12.11.2014 Views

Zero Waste SA guidelines for managing waste at events and venues

Zero Waste SA guidelines for managing waste at events and venues

Zero Waste SA guidelines for managing waste at events and venues

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

12345<br />

WASTE<br />

MINIMI<strong>SA</strong>TION<br />

GUIDE<br />

EVENTS AND VENUES<br />

5 STEP PLAN


2<br />

STEP


WASTE<br />

MANAGEMENT<br />

HIERARCHY<br />

1<br />

The <strong>Waste</strong> Management Hierarchy should frame any approach to <strong>managing</strong> <strong>and</strong> reducing <strong>waste</strong>.<br />

The in<strong>for</strong>m<strong>at</strong>ion <strong>and</strong> support tools in this guideline follow the hierarchy.<br />

MOST PREFERABLE<br />

Avoid<br />

Reduce<br />

Reuse<br />

Recycle<br />

Recover<br />

Tre<strong>at</strong>ment<br />

Disposal<br />

LEAST PREFERABLE<br />

Source: <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong>, South Australia’s <strong>Waste</strong> Str<strong>at</strong>egy 2005–2010


2<br />

CONTENTS<br />

THE WASTE HIERARCHY 1<br />

REDUCING WASTE 3<br />

THE GUIDELINE AND TOOLS 4<br />

> Who should use this guideline 4<br />

> How to use this guideline 5<br />

> The <strong>waste</strong> management plan approach 5<br />

> Roles <strong>and</strong> responsibilities 6<br />

STEP 1 THE WASTE MANAGEMENT PLAN 8<br />

1.1 Get started 8<br />

1.2 Identify barriers <strong>and</strong> drivers to change<br />

– SWOT analysis 8<br />

1.3 Assess <strong>waste</strong> gener<strong>at</strong>ion <strong>and</strong> disposal 9<br />

1.4 Identify options <strong>for</strong> improvement<br />

– <strong>waste</strong> stream management 10<br />

1.5 Set goals <strong>and</strong> targets 11<br />

1.6 Develop actions 12<br />

STEP 2 GAINING COMMITMENT 13<br />

2.1 In<strong>for</strong>mal 13<br />

2.2 Formal 13<br />

2.3 Contract <strong>and</strong> tender clauses 13<br />

STEP 3 PROVIDING INFRASTRUCTURE 14<br />

3.1 Bin signage <strong>and</strong> colour st<strong>and</strong>ards 14<br />

3.2 Choosing your infrastructure 18<br />

3.3 Front of house 18<br />

3.4 Back of house 20<br />

STEP 4 EDUCATING AND MARKETING 21<br />

4.1 Staff <strong>and</strong> vendor educ<strong>at</strong>ion 21<br />

4.2 P<strong>at</strong>ron educ<strong>at</strong>ion <strong>and</strong> marketing 21<br />

STEP 5 REPORTING AND EVALUATION 23<br />

5.1 Tracking improvements in <strong>waste</strong><br />

gener<strong>at</strong>ion <strong>and</strong> disposal 23<br />

5.2 Self evalu<strong>at</strong>ion of your success 23<br />

5.3 Sharing the in<strong>for</strong>m<strong>at</strong>ion with interested<br />

parties 23<br />

5.4 Learning from your experiences/continual<br />

improvement 23<br />

EVEN MORE INFORMATION 24<br />

FREQUENTLY ASKED QUESTIONS 25<br />

ATTACHMENTS<br />

Attachment A <strong>Waste</strong> management plan templ<strong>at</strong>e 27<br />

Attachment B Example <strong>waste</strong> management plan 29<br />

Attachment C SWOT analysis templ<strong>at</strong>e 32<br />

Attachment D <strong>Waste</strong> assessment templ<strong>at</strong>e 33<br />

Attachment E H<strong>and</strong>y how–to guide <strong>for</strong> <strong>waste</strong> items 34<br />

Attachment F Goals <strong>and</strong> options <strong>for</strong> improvement<br />

templ<strong>at</strong>e 36<br />

Attachment G Example contract <strong>and</strong> tender clauses 37<br />

Attachment H Example staff training posters 40<br />

Attachment I Monitoring checklist 42<br />

Attachment J <strong>Waste</strong> stream conversion chart 43<br />

Attachment K <strong>Waste</strong> <strong>and</strong> recycling reporting templ<strong>at</strong>e 44<br />

Attachment L Self evalu<strong>at</strong>ion templ<strong>at</strong>e 45<br />

GLOS<strong>SA</strong>RY 47<br />

DID YOU ASK ALL THESE<br />

QUESTIONS? 48


REDUCING WASTE<br />

3<br />

A significant amount of <strong>waste</strong> sent to l<strong>and</strong>fill is<br />

potentially recyclable. Recycling <strong>at</strong> <strong>events</strong> <strong>and</strong><br />

<strong>venues</strong> can:<br />

> conserve resources, including energy, w<strong>at</strong>er <strong>and</strong><br />

m<strong>at</strong>erials<br />

> reduce greenhouse gas emissions<br />

> be a positive marketing tool <strong>for</strong> your event<br />

organisers or venue<br />

> increase the environmental awareness of vendors<br />

<strong>and</strong> p<strong>at</strong>rons<br />

> cre<strong>at</strong>e employment in collecting, sorting <strong>and</strong><br />

reprocessing recyclables, <strong>and</strong> boost South<br />

Australia’s economy<br />

> help us reach the <strong>waste</strong> minimis<strong>at</strong>ion target of<br />

South Australia’s Str<strong>at</strong>egic Plan – reduce <strong>waste</strong> to<br />

l<strong>and</strong>fill by 25% by 2014<br />

> reduce the overall impact of the event on the<br />

environment.<br />

STEP


4<br />

THE GUIDELINE<br />

AND TOOLS<br />

This guideline provides ready-to-use tools particularly<br />

<strong>for</strong> planning, example words <strong>for</strong> contracts <strong>and</strong><br />

service agreements, simple language, <strong>and</strong> an easy<br />

to follow step-by-step process <strong>for</strong> developing <strong>waste</strong><br />

minimis<strong>at</strong>ion programs <strong>for</strong> <strong>events</strong> <strong>and</strong> event <strong>venues</strong>.<br />

Community awareness <strong>and</strong> underst<strong>and</strong>ing of<br />

environmental issues is growing. More people are<br />

dem<strong>and</strong>ing goods <strong>and</strong> services th<strong>at</strong> consider the<br />

environment <strong>and</strong> demonstr<strong>at</strong>e clear environmental<br />

per<strong>for</strong>mance. <strong>Waste</strong> management is more than using<br />

less l<strong>and</strong>fill space. The production, transport <strong>and</strong><br />

disposal of <strong>waste</strong> also produces significant greenhouse<br />

gas emissions <strong>and</strong> uses valuable resources.<br />

This guideline is designed to help you to reduce the<br />

amount of <strong>waste</strong> produced <strong>at</strong> your event or venue.<br />

This will be beneficial <strong>for</strong> the environment <strong>and</strong> <strong>for</strong> your<br />

bottom line.<br />

WHO SHOULD USE THIS GUIDELINE<br />

This guideline is designed <strong>for</strong> organisers from small<br />

(e.g. school fetes <strong>and</strong> community fairs), medium (e.g.<br />

one day cultural food <strong>and</strong> wine/sports <strong>events</strong>) to large<br />

<strong>events</strong> (e.g. st<strong>at</strong>e sporting or music festivals).<br />

Event organisers <strong>and</strong> venue managers generally carry<br />

most responsibility <strong>for</strong> <strong>waste</strong> management initi<strong>at</strong>ives<br />

but many other contributors also have a role to play,<br />

including clients, per<strong>for</strong>mers, p<strong>at</strong>rons, sponsors <strong>and</strong><br />

associ<strong>at</strong>ed contractors.<br />

For <strong>waste</strong> to be reduced <strong>at</strong> <strong>events</strong> <strong>and</strong> <strong>venues</strong>, all<br />

associ<strong>at</strong>ed key individuals <strong>and</strong> groups need to set<br />

goals <strong>and</strong> develop actions <strong>for</strong> <strong>waste</strong> minimis<strong>at</strong>ion.<br />

The table on page 6 summarises the typical roles <strong>and</strong><br />

responsibilities <strong>for</strong> organising an event or <strong>managing</strong><br />

a venue. The far right column lists the sections in this<br />

guideline th<strong>at</strong> can help each personnel type.<br />

HINT<br />

WASTE DISPO<strong>SA</strong>L TO LANDFILL IS A SIGNIFICANT CONTRIBUTOR<br />

TO GREENHOUSE GAS (GHG) EMISSIONS. Any goals to reduce GHG<br />

emissions <strong>at</strong> <strong>events</strong> <strong>and</strong> <strong>venues</strong> should incorpor<strong>at</strong>e <strong>waste</strong> reduction<br />

initi<strong>at</strong>ives, including avoidance <strong>and</strong> separ<strong>at</strong>ion (particularly the<br />

removal of organic loads such as food <strong>waste</strong> <strong>for</strong> composting).


THE GUIDELINE<br />

AND TOOLS<br />

5<br />

HOW TO USE THIS GUIDELINE<br />

The 5 Steps to <strong>Waste</strong> Management Success can be<br />

followed by everyone involved in planning <strong>and</strong> running<br />

an event or venue <strong>and</strong> help reduce the amount of<br />

<strong>waste</strong> m<strong>at</strong>erial sent to l<strong>and</strong>fill.<br />

STEP<br />

STEP<br />

The 5 steps are:<br />

1. Developing a <strong>waste</strong> management plan<br />

2. Gaining commitment<br />

3. Providing infrastructure<br />

4. Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

5. Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

The chart links the stages of <strong>waste</strong> management<br />

to their place in this guideline <strong>and</strong> the available<br />

support tools.<br />

You are encouraged to follow the steps in<br />

chronological order, from start to finish. If you<br />

frequently prepare <strong>events</strong> or manage a fixed venue,<br />

you may have developed a familiarity with the<br />

process <strong>and</strong> can proceed directly to the support<br />

tools <strong>for</strong> download. Make sure you look <strong>at</strong> the<br />

h<strong>and</strong>y checklist on the inside back cover.<br />

STEP<br />

THE WASTE MANAGEMENT PLAN APPROACH<br />

Plan how <strong>waste</strong> will be managed well be<strong>for</strong>e an event.<br />

Sometimes decisions about <strong>waste</strong> management are left<br />

too l<strong>at</strong>e <strong>for</strong> effective measures to be taken. A carefully<br />

developed <strong>waste</strong> management plan (WMP) is your best<br />

chance of meeting your <strong>waste</strong> reduction goals (check<br />

out Step 1 on page 8).<br />

Using a WMP will ensure everyone approaches the<br />

situ<strong>at</strong>ion in a consistent manner, promote better<br />

planning <strong>and</strong> evalu<strong>at</strong>ion processes, <strong>and</strong> ensure a<br />

more efficient use of resources because actions are<br />

clearly alloc<strong>at</strong>ed to responsible parties. You may also<br />

find th<strong>at</strong> you can use your original WMP to plan future<br />

<strong>events</strong> or <strong>for</strong> continued improvement <strong>at</strong> your event or<br />

venue, through regular review <strong>and</strong> evalu<strong>at</strong>ion.<br />

STEP<br />

STEP<br />

STEP


6<br />

THE GUIDELINE<br />

AND TOOLS<br />

ROLES AND RESPONSIBILITIES<br />

WHO RESPONSIBILITIES STEP<br />

Event organiser<br />

• Professional company<br />

• Member of the public<br />

• Staff of a school<br />

• Management committee<br />

of a club<br />

• Volunteers<br />

• Local council<br />

represent<strong>at</strong>ive<br />

• Coordin<strong>at</strong>e development <strong>and</strong><br />

implement<strong>at</strong>ion of the WMP<br />

• Run the event<br />

• Have str<strong>at</strong>egic overview of <strong>waste</strong><br />

minimis<strong>at</strong>ion by all personnel <strong>and</strong> onground<br />

<strong>waste</strong> management activities<br />

1 Developing a WMP<br />

2 Gaining commitment<br />

3 Providing infrastructure<br />

4 Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

5 Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

Site/venue owner<br />

• Local council<br />

• School<br />

• Government<br />

• Priv<strong>at</strong>e l<strong>and</strong>owner<br />

• Venue owner<br />

• Ultim<strong>at</strong>ely responsible <strong>for</strong> implement<strong>at</strong>ion<br />

of procedures in the WMP<br />

• Probably help organise the event <strong>at</strong><br />

some level<br />

• May have specific criteria to be followed<br />

<strong>and</strong> incorpor<strong>at</strong>ed into the WMP<br />

1 Developing a WMP<br />

2 Gaining commitment<br />

3 Providing infrastructure<br />

5 Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

Sponsors<br />

• Business<br />

• Government<br />

• May have an interest in reporting <strong>and</strong><br />

evalu<strong>at</strong>ing the WMP<br />

• May be part of implementing the WMP by<br />

including <strong>waste</strong> reduction advertisements<br />

along with their sponsorship<br />

• May be included in other activities,<br />

such as not using inappropri<strong>at</strong>e m<strong>at</strong>erial<br />

(e.g. plastic bags, plastic novelties) <strong>for</strong><br />

promotional items<br />

1 Developing a WMP<br />

4 Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

5 Reporting <strong>and</strong> evalu<strong>at</strong>ion


THE GUIDELINE<br />

AND TOOLS<br />

7<br />

ROLES AND RESPONSIBILITIES<br />

WHO RESPONSIBILITIES STEP<br />

Vendors<br />

• Can produce large quantities of <strong>waste</strong><br />

1 Developing a WMP<br />

• Commercial food <strong>and</strong><br />

in setting up <strong>and</strong> taking down vending<br />

2 Gaining commitment<br />

beverage vendors<br />

equipment or other m<strong>at</strong>erials, <strong>and</strong> in<br />

3 Providing infrastructure<br />

• Associ<strong>at</strong>ions/clubs selling<br />

preparing food items<br />

4 Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

food <strong>and</strong> beverage as a<br />

• Should be in<strong>for</strong>med of their <strong>waste</strong><br />

5 Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

fundraising venture<br />

minimis<strong>at</strong>ion <strong>and</strong> recycling responsibilities<br />

• Trade displays <strong>and</strong><br />

in line with the WMP<br />

stall holders<br />

• Should actively implement the WMP <strong>and</strong><br />

use facilities provided <strong>for</strong> <strong>waste</strong> reduction,<br />

recycling <strong>and</strong> composting where applicable<br />

• May choose or be required to provide<br />

more environmentally friendly food <strong>and</strong><br />

Service contractors<br />

• Suppliers of power,<br />

beverage packaging<br />

• Building <strong>and</strong> dismantling infrastructure<br />

may cre<strong>at</strong>e significant amounts of <strong>waste</strong><br />

1 Developing a WMP<br />

2 Gaining commitment<br />

STEP<br />

fencing, marquees,<br />

• Should be aware of their <strong>waste</strong><br />

3 Providing infrastructure<br />

portable toilets etc<br />

minimis<strong>at</strong>ion <strong>and</strong> recycling responsibilities<br />

5 Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

in line with the WMP<br />

• Should be aware of <strong>and</strong> appropri<strong>at</strong>ely use<br />

disposal <strong>and</strong> recycling facilities available<br />

<strong>Waste</strong> management service<br />

• Should be willing <strong>and</strong> able to collect<br />

1 Developing a WMP<br />

providers<br />

different <strong>waste</strong> streams<br />

2 Gaining commitment<br />

• Contractors responsible<br />

• Should be consulted on developing<br />

3 Providing infrastructure<br />

<strong>for</strong> removing <strong>waste</strong> <strong>and</strong><br />

specific requirements in the WMP be<strong>for</strong>e<br />

5 Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

recyclables from an event<br />

the event<br />

or venue<br />

• Should be seen as an integral part of the<br />

<strong>waste</strong> minimis<strong>at</strong>ion <strong>and</strong> recycling ef<strong>for</strong>ts <strong>at</strong><br />

an event or venue<br />

‘Green police’<br />

• Educ<strong>at</strong>e p<strong>at</strong>rons <strong>and</strong> vendors<br />

2 Gaining commitment<br />

• Event organising staff<br />

• Guide p<strong>at</strong>rons <strong>and</strong> vendors on correct use<br />

