- Page 1 and 2: PROPOSAL TO THE TOWNSHIP OF WEST WI
- Page 3 and 4: Contents 01 Firm Overview 02 Proces
- Page 5 and 6: The Firm J. Robert Hillier founded
- Page 7: Urban Design | Planning The urban d
- Page 10 and 11: Process, Work Plan, Approach We bel
- Page 12 and 13: DEVELOP STRATEGIES Following the Id
- Page 14 and 15: We request that upon final review o
- Page 16 and 17: Recommended Work Plan Summary and S
- Page 18 and 19: Hillier often organizes and partici
- Page 20: Design and Visioning Workshops Rece
- Page 25 and 26: Ardmore Transit Center Lower Merion
- Page 27 and 28: Glenside Transit Center Cheltenham
- Page 29 and 30: Parkside Neighborhood Strategic Pla
- Page 31 and 32: City of Plainfield Downtown Redevel
- Page 33 and 34: The Highlands of Morristown Station
- Page 35 and 36: Hulfish North Townhomes at Palmer S
- Page 37 and 38: Camden Downtown Charette Camden, NJ
- Page 39 and 40: Trenton Capital District Developmen
- Page 41 and 42: Kanata West Concept Development Pla
- Page 43 and 44: Princeton Public Library Princeton,
- Page 46 and 47: “Room for young people to grow”
- Page 48 and 49: to private gardens or decks. All re
- Page 50 and 51: The University Medical Center at Pr
- Page 53 and 54: This master plan for a cultural, re
- Page 55: Qingpu Retail Market Shanghai, Chin
- Page 58 and 59: New Construction 1,054,000 SF Archi
- Page 60 and 61: New Construction 2,100,000 SF Archi
- Page 62 and 63: Long Section Through Atrium
- Page 64 and 65: Ground Floor Plan 1.3 million SF Ar
- Page 67: WATER CONSERVATION Although not an
- Page 71:
ENERGY EFFICIENCY We are a civiliza
- Page 75:
References
- Page 81 and 82:
THE NEW YORK TIMES, SUNDAY, NOVEMBE
- Page 93:
Team Qualifications
- Page 96 and 97:
This approach has been used through
- Page 98 and 99:
First National Bank of Princeton, 1
- Page 101 and 102:
Anish Kumar, AIA, AICP, PP Associat
- Page 103:
Duck Island Concept Plan Hamilton T
- Page 106 and 107:
Lucas Gallery, Princeton NJ: Instal
- Page 109:
Emily Young Urban Planner Designer
- Page 112 and 113:
Howard University Washington, DC Be
- Page 115:
Brian C. Meneghin, CLA, ASLA Senior
- Page 119:
West Windsor Township Bicycle/ Pede
- Page 123 and 124:
Orth - Rodgers Associates, Inc. TRA
- Page 125:
Route 206 Pedestrian and Bicycle Ac
- Page 129:
PAOLIAOLI RAILAIL YARDSARDS AND TRA
- Page 133 and 134:
ANDREA H. FINN, PWS Project Manager
- Page 135 and 136:
DANIEL A. KUEPER, AICP, PP Planning
- Page 137 and 138:
BRIAN M. STANKUS, PE, PTOE Project
- Page 139 and 140:
Profile of the Firm Economics Resea
- Page 141:
Ridge Hill Village Center Client Re
- Page 145:
Harriman State Campus Redevelopment
- Page 149 and 150:
Shuprotim Bhaumik, Principal Shupro
- Page 151 and 152:
Kate Coburn, Principal Kate Coburn
- Page 153:
Benjamin C. Sigman, Associate Mr. S
- Page 156 and 157:
VNHA has served clients as professi
- Page 158 and 159:
UTILITY SYSTEMS DESIGN Van Note-Har
- Page 161:
THOMAS E. O’SHEA, P.E., P.P., C.M
- Page 164 and 165:
Compensation The Township of West W
- Page 166:
Standard Hourly Billing Rate Schedu
- Page 169:
Telephone (toll charges) Telephone
- Page 201:
500 Alexander Park Princeton, NJ 08