Chapter 3 - Adif
Chapter 3 - Adif
Chapter 3 - Adif
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Modified Routes<br />
Changes of layout<br />
LINE OF IBERIAN GAUGE FROM ALCÁZAR DE SAN JUAN TO CÁDIZ:<br />
• Change of the existing layout entering into service, the new variant to single track between Las Cabezas de San Juan<br />
and Jerez Airport as a preliminary to undertake the work to double the track in this section.<br />
• Entry into service of one of both tracks in the new underground layout in the municipality of Puerto Real as a preliminary<br />
to the work of track duplication in urban connector in this location..<br />
LINE OF IBERIAN GAUGE FROM EL REGUERÓN TO ALACANT-TERMINAL:<br />
• Entry into service of the new layout on single track between kilometer points 36/943 and 41/104, located in the vicinity<br />
of Albatera-Catral station allowing progress to complete the platform works on high speed line between Alicante and<br />
Murcia.<br />
Changes of Traffic Safety Systems and Traffic Management on <strong>Adif</strong> managed Network:<br />
Without changes<br />
Sections out of service: Without changes<br />
60<br />
Network Statement Update 2014 V.0