4 Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

• Venue staff<br />

of <strong>waste</strong> <strong>and</strong> recycling facilities<br />

• Volunteers<br />

• Ensure vendors are adhering to applicable<br />

contract clauses – particularly important<br />

back of house<br />

• Ensure <strong>waste</strong> service providers are<br />

adhering to applicable contract clauses


8<br />

STEP 1.<br />

THE WASTE<br />

MANAGEMENT PLAN<br />

STEP<br />

1.1 GET STARTED<br />

A <strong>waste</strong> management plan is a simple <strong>and</strong><br />

effective means to minimising <strong>waste</strong> gener<strong>at</strong>ion<br />

<strong>at</strong> an event or fixed venue. The process can<br />

bring together all the necessary in<strong>for</strong>m<strong>at</strong>ion<br />

<strong>for</strong> establishing a coordin<strong>at</strong>ed approach to<br />

<strong>waste</strong> management including planning, doing,<br />

checking <strong>and</strong> taking corrective action, when<br />

<strong>and</strong> where necessary.<br />

A WMP can be as detailed as necessary. You might<br />

need only four actions to reduce <strong>waste</strong>; you might<br />

need many more. Keep things clear <strong>and</strong> concise so<br />

th<strong>at</strong> everyone who needs to, can underst<strong>and</strong> each<br />

action <strong>and</strong> implement it.<br />

The first step is to list everyone who will impact on<br />

<strong>waste</strong> reduction:<br />

> event organising committee<br />

> venue management team<br />

> vendors (including food <strong>and</strong> drink vendors)<br />

> event or venue service providers (businesses<br />

supplying fencing, portable toilets, power supply)<br />

> <strong>waste</strong> management providers (including cleaning<br />

<strong>and</strong> <strong>waste</strong> contractors)<br />

> event or venue support staff<br />

> site owners.<br />

They must all be committed to implementing <strong>waste</strong><br />

minimis<strong>at</strong>ion measures so talk to them <strong>and</strong> get their<br />

input on their area of impact <strong>and</strong> expertise. Include<br />

them as much as possible in the development of the<br />

WMP. Some might make their best contribution as<br />

members of your <strong>waste</strong> management committee,<br />

which could be <strong>for</strong>med to develop the WMP <strong>and</strong><br />

oversee its delivery.<br />

A good WMP is easy to underst<strong>and</strong> <strong>and</strong> has clear<br />

responsibilities assigned with timeframes <strong>for</strong><br />

completing actions. It will help everyone focus on their<br />

part in achieving success. The blank WMP templ<strong>at</strong>e<br />

(Attachment A, p27) can be modified <strong>for</strong> your event’s<br />

specific needs. Attachment B (p29) has a simple WMP<br />

<strong>for</strong> an example event. But be<strong>for</strong>e you can fill yours in<br />

you need to do some homework.<br />

1.2 IDENTIFY BARRIERS AND DRIVERS<br />

TO CHANGE – SWOT ANALYSIS<br />

Identify <strong>and</strong> record the reasons why you want to<br />

improve <strong>waste</strong> management <strong>at</strong> your event or<br />

venue, <strong>and</strong> issues th<strong>at</strong> might prevent or obstruct<br />

your <strong>waste</strong> management ef<strong>for</strong>ts (see the table<br />

below <strong>for</strong> common examples).<br />

Common drivers <strong>and</strong> barriers to <strong>waste</strong> management success<br />

DRIVERS<br />

• Customers are requesting ‘green’ options <strong>for</strong> their <strong>events</strong> or functions<br />

• Event or venue management is now more environmentally aware<br />

<strong>and</strong> wants environmental improvement<br />

• Attracting ‘green’ customers could give you a competitive advantage<br />

• Improvements can be used <strong>for</strong> positive marketing<br />

• Y ou need to meet contract clauses or policies <strong>for</strong> increasing reuse<br />

<strong>and</strong> recycling of <strong>waste</strong><br />

BARRIERS<br />

• Time poor<br />

• Cost prohibitive<br />

• Space <strong>for</strong> extra bins is an issue<br />

• Management doesn’t<br />

support <strong>waste</strong> management<br />

improvements<br />

• Customers are not dem<strong>and</strong>ing<br />

‘green’ options


STEP 1.<br />

THE WASTE<br />

MANAGEMENT PLAN<br />

9<br />

The simple <strong>and</strong> effective strengths, weaknesses,<br />

opportunities <strong>and</strong> thre<strong>at</strong>s (SWOT) analysis technique<br />

(see templ<strong>at</strong>e in Attachment C, p32) will help identify<br />

the drivers <strong>and</strong> barriers unique to your situ<strong>at</strong>ion.<br />

Include as many identified key stakeholders as<br />

possible, <strong>and</strong> set aside some time to work through<br />

it as a group. It is a gre<strong>at</strong> way to build agreement<br />

<strong>and</strong> underst<strong>and</strong>ing of the issues, <strong>and</strong> will improve<br />

efficiencies <strong>and</strong> the overall success of your <strong>waste</strong><br />

management approach. The long-term benefits will<br />

make the time <strong>and</strong> ef<strong>for</strong>t worthwhile.<br />

Feed your identified drivers <strong>and</strong> barriers into your<br />

options <strong>for</strong> improvement (see below).<br />

1.3 ASSESS WASTE GENERATION<br />

AND DISPO<strong>SA</strong>L<br />

Many activities during the course of an event gener<strong>at</strong>e<br />

<strong>waste</strong> <strong>and</strong> much of it can be separ<strong>at</strong>ed into different<br />

‘<strong>waste</strong> <strong>and</strong> recycling streams’. Often the biggest<br />

opportunities <strong>for</strong> improving <strong>waste</strong> management are<br />

wrapped around usable items.<br />

HINT<br />

ASK YOUR WASTE CONTRACTOR TO<br />

HELP YOU IDENTIFY EXPECTED<br />

WASTE STREAMS:<br />

> Can they tell you how much <strong>waste</strong><br />

was sent to l<strong>and</strong>fill from a previous<br />

or similar event?<br />

> Do they remember wh<strong>at</strong> the main<br />

<strong>waste</strong> streams were?<br />

If your <strong>waste</strong> contractor cannot help<br />

you, try previous staff, vendors or<br />

p<strong>at</strong>rons <strong>for</strong> anecdotal evidence.<br />

e.g. an event with many stallholders who set up<br />

<strong>and</strong> take down exhibits will produce large<br />

amounts of packaging <strong>waste</strong> such as paper/<br />

cardboard, plastics <strong>and</strong> wood <strong>waste</strong><br />

e.g. vendors <strong>and</strong> c<strong>at</strong>erers might use large<br />

quantities of cardboard <strong>and</strong> plastic wrapping<br />

to protect their property during transport<br />

or they might use many plastic cups <strong>and</strong><br />

glass bottles<br />

e.g. an event which includes animals will produce<br />

large quantities of food/green <strong>waste</strong>.<br />

Start by taking a (real or virtual) ‘walk through’ of all<br />

areas of an event or venue to familiarise yourself with<br />

the site. Get as much in<strong>for</strong>m<strong>at</strong>ion as possible <strong>and</strong> detail:<br />

> the activities th<strong>at</strong> will be part of the event, <strong>and</strong> the<br />

<strong>waste</strong> types they’ll probably produce<br />

> the types of m<strong>at</strong>erials produced or likely to be<br />

produced<br />

> the estim<strong>at</strong>ed amount of each type of m<strong>at</strong>erial<br />

> how the different streams produced are currently<br />

collected <strong>and</strong> managed/intended to be managed.<br />

You’ll find a simple <strong>waste</strong> assessment templ<strong>at</strong>e in<br />

Attachment D (p33).<br />

STEP


10<br />

STEP 1.<br />

THE WASTE<br />

MANAGEMENT PLAN<br />

1.4 IDENTIFY OPTIONS FOR IMPROVEMENT – WASTE STREAM MANAGEMENT<br />

Now th<strong>at</strong> you have a picture of the <strong>waste</strong>, put your thoughts to avoiding, reducing, reusing <strong>and</strong> recycling (see the<br />

<strong>Waste</strong> Management Hierarchy inside the front cover) your identified <strong>waste</strong> types. Consider the simple questions<br />

below.<br />

Applying the <strong>Waste</strong> Management Hierarchy<br />

CAN YOU . . .<br />

AVOID some <strong>waste</strong>?<br />

ASK YOURSELF<br />

Do you really need th<strong>at</strong> item or can you elimin<strong>at</strong>e it altogether?<br />

e.g. Can cold drinks be served in original packaging like bottles or<br />

cans instead of in cups?<br />

STEP<br />

REDUCE the <strong>waste</strong> gener<strong>at</strong>ed by<br />

substituting ‘green’ items th<strong>at</strong> can be<br />

recycled or composted?<br />

REUSE some m<strong>at</strong>erials?<br />

Is there a ‘greener’ way to provide items to consumers <strong>and</strong> p<strong>at</strong>rons?<br />

e.g. At a fete or fair, can you supply items in recycled paper bags<br />

or without bags instead of in plastic? Can you choose food<br />

th<strong>at</strong> requires no wrapping or packaging such as a sausage in<br />

bread held by a serviette?<br />

Can you reuse m<strong>at</strong>erials, signs, packaging, marketing or other<br />

infrastructure <strong>at</strong> future <strong>events</strong>?<br />

e.g. Can you use <strong>and</strong> wash ‘proper’ cutlery <strong>and</strong> crockery instead<br />

of disposables? Can stallholders take home m<strong>at</strong>erials they<br />

bring in <strong>and</strong> use them <strong>at</strong> other <strong>events</strong>?<br />

RECYCLE even more m<strong>at</strong>erial?<br />

Can some items be made into something else or recycled or by a<br />

suitable <strong>waste</strong> contractor?<br />

eg. Paper <strong>and</strong> cardboard can easily be separ<strong>at</strong>ed using special<br />

bins <strong>and</strong> sent <strong>for</strong> recycling. In South Australia bottles, cans<br />

<strong>and</strong> other refund items are easy to separ<strong>at</strong>e <strong>and</strong> recycle. And<br />

you can make some money!<br />

COMPOST some or more of the<br />

m<strong>at</strong>erial produced?<br />

Could some <strong>waste</strong> items make gre<strong>at</strong> compost <strong>for</strong> the garden?<br />

eg. Food scraps, paper pl<strong>at</strong>es <strong>and</strong> cups, wooden cutlery, special<br />

cornstarch or polylactic acid (PLA) cups are all made of<br />

organic m<strong>at</strong>ter <strong>and</strong> can be composted <strong>for</strong> gardens.<br />

Finding the answers to these questions might seem difficult <strong>at</strong> first but it doesn’t need to be. Remember to talk<br />

to the people who know – staff, contractors, vendors <strong>and</strong> c<strong>at</strong>erers. Discuss each area of the event or venue so<br />

th<strong>at</strong> you have as much ‘on-ground’ in<strong>for</strong>m<strong>at</strong>ion as possible.<br />

The h<strong>and</strong>y how-to guide <strong>for</strong> <strong>waste</strong> streams (Attachment E, p34) details a range of different <strong>waste</strong> items <strong>and</strong><br />

altern<strong>at</strong>ives to avoid, reduce, reuse, recycle or compost.


STEP 1.<br />

THE WASTE<br />

MANAGEMENT PLAN<br />

11<br />

1.5 SET GOALS AND TARGETS<br />

The in<strong>for</strong>m<strong>at</strong>ion you have g<strong>at</strong>hered on drivers <strong>and</strong> barriers, on the<br />

<strong>waste</strong> situ<strong>at</strong>ion <strong>and</strong> on your options <strong>for</strong> improvement can now be<br />

consolid<strong>at</strong>ed into goals <strong>for</strong> <strong>waste</strong> management. Firm goals allow you<br />

to set actions <strong>for</strong> achieving them <strong>and</strong>, after it’s all over, review your<br />

per<strong>for</strong>mance against them to assess your success. Goals need to be<br />

simple, measurable, achievable, realistic <strong>and</strong> time based (‘SMART’)<br />

<strong>and</strong> all stakeholders need to know about them.<br />

Setting ‘SMART’ goals<br />

GOAL<br />

SIMPLE<br />

ASK YOURSELF<br />

> Is the goal/target well defined?<br />

> Is it clear to anyone who has a basic knowledge of the project?<br />

MEASURABLE<br />

ACHIEVABLE<br />

> Do you know how far away completion is?<br />

> Will you know when it has been achieved?<br />

> Are the resources available to achieve your goal?<br />

> Are there limited obstacles?<br />

STEP<br />

REALISTIC<br />

> Is the goal within the availability of resources, knowledge <strong>and</strong> time?<br />

TIME BASED<br />

Record your defined goals<br />

next to your options <strong>for</strong><br />

improvement on the templ<strong>at</strong>e<br />

in Attachment F (p36). If some<br />

options don’t seem to fit your<br />

goals, keep them aside <strong>for</strong> when<br />

you have extra time or resources<br />

to include them.<br />

> Do you have enough time to achieve the goal?<br />

> Is there a measurable component so you can determine if <strong>and</strong><br />

when you have achieved your goal(s)?<br />

HINT<br />

SOME STANDARD WASTE MANAGEMENT GOAL AND TARGET<br />

EXAMPLES MIGHT BE:<br />

> Reduce the amount of <strong>waste</strong> sent to l<strong>and</strong>fill by 20%<br />

(based on previous years or st<strong>and</strong>ard level)<br />

> Increase the amount of recycled m<strong>at</strong>erial (by either tonnage or %)<br />

collected (based on previous or st<strong>and</strong>ard level)<br />

> Increase the proportion of recycling bins to general <strong>waste</strong> bins<br />

> Become a recognised leader in running a green event/venue<br />

> Minimise contamin<strong>at</strong>ion of recycling <strong>and</strong>/or composting bins<br />

(based on previous or st<strong>and</strong>ard level)<br />

> Install systems to collect food <strong>waste</strong> <strong>for</strong> composting by a certain d<strong>at</strong>e


12<br />

STEP 1.<br />

THE WASTE<br />

MANAGEMENT PLAN<br />

1.6 DEVELOP ACTIONS<br />

Actions speak louder than words <strong>and</strong> your goals<br />

will not be met without clearly defined actions with<br />

alloc<strong>at</strong>ed responsibilities <strong>and</strong> timelines.<br />

STEP<br />

Some actions will depend on others being completed.<br />

For example you would only provide compostable bins<br />

if you had a clear action to in<strong>for</strong>m your c<strong>at</strong>erers th<strong>at</strong><br />

all biodegradable m<strong>at</strong>erial is to go in the compostable<br />

bin. Staff training in<strong>for</strong>m<strong>at</strong>ion about <strong>waste</strong> minimis<strong>at</strong>ion<br />

measures can’t be developed until you have decided<br />

on the <strong>waste</strong> separ<strong>at</strong>ion measures th<strong>at</strong> are to be<br />

employed. Complete this in<strong>for</strong>m<strong>at</strong>ion using the <strong>waste</strong><br />

management plan templ<strong>at</strong>e (Attachment A, p27).<br />

Some actions might be on the ground; some might be<br />

in preparing contracts or researching possibilities.<br />

e.g. Include conditions <strong>and</strong> restrictions in the<br />

vendor, <strong>waste</strong> service provider, c<strong>at</strong>erer or<br />

cleaner agreements (see wording examples<br />

in Attachment G, p37).<br />

e.g. Find recyclable <strong>and</strong> compostable options <strong>for</strong><br />

packaging items.<br />

e.g. Ask vendors <strong>and</strong> participants <strong>at</strong> your<br />

conference to produce items electronically <strong>for</strong><br />

download or in a more <strong>waste</strong>-wise way. For<br />

example, no plastic covers or binders simplifies<br />

paper recycling <strong>and</strong> elimin<strong>at</strong>es plastic <strong>waste</strong>.<br />

e.g. Arrange <strong>for</strong> the wood, plastic, paper, cardboard<br />

<strong>and</strong> metal <strong>waste</strong> produced during stall set-up<br />

<strong>and</strong> pull-down (or bump-in <strong>and</strong> bump-out) <strong>at</strong><br />

exhibitions or fairs to be source separ<strong>at</strong>ed into<br />

different bins or collections points if you have<br />

room <strong>and</strong> the staff available to assist.<br />

e.g. Arrange <strong>for</strong> your <strong>waste</strong> service provider to<br />

collect large amounts of recyclables in one bin<br />

or collection area <strong>for</strong> sorting <strong>at</strong> their depot or<br />

transfer facility.<br />

HINT<br />

ENSURE THERE ARE ACTIONS IN ALL KEY<br />

AREAS OF WASTE MANAGEMENT:<br />

> Gaining commitment<br />

> Providing infrastructure<br />

> Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

> Reporting <strong>and</strong> evalu<strong>at</strong>ion.<br />

Too much emphasis on any one area could<br />

hamper overall success. For example, all<br />

the commitment you could want won’t help<br />

without contractors <strong>and</strong> p<strong>at</strong>rons knowing<br />

the correct action to take.<br />

Now you have a plan:<br />

time to put it into practice.


