Final SHLAA Report (December 2009) - The Royal Borough of ...
Final SHLAA Report (December 2009) - The Royal Borough of ...
Final SHLAA Report (December 2009) - The Royal Borough of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
38 <strong>Final</strong> <strong>SHLAA</strong> <strong>Report</strong> (<strong>December</strong> <strong>2009</strong>)<br />
<strong>Royal</strong> <strong>Borough</strong> <strong>of</strong> Windsor and Maidenhead <strong>SHLAA</strong> report (<strong>December</strong> <strong>2009</strong>)<br />
APPENDIX 6: Maidenhead Area Action Plan (estimated yields)<br />
APPENDIX 6: Maidenhead Area Action Plan (estimated yields)<br />
Area Phasing:<br />
0 to 5 years<br />
Phasing:<br />
6 to 10 years<br />
Phasing:<br />
11 years onwards<br />
West Street 0 300 0<br />
Broadway 105 1 0 0<br />
Railway Station 0 0 0<br />
York Road 0 0 385<br />
High Street / York Stream 0 150 90<br />
Stafferton Way 0 0 0<br />
Total 105 450 475<br />
1 This has been reduced from 150 to take account <strong>of</strong> an existing consent for 45 residential units