21.11.2014 Views

revised RFP Document - Uttar Pradesh Tourism

revised RFP Document - Uttar Pradesh Tourism

revised RFP Document - Uttar Pradesh Tourism

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DEPARTMENT OF TOURISM<br />

GOVERNMENT OF UTTAR PRADESH<br />

REQUEST FOR PROPOSAL (<strong>RFP</strong>)<br />

FOR SELECTION OF<br />

PROJECT MANAGEMENT CONSULTANT<br />

FOR<br />

INTEGRATED INFRASTRUCTURE<br />

DEVELOPMENT AROUND TAJ<br />

NOVEMBER 2012<br />

(Revised based on Pre-bid Queries raised by Applicants)<br />

Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Paryatan Bhawan, C-13, Vipin Khand, Gomti Nagar, Lucknow: 226 010


Disclaimer<br />

The information contained in this Request for Proposal (the “<strong>RFP</strong>”) document or subsequently provided to<br />

Applicants, whether in documentary or any other form by or on behalf of the Authority or any of their<br />

employees or advisors, is provided to Applicants, on the terms and conditions set out in this <strong>RFP</strong> and such<br />

other terms and conditions subject to which such information is provided.<br />

This <strong>RFP</strong> is not an agreement and is neither an offer nor invitation of offer by the Authority to the prospective<br />

Applicants or any other person. The purpose of this <strong>RFP</strong> is to provide interested parties with information that<br />

may be useful to them in making their Proposal pursuant to this <strong>RFP</strong>. This <strong>RFP</strong> includes statements, which<br />

reflect various assumptions and assessments arrived at by the Authority in relation to the Consultancy. Such<br />

assumptions, assessments and statements do not purport to contain all the information that each Applicant<br />

may require. This <strong>RFP</strong> may not be appropriate for all persons, and it is not possible for the Authority, its<br />

employees or advisors to consider the investment objectives, financial situation and particular needs of each<br />

party who reads or uses this <strong>RFP</strong>. The assumptions, assessments, statements and information contained in<br />

this <strong>RFP</strong>, may not be complete, accurate, adequate or correct. Each Applicant should, therefore, conduct its<br />

own investigations and analysis and should check the accuracy, adequacy, correctness, reliability and<br />

completeness of the assumptions, assessments, statements and information contained in this <strong>RFP</strong> and obtain<br />

independent advice from appropriate sources.<br />

Information provided in this <strong>RFP</strong> to the Applicants is on a wide range of matters, some of which depends<br />

upon interpretation of law. The information given is not an exhaustive account of statutory requirements and<br />

should not be regarded as a complete or authoritative statement of law. The Authority accepts no<br />

responsibility for the accuracy or otherwise for any interpretation or opinion on law expressed herein.<br />

The Authority, its employees and advisors make no representation or warranty and shall have no liability to<br />

any person, including any Applicant under any law, statute, rules or regulations or tort, principles of<br />

restitution or unjust enrichment or otherwise for any loss, damages, cost or expense which may arise from or<br />

be incurred or suffered on account of anything contained in this <strong>RFP</strong> or otherwise, including the accuracy,<br />

adequacy, correctness, completeness or reliability of the <strong>RFP</strong> and any assessment, assumption, statement or<br />

information contained therein or deemed to form part of this <strong>RFP</strong> or arising in any way in this Selection<br />

Process.<br />

The Authority also accepts no liability of any nature whether resulting from negligence or otherwise<br />

howsoever caused arising from reliance of any Applicant upon the statements contained in this <strong>RFP</strong>.<br />

The Authority may in its absolute discretion, but without being under any obligation to do so, update, amend<br />

or supplement the information, assessment or assumptions contained in this <strong>RFP</strong>.<br />

The issue of this <strong>RFP</strong> does not imply that the Authority is bound to select an Applicant or to appoint the<br />

Selected Applicant, as the case may be, for the Consultancy and the Authority reserves the right to reject all<br />

or any of the Proposals without assigning any reason whatsoever.<br />

The Applicant shall bear all its costs associated with or relating to the preparation and submission of its<br />

Proposal including but not limited to preparation, copying, postage, delivery fees, expenses associated with<br />

any demonstrations or presentations which may be required by the Authority or any other costs incurred in<br />

connection with or relating to its Proposal. All such costs and expenses will remain with the Applicant and the<br />

Authority shall not be liable in any manner whatsoever for the same or for any other costs or other expenses<br />

incurred by an Applicant in preparation or submission of the Proposal, regardless of the conduct or outcome<br />

of the Selection Process.<br />

Request for Proposal 1


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Contents<br />

1 INTRODUCTION................................................................................................... 4<br />

1.1 Background ............................................................................................................... 4<br />

1.2 Request for Proposal ................................................................................................. 4<br />

1.3 Due diligence by Applicants ..................................................................................... 5<br />

1.4 Sale of <strong>RFP</strong> <strong>Document</strong> .............................................................................................. 5<br />

1.5 Validity of the Proposal ............................................................................................ 5<br />

1.6 Selection Process of a Consultant ............................................................................. 5<br />

1.7 Schedule of Selection Process .................................................................................. 5<br />

1.8 Pre-Proposal Conference .......................................................................................... 6<br />

1.9 Communications ....................................................................................................... 6<br />

2 INSTRUCTIONS TO APPLICANTS .................................................................. 6<br />

2.1 Scope of Proposal ...................................................................................................... 6<br />

2.2 Conditions of Eligibility of Applicants .................................................................... 7<br />

2.3 Conflict of Interest .................................................................................................... 9<br />

2.4 Number of Proposals ................................................................................................. 9<br />

2.5 Cost of Proposal ........................................................................................................ 9<br />

2.6 Site visit and verification of information .................................................................. 9<br />

2.7 Acknowledgement by Applicant ............................................................................ 10<br />

2.8 Right to reject any or all Proposals ......................................................................... 10<br />

2.9 Contents of the <strong>RFP</strong> <strong>Document</strong> .............................................................................. 10<br />

2.10 Clarifications ........................................................................................................... 11<br />

2.11 Amendment of <strong>RFP</strong> <strong>Document</strong> .............................................................................. 12<br />

2.12 Language ................................................................................................................. 12<br />

2.13 Format and signing of Proposal .............................................................................. 12<br />

2.14 Technical Proposal .................................................................................................. 13<br />

2.15 Financial Proposal ................................................................................................... 14<br />

2.16 Submission of Proposal ........................................................................................... 14<br />

2.17 Proposal Due Date ................................................................................................... 15<br />

2.18 Late Proposals ......................................................................................................... 15<br />

2.19 Modification/ substitution/ withdrawal of Proposals ............................................. 15<br />

2.20 Bid Security ............................................................................................................. 15<br />

2.21 Evaluation of Proposals .......................................................................................... 16<br />

2.22 Confidentiality ......................................................................................................... 17<br />

2.23 Clarifications ........................................................................................................... 17<br />

2.24 Substitution of Key Personnel ................................................................................ 18<br />

2.25 Indemnity ................................................................................................................. 18<br />

Request for Proposal 2


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.26 Award of Consultancy ............................................................................................ 18<br />

2.27 Execution of Agreement ......................................................................................... 18<br />

2.28 Commencement of Assignment .............................................................................. 18<br />

2.29 Proprietary data ....................................................................................................... 19<br />

3 CRITERIA FOR EVALUATION ...................................................................... 19<br />

3.1 Evaluation of Technical Proposals ......................................................................... 19<br />

3.2 Evaluation of Financial Proposal ............................................................................ 25<br />

4 FRAUD AND CORRUPT PRACTICES ........................................................... 26<br />

4.1 General .................................................................................................................... 26<br />

5 MISCELLANEOUS ............................................................................................. 27<br />

5.1 Pre-proposal Conference ......................................................................................... 27<br />

5.2 Performance security ............................................................................................... 28<br />

5.3 Period of Consultancy ............................................................................................. 28<br />

Request for Proposal 3


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

1 INTRODUCTION<br />

1.1 Background<br />

1.1.1 Agra is a popular tourist destination and home to World Heritage Sites and<br />

internationally known historical monuments of Taj Mahal, Agra Fort, and<br />

Fatehpur Sikri. Agra is at a distance of 200 kilometres from India’s capital city<br />

New Delhi, and approximately 300 kilometres from the State capital Lucknow.<br />

According to a study carried out by the <strong>Tourism</strong> Ministry, Government of India,<br />

about 35 percent of foreign tourists visit India only to see the Taj Mahal that is<br />

not only Agra's number one landmark but also India's top heritage site. Taj<br />

Mahal is situated on the Eastern bank of river Yamuna. The Taj Mahal is<br />

located in Tajganj Municipal ward of Agra. The area is surrounded by famous<br />

Sahjahan Park and Taj Nature Walk.<br />

1.1.2 Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong>, the nodal agency for<br />

implementing tourism infrastructure in the state is making various endeavours to<br />

improve infrastructure around Taj Mahal. Based on a recent study, the Authority<br />

has identified the following components of world class quality befitting to the<br />

World Heritage Site of the Taj to be implemented in a time bound manner (the<br />

“Project”).<br />

a. Development of world class approach roads to Taj Mahal (East Gate, West<br />

Gate and South Gate approach road)<br />

b. Development of Tajganj infrastructure<br />

c. Development of adjoining gardens (Sahjahan Garden, Taj Nature Walk,<br />

Mehtab Bagh) and<br />

d. Landscaping of nearby river front<br />

1.1.3 In pursuance of the above, Director General <strong>Tourism</strong>, Government of <strong>Uttar</strong><br />

<strong>Pradesh</strong> (“Authority”) has decided to carry out the process for selection of a<br />

Project Management Consultant (“Consultant”) for providing Consultancy<br />

services for the Project in prescribed format set out in this <strong>RFP</strong> <strong>Document</strong>.<br />