STEP 2. GAINING<br />

COMMITMENT<br />

13<br />

2.1 INFORMAL<br />

Any number of sponsors, staff, contractors,<br />

c<strong>at</strong>erers, <strong>and</strong> food <strong>and</strong> beverage vendors could be<br />

involved in your event or venue.<br />

They need to be aware of the goals <strong>and</strong> actions <strong>for</strong><br />

<strong>waste</strong> management if they are to underst<strong>and</strong> <strong>and</strong><br />

support you. The best way to gain commitment is to<br />

encourage them to join your planning stages. If they<br />

help develop the <strong>waste</strong> management plan, they are<br />

more likely to take the necessary actions. Continue to<br />

keep them in<strong>for</strong>med about any decisions <strong>and</strong> policies<br />

made along the way.<br />

The support of the event or venue owner is also<br />

critical. Encourage them to see <strong>waste</strong> minimis<strong>at</strong>ion as<br />

valuable both economically <strong>and</strong> environmentally. For<br />

fixed <strong>venues</strong>, in particular, a reduction in the amount<br />

of <strong>waste</strong> sent to l<strong>and</strong>fill on an ongoing basis may be<br />

a financial incentive. As l<strong>and</strong>fill charges continue to<br />

increase, their <strong>waste</strong> costs could be reduced over time.<br />

2.2 FORMAL<br />

If the WMP has been developed be<strong>for</strong>e engaging<br />

a service provider, ensure any prospective service<br />

provider underst<strong>and</strong>s the plan <strong>and</strong> your goals, <strong>and</strong><br />

is committed to them. Tenders <strong>for</strong> service could<br />

specifically request in<strong>for</strong>m<strong>at</strong>ion in quotes <strong>and</strong><br />

proposals th<strong>at</strong> demonstr<strong>at</strong>e a service provider’s<br />

commitment to the plan, <strong>and</strong> the methods they will<br />

employ to achieve the goals within it. This will also<br />

help to ensure they have the capacity to achieve the<br />

goals you have set.<br />

2.3 CONTRACT AND TENDER CLAUSES<br />

The example contract <strong>and</strong> tender clauses in<br />

Attachment G (p37) can guide event <strong>and</strong> venue<br />

managers, <strong>waste</strong> contractors, service providers<br />

<strong>and</strong> vendors in the area of <strong>waste</strong> minimis<strong>at</strong>ion.<br />

They do not constitute a complete set of contract<br />

or tender clauses <strong>for</strong> all <strong>events</strong>, <strong>venues</strong> or sets of<br />

circumstances. R<strong>at</strong>her, they are a starting point<br />

<strong>for</strong> developing specific clauses or wording <strong>for</strong><br />

agreements between the parties.<br />

The examples cover:<br />

> Requests <strong>for</strong> tender – <strong>waste</strong> contracts<br />

> Requests <strong>for</strong> tender – c<strong>at</strong>erers/cleaners<br />

or other service providers<br />

> <strong>Waste</strong> target clause<br />

> <strong>Waste</strong> collection monitoring clause<br />

> <strong>Waste</strong> management system –<br />

conference/exhibition<br />

> Vendor/stallholder oblig<strong>at</strong>ions –<br />

conference/exhibition<br />

> Educ<strong>at</strong>ion <strong>and</strong> training<br />

> Food <strong>and</strong> beverage vendor agreements/clauses.<br />

STEP<br />

Another <strong>for</strong>mal way to ensure commitment is by<br />

including contractual arrangements in service<br />

contracts <strong>and</strong> agreements. A short clause can be<br />

written into inclusion contracts requiring service<br />

providers <strong>and</strong> vendors to supply m<strong>at</strong>erials <strong>and</strong> follow<br />

procedures in line with the WMP <strong>and</strong> this guideline.


14<br />

STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

STEP<br />

Now to the bins <strong>and</strong> signs – the front line of sorting<br />

<strong>waste</strong> <strong>at</strong> <strong>events</strong> <strong>and</strong> <strong>venues</strong> <strong>at</strong> both front<br />

of house <strong>and</strong> back of house.<br />

Take the time to work out the right options <strong>for</strong> bin<br />

numbers, <strong>and</strong> their system <strong>and</strong> placement, <strong>for</strong> your<br />

event. Below are a few simple consider<strong>at</strong>ions.<br />

How many bins?<br />

Each event will have different <strong>waste</strong> <strong>and</strong> recycling<br />

streams depending on the type, size, theme <strong>and</strong><br />

loc<strong>at</strong>ion of the event. It’s up to you to determine<br />

how many different bins you will need. Talk about<br />

the <strong>waste</strong>/recycling items you expect to gener<strong>at</strong>e<br />

<strong>at</strong> your event with some or all of the vendors, event<br />

organisers, sponsors, <strong>waste</strong>/recycling contractors<br />

<strong>and</strong> c<strong>at</strong>erers.<br />

3.1 BIN SIGNAGE AND COLOUR<br />

STANDARDS<br />

<strong>Waste</strong> streams <strong>and</strong> their associ<strong>at</strong>ed bin <strong>and</strong> lid/<br />

signage colours (based on Australian St<strong>and</strong>ard<br />

(AS 4123.7-2006): Mobile <strong>Waste</strong> Containers Part 7:<br />

Colours, Markings <strong>and</strong> Design<strong>at</strong>ion Requirements) are<br />

shown on the following pages. Adherence to these<br />

colours <strong>and</strong> markings sends consistent messages <strong>at</strong><br />

<strong>events</strong> <strong>and</strong> <strong>venues</strong> across South Australia, increases<br />

awareness <strong>and</strong> recognition by both the general public<br />

<strong>and</strong> <strong>waste</strong> <strong>and</strong>/or cleaning contractors. It improves<br />

use of the system <strong>and</strong> there<strong>for</strong>e minimises the amount<br />

of <strong>waste</strong> sent to l<strong>and</strong>fill.<br />

Ensure signage is clear <strong>and</strong> highly visible – on the<br />

bins, on the lids of bins <strong>and</strong>, if possible, above the bin.<br />

Where will the m<strong>at</strong>erials end up?<br />

Determine where the <strong>waste</strong>/recycling will be taken<br />

to (e.g. <strong>waste</strong> <strong>and</strong> recycling facilities, Scouts,<br />

commercial composters) <strong>and</strong> then discuss which bin<br />

configur<strong>at</strong>ions to use (e.g. a 2-bin system of cans <strong>and</strong><br />

bottles <strong>and</strong> general <strong>waste</strong> or a 3-bin system of cans<br />

<strong>and</strong> bottles, general <strong>waste</strong> <strong>and</strong> compostables). The<br />

combin<strong>at</strong>ion of bins in p<strong>at</strong>ron areas can be different to<br />

the bins in back of house areas.<br />

Is the signage <strong>and</strong> system clear?<br />

Clear signage <strong>for</strong> bins using a combin<strong>at</strong>ion of words<br />

<strong>and</strong> images can make all the difference to the success<br />

of your <strong>waste</strong> management system.<br />

A range of bin signage options is available <strong>for</strong><br />

download <strong>and</strong> use from the <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> website <strong>at</strong><br />

www.zero<strong>waste</strong>.sa.gov.au. When printing signage <strong>for</strong><br />

use, consider where the bins will be loc<strong>at</strong>ed. Do you<br />

need to have signs professionally printed on canvas<br />

stickers so th<strong>at</strong> they can withst<strong>and</strong> harsh we<strong>at</strong>her<br />

conditions or have an extended life? Can you print<br />

signs yourself <strong>and</strong> lamin<strong>at</strong>e the copies <strong>for</strong> <strong>at</strong>tachment<br />

on your bins? Do you need to resize signs to fit the side<br />

<strong>and</strong> lids of the bins you will be using?<br />

Use of the suggested signage will help to st<strong>and</strong>ardise<br />

<strong>waste</strong> <strong>and</strong> recycling signage across South Australia to<br />

help everyone to make positive behaviour changes.<br />

The following pages show common examples <strong>for</strong><br />

both front of house <strong>and</strong> back of house areas. The<br />

configur<strong>at</strong>ion possibilities are many but keep it as<br />

simple as possible so p<strong>at</strong>rons, cleaners <strong>and</strong> anyone<br />

else who has to use the system can follow it.


STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

15<br />

BIN SIGNAGE AND COLOUR STANDARDS<br />

Drink Bottles,<br />

Cans <strong>and</strong> Cartons<br />

St<strong>and</strong>ard bin <strong>and</strong> lid/signage colours<br />

(download from www.zero<strong>waste</strong>.sa.gov.au)<br />

Bin lid – yellow 108<br />

Compostables<br />

Bin body<br />

dark green or black<br />

Bin lid – green 802<br />

Drink Bottles,<br />

Cans <strong>and</strong> Cartons<br />

STEP<br />

Bin body<br />

dark green or black<br />

Compostables<br />

Bin lid – red 032<br />

Bin body<br />

dark green or black<br />

General <strong>Waste</strong>


16<br />

STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

BIN SIGNAGE AND COLOUR STANDARDS<br />

Mixed Recycling<br />

St<strong>and</strong>ard bin <strong>and</strong> lid/signage colours<br />

(download from www.zero<strong>waste</strong>.sa.gov.au)<br />

Bin lid – yellow 108<br />

Bin body<br />

dark green or black<br />

Mixed Recycling<br />

STEP<br />

Food <strong>Waste</strong> Only<br />

Bin lid – burgundy 1805<br />

Bin body<br />

dark green or black<br />

Food <strong>Waste</strong> Only<br />

Paper & Cardboard<br />

Bin lid – process blue<br />

Bin body<br />

dark green or black<br />

Paper & Cardboard


STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

17<br />

BIN SIGNAGE AND COLOUR STANDARDS<br />

Plastics<br />

St<strong>and</strong>ard bin <strong>and</strong> lid/signage colours<br />

(download from www.zero<strong>waste</strong>.sa.gov.au)<br />

Bin lid – orange 1655<br />

Bin body<br />

dark green or black<br />

Plastics<br />

Mixed Glass Bottles<br />

Bin lid – yellow 108<br />

STEP<br />

Bin body<br />

dark green or black<br />

Mixed Glass<br />

Bottles<br />

Other images can be downloaded from<br />

www.zero<strong>waste</strong>.sa.gov.au


18<br />

STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

3.2 CHOOSING YOUR INFRASTRUCTURE<br />

Base your decision about the <strong>waste</strong> streams you will<br />

separ<strong>at</strong>e, <strong>and</strong> there<strong>for</strong>e the types of bins you will need<br />

<strong>at</strong> your event or venue, on your:<br />

> expected <strong>waste</strong> streams<br />

> options <strong>for</strong> improvement<br />

> <strong>waste</strong> management improvement goals.<br />

th<strong>at</strong> co-loc<strong>at</strong>ing all bins minimises contamin<strong>at</strong>ion<br />

r<strong>at</strong>es. A recycling bin on its own has a much higher<br />

chance of contamin<strong>at</strong>ion than the same bin coloc<strong>at</strong>ed<br />

with a general <strong>waste</strong> bin. People can place<br />

items they are unsure about in the general <strong>waste</strong> bin<br />

<strong>and</strong> contamin<strong>at</strong>ion in the recycling stream will be<br />

minimised. Anecdotal evidence also suggests less<br />

contamin<strong>at</strong>ion in bins placed side-by-side than in<br />

those set back-to-back.<br />

STEP<br />

Determine the best configur<strong>at</strong>ions <strong>for</strong> both front of<br />

house <strong>and</strong> back of house.<br />

3.3 FRONT OF HOUSE<br />

Structure<br />

You might already have bins th<strong>at</strong> can be easily modified<br />

using the signage available from the <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong><br />

website, or you may need to purchase or hire new bins;<br />

your <strong>waste</strong> contractor may provide bins as part of their<br />

service. Wh<strong>at</strong>ever the case, make sure the bins are<br />

structurally sound <strong>and</strong> easy to use <strong>and</strong> see, even from<br />

a reasonable distance. The height of the bin itself or<br />

the use of overhead signage might be a consider<strong>at</strong>ion<br />

<strong>for</strong> large outdoor <strong>events</strong>. Bins should be easy to loc<strong>at</strong>e<br />

<strong>for</strong> p<strong>at</strong>rons <strong>and</strong> staff, <strong>and</strong> most importantly easy to use<br />

– no hard to use lids or openings!<br />

Place the <strong>waste</strong>-m<strong>at</strong>erial signs on the side <strong>and</strong> <strong>at</strong> the<br />

point of disposal (lid or opening) of each bin. You may<br />

even decide to use overhead signage or to have your<br />

entire bin in the colour of the intended <strong>waste</strong> stream<br />

to be deposited.<br />

Bin placement <strong>and</strong> service requirements<br />

Where more than one bin type will be provided, such<br />

as a general <strong>waste</strong> bin <strong>and</strong> a recycling bin, co-loc<strong>at</strong>e<br />

(loc<strong>at</strong>e together) all bin options. P<strong>at</strong>rons can assess<br />

the options <strong>and</strong> select the correct bin. Anecdotal<br />

evidence <strong>and</strong> <strong>waste</strong> st<strong>at</strong>istics from <strong>events</strong> suggests<br />

Think carefully about the actual loc<strong>at</strong>ion of bins. They<br />

should be easily accessible, highly visible <strong>and</strong> facing<br />

the flow of traffic through an area. Visibility is very<br />

important, particularly <strong>at</strong> night <strong>events</strong> or in darkly<br />

lit <strong>venues</strong>. Loc<strong>at</strong>e bins in well lit areas, or consider<br />

<strong>waste</strong> management needs when planning loc<strong>at</strong>ions<br />

of portable lighting.<br />

Estim<strong>at</strong>e when most m<strong>at</strong>erial will be gener<strong>at</strong>ed. Just<br />

be<strong>for</strong>e, during <strong>and</strong>/or just after main meal times are<br />

probably the best times <strong>for</strong> bins to be emptied or<br />

replaced – your event or venue remains clean <strong>and</strong><br />

tidy, <strong>and</strong> contamin<strong>at</strong>ion of <strong>waste</strong> streams is less likely.<br />

Frequent monitoring <strong>and</strong> servicing will help all bin<br />

options be available <strong>at</strong> any time. Volunteers or staff<br />

positioned <strong>at</strong> bin st<strong>at</strong>ions during periods of high use<br />

(e.g. meal times) can help with the correct separ<strong>at</strong>ion<br />

of <strong>waste</strong> or recycling items.<br />

If one bin becomes full in a co-loc<strong>at</strong>ed cluster of<br />

bins, people use the next available bin option, even<br />

if it is incorrect <strong>for</strong> the <strong>waste</strong>. They are unlikely to<br />

walk to another bin st<strong>at</strong>ion to find an empty <strong>waste</strong> or<br />

recycling bin.


STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

19<br />

POTENTIAL WASTE/<br />

RECYCLING STREAMS<br />

FRONT OF HOUSE SUGGESTED BIN CONFIGURATIONS<br />

• Large amounts of<br />

compostables including<br />

food <strong>waste</strong> <strong>and</strong><br />

compostable pl<strong>at</strong>es etc<br />

• Drink containers<br />

• All other <strong>waste</strong><br />

Compostables<br />

Drink Bottles,<br />

Cans <strong>and</strong> Cartons<br />

General <strong>Waste</strong><br />

• Large amounts of<br />

cardboard <strong>and</strong> paper<br />

• Drink containers<br />

• All other <strong>waste</strong> (suitable if<br />

not much food <strong>waste</strong> will<br />

be gener<strong>at</strong>ed <strong>at</strong> your event)<br />

• Many drink containers<br />

• All other <strong>waste</strong> (suitable if<br />

not much food <strong>waste</strong> or<br />

other recyclables will be<br />

gener<strong>at</strong>ed <strong>at</strong> your event)<br />

<strong>and</strong><br />

or<br />

Drink Bottles,<br />

Mixed Recycling Cans <strong>and</strong> Cartons<br />

Paper & Cardboard General <strong>Waste</strong><br />

Drink Bottles,<br />

Cans <strong>and</strong> Cartons<br />

General <strong>Waste</strong><br />

STEP<br />

HINT<br />

PLACE MORE BINS IN LOCATIONS WHERE MOST WASTE<br />

WILL BE GENERATED<br />

Think carefully about where people will congreg<strong>at</strong>e <strong>and</strong><br />

cre<strong>at</strong>e the <strong>waste</strong> streams expected <strong>at</strong> your event or venue:<br />

• Is it where food <strong>and</strong> drink is available <strong>for</strong> purchase<br />

<strong>and</strong>/or consumption?<br />

• Is it near the entrance <strong>and</strong> exit to the event?<br />

Use a map or plan of your event or venue to work it out.


20<br />

STEP 3.<br />

PROVIDING<br />

INFRASTRUCTURE<br />

STEP<br />

3.4 BACK OF HOUSE<br />

Structure<br />

Bin size <strong>and</strong> structure in kitchen <strong>and</strong> bar loc<strong>at</strong>ions<br />

may be restricted to the room you have available<br />

under benches or along walls. All users must<br />

underst<strong>and</strong> which <strong>waste</strong> stream belongs where.<br />

Minimise the risk of misuse <strong>and</strong> contamin<strong>at</strong>ion with<br />

good signage <strong>and</strong> staff training.<br />

In loading <strong>and</strong> unloading areas of larger <strong>venues</strong> or<br />

<strong>at</strong> outside <strong>events</strong>, you will most likely have room to<br />

place larger skip or roll-on roll-off bins <strong>for</strong> the <strong>waste</strong><br />

from front of house <strong>and</strong> back of house areas, ready<br />

<strong>for</strong> transfer to appropri<strong>at</strong>e <strong>waste</strong> or recycling facilities<br />

by staff or contractors. Clear signage <strong>and</strong> staff/vendor<br />

training will also be important here. Colour coding<br />

of the bins themselves is probably the best visual<br />

reminder <strong>for</strong> appropri<strong>at</strong>e <strong>waste</strong> separ<strong>at</strong>ion <strong>and</strong> will<br />

avoid frustr<strong>at</strong>ion <strong>and</strong>/or confusion <strong>for</strong> everyone.<br />

Occup<strong>at</strong>ional health <strong>and</strong> safety consider<strong>at</strong>ions must<br />

also in<strong>for</strong>m your decisions on bin size <strong>and</strong> loc<strong>at</strong>ion,<br />

particularly if <strong>waste</strong> is transferred from smaller to<br />

larger bins. Are steps or a bin lifter device required<br />

<strong>for</strong> example? Discuss these types of issues with your<br />

staff <strong>and</strong> with <strong>waste</strong> contractor or service providers,<br />

who may have access to this type of infrastructure.<br />

Bin placement <strong>and</strong> service requirements<br />

Estim<strong>at</strong>e the times when most <strong>waste</strong> will be gener<strong>at</strong>ed<br />

<strong>and</strong> your bins need emptying. Arrange appropri<strong>at</strong>e<br />

collection times with the <strong>waste</strong> service provider be<strong>for</strong>e<br />

the event. If access to the back of house area is<br />

restricted by size, design<strong>at</strong>e an area within or outside<br />

of the event venue <strong>for</strong> the bulk of the <strong>waste</strong> m<strong>at</strong>erial<br />

to be taken by appropri<strong>at</strong>e staff be<strong>for</strong>e removal.<br />

Make sure to arrange appropri<strong>at</strong>e collection times<br />

with appropri<strong>at</strong>e staff, the <strong>waste</strong> service provider<br />

or cleaning contractor be<strong>for</strong>e the event. Frequently<br />

monitor bins in case the estim<strong>at</strong>ed times prove<br />

incorrect <strong>and</strong> collection times need to be modified<br />

(see Step 5 Reporting <strong>and</strong> evalu<strong>at</strong>ion).<br />

At a large music event, <strong>at</strong>tempting to empty bins<br />

during major per<strong>for</strong>mances would cause crowd <strong>and</strong><br />

access problems. Empty bins immedi<strong>at</strong>ely be<strong>for</strong>e the<br />

crowd g<strong>at</strong>hers <strong>and</strong> as soon as it disperses to ensure<br />

maximum capacity in the bins during th<strong>at</strong> time. Make<br />

sure th<strong>at</strong> those responsible <strong>for</strong> emptying the bins are<br />

told about delays or changes to your program.<br />

BACK OF HOUSE SUGGESTED BIN CONFIGURATIONS<br />

Food <strong>Waste</strong> Only<br />

Plastics<br />

Mixed Glass<br />

Bottles Paper & Cardboard Mixed Recycling General <strong>Waste</strong>


STEP 4.<br />

EDUCATING AND<br />

MARKETING<br />

21<br />

4.1 STAFF AND VENDOR EDUCATION<br />

All staff <strong>and</strong> associ<strong>at</strong>ed personnel must underst<strong>and</strong><br />

why a WMP has been developed <strong>and</strong> their role in<br />

implementing it. Distribute a summary of the plan to<br />

everyone <strong>for</strong> their in<strong>for</strong>m<strong>at</strong>ion. Key points to include<br />

are ‘why we are reducing <strong>waste</strong> sent to l<strong>and</strong>fill’ <strong>and</strong><br />

‘how we are reducing <strong>waste</strong> sent to l<strong>and</strong>fill’.<br />

4.2 PATRON EDUCATING AND MARKETING<br />

Promotion can largely affect the success of <strong>waste</strong><br />

minimis<strong>at</strong>ion measures implemented. If people<br />

don’t know wh<strong>at</strong> you are trying to achieve <strong>and</strong><br />

why, they won’t change their behaviour. If they<br />

don’t underst<strong>and</strong> the different bin systems in<br />

place, how can they use them correctly?<br />

Suitable techniques to communic<strong>at</strong>e the important<br />

aspects of your WMP may include:<br />

> memos to staff<br />

> contractual oblig<strong>at</strong>ions referring to the WMP<br />

> briefing/training sessions<br />

> posters<br />

> signage<br />

> distribution of appropri<strong>at</strong>e <strong>waste</strong> management<br />

contacts <strong>for</strong> any questions.<br />

Give people this in<strong>for</strong>m<strong>at</strong>ion in simple, easy to<br />

underst<strong>and</strong> messages. Promote your ef<strong>for</strong>ts<br />

continuously leading up to <strong>and</strong> throughout your<br />

event or <strong>at</strong> your venue.<br />

STEP<br />

Gaining staff <strong>and</strong> vendor ownership of your goals<br />

will help to ensure your success. This is why key<br />

staff should help develop the WMP, particularly the<br />

alloc<strong>at</strong>ion of responsibilities <strong>and</strong> agreed timeframes<br />

<strong>for</strong> actions.<br />

Communic<strong>at</strong>ion is the key to their underst<strong>and</strong>ing of<br />

the goals <strong>and</strong> actions in the plan. If they underst<strong>and</strong><br />

wh<strong>at</strong> the event is trying to achieve, they are more<br />

likely to take action <strong>and</strong> put in the ef<strong>for</strong>t to achieve<br />

<strong>waste</strong> goals.<br />

HINT<br />

ENSURE EVENT STAFF UNDERSTAND AND ARE AWARE OF THE<br />

OPERATIONAL PROCEDURES<br />

Upd<strong>at</strong>e <strong>and</strong> educ<strong>at</strong>e staff about any changes to existing procedures through:<br />

> a brief staff training course<br />

> staff inductions<br />

> posters placed around back of house.<br />

Attachment H (p40) has examples of staff training posters <strong>and</strong> in<strong>for</strong>m<strong>at</strong>ion.


22<br />

STEP 4.<br />

EDUCATING AND<br />

MARKETING<br />

If the event or venue is aiming to reduce <strong>waste</strong> to<br />

l<strong>and</strong>fill, make sure th<strong>at</strong> aim is seen! And heard! Event<br />

organisers <strong>and</strong> venue managers can familiarise<br />

p<strong>at</strong>rons with <strong>waste</strong> minimis<strong>at</strong>ion <strong>and</strong> recycling be<strong>for</strong>e<br />

<strong>and</strong> after <strong>events</strong>, or continuously <strong>for</strong> a venue, by:<br />

STEP<br />

> advertising in newsletters, local newspapers <strong>and</strong><br />

circulars<br />

> using MC announcements to make p<strong>at</strong>rons<br />

aware of the <strong>waste</strong> system in place <strong>and</strong> your<br />

<strong>waste</strong> goals<br />

> issuing a media release or holding a media<br />

function<br />

> advertising on local television st<strong>at</strong>ions where<br />

available<br />

> gaining endorsement from a local celebrity,<br />

be<strong>for</strong>e <strong>and</strong> during the event.<br />

Tell p<strong>at</strong>rons your reasons <strong>for</strong> minimising <strong>waste</strong> going<br />

to l<strong>and</strong>fill <strong>and</strong> give them the appropri<strong>at</strong>e infrastructure<br />

to separ<strong>at</strong>e their <strong>waste</strong>. Make it easy <strong>for</strong> them to<br />

change their behaviour.<br />

Be cre<strong>at</strong>ive about the ways you promote your event or<br />

venue’s <strong>waste</strong> management system. Think outside the<br />

square to come up with some new <strong>and</strong> exciting ways<br />

to promote your <strong>waste</strong> messages.<br />

But remember, continuously<br />

monitor <strong>and</strong> make sure your<br />

systems are working. Your<br />

system must support your<br />

messages <strong>and</strong> vice versa.<br />

HINT<br />

A VARIETY OF TOOLS AND TECHNIQUES CAN BE USED TO<br />

PROMOTE WASTE MINIMI<strong>SA</strong>TION AND RECYCLING DURING<br />

AN EVENT OR CONTINUOUSLY AT A VENUE<br />

Some examples are:<br />

• signage <strong>and</strong> posters in areas of high visit<strong>at</strong>ion<br />

• PA/MC announcements<br />

• TV screen messages<br />

• advertising<br />

• volunteers spreading the word on the ground while<br />

monitoring <strong>and</strong> <strong>managing</strong> bin st<strong>at</strong>ions.


STEP 5.<br />

REPORTING AND<br />

EVALUATION<br />

23<br />

Reporting <strong>and</strong> evalu<strong>at</strong>ing your <strong>waste</strong><br />

minimis<strong>at</strong>ion actions <strong>and</strong> the success of your<br />

WMP are vital <strong>for</strong> continued success.<br />

Un<strong>for</strong>tun<strong>at</strong>ely, it is one of the last steps <strong>and</strong> so often does<br />

not have enough time, ef<strong>for</strong>t or emphasis alloc<strong>at</strong>ed to it.<br />

If in<strong>for</strong>m<strong>at</strong>ion is only anecdotal <strong>and</strong> not clearly recorded<br />

how will you really know wh<strong>at</strong> you have achieved?<br />

Reporting wh<strong>at</strong> you have learnt <strong>and</strong> achieved to your<br />

Board, sponsors, venue owners or event management<br />

(<strong>and</strong> p<strong>at</strong>rons if your event is annual or you manage<br />

a venue), will strengthen your case <strong>for</strong> continued<br />

alloc<strong>at</strong>ion of resources to <strong>waste</strong> management. It will<br />

also encourage alloc<strong>at</strong>ion of resources to future <strong>waste</strong><br />

minimis<strong>at</strong>ion projects or actions.<br />

5.1 TRACKING IMPROVEMENTS IN WASTE<br />

GENERATION AND DISPO<strong>SA</strong>L<br />

Measuring is a prerequisite to reporting. It allows<br />

you to know wh<strong>at</strong> has worked <strong>and</strong> wh<strong>at</strong> hasn’t.<br />

During your event, monitor how the <strong>waste</strong><br />

management system is functioning. Take note of the<br />

bins both front <strong>and</strong> back of house, have a look in<br />

them <strong>and</strong> ask the following questions:<br />

> Do they appear to contain the appropri<strong>at</strong>e<br />

m<strong>at</strong>erials/items?<br />

> Are they contamin<strong>at</strong>ed with other items th<strong>at</strong><br />

shouldn’t be in there?<br />

> If the system is not working as well anticip<strong>at</strong>ed,<br />

wh<strong>at</strong> might be the reasons?<br />

> Is the signage clear <strong>and</strong> easy to see?<br />

> Are the bins in suitable loc<strong>at</strong>ions?<br />

> Are c<strong>at</strong>erers <strong>and</strong> vendors acting in accordance<br />

with their verbal or contractual agreements?<br />

Note it down, suggest corrective action <strong>and</strong><br />

communic<strong>at</strong>e with them to make sure they are<br />

acting appropri<strong>at</strong>ely.<br />

A monitoring checklist templ<strong>at</strong>e is in<br />

Attachment I (p42).<br />

HINT<br />

SOME WASTE STREAMS MAY BE MEASURED IN DIFFERENT UNITS<br />

THE WASTE STREAM CONVERSION CHART (ATTACHMENT J, P43)<br />

MAY HELP YOU CONVERT KG TO M 3 AND VICE VER<strong>SA</strong>.<br />

5.2 SELF EVALUATION OF YOUR<br />

SUCCESS<br />

Ask yourself the following question:<br />

> Has the event or venue achieved its goals?<br />

If not, it should be possible to ascertain where things<br />

didn’t run to plan. Identify the successes <strong>and</strong> failures,<br />

learn <strong>and</strong> take corrective action <strong>for</strong> future <strong>events</strong>.<br />

> Were there things achieved th<strong>at</strong> weren’t<br />

planned <strong>for</strong>? How did these come about?<br />

Use the reporting <strong>and</strong> self evalu<strong>at</strong>ion templ<strong>at</strong>es in<br />

Attachments K (p44) <strong>and</strong> L (p45) to help you report<br />

your achievements <strong>and</strong> evalu<strong>at</strong>e your success.<br />

5.3 SHARING THE INFORMATION WITH<br />

INTERESTED PARTIES<br />

Document the <strong>waste</strong> management achievements<br />

<strong>for</strong> reporting <strong>and</strong> evalu<strong>at</strong>ion. New customers,<br />

contractors, staff, Board members <strong>and</strong> others can<br />

view where lessons have been learnt <strong>and</strong> how to be<br />

even more successful in the future.<br />

5.4 LEARNING FROM YOUR EXPERIENCES/<br />

CONTINUAL IMPROVEMENT<br />

Some actions may no longer be relevant; some new<br />

actions might be needed; some actions might need<br />

to be changed. The WMP should be flexible enough<br />

to accommod<strong>at</strong>e these changes. Regular reviews<br />

of progress towards the event’s or venue’s goals<br />

reveal which actions have been completed <strong>and</strong> wh<strong>at</strong><br />

still needs to be done. The <strong>waste</strong> management plan<br />

templ<strong>at</strong>e (Attachment A, p27) has a ‘st<strong>at</strong>us’ column<br />

<strong>for</strong> regular reviews.<br />

STEP


24<br />

EVEN MORE<br />

INFORMATION<br />

The <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> website<br />

www.zero<strong>waste</strong>.sa.gov.au has more in<strong>for</strong>m<strong>at</strong>ion<br />

on many aspects of <strong>waste</strong> management <strong>and</strong><br />

minimis<strong>at</strong>ion.<br />

There are a lot of resources out there th<strong>at</strong> can help<br />

you. The <strong>Waste</strong> Minimis<strong>at</strong>ion <strong>and</strong> Reduction Guide<br />

<strong>for</strong> the Retail Industry (see www.zero<strong>waste</strong>.sa.gov.au)<br />

may also have useful tips <strong>for</strong> your event or venue.<br />

Recycling loc<strong>at</strong>ions, <strong>waste</strong>/recycling services,<br />

cleaning contractors <strong>and</strong> biodegradable product<br />

suppliers can be found through a general internet<br />

search or the Yellow Pages.<br />

Make sure you talk to your existing <strong>waste</strong>/<br />

recycling contractor (if you have one).<br />

Don’t be afraid to ask them <strong>for</strong> further<br />

assistance. In some cases implementing<br />

<strong>waste</strong> minimis<strong>at</strong>ion measures may cost<br />

extra but remember to compare those<br />

costs with other service providers to find<br />

the best option <strong>for</strong> your situ<strong>at</strong>ion.


