<strong>KEEP</strong> <strong>TRACK</strong><br />

<strong>KEEP</strong> <strong>TRACK</strong><br />

REPORT ON RHOMBERG RAIL ACTIVITIES<br />

rhomberg New subsidiary of the rhomberg<br />

bahNtechNik group iN turkey Yeni iştiraklırhomberg<br />

bahntechnik group-türkiYe<br />

turkey: In August a contract was signed<br />

for the set-up of a new business corporation<br />

between the Turkish family enterprise<br />

Kalebozan Metalurji AS and the <strong>Rhomberg</strong><br />

Bahntechnik Holding <strong>Gmbh</strong> in Ankara.<br />

<strong>Rhomberg</strong>-Kalebozan is the youngest subsidiary<br />

of the internationally active <strong>Rhomberg</strong><br />

Bahntechnik Group and will be led by DI<br />

Hubert <strong>Rhomberg</strong>, Ing. Oswald Ortner and<br />

Dr. Halit Kalebozan, who will manage the<br />

operative side of the business in Turkey.<br />

Kalebozan A.S. was set up as a family firm<br />

in Ankara in 1996 and over the past few<br />

years it has established itself as a success-<br />

ful Turkish railway engineering company in<br />

commercial and mechanical track construction<br />

as well in the welding and electro-mechanical<br />

equipment sectors.<br />

The fusion of both enterprises not only<br />

means an extension of responsibilities<br />

but also a strong entrance into the rail<br />

way engineering market and a long-term<br />

strategic orientation towards international<br />

competition with the <strong>Rhomberg</strong><br />

Bahntechnik Group’s extensive portfolio.<br />

“For us this step is the entrance not only<br />

into the already booming track construction<br />

market in Turkey, but at the same<br />

Nr. 12-2008<br />

time it gives us the opportunity to position<br />

ourselves in Turkey and the bordering<br />

CEE markets as an international<br />

partner with a wide ranging portfolio of<br />

products and know how!“ said DI Huberg<br />

<strong>Rhomberg</strong> in support of the decision.<br />

Alongside commercial and mechanical<br />

track construction, slab tracks and<br />

project business, <strong>Rhomberg</strong>-Kalebozan<br />

will also offer business in the areas of<br />

electro-mechanical equipment, track<br />

work system technology and welding.<br />

There are currently 53 permanent workers<br />

at the new company in Turkey. >><br />

News * Own railway technology hall finished in Ressource Center Rheintal in Dornbirn.<br />

* <strong>Rhomberg</strong> Bahntechnik Group awarded contract for construction of railway technical instalation Brenner north.<br />

* Rheintal Dornbirn´de yeni ‘ray teknik atölyesi’ (araştırma ve geliştirme merkezi) inşa edilmiştir.<br />

* Brenner tünelin kuzey giriş bölümünün Demiryolu üstyapı (tünelde 40 km balastsız çift hat) ihalesini kazandık.


