WL and Complaints databases, and to provide refresher training on the data bases during the<br />

8 – 22 August period.<br />

• Continued supporting the IWMDs to review and consolidate the canal and drain network<br />

digital maps. This is on-going. To date, 35 IWMDs have completed their maps consisting of<br />

11 layers. These are under review. The remaining 10 IWMDs are all working on their maps<br />

but progress is slow.<br />

• Project staff attended monthly Water Distribution Team coordination meetings (5 events).<br />

Dr. Khaled Toubar (project coordinator) and Eng. Nabil Fawzi attended the September<br />

meetings.<br />

Task 2.3 PMP Indicators and Targets<br />

Year 1 Year 2 Year 3<br />

Task Indicator Units<br />

Base<br />

line Target Actual Target Actual<br />

Yr 3<br />

Target<br />

Actual<br />

Qtr 3<br />

2.3 Establishment of information Management Systems for Sustainable Water Resources Management<br />

2.3.a Number of IWMDs with<br />

calibrations for all<br />

authorized inflow and<br />

Number 0 0 0 45 0 45 42<br />

outflow structures<br />

2.3.b Number of IWMDs with<br />

MISD installed and<br />

Number 0 0 0 45 0 45<br />

42<br />

operational<br />

2.3.c Number of IWMDs with<br />

completed and approved<br />

water resource<br />

Number 0 0 0 0 0 45 0<br />

management plan<br />

2.3.d Number of IWMDs with<br />

water resource information<br />

systems installed and<br />

Number 0 0 0 45 0 45 45 1<br />

operational<br />

2.3.e Number of branch canals<br />

with flows monitored by<br />

IWMD<br />

Number 0 0 0 0 1 2 1<br />

1. All systems the project is responsible for have been installed. The ADSL service that<br />

MWRI is responsible for is lacking at 19 of the 45 districts.<br />

TASK 2.4: CAPACITY BUILDING<br />

OF MWRI PERSONNEL<br />

Dahlia Hamdy (LTTA, Training Specialist) is coordinator for this task. The major activity carried out<br />

during the report period was continuing providing financial and logistical support to all M.S. degree<br />

program participants.<br />

• In the American University of Cairo M.S. degree program, seven persons are currently<br />

enrolled and being supported by the project: two in environmental engineering, four in the<br />

Master of Engineering program; and one in intensive English.<br />

• In other local universities, 2 out of 14 persons have completed their master degree program,<br />

the project continued supporting the remaining 12 persons.<br />

Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 11