FREQUENTLY<br />

ASKED<br />

QUESTIONS<br />

25<br />

Where can I get bin signage from?<br />

Suggested bin signage is available <strong>for</strong> download<br />

<strong>and</strong> use from the <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> website:<br />

www.zero<strong>waste</strong>.sa.gov.au. Make your own signs to suit<br />

your unique situ<strong>at</strong>ion using the images on the website<br />

or make up your own. Always use the st<strong>and</strong>ard colour<br />

configur<strong>at</strong>ions <strong>and</strong> st<strong>and</strong>ard terms <strong>for</strong> <strong>waste</strong> streams to<br />

help staff, p<strong>at</strong>rons, vendors <strong>and</strong> contractors identify bins<br />

<strong>for</strong> source separ<strong>at</strong>ion.<br />

Where can I get bins from?<br />

Use bins th<strong>at</strong> you already have by simply adding the<br />

relevant signage <strong>for</strong> each <strong>waste</strong> stream. Or you could hire<br />

or purchase new or used bins from a number of sources:<br />

‘<strong>waste</strong> reduction <strong>and</strong> disposal services’ in the Yellow<br />

Pages, search ‘<strong>waste</strong> management’ on the internet.<br />

Does <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> have preferred suppliers?<br />

Any suppliers of food <strong>and</strong> beverage packaging should<br />

be able to supply biodegradable (compostable) or<br />

recyclable options. See ‘packaging m<strong>at</strong>erials’ in the<br />

Yellow Pages, or do a web search <strong>for</strong> ‘biodegradable<br />

packaging suppliers’.<br />

How much detail do I need to include<br />

in my WMP?<br />

A WMP can be as simple or as detailed as you decide.<br />

Make sure you set yourself SMART (simple, measurable,<br />

achievable, <strong>and</strong> realistic with a timeframe) goals <strong>and</strong><br />

appropri<strong>at</strong>e actions to achieve them. Alloc<strong>at</strong>e adequ<strong>at</strong>e<br />

resources (including staff or contractors) to carry out<br />

the actions. Review your progress with the <strong>waste</strong><br />

management d<strong>at</strong>a you have collected.<br />

How accur<strong>at</strong>e does my <strong>waste</strong> assessment<br />

have to be?<br />

Your <strong>waste</strong> assessment should be as accur<strong>at</strong>e as<br />

possible but does not need to be perfect. Identify all<br />

potential <strong>waste</strong>, <strong>and</strong> record actual or approxim<strong>at</strong>e<br />

amounts so th<strong>at</strong> appropri<strong>at</strong>e management <strong>and</strong><br />

minimis<strong>at</strong>ion measures can be determined.<br />

Wh<strong>at</strong> are the benefits of minimising <strong>waste</strong><br />

to l<strong>and</strong>fill?<br />

Minimising <strong>waste</strong> to l<strong>and</strong>fill conserves resources,<br />

reduces greenhouse gas emissions <strong>and</strong> increases<br />

environmental awareness by vendors <strong>and</strong> p<strong>at</strong>rons.<br />

More specifically, <strong>waste</strong> minimis<strong>at</strong>ion cre<strong>at</strong>es a very<br />

positive ‘green’ marketing tool <strong>for</strong> event organisers<br />

or venue management <strong>and</strong> could set you apart from<br />

your peers <strong>and</strong> competitors. The initial financial<br />

outlay to implement changes may be costly but <strong>for</strong><br />

a regular event or permanent venue, costs should<br />

reduce over time as you incorpor<strong>at</strong>e the <strong>waste</strong><br />

hierarchy into your oper<strong>at</strong>ions.<br />

How much will it cost?<br />

The cost of <strong>waste</strong> minimis<strong>at</strong>ion measures will depend<br />

on the goals you set yourself. A bin system with <strong>waste</strong><br />

separ<strong>at</strong>ion options, <strong>for</strong> example, can be expensive,<br />

but separ<strong>at</strong>ion of <strong>waste</strong> <strong>at</strong> source is the best way to<br />

ensure <strong>waste</strong> is ultim<strong>at</strong>ely diverted from l<strong>and</strong>fill <strong>and</strong><br />

you achieve your <strong>waste</strong> management goals.<br />

How important is it to use contract clauses <strong>for</strong><br />

<strong>waste</strong> management?<br />

Even with a good working rel<strong>at</strong>ionship with your clients<br />

or contractors, <strong>for</strong>malised <strong>waste</strong> minimis<strong>at</strong>ion measures<br />

<strong>and</strong> goals will help reduce errors or misunderst<strong>and</strong>ings.<br />

The examples in Attachment G (p37) can help <strong>for</strong>mul<strong>at</strong>e<br />

appropri<strong>at</strong>e agreements cooper<strong>at</strong>ively with your client<br />

or contractor, or prepare a proposed contract or tender<br />

document separ<strong>at</strong>ely <strong>for</strong> approval by your client or<br />

contractor.<br />

Do I need to use the same <strong>waste</strong> contractor I<br />

have always used?<br />

This is entirely your decision. Discuss your proposed<br />

approach to <strong>waste</strong> minimis<strong>at</strong>ion, your goals <strong>and</strong> how<br />

they could be achieved with your current contractor.<br />

If you are not s<strong>at</strong>isfied with their solutions, proposals<br />

or costing, request some in<strong>for</strong>m<strong>at</strong>ion <strong>and</strong> quotes from<br />

other service providers.<br />

STEP


26<br />

FREQUENTLY<br />

ASKED<br />

QUESTIONS<br />

I want to use food packaging m<strong>at</strong>erials th<strong>at</strong><br />

are biodegradable/compostable/degradable.<br />

Wh<strong>at</strong>’s the difference between them <strong>and</strong><br />

where can I get them?<br />

The glossary on page 47 has definitions of<br />

biodegradable, compostable <strong>and</strong> degradable. Make<br />

sure th<strong>at</strong> if you use biodegradable or compostable<br />

products, you talk it over with your suppliers <strong>and</strong><br />

commercial composting facility. Some products th<strong>at</strong><br />

claim to be biodegradable or compostable will require<br />

conditions of a commercial composting facility (<strong>and</strong><br />

won’t work in your own garden) but even then may<br />

take longer than expected.<br />

Try searching the internet or Yellow Pages <strong>for</strong><br />

‘packaging suppliers’ <strong>and</strong>/or ‘packaging m<strong>at</strong>erials’ <strong>for</strong><br />

other options.<br />

Which contractors provide composting<br />

services?<br />

If your event is small <strong>and</strong> the amount of compostable<br />

<strong>waste</strong> you produce is rel<strong>at</strong>ively small, you may be able<br />

to compost this m<strong>at</strong>erial yourself. For larger volumes,<br />

use a commercial composting company.<br />

Is there a st<strong>and</strong>ard <strong>for</strong> bin signage <strong>and</strong> colour?<br />

Step 3 on page 14 of this guideline details the colour<br />

<strong>and</strong> words to use <strong>for</strong> <strong>waste</strong> stream source separ<strong>at</strong>ion<br />

<strong>at</strong> both <strong>events</strong> <strong>and</strong> <strong>venues</strong>. Use the colours <strong>and</strong> words<br />

provided <strong>for</strong> consistency, or alter or cre<strong>at</strong>e individual<br />

images to suit your particular situ<strong>at</strong>ion.<br />

Do I need to report any in<strong>for</strong>m<strong>at</strong>ion to <strong>Zero</strong><br />

<strong>Waste</strong> <strong>SA</strong>?<br />

<strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> always likes to hear about any<br />

group or organis<strong>at</strong>ion th<strong>at</strong> has introduced <strong>waste</strong><br />

management initi<strong>at</strong>ives but there is no oblig<strong>at</strong>ion to<br />

report any in<strong>for</strong>m<strong>at</strong>ion about your event.<br />

Should we concentr<strong>at</strong>e our <strong>waste</strong> management<br />

ef<strong>for</strong>ts on front or back of house?<br />

Your completed <strong>waste</strong> assessment (Attachment D,<br />

p33), summarising all <strong>waste</strong> produced <strong>at</strong> your event or<br />

venue, will help you to focus your ef<strong>for</strong>ts on the areas<br />

with the best <strong>waste</strong> minimis<strong>at</strong>ion opportunities.<br />

Are there any grants available from <strong>Zero</strong> <strong>Waste</strong><br />

<strong>SA</strong> to assist me?<br />

<strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> is no longer providing grants to <strong>events</strong><br />

to implement <strong>waste</strong> minimis<strong>at</strong>ion measures. <strong>Waste</strong><br />

minimis<strong>at</strong>ion activites are now regarded as a st<strong>and</strong>ard<br />

oper<strong>at</strong>ional cost of running an environmentally<br />

responsible event.<br />

I tried this be<strong>for</strong>e <strong>and</strong> it didn’t work, how can I<br />

make sure things succeed this time?<br />

This guideline may help you do better this time. Each<br />

situ<strong>at</strong>ion is unique but we believe th<strong>at</strong> the ‘5 Steps to<br />

Success’ will give any event or venue the best possible<br />

chance to achieve its <strong>waste</strong> minimis<strong>at</strong>ion goals. Each<br />

step is equally important; give each one adequ<strong>at</strong>e time<br />

<strong>and</strong> thought to ensure success. Appropri<strong>at</strong>e planning,<br />

support <strong>and</strong> infrastructure will all help you achieve<br />

your goals, <strong>and</strong> continuous monitoring <strong>and</strong> review<br />

will help you identify any issues early <strong>and</strong> adjust your<br />

focus accordingly. Reporting back to stakeholders will<br />

help close the loop, improve their underst<strong>and</strong>ing <strong>and</strong><br />

commitment, <strong>and</strong> minimise <strong>waste</strong> even more next time!<br />

Who can help me?<br />

There are many websites <strong>and</strong> tools dedic<strong>at</strong>ed to<br />

green <strong>events</strong> <strong>and</strong> minimising <strong>waste</strong> <strong>at</strong> <strong>events</strong> <strong>and</strong><br />

public places. Some other useful links include:<br />

Department of Environment <strong>and</strong> Conserv<strong>at</strong>ion NSW<br />

www.environment.nsw.gov.au/<strong>waste</strong>wis<strong>events</strong>/<br />

Sustainability Victoria: <strong>Waste</strong> Wise Program<br />

www.sustainability.vic.gov.au<br />

Keep South Australia Beautiful<br />

www.kesab.asn.au


ATTACHMENT A<br />

WASTE MANAGEMENT<br />

PLAN TEMPLATE<br />

27<br />

For a completed example see Attachment B (p29).<br />

Event/venue_________________________<br />

D<strong>at</strong>e WMP drafted____________________<br />

Name_______________________________<br />

CURRENT SITUATION<br />

Briefly describe the current <strong>waste</strong> management<br />

situ<strong>at</strong>ion. Attach your <strong>waste</strong> assessment<br />

(Attachment D, p33) as supporting in<strong>for</strong>m<strong>at</strong>ion.<br />

OPTIONS FOR IMPROVEMENT<br />

Describe your options <strong>for</strong> improving <strong>waste</strong><br />

management. Use the h<strong>and</strong>y <strong>waste</strong> tips<br />

(Attachment E, p34) as a guide.<br />

SETTING GOALS<br />

List the <strong>waste</strong> minimis<strong>at</strong>ion or recycling goals you<br />

have set <strong>for</strong> your event or venue.


28<br />

ATTACHMENT A<br />

WASTE MANAGEMENT<br />

PLAN TEMPLATE<br />

For a completed example see Attachment B (p30)<br />

ASPECT ACTION MEASURING<br />

SUCCESS<br />

(how will you know<br />

this action has been<br />

completed; wh<strong>at</strong> will<br />

it mean you have<br />

achieved?)<br />

Gaining commitment<br />

Infrastructure e.g.<br />

bins, signage<br />

Educ<strong>at</strong>ing <strong>and</strong><br />

marketing<br />

Reporting <strong>and</strong><br />

evalu<strong>at</strong>ion<br />

TIMEFRAME FOR<br />

COMPLETION<br />

(when does the<br />

action need to be<br />

completed, does it<br />

rely on something<br />

else being done first?)<br />

RESPONSIBILITY<br />

(who is responsible<br />

<strong>for</strong> doing the action<br />

or making sure it has<br />

been done?)<br />

STATUS<br />

(use this column to<br />

track your progress<br />

<strong>at</strong> regular review)


ATTACHMENT B<br />

EXAMPLE WASTE<br />

MANAGEMENT PLAN<br />

29<br />

CURRENT SITUATION<br />

Purpose of this task<br />

Briefly describe the current <strong>waste</strong> management<br />

situ<strong>at</strong>ion. Attach the <strong>waste</strong> assessment as<br />

supporting in<strong>for</strong>m<strong>at</strong>ion.<br />

Example<br />

We are a small venue hired out <strong>for</strong> priv<strong>at</strong>e parties. An<br />

onsite c<strong>at</strong>ering company provides food <strong>and</strong> beverage<br />

service <strong>for</strong> the parties which range from birthdays <strong>and</strong><br />

social club functions to wedding receptions. Currently,<br />

we have the following <strong>waste</strong> streams <strong>and</strong> <strong>waste</strong><br />

management processes:<br />

> Main kitchen: Mainly food prepar<strong>at</strong>ion <strong>waste</strong><br />

is gener<strong>at</strong>ed here, including food scraps, egg<br />

cartons, tins, milk cartons, plastic (clean <strong>and</strong><br />

soiled), cardboard boxes. Currently we only<br />

recycle cardboard boxes from this area.<br />

> Bar area: The main <strong>waste</strong> items produced here are<br />

bottles, cans, plastic cups, plastic straws, bottle<br />

tops <strong>and</strong> corks. Cardboard boxes <strong>and</strong> plastic wrap<br />

from bulk beverage packaging are also gener<strong>at</strong>ed.<br />

We recycle all bottles <strong>and</strong> cans from this area,<br />

along with cardboard boxes.<br />

> Within the venue (front of house): Bins are provided <strong>at</strong><br />

‘st<strong>and</strong> up’ <strong>events</strong> such as birthday parties <strong>for</strong> people<br />

to put any finger food scraps, serviettes, plastic cups<br />

<strong>and</strong> plastic straws into. It is a non-smoking venue so<br />

cigarette butts are not an issue.<br />

> General <strong>waste</strong> is collected in a 3 cubic metre<br />

bin once a week from the venue <strong>and</strong> more often<br />

if necessary. A 3 cubic metre bin of cardboard<br />

is also collected every week from the venue. All<br />

bottles <strong>and</strong> cans are collected in 3 large steel<br />

cages every 2 weeks.<br />

OPTIONS FOR IMPROVEMENT<br />

Purpose of this task<br />

Describe your options <strong>for</strong> improving <strong>waste</strong> management.<br />

Use the h<strong>and</strong>y <strong>waste</strong> tips <strong>for</strong>m as a guide.<br />

Example<br />

> Main kitchen:<br />

> Source separ<strong>at</strong>ion of food <strong>and</strong> other<br />

compostable m<strong>at</strong>erial within the main kitchen<br />

<strong>for</strong> composting in an enclosed compost<br />

receptacle loc<strong>at</strong>ed on site, <strong>for</strong> use on the<br />

l<strong>and</strong>scape garden around the venue.<br />

> Source separ<strong>at</strong>ion of recyclable items such<br />

as egg cartons, milk cartons, tins <strong>and</strong> plastic<br />

containers into a co-mingled recycling bin <strong>for</strong><br />

pick up by a <strong>waste</strong> service provider.<br />

> Source separ<strong>at</strong>ion of clean plastic wrap, film <strong>and</strong><br />

strapping into a bin dedic<strong>at</strong>ed to this m<strong>at</strong>erial <strong>for</strong><br />

pick up by a <strong>waste</strong> service provider.<br />

> Ensure only paper or other compostable pl<strong>at</strong>es<br />

are used <strong>for</strong> service <strong>at</strong> ‘st<strong>and</strong>-up’ <strong>events</strong>.<br />