türkiye: Ağustos ayında Türkiyede bir aile<br />

şirketi olan Kalebozan Metalurji ile <strong>Rhomberg</strong><br />

Bahntechnik Holding GmbH arasında<br />

yeni bir kuruluşun sözleşmeleri imzalandı.<br />

<strong>Rhomberg</strong>-Kalebozan bizim en genç Uluslar<br />

arası Bahntechnik Group‘daki İştirakli<br />

şirketimizdir. Bu grupta yönetim; DI Hubert<br />

<strong>Rhomberg</strong>, Ing Oswald Ortner ve Dr. Halit<br />

Kalebozan “Türkiyedeki operatif yönetimin<br />

idarecisi” dir.<br />

Kalebozan 1996 tarihinde Ankarada bir aile<br />

şirketi olarak kuruldu geçen yıla kadar Demiryolu<br />

tekniğinde başarı ile çalışmalarını<br />

hat yapımında ticari ve mekanik olarak yürüttü<br />

. Bu alanda kaynak işleri ve Elektromekanik<br />

donanımında da kendini tesis etti.<br />

Her iki kuruluşun beraberliği alandaki yetkiyi<br />

genişletmek ve devaman Demiryolu tekniğinde<br />

güçlü bir çıkış yapmaktadır. Uzun<br />

süreli strateji ile Uluslar arası yöndeki rekabeti<br />

<strong>Rhomberg</strong> Bahntechnik Group‘un geniş<br />

portfolio‘su ile imkan dahilinde sokulacaktır.<br />

sweden: Good news for <strong>Rhomberg</strong> Bahntechnik<br />

– our bid has been accepted for<br />

the construction of the slab track in Malmö<br />

(Sweden).<br />

The project in Malmö represents a further<br />

milestone in the dynamically growing region<br />

that lies between Copenhagen (DK) and<br />

Malmö (SE). Both cities were joined with<br />

the Öresund Bridge in 2000 which is the<br />

world’s longest cable-stayed bridge for both<br />

road and railway transport. By constructing<br />

twelve kilometres of slab track, the <strong>Rhomberg</strong><br />

Group will make a substantial contribution<br />

to the optimization of the connection<br />

between the two cities.<br />

Bankverket Produktion (SE) holds primary<br />

responsibility for the project. In addition to<br />

the slab track, the venture also entails a<br />

5km of ballast substructure, construction of<br />

overhead contact lines, electro-mechanical<br />

equipment as well as further accompanying<br />

measures concerning railway engineering<br />

equipment. The sum of the contract<br />

amounts to around 400 million SEK (41 million<br />

Euro).<br />

“Bu adım bizim için hali hazırda türkiyenin<br />

güçlü demiryolu pazarındaki yüksek konjüktür<br />

şansını ve CEE-markt sınırındaki Uluslar<br />

arası partner olarak geniş bir productpotfolio<br />

ve büyük Know-How ile yönlendirilecektir.<br />

“Gerekçeli karar DI Hubert <strong>Rhomberg</strong>.<br />

Ticari ve mekaniksel hat yapımının yanı-<br />

company name: <strong>Rhomberg</strong> Kalebozan<br />

Member of the <strong>Rhomberg</strong> Bahntechnik Group<br />

head office: Ankara, Türkei<br />

management board: DI Hubert <strong>Rhomberg</strong>, Ing. Oswald Ortner<br />

Dr. Halit Kalebozan<br />

employees 2008: 53<br />

expected turnover 08/09: 3-4 Mio. Euro<br />

product-portfolio: Project management, track renewal and<br />

construction, mechanized track renewal<br />

and construction, slab track,<br />

great success for rhomberg bahNtech-<br />

Nik iN schwedeN iSveçteki hat tekniğinde<br />

rhomberg!in büYük başarıSı<br />

the heart of the slab tack<br />

Casting the 12 km slab tracks in concrete<br />

constitutes the heart of the project and accounts<br />

for 50% of the overall costs of the<br />

venture. <strong>Rhomberg</strong> Bahntechnik GmbH<br />

was able to convince the awarding authority<br />

with its specialist knowledge and master<br />

plan and now carries sole responsibility for<br />

the casting of the tracks.<br />

Construction of the slab track starts in May<br />

2009. Completion of the project is scheduled<br />

for the summer 2010.<br />

isveç: <strong>Rhomberg</strong> Bahntechnik için<br />

iyi bir haber-Firma ; Malmö (isveç)‘te<br />

sıra -Balastsız hat ve proje ticareti Kardeş<br />

şirketimiz <strong>Rhomberg</strong>-Kalebozan tarafından<br />

Elektromekanik donanım ile sistem teknik<br />

hat ve kaynak çalışmalarını sunacaktır.<br />

Türkiyedeki yeni şirketin şuan 53 çalışanı<br />

mevcuttur.<br />

Firma Sözsel: <strong>Rhomberg</strong> – Kalebozan<br />

member of the <strong>Rhomberg</strong> Bahntechnik<br />

Group<br />

Firma ikamet: Ankara – Türkiye<br />

Yönetim: DI Hubert <strong>Rhomberg</strong>, Ing. Oswald Ortner<br />

Dr. Halit Kalebozan<br />

personel 2008: 53<br />

08/09 planlanan ciro: 3-4 Mio. Euro<br />

product-portfolio: Proje ticareti, ticari hat yapımı, mekaniksel<br />

hat yapımı, balastsız hat,<br />

balastsız tespitli yol yapımını aldı.<br />

Malmö bölgede dinamik bir büyüme gösteriyor.<br />

Kopenhagen (DK) ve Malmö (SE)<br />

kentleri 2000‘de Öresundbrücke ile birbirlerine<br />

bağlandılar. Bu dünyanın en uzun çapraz<br />

(Diagonal) halatlı köprüsü, Karayolu ve<br />

Demiryolu trafiğini kombine ettiler. <strong>Rhomberg</strong><br />

Grubu bu projede oniki Kilometre ile<br />

her iki kentin bağlanmasında çok önemli bir<br />

iş yaptılar.<br />

Proje (SE) balastsız yola ilaveten 5 km daha<br />

balastlı yol yapımını gerçekleştirdi, katener<br />

hattının elektro mekanik donanımını, hat<br />

tekniği şartları dahilinde donattı. Bu taahhüt<br />

yaklaşık 400.Milyon SEK (41 Milyon Euro)<br />

dur.<br />

balastsız Sabit Yolun kalbi<br />

12 Km balastsız yol bu projenin kalbidir ve<br />

toplam giderin % 50‘sini oluşturdu. <strong>Rhomberg</strong><br />

Bahntechnik GmbH kendisine ait uzman<br />

Know-How ile Konseptin toplamını tek<br />

yetkili olarak taşıyor. Hattın yapımına Mayıs<br />

2009‘da başlanacak ve 2010 yazında<br />

sonuçlanması planlandı.


