(RFI) : POLLUTION CHECK EQPT- DIESEL SMOKE METER 1 ...
(RFI) : POLLUTION CHECK EQPT- DIESEL SMOKE METER 1 ...
(RFI) : POLLUTION CHECK EQPT- DIESEL SMOKE METER 1 ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
REQUEST FOR INFORMATION (<strong>RFI</strong>) : <strong>POLLUTION</strong> <strong>CHECK</strong> <strong>EQPT</strong>-<br />
<strong>DIESEL</strong> <strong>SMOKE</strong> <strong>METER</strong><br />
1. Indian Army is planning to procure Pollution Check Eqpt-Diesel Smoke Meter<br />
(DSM) to implement prevalent pollution emission norms for Defence vehicles. The<br />
equipment should conform to applicable pollution emission norms i.e. BS-III/BS-IV and<br />
must have capability for upgradation to future norms.<br />
2. It is proposed to identify probable ‘Original Equipment Manufacturer’<br />
(OEM)/Vendors who can supply Diesel Smoke Meter to implement applicable pollution<br />
emission norms throughout India for defence vehicles. OEM/Vendors are requested to<br />
forward comprehensive details of theirs Diesel Smoke Meter (DSM) as per<br />
questionnaire attached. The responses are required to be forwarded within 28 days<br />
from the date of publication of this <strong>RFI</strong> at the following address :-<br />
Directorate General of EME (Equipment)<br />
Room No 72B<br />
B Block Hutments<br />
MGO’s Branch<br />
Integrated Head quarters of Ministry of Defence (Army)<br />
DHQ PO, New Delhi-110105<br />
FAX No. 0091-11-23019470
QUESTIONAIRE<br />
Q-1. Has the OEM been accorded approval by any of certifying agencies mentioned<br />
in Rule 126 of Central Motor Vehicle Rules-1981 and any amendments thereto made<br />
by Ministry of Road Transport & Highways for its equipment? If so, please specify<br />
certification agency and attach certificate?<br />
Q-2. Does OEM has obtain conformity to production (COP) from nominated agency?<br />
if so, intimate name of test agency and number of COP obtained till date?<br />
Q-3. What is the principle on which Diesel Smoke Meter functions ?<br />
Q-4. The range, resolution and accuracy (as applicable) of Diesel Smoke Meter<br />
(DSM) for following be mentioned :-<br />
Ser Parameter Range Resolution Accuracy<br />
No<br />
(a) Carbon Monoxide (CO)<br />
measurement<br />
(b) Hydro Carbon (HC)<br />
measurement<br />
(c) HC+NOx measurement<br />
(d) Nitrogen Oxide(NOx)<br />
measurement<br />
(e) PM<br />
(f) Opacity<br />
(g) Absorption<br />
(h) Engine RPM<br />
(j) Oil Temp<br />
(k) HSU<br />
(l) K<br />
(m) Linearity<br />
(n) Time constant<br />
Q-5. Please indicate physical dimensions of the equipment.<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
Length<br />
Breadth<br />
Height<br />
Weight<br />
Length of sample probe.<br />
(f) Length of measuring chamber.<br />
Q-6. Please intimate ‘Warm Up’ time of the equipment.<br />
Q-7. The followings environmental conditions and operating conditions for effective<br />
functioning of DSM be intimated:-<br />
(a)<br />
Operating temperature
(b)<br />
(c)<br />
(d)<br />
Humidity<br />
Power Supply<br />
Any other conditions if applicable.<br />
Q-8. Please intimate method of gas sampling.<br />
Q-9. Does your eqpt has provision of avoiding incorrect measurement?<br />
Q-10. Does your eqpt has built-in functional checks for satisfactory operation of the<br />
eqpt?<br />
Q-11. Please intimate the following information with respect to smoke measurement :-<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
(f)<br />
Range<br />
Resolution<br />
Accuracy<br />
Display<br />
Response time<br />
Smoke chamber temperature<br />
Q-12. Please intimate the following information with respect to Oil temperature<br />
