18.11.2014 Views

international civil aviation organization south american ... - ICAO

international civil aviation organization south american ... - ICAO

international civil aviation organization south american ... - ICAO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- 6 -<br />

3.2 The primary network of the new digital network should be the satellite network, in view<br />

of the high availability of a satellite-based network, as shown by the existing digital network in the SAM<br />

Region (REDDIG) in the last ten years.<br />

3.3 The ground network should encompass all the States of the Region. According to the<br />

information presented by the communication service providers, there were some States in the Region<br />

where the provider had no operations and therefore the regional communication service provider had to<br />

coordinate with other communication service providers in order to provide coverage to those countries,<br />

thus possibly increasing the cost of services in such locations.<br />

3.4 Since SAM States had approved the mixed (satellite + ground) network solution for the<br />

new digital network in the SAM Region, the technical specifications would be prepared taking into<br />

account the adopted solution. The implementation of a network would depend on the cost involved in<br />

this solution. The decision would be made at the Twelfth Meeting of Civil Aviation Authorities of the<br />

South American Region (RAAC/12) (Lima, Peru, 3-6 October 2011).<br />

3.5 The technical specifications to be drafted should not take into account the technical<br />

requirements of the new network but rather the performance parameters, such as availability, safety,<br />

integrity, reliability, robustness, management capacity, and life of network equipment.<br />

3.6 Furthermore, to ensure network availability, the technical specifications should include<br />

the necessary spare parts and training for the personnel that will be responsible for maintaining the new<br />

network.<br />

3.7 Consideration was given to the possibility of reusing some pieces of equipment of the<br />

existing network, such as the amplifiers and the antennas. In this sense, the companies participating in the<br />

bidding process should make site visits to confirm such possibility.<br />

3.8 Likewise, it was also felt that the technical specifications should include the requirement<br />

for installing the new network in a way that ensured service continuity. One such requirement would be<br />

the need to have additional bandwidth.<br />

- - - - - -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!