1.1.4 Scope of Consultancy is mentioned in Schedule I of this <strong>RFP</strong> <strong>Document</strong>.<br />

1.2 Request for Proposal<br />

1.2.1 The Authority invites Proposals (the “Proposal or Bid”) for selection of a<br />

Consultant to prepare detailed project reports, detailed engineering and detailed<br />

estimates based on necessary surveys, review and approval of existing designs<br />

and drawings, obtain the necessary approvals and clearances required for Project<br />

implementation, assist the Authority in procuring Contractors, day to day<br />

supervision, monitoring of progress and quality of construction, erection and<br />

installation work, reporting and ensuring compliance by the Contractor with the<br />

design and specifications during implementation period of the Project<br />

(“Consultancy”) through an open competitive Selection Process in accordance<br />

with the procedure set out herein.<br />

Request for Proposal 4


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

1.3 Due diligence by Applicants<br />

1.3.1 Applicants are encouraged to inform themselves fully about the Assignment and<br />

the local conditions before submitting the Proposal by paying a visit to the<br />

Authority and the Project site, sending written queries to the Authority, and<br />

attending a Pre-Proposal Conference on the date and time specified in Clause<br />

1.8.<br />

1.4 Sale of <strong>RFP</strong> <strong>Document</strong><br />

1.4.1 <strong>RFP</strong> document can be obtained between 1100 hrs and 1600 hrs on all working<br />

days from October 27, 2012 to November 30, 2012 from the office of Director<br />

General, <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong>, Paryatan Bhawan, C-13, Vipin<br />

Khand, Gomti Nagar, Lucknow on payment of a fee of Rs. 10,000 (Rupees Ten<br />

thousand) only (cost of <strong>RFP</strong> <strong>Document</strong>) in the form of a Demand Draft drawn<br />

on any Nationalised/Scheduled Bank in India in favour of Director General,<br />

<strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong> and payable at Lucknow. The <strong>RFP</strong><br />

<strong>Document</strong> can also be downloaded from the Official Website of the Authority<br />

(www.up-tourism.com/tender). In case of a downloaded form, the Applicant has<br />

to provide the aforesaid Demand Draft along with the Proposal. The Proposal<br />

without the aforesaid Demand Draft will not be considered. The cost of <strong>RFP</strong><br />

<strong>Document</strong> is not refundable in any case.<br />

1.5 Validity of the Proposal<br />

1.5.1 The Proposal shall be valid for a period of 180 days from the date of opening of<br />

the Financial Proposal.<br />

1.6 Selection Process of a Consultant<br />

1.6.1 The Authority has adopted a two stage selection process (collectively the<br />

“Selection Process”) in evaluating the Proposals comprising Technical and<br />

Financial proposals to be submitted in two separate sealed envelopes. In the first<br />

stage, a technical evaluation will be carried out as specified in Clause 3.1. In the<br />

second stage, the financial evaluation will be carried out as specified in Clause<br />

3.2. The weightage to Technical and Financial Proposals would be 80% and<br />

20% respectively. The Applicant scoring maximum Total Marks would be<br />

recommended for selection.<br />

1.7 Schedule of Selection Process<br />

1.7.1 The Authority would endeavour to adhere to the following schedule:<br />

Last date for receiving November 19, 2012<br />

queries/clarifications<br />

Proposal Due Date (PDD) December 03, 2012<br />

Opening of Technical Proposals December 03, 2012<br />

15.30 Hrs. at Conference Hall, Paryatan<br />

Bhawan, C-13, Vipin Khand, Gomti Nagar<br />

Lucknow: 226 010<br />

Request for Proposal 5


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Opening of Financial Proposals<br />

Letter of Intent (LOI)<br />

Signing of Agreement<br />

To be intimated later<br />

Within 15 days from opening of Financial<br />

Proposals<br />

Within 15 days from issuance of LOI<br />

1.8 Pre-Proposal Conference<br />

1.8.1 The pre-proposal conference will be held to explain the Project and scope of work<br />

in detail to the prospective Applicants. This opportunity will also be used for<br />

obtaining the feedback on <strong>RFP</strong> by the prospective Applicants. The date, time and<br />

venue of Pre-Proposal Conference shall be:<br />

Date November 16, 2012<br />

Time<br />

15.00 Hrs<br />

Venue<br />

Conference Hall, 4 th Floor, Paryatan Bhawan, Lucknow<br />

1.9 Communications<br />

1.9.1 All communications including the submission of Proposal should be addressed<br />

to:<br />

Manoj Kumar Singh, IAS<br />

Director General, <strong>Tourism</strong><br />

Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Paryatan Bhawan, C-13, Vipin Khand, Gomti Nagar<br />

Lucknow: 226 010<br />

Phone: 91-522-2308916, 2307095, E-mail: upstdc@up-tourism.com<br />

1.9.2 For the purpose of site visit and other queries the Applicants are required to<br />

contact the below mentioned person:<br />

Manoj Panda (Project Management Unit)<br />

Contact No: 07381010273<br />

E-mail: pandamanoj@rediffmail.com<br />

2 INSTRUCTIONS TO APPLICANTS<br />

2.1 Scope of Proposal<br />

2.1.1 Detailed description of the objectives, scope of services, deliverables and other<br />

requirements relating to this proposal are specified in this <strong>RFP</strong>. In case an<br />

Applicant possesses the requisite experience and capabilities required for<br />

undertaking the Consultancy, it may participate in the Selection Process in<br />

response to this invitation to offer. The manner in which the Proposal is required<br />

to be submitted, evaluated and accepted is explained in this <strong>RFP</strong>.<br />

2.1.2 Applicants are advised that the selection of Consultant shall be on the basis of<br />

an evaluation by the Authority through the Selection Process specified in this<br />

<strong>RFP</strong>. Applicants shall be deemed to have understood and agreed that no<br />

explanation or justification for any aspect of the Selection Process will be given<br />

Request for Proposal 6


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

and that the Authority’s decisions are without any right of appeal whatsoever.<br />

2.1.3 The Applicant shall submit its Proposal in the prescribed <strong>RFP</strong> <strong>Document</strong> and<br />

manner specified in this <strong>RFP</strong>. The Technical Proposal shall be submitted in the<br />

form at Appendix-I and the Financial Proposal shall be submitted in the form at<br />

Appendix-II.<br />

2.2 Conditions of Eligibility of Applicants<br />

2.2.1 Applicants must read carefully the minimum conditions of eligibility (the<br />

“Conditions of Eligibility”) provided herein. Proposals of only those<br />

Applicants who satisfy the Conditions of Eligibility will be considered for<br />

evaluation.<br />

2.2.2 The Applicants eligible for participating in the Assignment shall be a company<br />

registered in India under the Companies Act, 1956 with existence from the last<br />

three years fulfilling each of the following requirements. The Applicant can also<br />

be a Consortium of maximum three companies with a Lead member:<br />

Technical Capacity: Experience as Project Management Consultant for at least<br />

three (3) completed Eligible Assignments, with minimum cost of each project of<br />

Rs. 50 crores (excluding cost of land)<br />

Financial Capacity: The Applicant shall have an average annual turnover of at<br />

least Rs 25 crores in last three financial years (2009-2010, 2010-2011, 2011-<br />

2012). The Financial Capacity has to be met by the Lead Member only.<br />

2.2.3 The Applicant should have a team of experts and specialists (“Key Personnel”)<br />

in their respective areas of expertise and managerial/support staff such that the<br />

Applicant should be able to complete the Consultancy within the specified time<br />

schedule. The Applicant may associate various Key Personnel in the proposed<br />

team<br />

2.2.4 The Project Manager shall be deployed within 7 days of the written intimation<br />

issued by the Authority whereas the other members of the Team shall be<br />

deployed within 15 days of written intimation issued by the Authority, as<br />

required. The composition of the Consultant Team shall be as follows:<br />

Team<br />

Team Leader/<br />

Project<br />

Manager<br />

Civil<br />

Engineer<br />

(Building and<br />

Infra.)<br />

Educational<br />

Qualification<br />

Graduation in<br />

Civil<br />

Engineering/<br />

Architecture<br />

Bachelor in<br />

Engineering<br />

Length of<br />

Professional<br />

Experience<br />

(in Years)<br />

Experience on Eligible<br />

Assignments<br />

15 He should have led Project<br />

Management teams for 2<br />

Eligible Assignments.<br />

10 He should have worked as a<br />

Building/ Infrastructure<br />

Engineer for 1 Eligible<br />

Assignments<br />

Request for Proposal 7


Civil<br />

Engineer<br />

(Water<br />

supply/<br />

sanitation)<br />

Design /<br />

Structural<br />

Engineer<br />

Electrical<br />

Engineer<br />

Landscape<br />

Planner<br />

Cultural<br />

Heritage<br />

Conservation<br />

Specialist<br />

Community<br />

Development<br />

Specialist/<br />

Livelihood<br />

Expert<br />

Procurement<br />

Specialist<br />

Safeguards<br />

Specialist-<br />

Environment<br />

Project<br />

Monitoring<br />

Specialist<br />

Bachelor in<br />

Engineering<br />

Bachelor in<br />

Civil<br />

Engineering<br />

Bachelor in<br />

Electrical<br />

Engineering<br />

PG in<br />

Architecture /<br />

Degree in<br />

Landscape<br />

Architecture/<br />

Planning<br />

PG in<br />

Conservation<br />

Planning/Cons<br />

ervation<br />

Management<br />

PG in Social<br />

science/<br />

Management<br />

or related field<br />

Bachelor in<br />

Civil<br />

Engineering<br />

Bachelor in<br />

Planning/<br />

Environment/<br />

Ecology<br />

Bachelor in<br />

Civil<br />

Engineering<br />

Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

10 He should have worked as a<br />

Water supply/ Sanitation<br />

Engineer for 1 Eligible<br />

Assignments<br />

10 He should work as Design<br />

and Structural engineer<br />

10 He should have worked as an<br />

Electrical Engineer for 1<br />

Eligible Assignments<br />

10 He should have worked as a<br />

Landscape Planner for 1<br />

Eligible Assignments<br />

10 He should have worked as a<br />

Conservation Specialist for 1<br />

Eligible Assignments<br />

10 He should have worked as a<br />

Community Development<br />

Specialist for 1 Eligible<br />

Assignments<br />

10 He should have worked as a<br />

Procurement Specialist for 2<br />

Eligible Assignments<br />

10 He should have worked as an<br />

Environmental Specialist for<br />

1 Eligible Assignments<br />

10 He should have worked as a<br />

Project Monitoring Specialist<br />

for 1 Eligible Assignments<br />

Support Staff<br />

Transport Planner, Site Engineer, Auto CAD Operator etc.<br />

2.2.5 The Applicant shall enclose with Proposal its Audited Annual Accounts<br />

certified by its Statutory Auditors /Chartered Accountants that ordinarily audits<br />

the annual accounts of the Applicant.<br />

2.2.6 Any entity which has been barred by the Central Government, or any State<br />

Government, or a statutory authority or a public sector undertaking, as the case<br />

may be, from participating in any project, and the bar subsists as on the date of<br />