overhaul oF lıneS at krümmlı täuFFelen –<br />

hagNeck krümmli täuFFelen-hagneck'de<br />

hat güzergah YenilemeSi<br />

Switzerland: <strong>Rhomberg</strong> Bahntechnik AG,<br />

St. Gallen and a local construction company<br />

(both ARGE) carried out the Krümmli<br />

line overhaul in Täuffelen – Hagneck, in the<br />

Swiss canton of Berne.<br />

The contract involved dismantling and reassembling<br />

755 metres of railway tracks<br />

which included building a new foundation<br />

layer, track drainage and new verges. In<br />

addition, 755 m of cable channels were laid,<br />

200 m of ballast cages were relocated for<br />

verge safety and two new level-crossings<br />

were built.<br />

The renovation work was made difficult by<br />

the demanding building ground and all of<br />

the additional services that were associated<br />

with the project, as well as heavy rain during<br />

the construction phases. This caused a<br />

constant re-shuffling of the course of construction<br />

as well as the schedule.<br />

The ARGE team and its extraordinarily high<br />

level of commitment meant that the project<br />

Spectacular challenge For track auStralıa<br />

track auStralıa için görkemli bir<br />

meydaN okuma<br />

australia: Track Australia, the Australian<br />

subsidiary of <strong>Rhomberg</strong> Bahntechnik Holding<br />

GmbH was given the spectacular as<br />

signment of completing the world’s heaviest<br />

railway track infrastructure for goods<br />

trains in remote North West Australia by the<br />

Fortescue Metal Group (FMG, www.fmgl.<br />

com.au). With an axle load of 40 tonnes, the<br />

270 km-long private railway line will also be<br />

the highest-capacity railway in the world.<br />

After the first stage of setting 270 km of<br />

tracks with a ballast height of 150 mm and<br />

laying the tracks, Track Australia will now<br />

be able to continue and complete this prestigious<br />

project. First the track will be raised<br />

by 100 mm, after that it will be compressed<br />

and levelled, making sure that a tolerance<br />

of just +/- 5 mm is observed. In this way<br />

the current axle load of 25 tonnes will be<br />

raised to the target load of 40 tonnes and<br />

normal rail operations will then be able to<br />

commence.<br />

Normal operations will see a transport route<br />

of 250 km for iron ore from an inland mine<br />

to Port Hedland with a 2.5 km long train<br />

(220 wagons and 30,000 tonnes weight)<br />

which will then be loaded onto ships with<br />

180,000 tonne cargo capacity.<br />

Track Australia was responsible for the<br />

transport of the engine train measuring 70<br />

was successfully completed and handed<br />

over to the client. The route was completed<br />

on schedule and ready for train operation<br />

on 7 May 2008 and officially handed over to<br />

the client on 17 June 2008.<br />

isviçre: ARGE timinin üstün mesaileri ile<br />

proje başarı ile sonuçlandırılarak işin sahibine<br />

teslim edilmiştir. ARGE Seeland (Rhom-<br />

metres and weighing 220 tonnes across the<br />

roads of the East Coast up to North West<br />

Australia. It took around 10 days to transport<br />

across the stretch of 3,500 km and the transport<br />

was under non-stop police observation.<br />