> Bar area:<br />

> Source separ<strong>at</strong>ion of clean plastic wrap,<br />

film <strong>and</strong> strapping into a bin dedic<strong>at</strong>ed to<br />

this m<strong>at</strong>erial <strong>for</strong> pick up by a <strong>waste</strong> service<br />

provider.<br />

> Can we recycle bottle tops?<br />

> Can we recycle corks?<br />

> Front of house:<br />

> Provide a separ<strong>at</strong>e bin <strong>for</strong> bottles <strong>and</strong> cans,<br />

<strong>and</strong> another bin <strong>for</strong> food scraps, pl<strong>at</strong>es <strong>and</strong><br />

serviettes <strong>at</strong> ‘st<strong>and</strong>-up’ <strong>events</strong> with clear<br />

signage <strong>for</strong> each bin.<br />

SETTING GOALS<br />

List the <strong>waste</strong> minimis<strong>at</strong>ion or recycling goals you<br />

have set <strong>for</strong> your event or venue.<br />

> Reduce the frequency of general <strong>waste</strong> pick up to<br />

<strong>for</strong>tnightly<br />

> Reduce the amount of <strong>waste</strong> sent to l<strong>and</strong>fill by<br />

25% in 6 months


30<br />

ATTACHMENT B<br />

EXAMPLE WASTE<br />

MANAGEMENT PLAN<br />

ASPECT ACTION MEASURING<br />

SUCCESS<br />

TIMEFRAME FOR RESPONSIBILITY STATUS<br />

COMPLETION<br />

Gaining<br />

commitment<br />

Hold meeting with onsite c<strong>at</strong>erers<br />

to gain agreement <strong>for</strong> source<br />

separ<strong>at</strong>ion of m<strong>at</strong>erial in kitchen<br />

Meeting held, verbal<br />

commitment gained<br />

February 2011 Manager Meeting held; c<strong>at</strong>erers feedback all<br />

positive<br />

Write responsibilities into a st<strong>and</strong>ard<br />

oper<strong>at</strong>ing procedure (SOP) <strong>and</strong><br />

distribute to all staff <strong>for</strong> sign off<br />

SOP developed, all staff<br />

signed<br />

February 2011 Manager SOP developed, currently being<br />

circul<strong>at</strong>ed<br />

Train staff on the new bin systems Training session held March 2011–<br />

ongoing<br />

Manager, c<strong>at</strong>ering<br />

manager<br />

Training session booked <strong>for</strong><br />

15 March<br />

Develop posters <strong>for</strong> main kitchen<br />

area on the new bin systems<br />

Posters displayed March 2011 C<strong>at</strong>ering staff Graphics produced <strong>for</strong> posters to<br />

be h<strong>and</strong>ed out <strong>at</strong> training session<br />

Providing<br />

infrastructure<br />

Liaise with current <strong>waste</strong><br />

contractor to see if they can<br />

assist with aims<br />

Modified contract<br />

arrangements<br />

established<br />

February 2011 Manager Meeting with contractor held,<br />

contract developed <strong>and</strong> approved<br />

Determine which bins, where, how<br />

many; <strong>and</strong> signage to accompany<br />

them<br />

Bin plan developed<br />

using a map of the<br />

venue<br />

February 2011 Manager, c<strong>at</strong>ering<br />

manager<br />

Compostables back of house,<br />

recycling <strong>and</strong> general <strong>waste</strong> front<br />

of house (may start compostables<br />

FOH next year)<br />

Frequency of service – discuss<br />

with <strong>waste</strong> contractors<br />

Service frequency<br />

agreed<br />

February 2011 Manager, <strong>waste</strong><br />

contractor<br />

Service frequency <strong>for</strong> FOH <strong>and</strong> BOH<br />

agreed <strong>and</strong> included in contract<br />

Monitoring bin use – do we need<br />

to change position?<br />

Bin position finalised Ongoing C<strong>at</strong>ering manager,<br />

function coordin<strong>at</strong>or<br />

Ongoing monitoring during the<br />

event


ATTACHMENT B<br />

EXAMPLE WASTE<br />

MANAGEMENT PLAN<br />

31<br />

ASPECT ACTION MEASURING<br />

SUCCESS<br />

TIMEFRAME FOR RESPONSIBILITY STATUS<br />

COMPLETION<br />

Educ<strong>at</strong>ing<br />

<strong>and</strong><br />

marketing<br />

Provide in<strong>for</strong>m<strong>at</strong>ion on <strong>waste</strong><br />

minimis<strong>at</strong>ion <strong>at</strong> venue in info<br />

packs <strong>for</strong> potential p<strong>at</strong>rons<br />

In<strong>for</strong>m<strong>at</strong>ion pack<br />

modified<br />

March 2011–<br />

ongoing<br />

Function<br />

coordin<strong>at</strong>or<br />

Info packs framework developed,<br />

currently coll<strong>at</strong>ing in<strong>for</strong>m<strong>at</strong>ion<br />

Ensure p<strong>at</strong>rons are aware of<br />

different bin systems; talk<br />

with hirers be<strong>for</strong>e event to<br />

communic<strong>at</strong>e the system; include<br />

in hire agreement<br />

Checklist in hire<br />

agreement signed by<br />

sales person <strong>and</strong> hirer<br />

Ongoing Function sales To be actioned<br />

Reporting<br />

<strong>and</strong><br />

evalu<strong>at</strong>ion<br />

Continual review of actions – are<br />

we achieving our goals? Review<br />

plan every 6 weeks<br />

6-weekly reviews<br />

completed<br />

Ongoing: every All First review of plan completed<br />

6 weeks<br />

Assign responsibility <strong>for</strong> recording<br />

in<strong>for</strong>m<strong>at</strong>ion about <strong>waste</strong> collected<br />

(using recording templ<strong>at</strong>e)<br />

Responsibility assigned<br />

<strong>and</strong> reporting templ<strong>at</strong>e<br />

filled in each week<br />

February 2011–<br />

ongoing<br />

Manager <strong>and</strong> then<br />

design<strong>at</strong>ed staff<br />

member<br />

<strong>Waste</strong> ‘champion’ nomin<strong>at</strong>ed <strong>for</strong><br />

each area BOH; cross check details<br />

with contractor report<br />

Report achievements <strong>at</strong> regular<br />

staff meetings – st<strong>and</strong>ard agenda<br />

item<br />

Agenda item added Monthly Manager <strong>Waste</strong> agenda item added <strong>for</strong> this<br />

event<br />

Evalu<strong>at</strong>e success <strong>at</strong> the end of 6<br />

months <strong>and</strong> review further actions<br />

Review completed,<br />

WMP version 2<br />

compiled<br />

June 2011 All To be actioned


32<br />

ATTACHMENT C<br />

SWOT ANALYSIS<br />

TEMPLATE<br />

Wh<strong>at</strong> are your strengths <strong>and</strong> weaknesses in the way you currently manage <strong>waste</strong> <strong>at</strong> your event or venue?<br />

This is your current position. Wh<strong>at</strong> about your opportunities or thre<strong>at</strong>s? These are the things th<strong>at</strong> can<br />

influence your current <strong>and</strong> future <strong>waste</strong> management. Respond to the st<strong>at</strong>ement: ‘<strong>waste</strong> management <strong>at</strong><br />

our event (or venue)’ by filling in the blank boxes below. Include key staff <strong>and</strong> stakeholders in this process.<br />

The completed table will give you a holistic view of your <strong>waste</strong> management position.<br />

RESPONSE: WASTE MANAGEMENT AT OUR EVENT OR VENUE . . .<br />

Strengths • Driver<br />

Weaknesses • Barrier<br />

Opportunities • Driver<br />

Thre<strong>at</strong>s • Barrier


ATTACHMENT D<br />

WASTE ASSESSMENT<br />

TEMPLATE<br />

33<br />

Use this simple <strong>waste</strong> assessment templ<strong>at</strong>e to help you underst<strong>and</strong> your current situ<strong>at</strong>ion.<br />

Name of event/venue: Completed by: D<strong>at</strong>e:<br />

NAME OF AREA<br />

DESCRIPTION OF<br />

MAIN WASTE<br />

ESTIMATED<br />

CURRENT WASTE<br />

(e.g. main kitchen,<br />

ACTIVITIES<br />

ITEMS<br />

AMOUNT<br />

MANAGEMENT<br />

back of house, arts<br />

(describe simply the<br />

PRODUCED<br />

(kg, m3 or % of total<br />

(where does<br />

<strong>and</strong> craft stalls)<br />

activities in this area)<br />

<strong>waste</strong> <strong>for</strong> the area)<br />

<strong>waste</strong> go?)


34<br />

ATTACHMENT E<br />

HANDY HOW-TO GUIDE<br />

FOR WASTE ITEMS<br />

C<strong>at</strong>ering item<br />

Typical <strong>waste</strong><br />

produced<br />

How to AVOID<br />

How to<br />

REDUCE<br />

How to<br />

RECYCLE<br />

How to COMPOST<br />

Baked pot<strong>at</strong>oes,<br />

hamburgers<br />

Foam containers<br />

Use cardboard clams or<br />

pl<strong>at</strong>es <strong>and</strong> compost with<br />

food scraps<br />

BBQ, roast, Asian<br />

food<br />

Plastic pl<strong>at</strong>es<br />

Use cardboard clams or<br />

pl<strong>at</strong>es <strong>and</strong> compost with<br />

food scraps<br />

S<strong>and</strong>wiches, cold<br />

rolls<br />

Non-recyclable<br />

plastic<br />

containers<br />

Provide recyclable<br />

PET plastic<br />

containers when<br />

using a commingled<br />

recycling bin system<br />

Wrap in paper or paper<br />

bag<br />

Fairy floss<br />

Plastic bags<br />

without h<strong>and</strong>les<br />

Cellophane<br />

Do not provide<br />

fairy floss from<br />

bags; make fresh<br />

Supply in paper bag,<br />

if necessary, or on<br />

wooden stick<br />

Mini sauce<br />

containers, soy<br />

sauce sachets<br />

Empty foil<br />

packets or<br />

sauce packets<br />

Provide sauce<br />

or soy bottles<br />

<strong>at</strong> self serve<br />

st<strong>at</strong>ion or <strong>at</strong><br />

food stall<br />

Mayonnaise, salad,<br />

gherkin packaging<br />

etc<br />

Plastic bags with<br />

food <strong>waste</strong><br />

Obtain produce<br />

fresh <strong>and</strong> direct<br />

Purchase in<br />

recyclable tubs or<br />

packaging<br />

Ice cream, yoghurt<br />

containers<br />

Plastic<br />

containers<br />

Buy only in bulk<br />

quantities<br />

Use recyclable<br />

packaging <strong>and</strong><br />

recycling bins<br />

provided<br />

Cutlery<br />

<strong>Waste</strong> cutlery<br />

with food scraps<br />

Use washable<br />

<strong>and</strong> reusable<br />

cutlery<br />

Use cornstarch or<br />

wooden <strong>for</strong>ks, spoons,<br />

<strong>and</strong> knives<br />

Table covers,<br />

serviettes<br />

Paper or<br />

plastic <strong>waste</strong><br />

tablecloths<br />

Use washable<br />

fabric tablecloths<br />

<strong>and</strong> serviettes<br />

Use paper tablecloths<br />

<strong>and</strong> paper serviettes<br />

Wine, beer<br />

Wine corks <strong>and</strong><br />

beer bottle lids<br />

Use kegs <strong>for</strong><br />

beer <strong>and</strong> screw<br />

top lids <strong>for</strong> wine<br />

where available<br />

Corks can be<br />

recycled<br />

Use cornstarch or<br />

compostable cups<br />

Cold drinks Plastic cups Use washable<br />

reusable<br />

glassware<br />

Use PET recyclable<br />

plastic cups<br />

Use paper, cardboard<br />

cornstarch or<br />

compostable cups<br />

Hot drinks<br />

Plastic stirrers,<br />

polystyrene cups<br />

Use washable<br />

reusable<br />

glassware<br />

Use wooden stirrers <strong>and</strong><br />

cardboard ‘ridged’ cups


ATTACHMENT E<br />

HANDY HOW-TO GUIDE<br />

FOR WASTE ITEMS<br />

35<br />

C<strong>at</strong>ering item<br />

Typical <strong>waste</strong><br />

produced<br />

How to AVOID<br />

How to<br />

REDUCE<br />

How to<br />

RECYCLE<br />

How to COMPOST<br />

Pre-packaged<br />

products<br />

Cardboard<br />

Place cardboard<br />

packaging in<br />

recycling bins<br />

provided<br />

Small amounts of<br />

cardboard could be<br />

added to compostables<br />

Pre-packaged<br />

products<br />

Shrink wrap<br />

plastic <strong>and</strong><br />

plastic baling<br />

Request<br />

products do not<br />

come shrink<br />

wrapped or baled<br />

if possible<br />

Provide a separ<strong>at</strong>e<br />

recycling system <strong>for</strong><br />

clean, soft plastics<br />

Bin lining Garbage bags Do not provide<br />

bin liners if<br />

possible<br />

Use compostable<br />

cornstarch bin liners<br />

Multiple items<br />

purchased<br />

Plastic bags*<br />

Do not provide<br />

plastic bags<br />

Provide cardboard<br />

boxes or green bags<br />

<strong>for</strong> carrying<br />

Meals, snacks Food scraps Dispose of all food scraps<br />

<strong>and</strong> c<strong>at</strong>ering <strong>waste</strong> in<br />

compost bins provided<br />

* The South Australian Government has banned the supply of light weight, check-out style plastic shopping bags. Plastic<br />

bags (without h<strong>and</strong>les) used to package food items are not included in the ban.


36<br />

ATTACHMENT F<br />

GOALS AND OPTIONS FOR<br />

IMPROVEMENT TEMPLATE<br />

M<strong>at</strong>ch the options <strong>for</strong> improvement to your goals (in Attachment A – p27) using the table below<br />

OPTIONS FOR IMPROVEMENT<br />

GOAL<br />

•<br />

•<br />

•<br />

•<br />

OPTIONS FOR IMPROVEMENT (FOR THE FUTURE)<br />


ATTACHMENT G<br />

EXAMPLE CONTRACT &<br />

TENDER CLAUSES<br />

37<br />

The following example contract clauses are a guide<br />

<strong>for</strong> event <strong>and</strong> venue managers, <strong>waste</strong> contractors,<br />

service providers <strong>and</strong> vendors. They do not constitute<br />

a complete set of contract clauses applicable to any<br />

one event, venue or set of circumstances. They are<br />

a starting point <strong>for</strong> developing specific clauses or<br />

wording <strong>for</strong> agreements between parties involved in<br />

<strong>waste</strong> minimis<strong>at</strong>ion <strong>at</strong> <strong>events</strong> or <strong>venues</strong>.<br />

Not all examples presented here will suit your<br />

situ<strong>at</strong>ion. Feel free to pick <strong>and</strong> choose the items<br />

th<strong>at</strong> best fit your event or venue <strong>and</strong> to alter the<br />

wording to suit your needs.<br />

The examples are suitable <strong>for</strong> the following documents:<br />

> Requests <strong>for</strong> tender – <strong>waste</strong> contracts<br />

> Requests <strong>for</strong> tender – c<strong>at</strong>erers/cleaners or other<br />

service providers<br />

> <strong>Waste</strong> target clause<br />

> <strong>Waste</strong> collection monitoring clause<br />

> <strong>Waste</strong> management system – conference/<br />

exhibition<br />

> Vendors/stallholder oblig<strong>at</strong>ions – conference/<br />

exhibition<br />

> Educ<strong>at</strong>ion <strong>and</strong> training<br />

> Food <strong>and</strong> beverage vendor agreements/clauses<br />

REQUESTS FOR TENDER – WASTE<br />

CONTRACTS<br />

1. (Name of event/name of venue) is aiming to<br />

introduce effective <strong>waste</strong> minimis<strong>at</strong>ion initi<strong>at</strong>ives.<br />

<strong>Waste</strong> will be reduced, recycled <strong>and</strong>/or<br />

composted where possible.<br />

2. (Name of event/name of venue) is aiming to divert<br />

xx cubic metres/ x% of <strong>waste</strong> from l<strong>and</strong>fill. Within<br />

your tender proposal please detail:<br />

a. the source separ<strong>at</strong>ion/off-site sorting of <strong>waste</strong><br />

streams you propose<br />

b. the infrastructure required/you will supply to<br />

achieve this<br />

c. the educ<strong>at</strong>ion <strong>and</strong> training you will provide to<br />

your staff in order to successfully implement<br />

<strong>waste</strong> minimis<strong>at</strong>ion measures<br />

d. any educ<strong>at</strong>ion, awareness raising or training<br />

services you may provide to other relevant staff<br />

e. measures to be employed <strong>for</strong> a chain of<br />

custody approach to <strong>waste</strong> management to<br />

ensure <strong>waste</strong> streams are diverted from l<strong>and</strong>fill<br />

as agreed<br />

f. your monitoring <strong>and</strong> reporting capabilities <strong>and</strong><br />

how in<strong>for</strong>m<strong>at</strong>ion will be provided to (name of<br />

event/name of venue).<br />

REQUESTS FOR TENDER – CATERERS/<br />

CLEANERS OR OTHER SERVICE PROVIDERS<br />

1. (Name of event/name of venue) is aiming to divert<br />

xx cubic metres/ x% of <strong>waste</strong> from l<strong>and</strong>fill. Within<br />

your tender proposal please detail:<br />

a. the initial <strong>waste</strong> minimis<strong>at</strong>ion measures you will<br />

employ to help (name of event/name of venue)<br />

achieve its <strong>waste</strong> management goals<br />

b. continuous improvement measures you will<br />

employ to help (name of event/name of venue)<br />

achieve its <strong>waste</strong> management goals<br />

c. the educ<strong>at</strong>ion <strong>and</strong> training you will provide to<br />

your staff in order to ensure <strong>waste</strong> minimis<strong>at</strong>ion<br />

measures are successfully implemented<br />

d. any educ<strong>at</strong>ion or training services you may<br />

provide to other relevant staff<br />

e. your monitoring <strong>and</strong> reporting capabilities <strong>and</strong><br />

how in<strong>for</strong>m<strong>at</strong>ion will be provided to (name of<br />

event/name of venue).