Proposal, would not be eligible to submit a Proposal either by itself or through<br />

its Associate.<br />

Request for Proposal 8


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.2.7 An Applicant should have, during the last three years, neither failed to perform<br />

on any agreement, as evidenced by imposition of a penalty by an arbitral or<br />

judicial authority or a judicial pronouncement or arbitration award against the<br />

Applicant, nor been expelled from any project or agreement nor have had any<br />

agreement terminated for breach by such Applicant.<br />

2.3 Conflict of Interest<br />

2.3.1 An Applicant shall not have a Conflict of Interest that may affect the Selection<br />

Process or the Consultancy. Any Applicant found to have a Conflict of Interest<br />

shall be disqualified. In the event of disqualification, the Authority shall forfeit<br />

and appropriate the Bid Security without prejudice to any other right or remedy<br />

that may be available to the Authority hereunder or otherwise.<br />

For the purpose of this <strong>RFP</strong> <strong>Document</strong>, “Conflict of Interest” means the<br />

Applicant and its member shall not be involved in execution of the Project.<br />

2.3.2 The Authority requires that the Consultant provides professional, objective, and<br />

impartial advice and at all times hold the Authority’s interests paramount, avoid<br />

conflicts with other assignments or its own interests, and act without any<br />

consideration for future work. The Consultant shall not accept or engage in any<br />

assignment that would be in conflict with its prior or current obligations to other<br />

clients, or that may place it in a position of not being able to carry out the<br />

assignment in the best interests of the Authority.<br />

2.3.3 An Applicant appointed to provide Consultancy for this Project, shall be<br />

disqualified from subsequently providing goods or works or services related to<br />

the construction and operation of the same Project and any breach of this<br />

obligation shall be construed as Conflict of Interest.<br />

2.4 Number of Proposals<br />

2.4.1 No Applicant shall submit more than one Proposal for the Consultancy.<br />

2.5 Cost of Proposal<br />

2.5.1 The Applicants shall be responsible for all of the costs associated with the<br />

preparation of their Proposals and their participation in the Selection Process,<br />

visits to the Authority, Project site et cetera. The Authority will not be<br />

responsible or in any way liable for such costs, regardless of the conduct or<br />

outcome of the Selection Process.<br />

2.6 Site visit and verification of information<br />

2.6.1 Applicants are encouraged to submit their respective Proposals after visiting the<br />

Project site and ascertaining for themselves the site conditions, traffic, location,<br />

surroundings, climate, access to the site, availability of drawings and other data<br />

with the Authority.<br />

Request for Proposal 9


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.7 Acknowledgement by Applicant<br />

2.7.1 It shall be deemed that by submitting the Proposal, the Applicant has:<br />

a. made a complete and careful examination of the <strong>RFP</strong> <strong>Document</strong>;<br />

b. received all relevant information requested from the Authority;<br />

c. acknowledged and accepted the risk of inadequacy, error or mistake in the<br />

information provided in the <strong>RFP</strong> <strong>Document</strong> or furnished by or on behalf of<br />

the Authority or relating to any of the matters referred to in Clause 2.6<br />

above;<br />

d. satisfied itself about all matters, things and information, including matters<br />

referred to in Clause 2.6 herein above, necessary and required for<br />

submitting an informed Application and performance of all of its<br />

obligations thereunder;<br />

e. acknowledged that it does not have a Conflict of Interest; and<br />

f. agreed to be bound by the undertaking provided by it under and in terms<br />

hereof.<br />

2.7.2 The Authority shall not be liable for any omission, mistake or error on the part<br />

of the Applicant in respect of any of the above or on account of any matter or<br />

thing arising out of or concerning or relating to <strong>RFP</strong> <strong>Document</strong> or the Selection<br />

Process, including any error or mistake therein or in any information or data<br />

given by the Authority.<br />

2.8 Right to reject any or all Proposals<br />

2.8.1 Notwithstanding anything contained in this <strong>RFP</strong> <strong>Document</strong>, the Authority<br />

reserves the right to accept or reject any or all Proposal and to annul the<br />

Selection Process at any time without any liability or any obligation for such<br />

acceptance, rejection or annulment, and without assigning any reasons thereof.<br />

2.8.2 Without prejudice to the generality of Clause 2.8.1, the Authority reserves the<br />

right to reject any Proposal if:<br />

a. at any time, a material misrepresentation is made or discovered, or<br />

b. the Applicant does not provide, within the time specified by the Authority,<br />

the supplemental information sought by the Authority for evaluation of the<br />

Proposal.<br />

c. Misrepresentation/ improper response by the Applicant may lead to the<br />

disqualification of the Applicant. If such disqualification / rejection occurs<br />

after the Proposals have been opened and the highest ranking Applicant<br />

gets disqualified /rejected, then the Authority reserves the right to consider<br />

the next best Applicant, or take any other measure as may be deemed fit in<br />

the sole discretion of the Authority, including annulment of the Selection<br />

Process.<br />

2.9 Contents of the <strong>RFP</strong> <strong>Document</strong><br />

2.9.1 This <strong>RFP</strong> <strong>Document</strong> comprises the Disclaimer set forth hereinabove, the<br />

contents as listed below and will additionally include any Addendum /<br />

Amendment issued in accordance with Clause 2.11:<br />

Request for Proposal 10


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Request for Proposal<br />

1 Introduction<br />

2 Instructions to Applicants<br />

3 Criteria for Evaluation<br />

4 Fraud and corrupt practices<br />

5 Miscellaneous<br />

Schedules<br />

1 Terms of Reference<br />

2 Form of Agreement<br />

Appendices<br />

Appendix-I Technical Proposal<br />

Form 1 Letter of Proposal<br />

Form 2 Power of Attorney<br />

Form 3 Particulars of the Applicant<br />

Form 4 Financial Capacity of Applicant<br />

Form 5 Proposed Methodology and Work Plan<br />

Form 6 Abstract of Eligible Assignments of the Applicant<br />

Form 7<br />

Form 8<br />

Form 9<br />

Form 10<br />

Appendix-II<br />

Form 1<br />

Form 2<br />

2.10 Clarifications<br />

Details of Eligible Assignments of Applicant<br />

Experience in Consultancy in preparation of DPR/Detailed<br />

Engineering for other similar work in the infrastructure<br />

sectors<br />

Particulars of Personnel to be deployed<br />

CV of Key Personnel<br />

Financial Proposal<br />

Deployment Schedule<br />

Financial Proposal<br />

2.10.1 Applicants requiring any clarification on the <strong>RFP</strong> <strong>Document</strong> may send their<br />

queries to the Authority in writing before the date mentioned in the Schedule of<br />

Selection Process at Clause 1.7. The envelopes shall clearly bear the following<br />

identification:<br />

“Queries/Request for Additional Information concerning <strong>RFP</strong> <strong>Document</strong> for<br />

Integrated Infrastructure Development around Taj”<br />

The Authority shall endeavour to respond to the queries within the period<br />

specified therein but not later than 7 (seven) days prior to the Proposal Due<br />

Date. The responses will be sent by e-mail. The Authority will post the reply to<br />

all such queries on the Official Website and copies thereof will also be<br />

circulated to all Applicants who have purchased the <strong>RFP</strong> <strong>Document</strong> without<br />

identifying the source of queries.<br />

2.10.2 The Authority reserves the right not to respond to any questions or provide any<br />

clarifications, in its sole discretion, and nothing in this Clause 2.10 shall be<br />

construed as obliging the Authority to respond to any question or to provide any<br />

clarification.<br />

Request for Proposal 11


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.11 Amendment of <strong>RFP</strong> <strong>Document</strong><br />

2.11.1 At any time prior to the last date for submission of Proposal, the Authority may,<br />

for any reason, whether at its own initiative or in response to clarifications<br />

requested by an Applicant, modify the <strong>RFP</strong> document by the issuance of<br />

Addendum/ Amendment and posting it on the Official Website.<br />

2.11.2 All such amendments will be notified in writing through fax or e-mail to all<br />

Applicants who have purchased the <strong>RFP</strong> document. The amendments will also<br />

be posted on the Official Website along with the <strong>revised</strong> <strong>RFP</strong> <strong>Document</strong><br />

containing the amendments and will be binding on all Applicants.<br />

2.11.3 In order to afford the Applicants a reasonable time for taking an amendment into<br />

account, or for any other reason, the Authority may, in its sole discretion, extend<br />

the Proposal Due Date.<br />

2.12 Language<br />

2.12.1 The Proposal with all accompanying documents and all communications in<br />

relation to or concerning the Selection Process shall be in English language and<br />

strictly on the prescribed forms provided in this <strong>RFP</strong> <strong>Document</strong>. No supporting<br />

document or printed literature shall be submitted with the Proposal unless<br />

specifically asked for and in case any of these <strong>Document</strong>s is in another<br />

language, it must be accompanied by a true translation of that document in<br />

English, in which case, for all purposes of interpretation of the Proposal, the<br />

translation in English shall prevail.<br />

2.13 Format and signing of Proposal<br />

2.13.1 The Applicant shall provide all the information sought under this <strong>RFP</strong><br />

<strong>Document</strong>. The Authority would evaluate only those Proposals that are received<br />

in the specified forms and complete in all respects.<br />

2.13.2 The Applicant shall prepare one original set of the Proposal (together with<br />

copies of <strong>Document</strong>s required to be submitted along therewith pursuant to this<br />