For the highly motivated track Australia team<br />

the goal for completion of the project is end<br />

September. The contract value amounts to<br />

approx. AUS$ 2.5 m (EUR 1.5 m).<br />

berg Bahntechnik AG, St. Gallen. Yerel bir<br />

şirket olan <strong>Bau</strong>unternehmung/Stettler AG,<br />

Tauffelen-Hagneck,kanton Bern‘den Aare<br />

Seeland Biel) mobil AG (asm) diedie için<br />

güzergah yenilenmesi işini taahhüt etmiştir.<br />

Bu taahhüt 755 m‘lik hattın sökümü ve<br />

tekrar yapımını güzergah yenilenmesi, yeni<br />

temel oluşturulması , 200 m vibrasyonla sıkıştırma<br />

(banket emniyeti için balast kabı)<br />

bununla beraber iki yeni hemzemin geçit<br />

yapımı. İhale 30.Kasım.2007 tarihinde üstlenildi<br />

ve 25.mart.2008 tarihinde ise teslim<br />

edildi. Fakat zor inşaat ve yöre şartları buna<br />

bağlı kısmı ek işler yapım sürecindeki şikayetler<br />

işin süresi sonundada devam edilerek<br />

isteğe uygun olarak bitirildi.<br />

ARGE timinin üstün özverili çalışmaları ile<br />

proje başarı ile sonuçlandırılarak işletmeye<br />

17.haziran.2008 resmen teslim edilmiştir.<br />

Bu projenin gerçekleştirilmesinde özveri ile<br />

canla, başla çalışan ekibe teşekkür borçluyuz.<br />

Foto: Fortescue Metal Group (FMG)<br />

Track Australia, Avusturalya (iştirakli şirket)-<br />

<strong>Rhomberg</strong> Bahntechnik Holding GmbH,<br />

Fortescue Metal Group (FMG www.fmgl.<br />

com.au)dan çok görkemli bir taahhüt olan<br />

ve dünyanın en ağır ray alt yapısını oluşturacak<br />

olan Avustralyanın Kuzey Batısındaki<br />

yük taşıyacak olan hattın yapımını<br />

üstlenmiştir. 270 km‘lik özel olan bu yolda<br />

40 t. aks ağırlığında ve dünyanın en ağır<br />

>>


kapasiteli hattı olma özelliğini taşıyacaktır.<br />

İlk basamak olan 270 km hattın balast<br />

yüksekliği ise 150 mm olarak ve hat kaba<br />

döşenecektir. Bu Track Australia‘nın prestij<br />

taşıyan bir projesidir. İlk olarak hat 100<br />

mm kaldırılacak sıkıştırılıp, düzeltilecektir.<br />

Bu işlemde ise tolerans sadece +/-5 mm<br />

olarak talep edilmektedir. Şu anki aks yükü<br />

top QualıtY track maıntenance and neW<br />

track poiNts hat bakımı ve – Yeni Yapımlarda<br />

en YükSek kalıte<br />

austria: The increase in high speed routes<br />

is posing more demands on tracks and track<br />

construction. Bahnbau Wels with its highly<br />

modern machine groups for work on railway<br />

tracks guarantees top quality.<br />

highly modern machine groups<br />

The advantages of the Dynamic Stopfexpress<br />

09-4X(tamping machine) are obvious.<br />

Tracks can be laid quicker as a result<br />

of the increase in working speed. By working<br />

on four sleepers in a single operating<br />

process, we are able to carry out work of<br />

consistently high quality. The flexibility of<br />

the machine also means that casting one<br />

or two sleepers is possible. Additionally, the<br />

integrated dynamic track stabiliser has reduced<br />

the number of safety staff required.<br />

The ballast management system BDS 2000<br />

with its integrated MFS 100 material, conveyor<br />

and silo unit have also made work<br />

easier in certain areas, e.g. in the reduced<br />

amount of new ballast required in maintenance<br />