38<br />

ATTACHMENT G<br />

EXAMPLE CONTRACT &<br />

TENDER CLAUSES<br />

WASTE TARGET CLAUSE<br />

1. (Name of event/name of venue) aims to divert x%<br />

of all <strong>waste</strong> m<strong>at</strong>erial collected from l<strong>and</strong>fill. This<br />

will be achieved by implementing the following<br />

<strong>waste</strong> management system to allow <strong>for</strong> source<br />

separ<strong>at</strong>ion of <strong>waste</strong> items:<br />

a. Bins will be provided <strong>at</strong> (loc<strong>at</strong>ion) <strong>for</strong> the<br />

following separ<strong>at</strong>e streams of <strong>waste</strong>/recyclables:<br />

1........................................<br />

2........................................<br />

3........................................<br />

2. (a) (Company name covered by the contract/<br />

agreement) is responsible <strong>for</strong> <strong>and</strong> must ensure<br />

all staff <strong>and</strong> contractors are aware of the <strong>waste</strong><br />

diversion target <strong>and</strong> the actions required<br />

achieving this target.<br />

or<br />

2. (b) All staff are responsible <strong>for</strong> the successful<br />

implement<strong>at</strong>ion of (name of event/name of<br />

venue) <strong>waste</strong> minimis<strong>at</strong>ion goals. Staff found to<br />

be incorrectly separ<strong>at</strong>ing <strong>waste</strong> <strong>and</strong> recklessly<br />

ignoring source separ<strong>at</strong>ing <strong>guidelines</strong> will<br />

be asked to explain their actions, provided<br />

with further educ<strong>at</strong>ion <strong>and</strong> may be subject to<br />

disciplinary action as required.<br />

3. If agreed targets are not met, (use some<br />

<strong>for</strong>m of reduction in payment here or some<br />

other <strong>for</strong>m of penalty)<br />

4. If agreed chain of custody measures to ensure<br />

<strong>waste</strong> streams are diverted from l<strong>and</strong>fill are not<br />

implemented, (use some <strong>for</strong>m of reduction in<br />

payment here or some other <strong>for</strong>m of penalty)<br />

WASTE COLLECTION MONITORING CLAUSE<br />

1. To track collection <strong>and</strong> contamin<strong>at</strong>ion r<strong>at</strong>es, <strong>waste</strong><br />

collection monitoring checklists will be provided<br />

<strong>for</strong> completion by (person/position title). (Company<br />

name covered by the contract/agreement)<br />

must ensure th<strong>at</strong> these are completed <strong>at</strong> (d<strong>at</strong>e,<br />

timeframe) <strong>and</strong> provided to (person/position title)<br />

<strong>for</strong> coll<strong>at</strong>ion, analysis <strong>and</strong> reporting.<br />

2. Early reporting of potential problems will help<br />

ensure th<strong>at</strong> contamin<strong>at</strong>ion is kept to a minimum,<br />

by implementing appropri<strong>at</strong>e corrective action.<br />

WASTE MANAGEMENT SYSTEM –<br />

CONFERENCE/EXHIBITION<br />

1. The following separ<strong>at</strong>e bins are to be provided<br />

<strong>at</strong> (loc<strong>at</strong>ions) <strong>for</strong> source separ<strong>at</strong>ion of <strong>waste</strong>/<br />

recyclables m<strong>at</strong>erial:<br />

1........................................<br />

2........................................<br />

3........................................<br />

2. One large roll-on roll-off bin will be loc<strong>at</strong>ed <strong>at</strong><br />

(loc<strong>at</strong>ion) <strong>for</strong> collecting mixed recyclables.<br />

3. Mixed recyclables will be transported to (name)<br />

m<strong>at</strong>erials recovery facility <strong>for</strong> off-site sorting <strong>and</strong><br />

recycling.<br />

VENDORS/STALLHOLDERS OBLIGATIONS<br />

– CONFERENCE/EXHIBITION<br />

1. Separ<strong>at</strong>e bins will be provided <strong>for</strong> recycling<br />

of discarded m<strong>at</strong>erial during set up <strong>and</strong> pull<br />

down. You are asked to source separ<strong>at</strong>e <strong>waste</strong>/<br />

recyclables m<strong>at</strong>erials <strong>for</strong> disposal into the following<br />

different c<strong>at</strong>egories:<br />

1........................................<br />

2........................................<br />

3........................................<br />

2. These bins will be loc<strong>at</strong>ed <strong>at</strong> (loc<strong>at</strong>ion) during the<br />

following times:<br />

• D<strong>at</strong>e time–time<br />

• D<strong>at</strong>e time–time


ATTACHMENT G<br />

EXAMPLE CONTRACT &<br />

TENDER CLAUSES<br />

39<br />

3. Any items th<strong>at</strong> do not fit the listed <strong>waste</strong> streams<br />

should be taken away with you <strong>and</strong> reused or<br />

recycled appropri<strong>at</strong>ely or disposed in the general<br />

<strong>waste</strong> bins provided.<br />

4. Produce pamphlets, h<strong>and</strong>outs <strong>and</strong> present<strong>at</strong>ion<br />

notes electronically if possible, on a CD or a<br />

website <strong>for</strong> download. Do not encourage p<strong>at</strong>rons<br />

to print in<strong>for</strong>m<strong>at</strong>ion <strong>at</strong> a l<strong>at</strong>er d<strong>at</strong>e. Limit the<br />

use of folders.<br />

5. If this is unavoidable, print items on postconsumer<br />

recycled paper, double sided.<br />

6. No plastic folders or binding is permitted, to<br />

enable easier post-event recycling of unused or<br />

unwanted items.<br />

EDUCATION AND TRAINING<br />

1. (Person/position title/event or venue name) is<br />

responsible <strong>for</strong> ensuring (which staff) are aware<br />

of the <strong>waste</strong> management goals set by (person/<br />

position title/event or venue name). Any training<br />

<strong>and</strong> educ<strong>at</strong>ion required <strong>for</strong> staff to implement<br />

<strong>waste</strong> minimis<strong>at</strong>ion/source separ<strong>at</strong>ion effectively is<br />

the responsibility of (who).<br />

FOOD AND BEVERAGE VENDOR<br />

AGREEMENTS/CLAUSES<br />

1. (Name of event/name of venue) aims to divert<br />

x% of all <strong>waste</strong> m<strong>at</strong>erial collected from l<strong>and</strong>fill by<br />

implementing the following <strong>waste</strong> management<br />

system to allow <strong>for</strong> source separ<strong>at</strong>ion of <strong>waste</strong><br />

items. Bins will be provided <strong>at</strong> (back of house<br />

loc<strong>at</strong>ion) <strong>for</strong> the following separ<strong>at</strong>e streams of<br />

<strong>waste</strong>/recyclables:<br />

1........................................<br />

2........................................<br />

3........................................<br />

2. All c<strong>at</strong>erers/vendors are required to comply with<br />

the following requirements:<br />

> Drink containers will be recycled into other useable<br />

products, food containers made from sugar cane,<br />

cornstarch <strong>and</strong> cardboard will be composted <strong>and</strong><br />

used as fertiliser or garden soil.<br />

> Only items listed on your <strong>at</strong>tached order <strong>for</strong>m are<br />

to be deposited in the compostable bins provided<br />

back of house.<br />

> All other <strong>waste</strong> gener<strong>at</strong>ed in the stall th<strong>at</strong> does not<br />

comply with the <strong>at</strong>tached list, e.g. plastic wrapping,<br />

must be disposed of in a general <strong>waste</strong> bin.<br />

> All packaging <strong>for</strong> food or drink is to be ordered<br />

from (product supplier name) using your <strong>at</strong>tached<br />

order <strong>for</strong>m (develop <strong>for</strong> your event or venue).<br />

The following items are prohibited from use:<br />

> e.g. plastic pl<strong>at</strong>es <strong>and</strong> plastic cutlery<br />

Item.....................................................<br />

Item.....................................................<br />

> e.g. polystyrene cups<br />

Item.....................................................<br />

Item.....................................................<br />

> If you already have stocks of compostable food<br />

containers, please discuss the use of these items<br />

with (person/position title) to ensure they meet<br />

event requirements.<br />

> You are responsible <strong>for</strong> in<strong>for</strong>ming your staff of the<br />

<strong>waste</strong> system being implemented <strong>at</strong> the event<br />

<strong>and</strong> all staff must assist (<strong>waste</strong> contractor name/<br />

service provider name/event name/venue name)<br />

staff to keeping contamin<strong>at</strong>ion <strong>at</strong> a minimum.<br />

> All bins will be clearly labelled with the type of<br />

<strong>waste</strong> they can receive.<br />

> Your cooper<strong>at</strong>ion will ensure the environmental<br />

success of this event.<br />

> (if no connection to sewer facilities <strong>and</strong> event/<br />

venue is outside/in the open)<br />

> Liquid <strong>waste</strong> containers will be supplied.<br />

> Liquid <strong>waste</strong> is likely to arise from h<strong>and</strong> washing<br />

<strong>and</strong> dishwashing activities <strong>and</strong> from cooking.<br />

> Liquid <strong>waste</strong> is not to be poured into gutters or<br />

drains or anywhere not design<strong>at</strong>ed <strong>for</strong> liquid <strong>waste</strong>.<br />

> Buckets should be used where practicable <strong>and</strong><br />

then emptied into the bulk liquid <strong>waste</strong> containers<br />

when appropri<strong>at</strong>e.


40<br />

ATTACHMENT H<br />

EXAMPLE STAFF<br />

TRAINING POSTERS<br />

Generic pdf templ<strong>at</strong>es are available <strong>for</strong> download from www.zero<strong>waste</strong>.sa.gov.au.<br />

Print the pdf then set your own details in your chosen program to overprint in the blank top section<br />

Put your South Australian event<br />

or fixed venue name here<br />

This year, our event is going GREEN. In particular we want to reduce<br />

the amount of <strong>waste</strong> sent to l<strong>and</strong>fill by following the 3 Rs:<br />

REDUCE – REUSE – RECYCLE<br />

As a c<strong>at</strong>erer/contractor/staff member <strong>at</strong> this event, you can also play<br />

your part. Please:<br />

• place sawdust <strong>and</strong> animal <strong>waste</strong> ONLY in the stable bins – this<br />

m<strong>at</strong>erial will be transferred to a composting facility <strong>and</strong> end up<br />

nourishing <strong>SA</strong> soils<br />

• place all recyclables in the yellow topped ‘recyclables’ bins<br />

• dispose of all food scraps or cardboard in the green topped<br />

‘compostables’ bins<br />

• think carefully be<strong>for</strong>e disposing of your <strong>waste</strong> <strong>and</strong> keep an eye<br />

out <strong>for</strong> any in<strong>for</strong>m<strong>at</strong>ion <strong>and</strong> instructions <strong>at</strong> bins.<br />

Thank you <strong>for</strong> helping to make<br />

this a successful GREEN<br />

event/venue.


ATTACHMENT H<br />

EXAMPLE STAFF<br />

TRAINING POSTERS<br />

41<br />

Generic pdf templ<strong>at</strong>es are available <strong>for</strong> download from www.zero<strong>waste</strong>.sa.gov.au.<br />

Print the pdf then set your own details in your chosen program to overprint in the blank top section<br />

Put your South Australian event<br />

or fixed venue name here<br />

This event has adopted GREEN principles <strong>and</strong> has str<strong>at</strong>egies in place to reduce<br />

<strong>waste</strong> sent to l<strong>and</strong>fill by following the 3 Rs:<br />

REDUCE – REUSE – RECYCLE<br />

While working <strong>at</strong> this event/venue, YOU MUST<br />

• use the separ<strong>at</strong>e bins <strong>at</strong> the rear of the c<strong>at</strong>erer’s area to dispose of m<strong>at</strong>erials<br />

• take time to familiarise yourself with the different bins<br />

• place the correct <strong>waste</strong> in the appropri<strong>at</strong>e bin.<br />

Compostables (green label)<br />

Anything th<strong>at</strong> will break down in compost including:<br />

• foodstuffs (prepar<strong>at</strong>ion, leftovers)<br />

• small cardboard boxes<br />

• paper towel <strong>and</strong> serviettes<br />

• tea bags<br />

• egg shells<br />

• cork.<br />

Recyclables (yellow label)<br />

Anything th<strong>at</strong> can be recycled including:<br />

• tins <strong>and</strong> cans (e.g. from canned tom<strong>at</strong>oes)<br />

• aluminium cans<br />

• milk containers<br />

• icecream containers<br />

• yoghurt containers<br />

• large cardboard boxes.<br />

Thank you <strong>for</strong> helping to make this a successful GREEN event/venue.


