5. Performance Measures Tool (VPP Suite) Update<br />

Michael Pack presented an update on the <strong>Vehicle</strong> <strong>Probe</strong> <strong>Project</strong> Suite. He reviewed the<br />

usage statistics noting that as of As of <strong>February</strong> 1, 2012, over 13.4-Billion records have<br />

been downloaded. Over 512 users have access and 60 agencies have access.<br />

Michael reviewed the new functionality for the VPP Suite including:<br />

• Historic App<br />

o Can select a single day and compare it to other time ranges.<br />

o Can select specific days (or ranges) and times for the performance<br />

summaries tables<br />

• Sorting intersections by location on road instead of alphabetically<br />

• County search in the Recurring Bottleneck app (instead of statewide or corridor wide)<br />

• Bottleneck App – Time Spirals have more details – coloring represents length of the<br />

bottleneck<br />

• Separate Login page for the VPP Suite – less complicated<br />

Michael noted that the screencasts have been updated and recommended that participants<br />

view the tutorial at http://vpp.ritis.org/suite/screencast/. Michael also noted that it is now<br />

easier to request at account – go to https://www.ritis.org/ (as long as you have a signed<br />

DUA for the VPP).<br />

At the conclusion of Michael’s presentation, a couple of questions were asked. Michael<br />

noted that in the bottleneck application, the queue length is presented in miles. He also<br />

noted that any questions, comments or requests should be sent to vpp-support@ritis.org.<br />

6. Contract Issues and Funding Issues<br />

Joanna Reagle briefly reviewed the status of the pooled fund study. George Schoener<br />

reviewed the Coalition’s commitment to the <strong>Vehicle</strong> <strong>Probe</strong> <strong>Project</strong>. He noted that the<br />

Coalition has funding set up for the VPP at the current level through June 30, 2012. George<br />

stated that the Coalition’s proposal for the USDOT Multistate Corridor Operations and<br />

Management (MCOMP) Program included funding for the VPP through June 30, 2013. He<br />

noted that the outcome of the competition should be known by April 2012. It was noted that<br />

the funding for the competition is not part of the current federal transportation funding<br />

decisions.<br />

7. Review of Actions Items from this <strong>Webcast</strong><br />

No action items were generated from the webcast.<br />

<strong>February</strong> 8, 2012 4 <strong>Vehicle</strong> <strong>Probe</strong> <strong>Project</strong><br />