<strong>RFP</strong>) and clearly marked “ORIGINAL”.<br />

2.13.3 The Proposal and its copy shall be typed or written in indelible ink and signed<br />

by the authorised signatory of the Applicant who shall initial each page, in blue<br />

ink. In case of printed and published <strong>Document</strong>s, only the cover shall be<br />

initialled. All the alterations, omissions, additions, or any other amendments<br />

made to the Proposal shall be initialled by the person(s) signing the Proposal.<br />

The Proposals must be signed by the authorised representative holding the<br />

Power of Attorney of the Applicant.<br />

A copy of the Power of Attorney certified under the hands of Director of the<br />

Applicant and notarised by a notary public in the form specified in Appendix-I<br />

(Form-2) shall accompany the Proposal.<br />

Request for Proposal 12


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.14 Technical Proposal<br />

2.14.1 Applicant shall submit the technical proposal in Appendix-I “Technical<br />

Proposal”.<br />

2.14.2 While submitting the Technical Proposal, the Applicant shall, in particular, ensure<br />

that:<br />

a. The Bid Security is provided;<br />

b. all forms are submitted in the prescribed formats and signed by the<br />

authorised prescribed signatories;<br />

c. Power of Attorney, if applicable, is executed as per para 2.13.3 above;<br />

d. Curriculum Vitae (CVs) of all Key Personnel (as against para 2.2.4) have<br />

been included;<br />

e. CVs have been recently signed and dated in blue ink by the respective<br />

Personnel and countersigned by the Applicant. Photocopy or unsigned /<br />

countersigned CVs shall be rejected;<br />

f. Key Personnel would be available for the period indicated in the TOR;<br />

g. the Proposal is responsive in terms of Clause 2.21.2<br />

2.14.3 Failure to comply with the requirements spelt out in this Clause 2.14 shall make<br />

the Proposal liable to be rejected.<br />

2.14.4 If an individual Key Personnel makes a false averment regarding his qualification,<br />

experience or other particulars, or his commitment regarding availability for the<br />

Assignment is not fulfilled at any stage after signing of the Agreement, he shall be<br />

liable to be debarred for any future assignment of the Authority. The award of this<br />

Consultancy to the Applicant may also be liable to cancellation in such an event.<br />

2.14.5 The Technical Proposal shall not include any financial information relating to<br />

the Financial Proposal.<br />

2.14.6 The Authority reserves the right to verify all statements, information and<br />

documents, submitted by the Applicant in response to the <strong>RFP</strong> <strong>Document</strong>. Any<br />

such verification or the lack of such verification by the Authority to undertake<br />

such verification shall not relieve the Applicant of its obligations or liabilities<br />

hereunder nor will it affect any rights of the Authority thereunder.<br />

2.14.7 In case it is found during the evaluation or at any time before signing of the<br />

Agreement or after its execution and during the period of subsistence thereof, that<br />

one or more of the eligibility conditions have not been met by the Applicant or the<br />

Applicant has made material misrepresentation or has given any materially<br />

incorrect or false information, the Applicant shall be disqualified forthwith if not<br />

yet appointed as the Consultant either by issue of the LOI or entering into of the<br />

Agreement, and if the Selected Applicant has already been issued the LOI or has<br />

entered into the Agreement, as the case may be, the same shall, notwithstanding<br />

anything to the contrary contained therein or in this <strong>RFP</strong> <strong>Document</strong>, be liable to<br />

be terminated, by a communication in writing by the Authority without the<br />

Authority being liable in any manner whatsoever to the Applicant or Consultant,<br />

as the case may be.<br />

Request for Proposal 13


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

In such an event, the Authority shall forfeit and appropriate the Bid Security as<br />

mutually agreed pre-estimated compensation and damages payable to the<br />

Authority for, inter alia, time, cost and effort of the Authority, without prejudice<br />

to any other right or remedy that may be available to the Authority.<br />

2.15 Financial Proposal<br />

2.15.1 Applicants shall submit the Financial Proposal in the Appendix-II “Financial<br />

Proposal” clearly indicating the total cost of the Consultancy (Form-2 of<br />

Appendix-II) in both figures and words, in Indian Rupees, and signed by the<br />

Applicant’s Authorised Representative. In the event of any difference between<br />

figures and words, the amount indicated in words shall prevail. In the event of a<br />

difference between the arithmetic total and the total shown in the Financial<br />

Proposal, the lower of the two shall prevail.<br />

2.15.2 While submitting the Financial Proposal, the Applicant shall ensure the following:<br />

a. All the costs associated with the assignment shall be included in the<br />

Financial Proposal. These shall normally cover remuneration for all the<br />

Personnel (Expatriate and Resident, in the field, office, accommodation,<br />

air fare, equipment, printing of documents, surveys, geo-technical<br />

investigations. The total amount indicated in the Financial Proposal shall<br />

be without any condition attached or subject to any assumption, and shall<br />

be final and binding. In case any assumption or condition is indicated in<br />

the Financial Proposal, it shall be considered non-responsive and liable to<br />

be rejected.<br />

b. The Financial Proposal shall take into account all expenses and tax<br />

liabilities. For the avoidance of doubt, it is clarified that all taxes shall be<br />

deemed to be included in the costs shown under different items of the<br />

Financial Proposal. Further, all payments shall be subject to deduction of<br />

taxes at source as per Applicable Laws.<br />

c. Costs (including break down of costs) shall be expressed in INR.<br />

2.16 Submission of Proposal<br />

2.16.1 The Applicants shall submit the Proposal in hard bound/spiral bound form with<br />

all pages numbered serially and by giving an index of submissions. Each page of<br />

the submission shall be initialled by the Applicant or Authorised Representative<br />

of the Applicant as per the terms of the <strong>RFP</strong> <strong>Document</strong>. In case the Proposal is<br />

submitted on the <strong>RFP</strong> <strong>Document</strong> downloaded from Official Website, the<br />

Applicant shall be responsible for its accuracy and correctness as per the version<br />

uploaded by the Authority and shall ensure that there are no changes caused in<br />

the content of the downloaded <strong>Document</strong>. In case of any discrepancy between<br />

the downloaded or photocopied version of the <strong>RFP</strong> <strong>Document</strong> and the original<br />

<strong>RFP</strong> <strong>Document</strong> issued by the Authority, the latter shall prevail.<br />

2.16.2 The Proposal will be sealed in an outer envelope which will bear the address of<br />

the Authority, Consultancy name and the name and address of the Applicant.<br />

Request for Proposal 14


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.16.3 If the envelope is not sealed and marked as instructed above, the Authority<br />

assumes no responsibility for the misplacement or premature opening of the<br />

contents of the Proposal submitted and consequent losses, if any, suffered by the<br />

Applicant.<br />

2.16.4 The aforesaid outer envelope will contain two separate sealed envelopes; one<br />

clearly marked ‘Technical Proposal’ and the other clearly marked ‘Financial<br />

Proposal’. The envelope marked “Technical Proposal” shall contain:<br />

a. Application in the prescribed format (Form-1 of Appendix-I) along with<br />

Forms 2 to 10 of Appendix-I and supporting documents; and<br />

b. Bid security as specified in Clause 2.20.1<br />

The envelope marked “Financial Proposal” shall contain the Financial Proposal<br />

in the prescribed format (Forms 1 & 2 of Appendix-II).<br />

2.16.5 The completed Proposal must be delivered on or before the specified time on<br />

Proposal Due Date. Proposals submitted by fax, telex, telegram or e-mail shall<br />

not be entertained.<br />

2.17 Proposal Due Date<br />

2.17.1 Proposal should be submitted at or before 1500 hrs on the Proposal Due Date<br />

specified at Clause 1.7 at the address provided in Clause 1.9 in the manner and<br />

form as detailed in this <strong>RFP</strong> <strong>Document</strong>. A receipt thereof should be obtained<br />

from the person specified therein.<br />

2.17.2 The Authority may, in its sole discretion, extend the Proposal Due Date by<br />

issuing an Addendum in accordance with Clause 2.11 uniformly for all<br />

Applicants.<br />

2.18 Late Proposals<br />

2.18.1 Proposals received by the Authority after the specified time on Proposal Due<br />

Date shall not be eligible for consideration and shall be summarily rejected.<br />

2.19 Modification/ substitution/ withdrawal of Proposals<br />

2.19.1 No Proposal shall be modified, substituted, or withdrawn by the Applicant after<br />

the Proposal is submitted according to the provision Clause 2.17.1 above.<br />

2.19.2 Any alteration / modification in the Proposal or additional information or<br />

material supplied subsequent to its submission unless the same has been<br />

expressly sought for by the Authority, shall be disregarded.<br />

2.20 Bid Security<br />

2.20.1 The Applicant shall furnish as part of its Proposal, a Bid Security of Rs.<br />

1,00,000.00 (Rupees One Lakh) only in the form of a Demand Draft issued by<br />

the Nationalised/Scheduled Banks in India in favour of the Director General,<br />

Request for Proposal 15


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

<strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong> payable at Lucknow (the “Bid<br />

Security”).<br />

2.20.2 The Bid Security shall be refunded to the unsuccessful Applicants within a<br />

period of two (2) weeks from the date of signing of Agreement with the<br />

Successful Applicant. The Bid security of the Successful Applicant shall be<br />

refunded after signing of Agreement and submission of Performance Security.<br />

2.20.3 Any Proposal not accompanied by the Bid Security shall be rejected by the<br />

Authority as nonresponsive.<br />

2.20.4 The Authority shall not be liable to pay any interest on the Bid Security amount.<br />

2.20.5 The Applicant, by submitting its Application pursuant to this <strong>RFP</strong> <strong>Document</strong>,<br />

shall be deemed to have acknowledged that without prejudice to the Authority’s<br />

any other right or remedy hereunder or in law or otherwise, the Bid Security<br />

shall be forfeited and appropriated by the Authority under the following<br />

conditions:<br />

a. If an Applicant submits a non-responsive Proposal;<br />

b. If an Applicant engages in any of the Prohibited Practices specified in<br />

Section 4 of this <strong>RFP</strong> <strong>Document</strong>;<br />

c. If an Applicant withdraws its Proposal during the period of its validity as<br />

specified in this <strong>RFP</strong> <strong>Document</strong> and as extended by the Applicant from<br />

time to time;<br />

d. In the case of the Successful Applicant, if the said Applicant fails to (i)<br />

sign the Agreement or (ii) found to have a Conflict of Interest as specified<br />

in Clause 2.3<br />

2.21 Evaluation of Proposals<br />

2.21.1 The Authority shall open the Proposals at 1530 hours on the Proposal Due Date,<br />

at the place specified in Clause 1.7 in the presence of the Applicants or their<br />

authorised representatives who choose to attend. The authorised representative<br />

shall produce satisfactory evidence of authority from the Applicant for whom he<br />

is representing before opening of the proposal. The envelopes marked<br />

“Technical Proposal” shall be opened first. The envelopes marked “Financial<br />

