WL and Complaints databases, and to provide refresher training on the data bases during the<br />
8 – 22 August period.<br />
• Continued supporting the IWMDs to review and consolidate the canal and drain network<br />
digital maps. This is on-going. To date, 35 IWMDs have completed their maps consisting of<br />
11 layers. These are under review. The remaining 10 IWMDs are all working on their maps<br />
but progress is slow.<br />
• Project staff attended monthly Water Distribution Team coordination meetings (5 events).<br />
Dr. Khaled Toubar (project coordinator) and Eng. Nabil Fawzi attended the September<br />
meetings.<br />
Task 2.3 PMP Indicators and Targets<br />
Year 1 Year 2 Year 3<br />
Task Indicator Units<br />
Base<br />
line Target Actual Target Actual<br />
Yr 3<br />
Target<br />
Actual<br />
Qtr 3<br />
2.3 Establishment of information Management Systems for Sustainable Water Resources Management<br />
2.3.a Number of IWMDs with<br />
calibrations for all<br />
authorized inflow and<br />
Number 0 0 0 45 0 45 42<br />
outflow structures<br />
2.3.b Number of IWMDs with<br />
MISD installed and<br />
Number 0 0 0 45 0 45<br />
42<br />
operational<br />
2.3.c Number of IWMDs with<br />
completed and approved<br />
water resource<br />
Number 0 0 0 0 0 45 0<br />
management plan<br />
2.3.d Number of IWMDs with<br />
water resource information<br />
systems installed and<br />
Number 0 0 0 45 0 45 45 1<br />
operational<br />
2.3.e Number of branch canals<br />
with flows monitored by<br />
IWMD<br />
Number 0 0 0 0 1 2 1<br />
1. All systems the project is responsible for have been installed. The ADSL service that<br />
MWRI is responsible for is lacking at 19 of the 45 districts.<br />
TASK 2.4: CAPACITY BUILDING<br />
OF MWRI PERSONNEL<br />
Dahlia Hamdy (LTTA, Training Specialist) is coordinator for this task. The major activity carried out<br />
during the report period was continuing providing financial and logistical support to all M.S. degree<br />
program participants.<br />
• In the American University of Cairo M.S. degree program, seven persons are currently<br />
enrolled and being supported by the project: two in environmental engineering, four in the<br />
Master of Engineering program; and one in intensive English.<br />
• In other local universities, 2 out of 14 persons have completed their master degree program,<br />
the project continued supporting the remaining 12 persons.<br />
Quarterly Report Year 3: 3 rd Quarter (July - September 2011) 11