measurement:-<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
(f)<br />
(g)<br />
Range<br />
Resolution<br />
Accuracy<br />
Sensor<br />
Sensor length<br />
Sensor cable length<br />
Display<br />
Q-13. Please intimate the following information with respect to Engine speed<br />
measurement:-<br />
(a)<br />
(b)<br />
(c)<br />
Range<br />
Resolution<br />
Accuracy
(d)<br />
(e)<br />
(f)<br />
(g)<br />
Type<br />
Sensor cable length<br />
Display<br />
Display update time<br />
Q-14. Does the Diesel Smoke Meter manufactured by OEM has following<br />
capabilities/facilities:-<br />
(a) Facilities of measure engine RPM. - Yes/No/NA<br />
(b)<br />
Option to measure NOx and up-gradable to future norms as applicable.<br />
- Yes/No/NA<br />
(c) Does the accuracy of systems conforms to MoRTH/CMVR/TAP 115/116<br />
Chapter-3? - Yes/No/NA<br />
(d) Capability to measure all the parameters as laid out in rule 116(3) of<br />
CMVR for BS IV compliant vehs. - Yes/No/NA<br />
(e) Microprocessor based Auto Calibration - Yes/No/NA<br />
(f) Stand by Mode - Yes/No/NA<br />
(g) Alphanumeric display with backlight - Yes/No/NA<br />
for day/night operation<br />
(h) Interfacing port for computer communication - Yes/No/NA<br />
(j) Operatable on commercial AC supply/ - Yes/No/NA<br />
Rechargeable DC power supply<br />
(k) Self diagnostic/check type - Yes/No/NA<br />
(l) Low voltage warning indication - Yes/No/NA<br />
(m) Leak check facility - Yes/No/NA<br />
(n) Filter blockage warning - Yes/No/NA<br />
(o) Low flow warning - Yes/No/NA<br />
Q-15. Does printout generated by inbuilt printer of DSM will depict the followings :-<br />
(a) Photographed number plate of vehicle under check (if connected to<br />
computer and web camera). - Yes/No/NA<br />
(b) Time and date of test. - Yes/No/NA<br />
(c) Permitted emission limits as per BS III/BS IV norms or as applicable as<br />
per emission limits as per CMVR Rule, 116 (3) 1989. - Yes/No/NA
(d) Measurement result along with Cleared/Not - Yes/No/NA<br />
cleared or Pass/ Fail result.<br />
(e) Name of workshop/unit. - Yes/No/NA<br />
Q-16. Does the equipment of the OEM/Vendors is “Network Enabled”, to facilitate<br />
monitoring of data from centralized location? If yes, provide details of hardware and<br />
software.<br />
Q-17. The OEM/Vendor is requested to intimate minimum Battery Back up being<br />
provided with the eqpt.<br />
Q-18. Enclose the list of tools to be provided with Diesel Smoke Meter? Provide<br />
details in range & depth.<br />
Q-19. Please intimate details of marking on warning plate of Diesel Smoke Meter.<br />
Q-20. What is the warranty period of the Diesel Smoke Meter ?<br />
Q-21. Does OEM/Vendors has capacity & requisite infrastructure for providing training<br />
in first line maintenance and basic trouble shooting of Diesel Smoke Meter ?<br />
Q-22. Will vendors/OEM able to provide following technical literature along with the<br />
Diesel Smoke Meter?<br />
(a)<br />
(b)<br />
Governing drawings and technical specifications.<br />
User hand book including maintenance instruction (bilingual).<br />
(c) Technical Manuals i.e. Illustrated Spares Part List (ISPL) and workshop<br />
repair manual.<br />
(d) Manufacturers Recommended List of Spares (MRLS) along with cost for<br />
maintenance of 24 months.<br />
(e)<br />
List of SMTs/STEs and gauges along with cost.<br />
Q-23. Please intimate details of service network throughout the country.<br />
Q-24. Please intimate list of government department/undertaking/ autonomous<br />
bodies/Corporate sector to whom the OEM has supplied DSM and enclose the proof<br />
of satisfactory performance of the equipment.