f) The operati<strong>on</strong>al methodology to be adopted; including<br />

tolls/fees/charges collecti<strong>on</strong> procedures, m<strong>on</strong>itoring procedures and<br />

other service provisi<strong>on</strong>; and<br />

g) The proposed maintenance regime including the organisati<strong>on</strong>al system<br />

that will be adopted <str<strong>on</strong>g>for</str<strong>on</strong>g> routine maintenance and repair, l<strong>on</strong>ger-term<br />

inspecti<strong>on</strong>, m<strong>on</strong>itoring and rectificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> identified defects and<br />

normal deteriorati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Infrastructure/Facility.<br />

43.12 Statement <str<strong>on</strong>g>of</str<strong>on</strong>g> Proposed Technical Changes to the C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming Scheme<br />

43.12.1 In the event that the Bidder shall c<strong>on</strong>clude, as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> its `Project<br />

Appreciati<strong>on</strong> Statement‟, or otherwise, that it wishes to modify the<br />

proposals c<strong>on</strong>tained in the C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming Scheme, either materially or<br />

otherwise, the Bidder shall provide supporting drawings and calculati<strong>on</strong>s to<br />

justify the proposed deviati<strong>on</strong>s from the C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming Scheme.<br />

43.12.2 Such deviati<strong>on</strong>s shall be designed and evaluated, by the Bidder, in sufficient<br />

detail as to indicate, as a minimum:<br />

a) Any changes in the layout, line and level <str<strong>on</strong>g>for</str<strong>on</strong>g> the Infrastructure/Facility<br />

or its ancillary features;<br />

b) Any changes in the land requirements <str<strong>on</strong>g>for</str<strong>on</strong>g> the proposal;<br />

c) Any changes in the choice <str<strong>on</strong>g>of</str<strong>on</strong>g> materials; and<br />

d) Any c<strong>on</strong>sequential changes in terms <str<strong>on</strong>g>of</str<strong>on</strong>g> the design life, operati<strong>on</strong>al<br />

characteristics and maintenance needs <str<strong>on</strong>g>of</str<strong>on</strong>g> the facility.<br />

43.12.3 The results <str<strong>on</strong>g>of</str<strong>on</strong>g> these studies shall be included, by the Bidder, in a `Statement<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> Proposed Technical Changes to the C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming Scheme‟.<br />

43.12.4 In the event that the Bidder should decide to adopt the C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming Scheme,<br />

without amendment, a statement to this effect should be given.<br />

43.13 Statement <str<strong>on</strong>g>of</str<strong>on</strong>g> Land Requirements<br />

The Bidder shall provide statement <str<strong>on</strong>g>of</str<strong>on</strong>g> additi<strong>on</strong>al land requirements (if any).<br />

All cost relating to land requirements, shifting <str<strong>on</strong>g>of</str<strong>on</strong>g> utilities, resettlement issues<br />

etc. shall be borne by the Bidder. Employer shall however provide all<br />

possible assistance in this regard except financial.<br />

43.14 Work Programme<br />

43.14.1 The Bidder shall provide a detailed Work Programme, showing in quarterly<br />

intervals the anticipated start-up and c<strong>on</strong>structi<strong>on</strong> schedule to achieve the<br />

Availability Date specified in Clause IB 5.<br />

43.14.2 In preparing this Work Programme, Bidders are advised that it will be a<br />

c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>cessi<strong>on</strong> Agreement that specified secti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> the Project<br />

are completed and available <str<strong>on</strong>g>for</str<strong>on</strong>g> use at specified times. Failure to meet these<br />

specified targets will result in the impositi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> penalties <strong>on</strong> the C<strong>on</strong>cessi<strong>on</strong><br />

Company.<br />