010) 23


7. LIST OF REPORTS<br />

No. NAME DATE<br />

1 Annual Work Plan Year 1(January – December 2009) March 2009<br />

2 Quarterly Report Year 1: 1st Quarter (January–March 2009) April 2009<br />

3 Economic Feasibility of Alternative Crops with Potential for May 2009<br />

the Reuse of Treated Wastewater in Egypt<br />

4 Communication Plan May 2009<br />

5 IWRM I BCWUA Assessment July 2009<br />

6 Performance Monitoring Plan July 2009<br />

7 Farmer Baseline Survey July 2009<br />

8 MWRI Training Needs Assessment July 2009<br />

9 Quarterly Report Year 1: 2nd Quarter (April – June 2009) July 2009<br />

10 Quarterly Report Year 1: 3rd Quarter (July – September 2009) October 2009<br />

11 Annual Work Plan Year 2 (January–December 2010) December 2009<br />

12 Annual Report Year 1 (January–December 2009) January 2010<br />

13 Quarterly Report Year 2: 1st Quarter (January–March 2010) April 2010<br />

14 Feasibility of Wastewater Reuse with Annexes June 2010<br />

15 Quarterly Report Year 2: 2nd Quarter (April – June 2010) July 2010<br />

16 Quarterly Report Year 2: 3rd Quarter (July –September 2010) October 2010<br />

17 Annual Work Plan Year 3(January–December 2011) December 2010<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

Annual Report Year 2 (January–December 2010)<br />

Quarterly Report Year 3: 1 st Quarter (January-March 2011)<br />

Assessment of Communications Needs<br />

Quarterly Report Year 3: 2 nd Quarter (April-June 2011)<br />

Updated Communication Plan<br />

Introducing High Value/Low Water Consumption Crops<br />

Annual Work Plan Year 4 (October 2011-September 2012)<br />

Quarterly Report Year 3: 3 rd Quarter (July-Sept. 2011<br />

January 2011<br />

April 2011<br />

June 2011<br />

July 2011<br />

July 2011<br />

October 2011<br />

October 2011<br />

October 2011<br />

24 Quarterly Report Year 3: 2 nd Quarter (April – June 2011)


U.S. Agency for International Development<br />

1300 Pennsylvania Avenue, NW<br />

Washington, DC 20523<br />

Tel: (202) 712-0000<br />

Fax: (202) 216-3524<br />

www.usaid.gov<br />