Proposal” shall be kept sealed for opening at a later date.<br />

2.21.2 Prior to evaluation of Proposals, the Authority will determine whether each<br />

Proposal is responsive to the requirements of the <strong>RFP</strong>. The Authority may, in its<br />

sole discretion, reject any Proposal that is not responsive hereunder. A Proposal<br />

shall be considered responsive only if:<br />

a. the Technical Proposal is received in the form specified at Appendix-I;<br />

b. it is received by the Proposal Due Date including any extension thereof<br />

pursuant to Clause 2.17;<br />

c. it is accompanied by the Bid Security as specified in Clause 2.20.1.<br />

d. it is signed, sealed, bound together in hard cover and marked as stipulated<br />

in Clauses 2.13 and 2.16;<br />

Request for Proposal 16


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

e. it is accompanied by the Power of Attorney as specified in Clause 2.13.3;<br />

f. it contains all the information (complete in all respects) as requested in<br />

this <strong>RFP</strong> <strong>Document</strong>;<br />

g. it does not contain any condition or qualification; and<br />

h. it is not non-responsive in terms hereof.<br />

2.21.3 The Authority reserves the right to reject any Proposal which is non-responsive<br />

and no request for alteration, modification, substitution or withdrawal shall be<br />

entertained by the Authority in respect of such Proposals.<br />

2.21.4 The Authority shall subsequently examine and evaluate Proposals in accordance<br />

with the Selection Process specified at Clause 1.6 and the criteria set out in<br />

Section 3 of this <strong>RFP</strong> <strong>Document</strong>.<br />

2.21.5 After the technical evaluation, the Authority shall prepare a list of shortlisted<br />

Applicants in terms of Clause 3.1 for opening of their Financial Proposals. A<br />

date, time and venue will be notified to all shortlisted Applicants for announcing<br />

the result of technical evaluation and opening of Financial Proposals. Before<br />

opening of the Financial Proposals, the list of shortlisted Applicants along with<br />

their Technical Score will be read out. The opening of Financial Proposals shall<br />

be done in presence of respective representatives of Applicants who choose to<br />

be present according to clause 2.21.1 above. The Authority will not entertain<br />

any query or clarification from Applicants who fail to qualify at any stage of the<br />

Selection Process. The financial evaluation of the Proposals shall be carried out<br />

in terms of Clauses 3.2.<br />

2.21.6 Any information contained in the Proposal shall not in any way be construed as<br />

binding on the Authority, its agents, successors or assigns, but shall be binding<br />

against the Applicant if the Consultancy is subsequently awarded to it.<br />

2.22 Confidentiality<br />

2.22.1 Information relating to the examination, clarification, evaluation, and<br />

recommendation for the selection of Applicants shall not be disclosed to any<br />

person who is not officially concerned with the process or is not a retained<br />

professional adviser advising the Authority in relation to matters arising out of,<br />

or concerning the Selection Process. The Authority will treat all information,<br />

submitted as part of the Proposal, in confidence and will require all those who<br />

have access to such material to treat the same in confidence. The Authority may<br />

not divulge any such information unless it is directed to do so by any statutory<br />

entity that has the power under law to require its disclosure or is to enforce or<br />

assert any right or privilege of the statutory entity and/or the Authority.<br />

2.23 Clarifications<br />

2.23.1 To facilitate evaluation of Proposals, the Authority may, at its sole discretion,<br />

seek clarifications from any Applicant regarding its Proposal. Such<br />

clarification(s) shall be provided within the time specified by the Authority for<br />

this purpose. Any request for clarification(s) and all clarification(s) in response<br />

thereto shall be in writing.<br />

Request for Proposal 17


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.23.2 If an Applicant does not provide clarifications sought under Clause 2.23.1<br />

within the specified time, its Proposal shall be liable to be rejected. In case the<br />

Proposal is not rejected, the Authority may proceed to evaluate the Proposal by<br />

construing the particulars requiring clarification to the best of its understanding,<br />

and the Applicant shall be barred from subsequently questioning such<br />

interpretation of the Authority.<br />

2.24 Substitution of Key Personnel<br />

2.24.1 The Authority will not normally consider any request of the Successful<br />

Applicant for substitution of Key Personnel as the ranking of the Applicant is<br />

based on the evaluation of Key Personnel and any change therein may upset the<br />

ranking. Substitution will, however, be permitted if the Key Personnel is not<br />

available for reasons of any incapacity or due to health, subject to equally or<br />

better qualified and experienced personnel being provided to the satisfaction of<br />

the Authority.<br />

2.24.2 Substitution of the Team Leader will not normally be considered and may lead<br />

to disqualification of the Applicant or termination of the Agreement.<br />

2.25 Indemnity<br />

2.25.1 The Applicant shall, subject to the provisions of the Agreement, indemnify the<br />

Authority for an amount not exceeding the value of the Agreement for any<br />

direct loss or damage that is caused due to any deficiency in services.<br />

2.26 Award of Consultancy<br />

2.26.1 After selection, a Letter of Intent (the “LOI”) shall be issued, in duplicate, by<br />

the Authority to the Successful Applicant and the Successful Applicant shall,<br />

within 7 (seven) days of the receipt of the LOI, sign and return the duplicate<br />

copy of the LOI in acknowledgement thereof to the Authority. In the event the<br />

duplicate copy of the LOI duly signed by the Successful Applicant is not<br />

received by the stipulated date, the Authority may, unless it consents to<br />

extension of time for submission thereof, appropriate the Bid Security of such<br />

Applicant.<br />

2.27 Execution of Agreement<br />

2.27.1 After acknowledgement of the LOI as aforesaid by the Successful Applicant, it<br />

shall execute the Consultancy Agreement in the form mentioned in Schedule 2<br />

within the period prescribed in Clause 1.7. The Successful Applicant shall not<br />

be entitled to seek any deviation in the Agreement.<br />

2.28 Commencement of Assignment<br />

2.28.1 The Successful Applicant shall commence the Services at the Project site within<br />

7 (seven) days of the date of the Agreement or such other date as may be<br />

mutually agreed. If the Successful Applicant fails to sign the Agreement as<br />

specified in Clause 2.27.1, the Bid Security shall be forfeited and appropriated<br />

Request for Proposal 18


in accordance with the provisions of Clause 2.20.5.<br />

2.29 Proprietary data<br />

Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

2.29.1 Subject to the provisions of Clause 2.22, all documents and other information<br />

provided by the Authority or submitted by Successful Applicant to the Authority<br />

shall remain or become the property of the Authority. Successful Applicants<br />

may treat all information as strictly confidential. The Authority will not return<br />

any Proposal or any information related thereto. All information collected,<br />

analysed, processed or in whatever manner provided by the Applicant to the<br />

Authority in relation to the Consultancy shall be the property of the Authority.<br />

3 CRITERIA FOR EVALUATION<br />

3.1 Evaluation of Technical Proposals<br />

3.1.1 In the first stage, the Technical Proposal will be evaluated on the basis of<br />

Applicant’s experience, its understanding of TOR, proposed methodology and<br />

Work Plan, and the experience of Key Personnel. Only those Applicants whose<br />

Technical Proposals get a score of 80 marks or more out of 100 shall qualify for<br />

further consideration.<br />

3.1.2 A Proposal shall be rejected if the Team Leader scores less than 70% marks. In<br />

case the Selected Applicant has one Key Personnel, other than the Team Leader,<br />

who scores less than 70% marks, he would have to be replaced, with a better<br />

candidate who, in the opinion of the Authority, would score 70% or above.<br />

3.1.3 The scoring criteria to be used for evaluation shall be as follows:<br />

Parameter<br />

Experience in Consultancy for<br />

Eligible Assignment<br />

Experience in Consultancy in<br />

preparation of Detailed Project<br />

Report (DPR) for other similar<br />

work in the infrastructure<br />

sectors<br />

Annual<br />

Turnover<br />

Proposed Work Plan and<br />

Methodology<br />

Relevant Experience of the<br />

Maximum<br />

Criteria<br />

Marks<br />

30 3 Assignments: 18 Marks<br />

4 Marks for each additional<br />

Assignment subject to maximum<br />

of 30 Marks<br />

10 2.5 Marks each for other similar<br />

work in the infrastructure sectors<br />

(Maximum 4)<br />

5 Rs 25 crore and above: 5 marks<br />

10 Understanding: 2 Marks<br />

Methodology: 3 Marks<br />

Innovativeness/Comments on<br />

Terms of Reference: 2 Marks<br />

Work Program: 3 Marks<br />

Marking shall be done based on<br />

quality submission<br />

45 20% - Educational Qualification<br />

Request for Proposal 19


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Key Personnel<br />

Team Leader/ Project Manager 8<br />

Civil Engineer (Building and<br />

4<br />

Infrastructure)<br />

Civil Engineer (Water supply/<br />

4<br />

sanitation)<br />

Design/ Structural Engineer 4<br />

Electrical Engineer 4<br />

Landscape Planner 4<br />

Cultural Heritage Conservation<br />

3<br />

Specialist<br />

Community<br />

3<br />

Development/Livelihood<br />

Specialist<br />

Procurement Specialist 4<br />

Safeguards Specialist-<br />

3<br />

Environment<br />

Project Monitoring Specialist 4<br />

50% - Marks for the Eligible<br />

Assignments<br />

30% - other similar work in<br />

infrastructure sectors<br />

The details of the education and experience required for each position and terms<br />

of reference of each Applicant are as follows:<br />

Team Leader<br />

Education and Experience: Bachelors in Civil Engineer / Architecture with Post<br />

graduation in Planning / Project Management / or any engineering specialisation<br />

with around 15 years experience in design, management and supervision of urban<br />

infrastructure projects. Must have demonstrated leadership qualities.<br />

Terms of Reference<br />

a. Overall Management of the Project- manage all tasks required under the<br />

contract and ensure delivery of outputs in a timely and satisfactory manner<br />

in accordance with the overall project implementation schedule;<br />

b. Co-ordinate and assist the Authority in their functions and responsibilities<br />

design and implementation;<br />

c. Assist the Authority in coordinating with agencies such as ASI, Ministry of<br />

