16.11.2014 Views

COCHIN SHIPYARD LIMITED - Tenders India

COCHIN SHIPYARD LIMITED - Tenders India

COCHIN SHIPYARD LIMITED - Tenders India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5<br />

10 Rates shall be both in figures and words. Rates quoted should be in <strong>India</strong>n Rupees inclusive<br />

of all taxes and duties, including service tax if any, in accordance with the tender schedule.<br />

11 The rates quoted by the contractor shall be for finished items of works including supplying<br />

appropriate materials, labour, equipment/tools, conveyance etc. all complete, unless specified<br />

in the tender schedule.<br />

12 The tenderers are expected to have inspected the site, before quoting, read the conditions<br />

thoroughly and understand the works in all respect. Clarifications, if any may be obtained<br />

from the CGM (Tech) before the tender is submitted, and if clarifications/details are not<br />

obtained before the tender is submitted, no claim on this account will be admitted.<br />

13 The contractor is expected to acquaint himself with the site conditions, labour situation, wage<br />

and benefits applicable to labourers, working hours, out turn of work by labour and the<br />

fluctuations which are likely to happen till the work is completed on all the above aspects<br />

prior to quoting the rates. The submission of a tender by tenderer implies that he has made<br />

himself aware of all the above situations and conditions. Any extra claim on this account will<br />

not be entertained.<br />

14 The site being infront of Canteen Building, all precautions shall be taken to see that<br />

minimum disturbance is caused to the normal functioning of the canteen. The contractor shall<br />

not cause any obstruction in the premises of canteen especially in the front yard and the roads<br />

while storing/keeping the materials/tools/equipment. All care shall be taken to keep the<br />

premises clean without dumping any debris as far as possible.<br />

15 The contractor shall provide green shade nets in the executing site to prevent dust pollution<br />

to nearby working areas at no extra cost. The contractor shall taken into consideration the<br />

above aspect while quoting for the work.<br />

16 While undertaking the work extra care shall be taken to prevent any leakage of cement<br />

slurry/rain water or falling of dismantled materials etc. Necessary protective arrangements as<br />

approved by the Engineer-in charge shall be provided for this by the contractor at his own<br />

cost.<br />

17 The contractor shall thoroughly study the specifications and drawings and<br />

errors/omissions/modifications if any shall be brought to the notice of the Engineer-in-<br />

Charge well in advance so that a final decision in the matter could be given in time.<br />

18 10% of the bill amount (less EMD) will be deducted as security deposit from running<br />

account bills and the same shall be released after the successful completion of the<br />

observation period of 6 months.<br />

Signature of Contractor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!