10 Rates shall be both in figures and words. Rates quoted should be in <strong>India</strong>n Rupees inclusive<br />
of all taxes and duties, including service tax if any, in accordance with the tender schedule.<br />
11 The rates quoted by the contractor shall be for finished items of works including supplying<br />
appropriate materials, labour, equipment/tools, conveyance etc. all complete, unless specified<br />
in the tender schedule.<br />
12 The tenderers are expected to have inspected the site, before quoting, read the conditions<br />
thoroughly and understand the works in all respect. Clarifications, if any may be obtained<br />
from the CGM (Tech) before the tender is submitted, and if clarifications/details are not<br />
obtained before the tender is submitted, no claim on this account will be admitted.<br />
13 The contractor is expected to acquaint himself with the site conditions, labour situation, wage<br />
and benefits applicable to labourers, working hours, out turn of work by labour and the<br />
fluctuations which are likely to happen till the work is completed on all the above aspects<br />
prior to quoting the rates. The submission of a tender by tenderer implies that he has made<br />
himself aware of all the above situations and conditions. Any extra claim on this account will<br />
not be entertained.<br />
14 The site being infront of Canteen Building, all precautions shall be taken to see that<br />
minimum disturbance is caused to the normal functioning of the canteen. The contractor shall<br />
not cause any obstruction in the premises of canteen especially in the front yard and the roads<br />
while storing/keeping the materials/tools/equipment. All care shall be taken to keep the<br />
premises clean without dumping any debris as far as possible.<br />
15 The contractor shall provide green shade nets in the executing site to prevent dust pollution<br />
to nearby working areas at no extra cost. The contractor shall taken into consideration the<br />
above aspect while quoting for the work.<br />
16 While undertaking the work extra care shall be taken to prevent any leakage of cement<br />
slurry/rain water or falling of dismantled materials etc. Necessary protective arrangements as<br />
approved by the Engineer-in charge shall be provided for this by the contractor at his own<br />
cost.<br />
17 The contractor shall thoroughly study the specifications and drawings and<br />
errors/omissions/modifications if any shall be brought to the notice of the Engineer-in-<br />
Charge well in advance so that a final decision in the matter could be given in time.<br />
18 10% of the bill amount (less EMD) will be deducted as security deposit from running<br />
account bills and the same shall be released after the successful completion of the<br />
observation period of 6 months.<br />
Signature of Contractor