<strong>Tourism</strong>, Ministry of Culture, , other agencies and other stakeholders.<br />

d. Set up procedures and systems for overall project management and<br />

monitoring project implementation;<br />

e. Develop procedures and as necessary ensure transparent procurement<br />

including prequalification of contractors, evaluation of bids, awards of<br />

contracts etc., and assist the Department in undertaking bidding procedures<br />

including prequalification of the contractors, bidding, bid evaluation and<br />

preparation of bid evaluation reports and awards of contracts for<br />

procurement of equipment, materials and civil works for all contract<br />

packages;<br />

f. Provide solutions to the Authority on key technical issues;<br />

Request for Proposal 20


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

g. Oversee the design of the master plan and management plan for sites.<br />

h. Review preliminary design of the feasibility study including all sites, soil<br />

and other investigations and reconfirm all project components and contract<br />

packages, and specify surveys and investigations as necessary for detailed<br />

design;<br />

i. Contribute to design of all civil and structural design of the facilities and<br />

review detailed designs and associated bidding documents for all subproject<br />

components suitable for various procurement methods<br />

j. Assist the Authority with overall management and supervision of<br />

construction works including the resolution of contractual issues and<br />

preparation of as-built drawings;<br />

k. Review project implementation progress from the perspective of overall<br />

project management and detailed annual work plans, and recommend<br />

remedial measures as appropriate;<br />

l. Support the Authority in monitoring of sub projects, compliance with<br />

regard to assurance.<br />

Civil Engineer (for Building and Infrastructure and Water supply/<br />

sanitation)<br />

Bachelors in Civil Engineering with around 10 years experience in design of civil<br />

structures including infrastructure services such as water supply, sanitation and<br />

solid waste management.. The engineer should be conversant with National/<br />

International codes and best practices in design and management of historical<br />

sites.<br />

Terms of Reference<br />

With overall guidance from the Team Leader and inputs from other specialists,<br />

will be responsible for review and management of all activities such as review of<br />

designs including structural elements, estimates, procurement, bid documents of<br />

all civil and infrastructural facilities.<br />

The Engineer shall:<br />

a. Prepare TORs and coordinate all surveys and investigations required for the<br />

design of improvements;<br />

b. Prepare DPRs and detailed engineering of all sub-components along with<br />

detailed estimate and BoQs<br />

c. Support the team on aspects relating to sourcing of construction material<br />

and related tests;<br />

d. Assist the Authority in appraising subprojects, preparing subproject<br />

appraisal reports and finalizing the bid documents;<br />

e. Assist in bidding procedures including invitation of bids, bid evaluation,<br />

and awards of contract;<br />

f. Support the Authority in preparation of Evaluation reports and related<br />

transactions;<br />

g. Assist the Authority with overall management of works and in the<br />

resolution of contractual issues.<br />

Electrical Engineer<br />

Bachelors in Electrical Engineering with around 10 years experience in design of<br />

electrical installations, layouts etc. The engineer should be conversant with<br />

Request for Proposal 21


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

National/ International codes and best practices in design and management of<br />

infrastructure projects.<br />

Terms of Reference<br />

With overall guidance from the Team Leader and inputs from other specialists,<br />

will be responsible for design, review and management of all activities such as<br />

review of designs including estimates, procurement, bid documents of all<br />

electrical installations.<br />

The Engineer shall:<br />

a. Prepare TORs and coordinate all surveys and investigations required for the<br />

design of improvements;<br />

b. Prepare DPRs and detailed engineering of all sub-components along with<br />

detailed estimate and BoQs<br />

c. Support the team on aspects relating to sourcing of construction material<br />

and related tests;<br />

d. Assist the Authority in appraising subprojects, preparing subproject<br />

appraisal reports and finalizing the bid documents;<br />

e. Assist in bidding procedures including invitation of bids, bid evaluation,<br />

and awards of contract;<br />

f. Support the Authority in preparation of Evaluation reports and related<br />

transactions;<br />

g. Assist the Authority with overall management of works and in the<br />

resolution of contractual issues.<br />

Landscape Planner<br />

Degree in Architecture/ Landscape Planning with at least 10 years experience in<br />

preparation of Landscaping Plan for Parks, Streetscape, River front development,<br />

heritage building etc. Demonstrated ability to analyze site management problems;<br />

develop indicators; devise solutions, and design landscape components and<br />

supervise its construction.<br />

Terms of Reference<br />

a. Active participation in finalisation of Master Plans and Action Plans<br />

b. Detailed design of River front development<br />

c. Lead design of TOR for surveys and investigations required for the works<br />

near monuments;<br />

d. Finalise documents for procurement of contractors for execution of<br />

landscaping work<br />

e. Responsibilities will include supervision of works.<br />

Cultural Heritage Conservation Specialist<br />

Degree in Architecture/ Conservation and formal training in heritage<br />

conservation/ with at least 15 years experience in a senior management position at<br />

a major archaeological or monumental site(s) subject to intensive visitor pressure.<br />

Demonstrated ability to analyze site management problems; develop indicators;<br />

devise solutions, and design conservation and heritage components and supervise<br />

its construction.<br />

Request for Proposal 22


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Terms of Reference<br />

a. Review the design as suggested in the Master Plans and Management Plans<br />

and its fit within the overall site;<br />

b. Lead design of TOR for surveys and investigations required for the works<br />

near monuments;<br />

c. Assess and, when necessary, mitigate the impact of the sub project’s<br />

physical and non-physical interventions on the affected monuments and<br />

their surrounding buffer zones.<br />

d. Based on approval of the best option for improvements and in discussion<br />

with the experts and engineers, coordinate design consultants work and in<br />

implementation of the proposed activities in all the sites.<br />

e. Prepare and Coordinate designs for all elements (including working<br />

drawings);<br />

f. Oversee the implementation of all conservation work, restoration, removal,<br />

addition, rearrangement and other interventions / alterations to the physical<br />

structure and layout of the area near monuments / structures and other sites<br />

in the vicinity with particular attention to preserving the authenticity and<br />

integrity of the physical heritage and facilitation of integrated cultural<br />

tourism;<br />

g. Provide input into the design of environmental and visitor infrastructure and<br />

services to ensure that their design and construction is in conformity with<br />

the authenticity and integrity of the sites and needs of integrated cultural<br />

tourism;<br />

h. Review estimates in consultation with (i) the engineers, (ii) associated<br />

bidding documents, assist Consultant in bidding procedures including<br />

invitation of bids, bid evaluation, and awards of contracts and (iii) assist the<br />

Consultant with overall management of construction works and in the<br />

resolution of contractual issues and preparation of as-built drawings;<br />

i. Assist Community development specialist in developing measures for<br />

sustainable management of heritage site and properties;<br />

j. In close collaboration with the Site Engineers and the Safeguards<br />

Specialists, devise protocols and systems for on-site monitoring and<br />

predictive modeling and reporting of the impact of tourism on the state of<br />

conservation of the monument, their buffer zones; the surrounding<br />

environment and the affected human communities; and<br />

k. Draft an operations manual for the implementation of the afore-mentioned<br />

protocols and systems and conduct workshop to training concerned staff in<br />

the application of the manual.<br />

l. Define the Management plan and measures to ensure implementation.<br />

Finalise and assist the Team in Master and management Plan in full<br />

publishable format, together with the necessary maps; technical annexes;<br />

and time-bound action plans for the implementation of the Master Plan.<br />

Community Development/Livelihood Specialist<br />

Education and Experience: Masters in Social Sciences/ Management, around 10<br />

years experience in community mobilization and community based heritage<br />

tourism product development focused on livelihood. Design of livelihood and<br />

community based tourism products and in community capacity building.<br />

Request for Proposal 23


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Terms of Reference<br />

a. Prepare TORs for value chain analysis and lead community mobilization<br />

activities and related product development actions;<br />

b. Lead workshops and community consultations;<br />

c. Co-ordinate all activities of this component;<br />

d. Define sub projects elements and the cost;<br />

e. Preparation of performance monitoring reports<br />

Procurement Specialist<br />

Education and Experience: Bachelors in Civil Engineering with at least 10 years<br />

of experience in procurement of goods and services.<br />

Terms of Reference<br />

a. Prepare the procurement plan for all goods, works and services to be taken<br />

up during the Assignment and<br />

b. For specific activities under the Project support the Authority in finalizing<br />

of Bid <strong>Document</strong>s;<br />

c. Support in preparation of Evaluation reports and related transactions.<br />

Safeguards Specialist Environment<br />

Bachelor in Planning/ Environment/ Ecology with around 10 years experience in<br />

design and environment related safeguards for heritage property / site<br />

development and management. Should be conversant with relevant national and<br />

state Land and environmental laws, and orders/rulings of Hon’ble Courts.<br />

Terms of Reference<br />

a. Planning and implementation of works in Project area in view of Hon’ble<br />

Court’s directions, and existing rules, laws and byelaws;<br />

b. Assistance and advice on institutional strengthening and capacity building<br />

at the Authority and field levels in regards to environmental practices;<br />

c. Ensure that baseline surveys, environmental monitoring plans and<br />

programs, initial environmental impact examinations (IEE) as may be<br />

required are carried out;<br />

d. Preparation of Authority’s procedure compliant environmental safeguard<br />

actions including impact assessments if any during the design stage;<br />

e. Management plan and mitigation measures;<br />

f. Oversight of implementation of environmental standards and safeguards as<br />

part of Project implementation;<br />

g. Participate in preparation of Master Plan for project area and contribute to<br />

the environmental safeguards to the plan and sub components;<br />

h. Preparation of performance monitoring reports.<br />

Project Monitoring Specialist<br />

Education and Experience: Masters in Engineering/ Planning with around 10<br />

years of experience in project performance monitoring, preferably projects<br />

pertaining to heritage sites developments and management or urban planning and<br />

development.<br />

Request for Proposal 24


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Terms of Reference<br />

In relation to the project outcomes and in discussion with the team, design the<br />

project performance monitoring mechanisms for the Project to include:<br />

a. Definition of the Project Performance Monitoring System (PPMS), forms<br />

and monitoring schedule;<br />

b. Set up systems and procedures for Project management, implementation<br />

and monitoring of the progress;<br />

c. Assist in preparing PPMS for the Program and ensure that the necessary<br />

independent inputs are in place when and where required;<br />

d. Specify the requirements from the Environmental Engineer/ Planner and<br />

Cultural Heritage Specialist (Supervision Consultants) specific<br />

requirements on outcome monitoring;<br />

e. Identifying and specifying the baseline indicators of the project for output<br />

and outcome monitoring of the Program.<br />

3.1.4 Eligible Assignments<br />

For the purposes of determining Conditions of Eligibility and for evaluating the<br />

