Details - West Windsor Township
Details - West Windsor Township
Details - West Windsor Township
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
We will then meet with the steering<br />
committee meeting to present the draft plan<br />
recommendations before bringing them to the<br />
community. Additionally, together we will plan<br />
the content and logistics of the forthcoming<br />
Workshop.<br />
PLAN WORKSHOP<br />
At this workshop, participants will be asked to<br />
review the draft recommendations prepared<br />
by Hillier based on their input at the Strategies<br />
Workshop and recommend priorities for<br />
implementation of the plan elements. Our focus<br />
will be on short and long-term public policies as<br />
well as development actions (projects) that can<br />
be implemented by <strong>West</strong> <strong>Windsor</strong> and its public<br />
and private partners. These projects would include<br />
the full range of infrastructure investments,<br />
development projects (large site, infill, and<br />
adaptive reuse), and open space enhancements in<br />
the neighborhood.<br />
Workshop agenda will include presentations by<br />
the Hillier team, a hands-on work session for<br />
participants working in teams of 8 to 10 persons<br />
each, and brief presentations by a representative<br />
of each team.<br />
The Hillier team will prepare informational maps,<br />
visioning tools for the teamwork session, and a<br />
workshop summary of findings memorandum<br />
after the workshop.<br />
PHASE 3: DEVELOPING REGULATORY<br />
CONTROLS & DESIGN GUIDELINES<br />
Using the feedback from the community<br />
and the steering committee, we will revise<br />
each of the plans and prioritize or phase the<br />
recommendations. This will organize the plan<br />
elements to prepare for creating the Action Plan.<br />
Following the plan refinements, Hillier will prepare<br />
a strategic action plan, which will identify a series<br />
of activities <strong>West</strong> <strong>Windsor</strong> and its partners would<br />
conduct to implement the plan. Breaking down<br />
the plan recommendations into “action steps”<br />
makes the process of accomplishing larger<br />
projects more manageable.<br />
To the extent possible in the duration of the<br />
planning process, Hillier will document public<br />
and private sector entities that would typically be<br />
responsible for conducting the activities identified<br />
in the strategic action plan. This exercise<br />
will assist <strong>West</strong> <strong>Windsor</strong> in ensuring that the<br />
recommendations become feasible projects and<br />
that the plan document becomes a tool to support<br />
the community to fulfill the vision.<br />
We will meet with the steering committee to<br />
review this work, and to receive input prior<br />
to developing the final report. This meeting<br />
will confirm the implementation strategies,<br />
roles/responsibilities, and prepare for the report<br />
production and the final plan presentation.<br />
PHASE 4: PREPARATION OF FINAL<br />
DOCUMENT FOR SUBMISSION<br />
At the conclusion of the planning process and<br />
upon acceptance of all preliminary products<br />
prepared in the prior phases of work, Hillier will<br />
prepare a concise report to document the plan.<br />
The draft report will be provided in hard copy (5<br />
color copies), and as an electronic (.pdf) file on<br />
CD. This draft document will be reviewed with the<br />
steering committee and presented to the public<br />
and <strong>Township</strong> Planning Board.