13.11.2014 Views

Chapter 3 - Adif

Chapter 3 - Adif

Chapter 3 - Adif

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Modified Routes<br />

Changes of layout<br />

LINE OF IBERIAN GAUGE FROM ALCÁZAR DE SAN JUAN TO CÁDIZ:<br />

• Change of the existing layout entering into service, the new variant to single track between Las Cabezas de San Juan<br />

and Jerez Airport as a preliminary to undertake the work to double the track in this section.<br />

• Entry into service of one of both tracks in the new underground layout in the municipality of Puerto Real as a preliminary<br />

to the work of track duplication in urban connector in this location..<br />

LINE OF IBERIAN GAUGE FROM EL REGUERÓN TO ALACANT-TERMINAL:<br />

• Entry into service of the new layout on single track between kilometer points 36/943 and 41/104, located in the vicinity<br />

of Albatera-Catral station allowing progress to complete the platform works on high speed line between Alicante and<br />

Murcia.<br />

Changes of Traffic Safety Systems and Traffic Management on <strong>Adif</strong> managed Network:<br />

Without changes<br />

Sections out of service: Without changes<br />

60<br />

Network Statement Update 2014 V.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!