42<br />

ATTACHMENT I<br />

MONITORING<br />

CHECKLIST<br />

Use this checklist to help monitor the <strong>waste</strong> system effectiveness during the event or continuously <strong>at</strong><br />

your venue.<br />

Tick the boxes in the most appropri<strong>at</strong>e column <strong>and</strong> detail corrective actions taken or needing to be taken.<br />

And remember to follow up!<br />

YES NO DETAILS OF CORRECTIVE ACTION<br />

REQUIRED<br />

CORRECTIVE<br />

ACTION<br />

COMPLETED<br />

SIGNATURE AND<br />

DATE<br />

Are the correct <strong>waste</strong><br />

items in the correct bins?<br />

■ ■ ■<br />

Is there contamin<strong>at</strong>ion in<br />

any of your bins?<br />

■ ■ ■<br />

Is the loc<strong>at</strong>ion of the bins<br />

appropri<strong>at</strong>e?<br />

■ ■ ■<br />

Is signage present, clear<br />

<strong>and</strong> easy to see?<br />

■ ■ ■<br />

Are c<strong>at</strong>erers <strong>and</strong> vendors<br />

using bins appropri<strong>at</strong>ely?<br />

■ ■ ■


ATTACHMENT J<br />

WASTE STREAM<br />

CONVERSION CHART<br />

43<br />

For reporting in consistent units, use this conversion chart.<br />

Conversion factors<br />

<strong>Waste</strong> product<br />

Weight (kg)<br />

per one cubic<br />

metre 1<br />

weight (kg) to<br />

cubic metres<br />

divide weight<br />

(kg) by number<br />

cubic metres to<br />

weight (kg)<br />

multiply size of<br />

<strong>waste</strong> container<br />

cubic metres to<br />

weight (tonnes)<br />

multiply size of<br />

<strong>waste</strong> container<br />

weight in kg to<br />

tonnes<br />

divide weight<br />

(kg) by 1000<br />

below<br />

(in m 3 ) by<br />

(in m 3 ) by<br />

number below<br />

number below<br />

Aluminium cans (whole) 26 26 26 0.026<br />

Aluminium cans (fl<strong>at</strong>tened) 87 87 87 0.087<br />

Aluminium cans (baled) 154 154 154 0.154<br />

Glass bottles (whole) 174 174 174 0.174<br />

Glass bottles (half broken) 347 347 347 0.347<br />

Paper/cardboard 100 100 100 0.100<br />

Plastic containers 10 10 10 0.010<br />

Plastic containers (baled) 139 139 139 0.139<br />

Cans/tins (whole) 52 52 52 0.052<br />

Cans/tins (fl<strong>at</strong>tened) 130 130 130 0.130<br />

Cans/tins (baled) 226 226 226 0.226<br />

Wood/timber 300 300 300 0.300<br />

Co-mingled recycling<br />

(plastic/glass/tins/cans)<br />

63 63 63 0.063<br />

Source: Sustainability Victoria, <strong>Waste</strong> Wise Events Toolkit, modified by R3greensolutions, 2008<br />

1<br />

i.e. <strong>for</strong> every 1 m 3 of the <strong>waste</strong> product, there is (number in first column) kg of the <strong>waste</strong> product


44<br />

ATTACHMENT K<br />

WASTE AND RECYCLING<br />

REPORTING TEMPLATE<br />

Use to quantify your <strong>waste</strong> minimis<strong>at</strong>ion ef<strong>for</strong>ts, during or after your event. Aim to have actual quantities<br />

but if they aren’t available, estim<strong>at</strong>es can also be useful.<br />

<strong>Waste</strong> type<br />

(e.g. general <strong>waste</strong>,<br />

refund items, recycling,<br />

compostables, paper <strong>and</strong><br />

cardboard) Weight (kg)* Volume (m 3 )*<br />

%<br />

contamin<strong>at</strong>ion<br />

(per unit weight<br />

or volume)<br />

Main contamin<strong>at</strong>ion items<br />

* Use either option to quantify your results. If some results are in kilograms or tonnes <strong>and</strong> some in cubic metres,<br />

use the conversion chart in Attachment J (p43) to st<strong>and</strong>ardise.


ATTACHMENT L<br />

SELF EVALUATION<br />

TEMPLATE<br />

45<br />

Use this templ<strong>at</strong>e after your event to help you evalu<strong>at</strong>e your success in minimising <strong>waste</strong> <strong>at</strong> your event or<br />

venue. It may help in reporting to stakeholders, funding agencies or your Board.<br />

It has three parts:<br />

A = Calcul<strong>at</strong>ing your success, B = R<strong>at</strong>ing your success, C = Explaining your r<strong>at</strong>ings.<br />

PART A – CALCULATING YOUR SUCCESS<br />

Weight (kg)* Volume in (m 3 )*<br />

1 Total <strong>waste</strong> m<strong>at</strong>erial<br />

gener<strong>at</strong>ed <strong>at</strong> event/ venue<br />

2 M<strong>at</strong>erial recycled<br />

3 M<strong>at</strong>erial composted<br />

4<br />

(= 2 + 3)<br />

Total m<strong>at</strong>erial diverted<br />

from l<strong>and</strong>fill<br />

5<br />

(= 4/1 x 100)<br />

% diversion r<strong>at</strong>e<br />

* Use either option to quantify your results. If some results are in kilograms or tonnes <strong>and</strong> some in cubic metres,<br />

use the conversion chart in Attachment J (p43) to st<strong>and</strong>ardise.


46<br />

ATTACHMENT L<br />

SELF EVALUATION<br />

TEMPLATE<br />

PART B – RATING YOUR SUCCESS (BE HONEST!)<br />

Tick the boxes in the most appropri<strong>at</strong>e column. Ask other people involved in your event or venue to fill in<br />

a copy of this table as a reality check.<br />

R<strong>at</strong>e your success in the<br />

following areas:<br />

Very bad Bad Average Good Very good<br />

Planning<br />

■ ■ ■ ■ ■<br />

Providing infrastructure<br />

■ ■ ■ ■ ■<br />

Gaining commitment<br />

■ ■ ■ ■ ■<br />

Educ<strong>at</strong>ing <strong>and</strong> marketing<br />

■ ■ ■ ■ ■<br />

Reporting <strong>and</strong> evalu<strong>at</strong>ion<br />

■ ■ ■ ■ ■<br />

PART C – EXPLAINING YOUR RATINGS<br />

1. For those items th<strong>at</strong> you scored ‘average’ or below – wh<strong>at</strong> could you have done to improve or wh<strong>at</strong> could<br />

you do to improve next time/in the future?<br />

2. For those items th<strong>at</strong> you scored ‘good’ or ‘very good’ – wh<strong>at</strong> worked well?<br />

3. Could you AVOID, REDUCE, RECYCLE or COMPOST more next time? How?<br />

4. Wh<strong>at</strong> will you try to implement next time/ in the future? Provide details.


47<br />

GLOS<strong>SA</strong>RY<br />

> Back of house areas closed to the public including areas<br />

design<strong>at</strong>ed <strong>for</strong> administr<strong>at</strong>ion, kitchens, staff, vendor only<br />

areas <strong>and</strong> service areas.<br />

> Biodegradable degrad<strong>at</strong>ion caused by biological<br />

activity, particularly by enzyme action leading to<br />

significant changes in the m<strong>at</strong>erial’s chemical structure.<br />

Biodegradable products should break down cleanly, in<br />

a defined time period, to simple molecules found in the<br />

environment such as carbon dioxide <strong>and</strong> w<strong>at</strong>er.*<br />

> Cleaning contractor a company engaged by an event<br />

organiser or venue to carry out specific tasks such<br />

as cleaning of toilet facilities, transfer of <strong>waste</strong> from<br />

collection points to disposal points, litter collection.<br />

> Compost (noun) a product produced by the breakdown<br />

of organic m<strong>at</strong>ter, such as garden <strong>and</strong> food <strong>waste</strong>,<br />

by bacteria <strong>and</strong> other micro-organisms into a nutrient<br />

rich n<strong>at</strong>ural fertiliser. Compost improves soil structure,<br />

providing nutrients <strong>for</strong> plant growth <strong>and</strong> increases w<strong>at</strong>er<br />

<strong>and</strong> nutrient retention in the soil.<br />

> Compostable m<strong>at</strong>erials must be demonstr<strong>at</strong>ed to<br />

biodegrade <strong>and</strong> disintegr<strong>at</strong>e in a compost system during<br />

the composting process (typically around 12 weeks <strong>at</strong><br />

temper<strong>at</strong>ures over 50 o C). The compost must meet quality<br />

criteria such as heavy metal content, ecotoxicity, <strong>and</strong> no<br />

obvious distinguishable residues caused by the breakdown<br />

of the polymers. Compostable plastics are a subset of<br />

biodegradable plastics.*<br />

> Container Deposit Legisl<strong>at</strong>ion (CDL) South Australian<br />

incentive to recycle selected beverage containers with a<br />

10 cent refund to the depositor.<br />

> Degradable items designed to break down into smaller<br />

particle sizes to a specific extent within a given time <strong>and</strong><br />

within a specific environment (i.e. the item just breaks<br />

down into smaller pieces of plastic).**<br />

> Event a g<strong>at</strong>hering of people in a loc<strong>at</strong>ion to celebr<strong>at</strong>e,<br />

socialise or be entertained; not fixed to any one loc<strong>at</strong>ion<br />

> Fixed venue a loc<strong>at</strong>ion where g<strong>at</strong>herings frequently<br />

occur <strong>for</strong> celebr<strong>at</strong>ion, socialising <strong>and</strong> entertainment.<br />

> Front of house areas open to members of the public,<br />

<strong>for</strong> example grassy spaces, marquees, exhibition<br />

spaces, bars, dining areas <strong>and</strong> toilets.<br />

> Greenhouse gas emissions emissions which contribute<br />

to the global issue of clim<strong>at</strong>e change, including carbon<br />

dioxide, methane, nitrous oxide; in a <strong>waste</strong> management<br />

context, they could be gener<strong>at</strong>ed by <strong>waste</strong> transport <strong>and</strong><br />

disposal methods.<br />

> Green police a term used to describe volunteers or<br />

staff tasked with the duty of p<strong>at</strong>ron educ<strong>at</strong>ion <strong>and</strong><br />

encouragement in <strong>waste</strong> disposal <strong>and</strong> recycling <strong>at</strong> an<br />

event of venue; they may also g<strong>at</strong>her collection <strong>and</strong><br />

contamin<strong>at</strong>ion r<strong>at</strong>e d<strong>at</strong>a on your behalf.<br />

> Infrastructure front of house <strong>and</strong> back of house <strong>waste</strong><br />

management systems, consisting of bins, signage<br />

<strong>and</strong> any support infrastructure such as bin caps <strong>and</strong><br />

surrounds.<br />

> Non-renewable items which can only be used a finite<br />

number of times (usually once) be<strong>for</strong>e becoming <strong>waste</strong>.<br />

> Packaging supplier provider of packaging products<br />

used <strong>for</strong> food, drinks <strong>and</strong> other items.<br />

> P<strong>at</strong>rons visitors (both paying <strong>and</strong> non-paying) to an<br />

event or venue.<br />

> Recycle process used m<strong>at</strong>erials into new products.<br />

> Source separ<strong>at</strong>ion the separ<strong>at</strong>ion of <strong>waste</strong> m<strong>at</strong>erials<br />

into different streams (e.g. recyclables, compostables,<br />

refund items) <strong>at</strong> the loc<strong>at</strong>ion (source) where they are<br />

gener<strong>at</strong>ed or produced.<br />

> South Australia’s Str<strong>at</strong>egic Plan sets out key objectives<br />

<strong>and</strong> targets <strong>for</strong> <strong>waste</strong> management in South Australia.<br />

> Supply chain the network of retailers, distributors,<br />

transporters, storage facilities <strong>and</strong> suppliers th<strong>at</strong><br />

particip<strong>at</strong>e in the sale, delivery <strong>and</strong> production of a<br />

particular product or service.<br />

> Vendors any person or company th<strong>at</strong> provides goods or<br />

services <strong>at</strong> an event or venue.<br />

> <strong>Waste</strong> discarded items (either liquid or solid) or those<br />

with no further purpose to humans.<br />

> <strong>Waste</strong> Hierarchy a n<strong>at</strong>ionally <strong>and</strong> intern<strong>at</strong>ionally<br />

accepted guide <strong>for</strong> prioritising <strong>waste</strong> management<br />

practices <strong>for</strong> the optimal environmental outcome; it sets<br />

out the preferred order of <strong>waste</strong> management practices<br />

from the most preferred to least preferred.<br />

> <strong>Waste</strong> service provider a provider of services <strong>and</strong>/or<br />

infrastructure to manage <strong>waste</strong> gener<strong>at</strong>ed through<br />

human activity.<br />

> <strong>Waste</strong> streams <strong>waste</strong> items separ<strong>at</strong>ed into different<br />

c<strong>at</strong>egories e.g. cardboard <strong>and</strong> paper, refund/deposit<br />

items, plastic wrapping <strong>and</strong> compostable m<strong>at</strong>erial.<br />

> <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> a South Australian Government body<br />

established to elimin<strong>at</strong>e <strong>waste</strong> or its consignment to l<strong>and</strong>fill<br />

<strong>and</strong> advance the development of resource recovery <strong>and</strong><br />

recycling under the <strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong> Act 2004.<br />

* www.environment.gov.au/settlements/public<strong>at</strong>ions/<strong>waste</strong>/<br />

degradables/biodegradable/<br />

**(Using Degradable Plastics in Australia – A Product<br />

Stewardship Guide <strong>and</strong> Commitment, PACIA 2007)


48<br />

DID YOU ASK ALL<br />

THESE QUESTIONS?<br />

AREA OF<br />

CONSIDERATION<br />

>> >> >><br />

QUESTION 1 QUESTION 2 QUESTION 3<br />

Current <strong>waste</strong><br />

Which types of <strong>waste</strong> are<br />

How is this <strong>waste</strong><br />

Which opportunities can<br />

management<br />

likely to be gener<strong>at</strong>ed?<br />

currently being<br />

easily be built upon? Which<br />

practices<br />

managed?<br />

<strong>waste</strong> can be avoided?<br />

Support from<br />

Is the organising<br />

Has it been presented<br />

Can the committee<br />

event organising<br />

committee supportive<br />

with some <strong>waste</strong><br />

appoint an appropri<strong>at</strong>e<br />

committee<br />

of improving <strong>waste</strong><br />

management options <strong>and</strong><br />

person to oversee <strong>waste</strong><br />

management?<br />

the benefits of recycling?<br />

management?<br />

Type of event<br />

Wh<strong>at</strong> type of crowd is<br />

How will p<strong>at</strong>ronage<br />

Which <strong>waste</strong> promotion<br />

expected? (age group,<br />

influence your <strong>waste</strong><br />

activities are likely to be<br />

families, gender)<br />

management goals <strong>and</strong><br />

best received <strong>and</strong> how?<br />

focus?<br />

Resources <strong>for</strong> new<br />

Have you identified<br />

Is there a secured<br />

Are costs likely to increase<br />

<strong>waste</strong> minimis<strong>at</strong>ion<br />

options <strong>for</strong> improvement<br />

budget <strong>for</strong> <strong>waste</strong><br />

with improved <strong>waste</strong><br />

practices<br />

<strong>and</strong> likely costs?<br />

activities?<br />

management or stay much<br />

the same?<br />

Size <strong>and</strong> type of<br />

Have you organised a<br />

Will p<strong>at</strong>rons be bringing<br />

Can you require th<strong>at</strong> all<br />

event<br />

suitable number of bins<br />

in their own food or<br />

foods are purchased within<br />

<strong>and</strong> associ<strong>at</strong>ed signage?<br />

beverages which may<br />

the confines of the event<br />

require disposal?<br />

venue, to have some control<br />

over the <strong>waste</strong>s gener<strong>at</strong>ed?<br />

Event venue<br />

Is there space <strong>for</strong><br />

Are the food, c<strong>at</strong>ering<br />

Where will individual bins<br />

additional bins <strong>and</strong><br />

<strong>and</strong> beverage outlets<br />

be transported during the<br />

access <strong>for</strong> <strong>waste</strong> pick up<br />

in one spot or spread<br />

event when full?<br />

utilities?<br />

across the site?<br />

Event staff<br />

Are staff aware of <strong>waste</strong><br />

Have they been briefed<br />

Have they read <strong>and</strong><br />

management objectives<br />

on <strong>waste</strong> practices being<br />

understood a <strong>waste</strong><br />

<strong>for</strong> your event?<br />

used?<br />

management procedure?<br />

<strong>Waste</strong> contractors<br />

Have you discussed your<br />

Can they provide the<br />

Have you searched <strong>for</strong><br />

<strong>waste</strong> objectives with<br />

level of service you<br />

<strong>waste</strong> contractors th<strong>at</strong> can<br />

your contractor?<br />

require?<br />

c<strong>at</strong>er <strong>for</strong> your event’s needs?<br />

Do you have all the answers (<strong>and</strong> have you written them down)?


49<br />

<strong>Zero</strong> <strong>Waste</strong> <strong>SA</strong><br />

Level 8<br />

St<strong>at</strong>ewide House<br />

99 Gawler Place<br />

ADELAIDE <strong>SA</strong> 5000<br />

Telephone: (08) 8204 2051<br />

Facsimile: (08) 8204 1911<br />

Email: zero<strong>waste</strong>@zero<strong>waste</strong>.sa.gov.au<br />

Internet: www.zero<strong>waste</strong>.sa.gov.au<br />

Printed on recycled paper

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!