Proposals under this <strong>RFP</strong> <strong>Document</strong>, advisory/ consultancy assignments in<br />

respect of preparation of Detailed Project Report (DPR)/ detailed engineering<br />

including engineering surveys and social and environmental impact assessment,<br />

community consultation, Project Management Consultancy Services involving<br />

independent review and approval of designs and drawings, preparation of bid<br />

documents, procurement of contractors, day to day supervision, monitoring of<br />

progress and quality of construction, erection and installation work, reporting<br />

and ensuring compliance by the Contractor with the Design and Specifications<br />

during implementation period for infrastructure development for the following<br />

type of projects shall be deemed as eligible assignments (the “Eligible<br />

Assignments”):<br />

Urban renewal project or Heritage project or<br />

Integrated infrastructure development works (Such as Building Works, Road<br />

works, Water supply, Drainage, Electrical Works, River front development,<br />

landscaping etc.)<br />

3.2 Evaluation of Financial Proposal<br />

3.2.1 In the second stage, the financial evaluation will be carried out. For financial<br />

evaluation, the total cost indicated in the Financial Proposal, will be considered.<br />

a) The Authority will determine whether the Financial Proposals are<br />

complete, unqualified and unconditional. The cost indicated in the<br />

Financial Proposal shall be deemed as final and reflecting the total cost of<br />

services. Omissions, if any, in costing any item shall not entitle the<br />

Applicant to be compensated and the liability to fulfil its obligations as<br />

per the TOR within the total quoted price shall be that of the Consultant.<br />

Applicants securing 80% marks in Technical Proposal shall qualify for<br />

opening of Financial Proposal. The weightage to Technical and Financial<br />

Proposals would be 80% and 20% respectively.<br />

Request for Proposal 25


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

b) The total marks obtained out of 100 marks in Technical Proposal shall be<br />

scaled down to a maximum of 80 as follows which shall henceforth be<br />

the total marks obtained by the Applicants against the Technical<br />

Proposal.<br />

Marks (maximum 80) on Technical Proposal (A) = 0.80 x Marks of<br />

Technical Proposal under evaluation<br />

c) The least Financial Proposal would be best Financial Proposal and shall<br />

be awarded 20 marks. Other Financial Proposals would be awarded<br />

marks out of maximum 20 based on following formula:<br />

Marks (maximum 20) on Financial Proposal (B) = 0.20 x (Lowest<br />

Financial Proposal/ Financial Proposal under evaluation) x100<br />

d) Total Marks = A+B<br />

e) The Bidder scoring maximum Total Marks would be recommended for<br />

selection.<br />

4 FRAUD AND CORRUPT PRACTICES<br />

4.1 General<br />

4.1.1 The Applicants and their respective officers, employees, agents and advisers shall<br />

observe the highest standard of ethics during the Selection Process.<br />

Notwithstanding anything to the contrary contained in this <strong>RFP</strong> <strong>Document</strong>, the<br />

Authority shall reject a Proposal without being liable in any manner whatsoever<br />

to the Applicant, if it determines that the Applicant has, directly or indirectly or<br />

through an agent, engaged in corrupt practice, fraudulent practice, coercive<br />

practice, undesirable practice or restrictive practice (collectively the “Prohibited<br />

Practices”) in the Selection Process. In such an event, the Authority shall,<br />

without prejudice to its any other rights or remedies, forfeit and appropriate the<br />

Bid Security or Performance Security, as the case may be.<br />

4.1.2 Without prejudice to the rights of the Authority under Clause 4.1.1 hereinabove<br />

and the rights and remedies which the Authority may have under the LOI or the<br />

Agreement, if an Applicant , as the case may be, is found by the Authority to have<br />

directly or indirectly or through an agent, engaged or indulged in any corrupt<br />

practice, fraudulent practice, coercive practice, undesirable practice or restrictive<br />

practice during the Selection Process, or after the issue of the LOI or the<br />

execution of the Agreement, such Applicant or Consultant shall not be eligible to<br />

participate in any tender or <strong>RFP</strong> issued by the Authority during a period of 2<br />

(two) years from the date such Applicant or Consultant, as the case may be, is<br />

found by the Authority to have directly or through an agent, engaged or indulged<br />

in any corrupt practice, fraudulent practice, coercive practice, undesirable practice<br />

or restrictive practice, as the case may be.<br />

4.1.3 For the purposes of this Section, the following terms shall have the meaning<br />

hereinafter respectively assigned to them:<br />

Request for Proposal 26


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

a. “corrupt practice” means (i) the offering, giving, receiving, or soliciting,<br />

directly or indirectly, of anything of value to influence the action of any<br />

person connected with the Selection Process (for avoidance of doubt,<br />

offering of employment to or employing or engaging in any manner<br />

whatsoever, directly or indirectly, any official of the Authority who is or<br />

has been associated in any manner, directly or indirectly with the Selection<br />

Process or the LOI or has dealt with matters concerning the Agreement or<br />

arising therefrom, before or after the execution thereof, at any time prior to<br />

the expiry of one year from the date such official resigns or retires from or<br />

otherwise ceases to be in the service of the Authority, shall be deemed to<br />

constitute influencing the actions of a person connected with the Selection<br />

Process); or (ii) save as provided herein, engaging in any manner<br />

whatsoever, whether during the Selection Process or after the issue of the<br />

LOI or after the execution of the Agreement, as the case may be, any<br />

person in respect of any matter relating to the Project or the LOI or the<br />

Agreement, who at any time has been or is a legal, financial or technical<br />

consultant/ adviser of the Authority in relation to any matter concerning<br />

the Project;<br />

b. “fraudulent practice” means a misrepresentation or omission of facts or<br />

disclosure of incomplete facts, in order to influence the Selection Process;<br />

c. “coercive practice” means impairing or harming or threatening to impair<br />

or harm, directly or indirectly, any persons or property to influence any<br />

person’s participation or action in the Selection Process;<br />

d. “undesirable practice” means (i) establishing contact with any person<br />

connected with or employed or engaged by the Authority with the<br />

objective of canvassing, lobbying or in any manner influencing or<br />

attempting to influence the Selection Process; or (ii) having a Conflict of<br />

Interest; and<br />

e. “restrictive practice” means forming a cartel or arriving at any<br />

understanding or arrangement among Applicants with the objective of<br />

restricting or manipulating a full and fair competition in the Selection<br />

Process.<br />

5 MISCELLANEOUS<br />

5.1 Pre-proposal Conference<br />

5.1.1 Pre-Proposal Conference of the Applicants shall be convened at the designated<br />

date, time and place. A maximum of two representatives of each Applicant shall<br />

be allowed to participate on production of an authority letter from the Applicant.<br />

5.1.2 During the course of Pre-Proposal Conference, the Applicants will be free to<br />

seek clarifications and make suggestions for consideration of the Authority. The<br />

Authority shall endeavour to provide clarifications and such further information<br />

as it may, in its sole discretion, consider appropriate for facilitating a fair,<br />

transparent and competitive Selection Process.<br />

Request for Proposal 27


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

5.2 Performance security<br />

5.2.1 The successful Applicant will have to give a Bank Guarantee of an amount of 10<br />

percent of the Consultancy amount as Performance Security. Bank Guarantee<br />

shall be in favour of Director General <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

valid for the period of 30 months. Bank Guarantee shall be issued by any<br />

Nationalised or Scheduled Bank. Bank Guarantee shall be submitted 15 days<br />

before execution of Consultancy Agreement between Successful Consultant and<br />

Authority<br />

5.3 Period of Consultancy<br />

5.3.1 The Consultancy period shall be initially for two years effective from the date of<br />

signing of Agreement between Successful Consultant and the Authority which<br />

period may be extended by another term of one year. No additional payment<br />

shall be made for the execution of assigned work. However, if the Project cost<br />

increases subsequently by inclusion of new work then the payment shall be<br />

made on pro-rata basis.<br />

Request for Proposal 28


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Schedules<br />

Request for Proposal 29


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Schedule 1<br />

TERMS OF REFERENCE (TOR)<br />

1. Introduction<br />

The project components are mainly: East Gate Road, West Gate Road, South Gate<br />

Road, Fatehabad Road and Taj ganj Ward. The planning of work is supposed to be<br />

done for 1.0 km radius from outer boundary of Taj Mahal. The aggregated block<br />

estimated cost of the Project is expected around Rs 150 crore. The Authority is<br />

anticipating completing the Project within next 2 years that may need Project<br />

Management Services. However, the Authority shall have the discretion to increase<br />

or decrease the number of components under the Project.<br />

The Terms of Reference (the “TOR”) and the scope of the Consultancy for this<br />

assignment are specified below.<br />

2. Objective<br />

The prime objective of the assignment is to:<br />

a. Assist the Authority in creating and maintaining world class infrastructure in<br />

areas around Taj.<br />

b. Make arrangements for maintenance of created infrastructure on long term<br />

basis.<br />

c. Ensure greater participation by local communities in tourism-related<br />

economic and livelihood activities.<br />

3. Scope of Works<br />

Without limiting the scope, the Consultant has to work in close liaison with the<br />

