16.11.2014 Views

COCHIN SHIPYARD LIMITED - Tenders India

COCHIN SHIPYARD LIMITED - Tenders India

COCHIN SHIPYARD LIMITED - Tenders India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11<br />

61 The tenderer shall specify the PAN No: allotted to him so that DGM (Fin) can ascertain his<br />

liability to the Income Tax Department. The income tax/KVAT/ any other statutory taxes, as<br />

per the rules /directions of the concerned departments, prevailing in force at the time of<br />

payment of bills will be deducted while making payment or when crediting the amount to the<br />

account.<br />

62 The contractors registered under the Kerala Value Added Tax Act, 2003 shall produce a<br />

Liability Certificate, along with the bill, in relation to the works contract, from the Assessing<br />

Authority showing the tax liability or tax remittance as the case may be and the works<br />

contract tax deduction will be made accordingly. Otherwise Works Contract tax @8% plus<br />

CESS as applicable in the case of registered contractors and @10% plus CESS as applicable<br />

in the case of unregistered contractors will be deducted from the payment released against the<br />

contract.<br />

63 All rejected materials shall be removed with in 3 days from the date of written order to that<br />

effect. In case the rejected materials are not removed within the specified period mentioned<br />

above the same will be removed by CSL at the cost and risk of the contractor.<br />

64 CSL is an ISO 9001, ISO 14001 and ISO 18001 certified firm. All the contractors and<br />

subcontractors shall comply with the measures related to the Quality, Health, and Safety &<br />

Environment (QHSE) policy of CSL. Any clarification related to IMS requirements of the<br />

yard, may be obtained by the contractor from the Engineer in charge or the authorized<br />

representative of the contract, prior to the commencement of work<br />

65 The final bill shall be paid within three months from the date of submission of claim (bill) by<br />

the contractor or completion of all the items of work or date of acceptance of the bill by both<br />

parties which ever is later.<br />

66 It will be mandatory for the bidders to indicate their bank account numbers and other relevant<br />

E-payment details so that payments could be made through ECS/EFT mechanism instead of<br />

payment through cheques, wherever feasible.<br />

67 Secured advance shall be given for non-perishable materials as provided in Clause 15 of<br />

Conditions of Contract of GCC. Cement, Sand and different grades of hard granite broken<br />

stones will not considered as a non-perishable item. For materials brought without valid<br />

material Declaration forms issued from CISF Security section of CSL, Secured advance shall<br />

be paid against a Bank Guarantee for an equivalent amount. Decision of the Engineer in<br />

Charge to this aspect will be final.<br />

68 Ground rental charges at the prevailing rate of Rs 5 per Sqm per month will be levied from<br />

the contractor and will be recovered from the payment due to the contractor for the land<br />

Signature of Contractor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!