tamping work or in the optimization<br />

of resources. MFS 100 has increased the<br />

intake capacity of ballast from 20 m 3 to up<br />

to 88 m 3 .<br />

The combination of all these advantages<br />

provides ideal usage of the blockades with<br />

high profitability for the customer.<br />

rhomberg bahntechnik gmbh, rte technologie gmbh<br />

Mariahilfstraße 29 > 6900 Bregenz (Austria)<br />

Tel. +43 5574 403 220 > Fax +43 5574 403 229<br />

www.bahntechnik.com > info@bahntechnik.com<br />

rhomberg bahntechnik ag, Spl-rhomberg ag<br />

Poststrasse 17 > 9000 St. Gallen (Switzerland)<br />

Tel. +41 71 228 63 53 > Fax +41 71 228 63 59<br />

www.bahntechnik.ch > info@bahntechnik.ch<br />

track australia pty limited<br />

28 Toohey Road, Wetherill Park NSW 2164 (Australia)<br />

Tel. +61 2 9756 0777 > Fax +61 2 9756 0707<br />

info@trackaustralia.com<br />

25 t.‘dır ve hedef 40 t. yükseltmektir, bu hat<br />

normal işletmeye devredilecektir.<br />

Bu normal işletme ülke içine doğru yönde<br />

kurulacak 250 km‘lik bu yolda 2.5 km uzunluğundaki<br />

katarla demir cevheri (220 vagon<br />

ve 30.000 t ağırlık) port hedland‘ataşınarak<br />

180.000 tonluk yük taşıma kapasiteli gemilere<br />

boşaltılacaktır. Track Australia bu ta-<br />

avusturya: Yüksek hız hatlarının artışı hatlarda<br />

ve bunların yapımında daima yükselen<br />

şartlara talebi artırmaktadır. Hat yapımcısı<br />

Wels en yüksek kaliteyi modern Makine<br />

grupları ile çalışarak bu işlemleri gerçekleştirmektedir.<br />

en modern makine grupları<br />

Die Vorteile der Dynamic Stopfexpress 09-<br />

Dynamik stopfexpress 09-4x (Dinamik Buraj<br />

eksperesi 09-4x) bütün avantajları ile elimizdedir.<br />

Yükseltilmiş iş hızı hatdaki işi en<br />

kısa sürede bitirir. Bir girişimde dört travers<br />

işlemini eşit ve yüksek kalitede yapar. Maki-<br />

nanın fleksibilitesi bize bir veya iki traversli<br />

işlemide sağlar. Entegre dinamik hat stabilizasyonu<br />

sayesinde daha az emniyet personeline<br />

ihtiyaç duyulur.<br />

Balast ekonomi sistemi BDS 2000 ‚ e entegre<br />

edilmiş malzeme sevk ve Silo birimi<br />

MFS 100 ise birçok avantaj sağlar. Bunlardan<br />

bakım burajında yeni balasta az ihtiyaç<br />

görülmesi, MFS 100 sayesinde balast kapasitesi<br />

20 m³ ‚den 88 m³‘ e yükseltebiliriz.<br />

Bütün bu kombinasyonlar müşteriye yüksek<br />

kullanım olanağı sağlar.<br />

bahnbau Wels gmbh, bittner bahn- und gleisbau gmbh,<br />

rhomberg gleisbau gmbh<br />

Grünbachplatz, Postfach 115 > 4600 Wels (Austria)<br />

Tel. +43 7242 47045 0 > Fax +43 7242 47045 1<br />

www.bbw.at > office@bbw.at<br />

rhomberg-kalebozan demiryolu ıns.San.ve tic.a.S.<br />

Beysukent Dalaman Sok. No: 10 > 06800 Cankaya - Ankara<br />

(Turkey)<br />

Tel. +90 312 236 42 73 > Fax +90 312 236 42 78<br />

www.rhomberg-kalebozan.com.tr > info@rhomberg-kalebozan.com.tr<br />

www.bahNtechNik.com<br />

ahhüt için 70 m uzunluğunda 220 t. toplam<br />

ağırlıktaki Makina parkını Doğu Sahilinden<br />

Kuzey batı Avustralyaya taşıyacak. Bu taşıma<br />

3.500 km‘lik mesafeye 10 günde yapılacak.<br />

Bazen bu taşımaya polis araçları refakat<br />

edecektir. Bu yüksek motivasyonlu hedef<br />

Ağustos ayı ortasında sona erecektir. İhale<br />

volümü 2.5 AUS $ Mio (EUR 1.5 Mio ).