13.11.2014 Views

( US Army Strategic Communications Command ... - Survival Books

( US Army Strategic Communications Command ... - Survival Books

( US Army Strategic Communications Command ... - Survival Books

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WWW.SURVIVALEBOOKS.COM<br />

FM 11-23<br />

radio, and wire and cable facilities. The company<br />

commander and the technical control officer coordinate<br />

with commanders, staffs, and technical<br />

control elements of all signal units associated<br />

with the tropo company operations including<br />

communications, mess, and area defense.<br />

Section III.<br />

TROPO PLATOON OPERATIONS<br />

13-15. Introduction (2) Two fixed station multiplex equipment<br />

The tropo platoon installs, operates, and maintains<br />

four multichannel tropo terminals and associated<br />

patching central facilities as directed<br />

(para 13-20a). The platoon includes a headquarters<br />

element and two tropo sections.<br />

13-16. Platoon Headquarters<br />

ment installs, operates, and maintains the equip-<br />

ment used to interconnect, reroute, and test all<br />

communications circuits entering or leaving the<br />

tropo site. To accomplish this, the PATCENT<br />

elementisassignedthefollowingpersonnel:<br />

(1) A fixed station technical control super-<br />

visor.<br />

The platoon headquarters includes a platoon<br />

leader, a platoon sergeant, a light-truck driver,<br />

and a radio operator who operates an SSB radio<br />

mounted in the platoon headquarters truck. The<br />

SSB radio is used in either the company command<br />

and control net or in the platoon command<br />

and control net as required. The platoon headquarters<br />

is located in the vicinity of or is collocated<br />

with one or more of its tropo terminals.<br />

operator/repairmen.<br />

(3) A senior multipurpose power generator<br />

operator/mechanic.<br />

(4) A senior tropo operator.<br />

(5) A multipurpose power generator<br />

operator/mechanic.<br />

(6) Two tropo operators.<br />

(2) Four fixed station technical controllers.<br />

13-17. Tropo Section<br />

(3) Two fixed station electronic equipment<br />

A tropo section includes a section supervisor and repairmen.<br />

25 other personnel. It is organized into two tropo<br />

teams and a PATCENT. The two tropo teams op- (4) A seor multipurpose generator<br />

operator/mechanic.<br />

erate a multichannel communications link, the<br />

terminals of which may be separated by as much (5) A multipurpose power generator<br />

as 160 km. The section PATCENT is collocated operator/mechanic.<br />

with one of these terminals. The other terminal<br />

of the section must be provided with PATCENT<br />

facilities from another communications element,<br />

such as a collocated multichannel radio or a<br />

heavy tropo terminal. Sufficient personnel are assigned<br />

to the section to provide an on-site 24-hour<br />

operational and direct support level electronic<br />

SUPERVISOR<br />

maintenance capability (para 13-21).<br />

a. Tropo Team Personnel. Each of the two<br />

tropo teams of the section installs, operates, and<br />

maintains the tropo and multiplex equipment of LIGHT LIGHT<br />

TROPO TEAM<br />

TROPO TEAM<br />

a tropo terminal. To accomplish this, a light<br />

tropo team is assigned the following personnel: FM 11-367-5-3<br />

(1) A tropo team chief. Figure 13-4. Light tropo section functional organization.<br />

Section IV. TECHNICAL CONTROL SECTION OPERATIONS<br />

13-18. Introduction using a TECHCONCEN consisting of an opera-<br />

The company commander and the technical con- tions central (para 13-19) and a patching central<br />

trol officer provide 24-hour officer supervision of (para 13-20) provides technical control, circuit<br />

the 16-man technical control section. This section, patching, limited test facilities, and supervision<br />

13-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!