Authority and will be responsible for the following tasks:<br />

a. The Consultant shall be responsible for overall supervision, coordination and<br />

management of the Project and its all sub-components<br />

b. Recently, the Authority has prepared a Detailed Project Report (DPR) of<br />

approach road and infrastructure in Tajganj ward that should be taken as a<br />

module of work and be reviewed and improved upon by the Consultant.<br />

Similarly improvement and development works of different<br />

Departments/Government Agencies are in progress at different stages in the<br />

Project Area which should be reviewed and improved upon by the Consultant<br />

to make them a part of the Master Plan. The main components which will<br />

form part of the detailed Master Plan are:<br />

<br />

<br />

<br />

Approach roads to Taj.<br />

Development of Tajganj ward’s basic urban infrastructure (such as<br />

water supply, sanitation, road and public transport, electricity,<br />

landscape, solid waste management, and environmental improvement)<br />

and incidental services (such as public toilets, street signage and<br />

lighting) at appropriate locations.<br />

Park development and landscaping of Riverfronts<br />

Request for Proposal 30


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

c. Review all existing Reports, DPRs, on-going projects and finalise the Master<br />

Plan based on ground checking subject to necessary surveys as required.<br />

d. The Consultant shall be responsible for effectively leading and taking<br />

initiative to manage, execute and implement the Project by carrying all<br />

necessary surveys and design the sub-projects plus ensuring proper<br />

construction supervision.<br />

e. The work entails co-ordination with many important stakeholders like the<br />

residents of the area, shop owners, Hotel owners and associations,<br />

Archaeological Survey of India, Central Industrial Security Force, the District<br />

Administration, Forest Department, Horticulture Department, Irrigation<br />

Department, Department of <strong>Tourism</strong>, Ministry of <strong>Tourism</strong>, Government of<br />

India, and Ministry of Culture, Government of India. There are a number of<br />

studies and documentation on Taj and surrounding area by many reputed<br />

institutions, which will be made available to the Consultant, which can be<br />

assimilated in the preparation of DPRs.<br />

Periodically conduct Stakeholder’s consultation meeting to incorporate<br />

necessary inputs/changes for the Master Plan and DPR<br />

Follow participatory approach while finalising the Master Plan<br />

f. The Consultant shall assist the Authority in getting necessary clearances and<br />

approvals as applicable from concerned authorities including Hon’ble Supreme<br />

Court and accordingly finalise the necessary documents.<br />

g. The Consultant shall prepare the Detailed Project Reports of identified<br />

components along with necessary engineering details for ease of<br />

implementation.<br />

h. The Consultant shall prepare all necessary procurement documents, carry out<br />

scrutiny and assist in processing of tender documents for the various works<br />

under the Project incorporating all statutory / mandatory provisions in respect<br />

of labour laws, taxes/ levies etc. as per relevant rules, and obtaining approval<br />

from the Authority. The Consultant shall assist the Authority in Tender<br />

Process Management which shall include pre tender meetings, compilation of<br />

queries, preparation of draft response, opening and evaluation of tenders,<br />

negotiation if required and signing of agreement etc.<br />

i. The Consultant shall be responsible for the day to day supervision of<br />

construction works at site through contractors, quality control, taking<br />

measurements, entering measurements in the Measurement Books certifying<br />

and finalizing the bill of contracts, handing over completed works and attend<br />

to audit queries & all arbitration / litigation cases with respect to the Project.<br />

j. The Consultant shall check and finalize contractor’s detailed programme of<br />

activities commensurate with the tender provisions, requirement of labour,<br />

materials and samples and delivery of products requiring long lead time<br />

procurement.<br />

Request for Proposal 31


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

k. The Consultant shall conduct preliminary interaction with the contractor and<br />

ensure timely release of drawings well in advance as per the requirement.<br />

l. The Consultant shall be responsible for the field supervision carrying out<br />

field tests on materials, structures etc. and obtaining necessary approvals<br />

thereon and maintaining adequate records thereof on the forms prescribed by<br />

the Authority. The Consultant shall ensure proper establishment of field<br />

laboratories/quality control equipments on site by contractors to conduct tests<br />

on materials/mixes being used for construction such as cement, steel, bricks,<br />

mortars, concretes et cetera. Essential gauges, instruments etc. should be got<br />

calibrated periodically. The Consultant shall maintain necessary site records<br />

and obtain data in support of the same. They shall carry out field and<br />

laboratory tests on materials of construction as well as partially or completely<br />

erected structures etc. and maintain adequate records thereof.<br />

m. The Consultant shall avoid cropping up of Extra items/ substituted items and<br />

deviations should strictly be avoided. However, in unavoidable circumstances<br />

extra items/substituted items, deviation the necessary statement duly<br />

supported by justification and analysis of rates shall be submitted as per<br />

CPWD/PWD formats or any other formats approved by the Authority along<br />

with Consultant’s recommendations for extra/substituted items. The<br />

Consultant should ensure that the case is put up for the Authority’s approval<br />

early enough so that in no case construction work suffers on this account. As<br />

regards grant of time extension cases, prior approval of the Authority should<br />

be obtained by the Consultant.<br />

n. The Consultant shall suggest modifications, if any, due to site conditions and<br />

submit the recommendations along with cost variations on account of the<br />

same to the Authority for approval.<br />

o. The Project Manager shall be responsible for the planning and monitoring<br />

progress by using modern methods of control such as computerized PERT /<br />

CPM (either by Primavera or MS-Projects), submission of progress reports of<br />

work executed monthly. Both financial and physical progress reports with<br />

reference to prefixed targets will be prepared. Constant review of progress<br />

within present time and cost parameters will have to be done. The Consultant<br />

shall suggest improvements from time to time. The Consultants inform the<br />

Authority of the progress of the Project vis-à-vis PERT/CPM controls on a<br />

monthly basis.<br />

p. The Consultant shall ensure the contractual obligation such as<br />

implementation of Labor laws, environmental/safety management system<br />

obligations and other statutory regulations are adhered during the<br />

construction to completion stage.<br />

q. The Consultant shall ensure adherence of safe working procedures at<br />

construction site and conduct safety audit at site and shall submit monthly<br />

safety audit reports to the Authority non-adherence to the safety instruction,<br />

unsafe practices followed by the contractor if any and shall report any<br />

Request for Proposal 32


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

accident and its analysis with recommended preventive and corrective<br />

actions.<br />

r. The Consultant shall be required to participate in the Project review meetings<br />

held from time to time by the Authority, as also to participate in emergency<br />

or extraordinary meetings held to deal with any emergency, force majeure<br />

event or other exigencies.<br />

s. The Consultant shall submit monthly compliance of environmental safe guard<br />

measures implemented by the contractors.<br />

t. The Consultant shall be responsible for assessing, verifying and sending<br />

replies to the day-to-day issues raised by the contractors during the execution<br />

of work or after completion of the work. However, in case of any claims with<br />

financial implication, approval of the Authority shall be obtained. Nothing<br />

extra will be paid to the consultant for such works.<br />

u. The Consultant shall provide all technical services/ guidance/ advice as may<br />

in any way relate to or arise out of the construction of the said work as have<br />

been entrusted to the Consultant by the Authority.<br />

v. The Consultant shall prepare a realistic cash flow/ expenses on budget head<br />

for the Project on available information and update the same as required on a<br />

regular basis to reflect the current status.<br />

w. The Consultant shall keep the Authority appraised of any delays; keep a<br />

hindrance register indicating all details of all such delays which will also be<br />

furnished with recommendations for approval of the Authority for grant of<br />

extension of time by the Authority to contractors.<br />

x. Reconciliation of the quantities for the final bill shall be done by the<br />

Consultant before the final bill is submitted to the Authority. The Consultant<br />

shall ensure that all the test reports /certificates, guarantees, warrantees bonds<br />

are obtained.<br />

y. Obtain and submit all the records and the records of any changes made in the<br />

works during the progress of works and submit adequate number of<br />

completion reports and completion drawings for the Project, prepared by the<br />

contractor/consultant incorporating all such changes, duly authenticated as<br />

required for obtaining “Completion/Occupancy Certificate" from statutory<br />

authorities, wherever required.<br />

z. Obtain certification and submit “As Built Drawings” prepared by the<br />

Contractor at an appropriate scale indicating the details of building, structure<br />

and services duly authenticating and supply 3 sets of as built/completion<br />

drawings to the Authority also hand over the originals of the completed<br />

drawings.<br />

aa.<br />

Submit two soft copies of the entire drawings / documents and two sets of<br />

drawings on reproducible paper for the works executed to the Authority.<br />

Request for Proposal 33


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

bb. Verification of work on its completion and issuing completion certificates<br />

(virtual as well as actual) for the completed works, so as to enable the<br />

Authority to record completion of the works.<br />

cc.<br />

Verification by taking and recording joint measurements of the final bill to be<br />

submitted by the contractors, process, certify and recommend as per the terms<br />

and conditions of contract agreement for release of final payment by the<br />

Authority and attend to the observations /queries raised while processing the<br />

same for payments by the Authority.<br />

dd. The Consultant shall also submit necessary information as required by the<br />

Authority for finalization of accounts.<br />

ee.<br />

ff.<br />

The Consultant shall maintain complete documentation and render all<br />

technical services as may in any way relate to or arise out of the construction<br />

of the said work as have been entrusted to the Consultant by the Authority.<br />

The Consultant shall get the “Maintenance Manual” for infrastructure and all<br />

the internal and external services prepared by the contractor (s).<br />

gg. Identification and quantification of estimated financial impact of the Project<br />

on Government resources;<br />

hh. Creating performance indicators/ parameters for maintenance of assets<br />

created.<br />

4. Deliverables<br />

Inception Report<br />

Within a month of mobilization, the Consultant will submit an Inception Report. The<br />

Inception Report should consist of a detailed work plan with detailed of<br />

implementation strategies for each sub-component.<br />

Master Plan and Action Plans<br />

Upon commencement, the Consultant, in close coordination with the Authority, shall<br />

prepare the Project’s Master Plan and Action Plan for the development of the said<br />

area. The Action Plan will include a detailed description of activities that are to be<br />

carried out for development in the Project area. The Action Plan will include<br />

quantitative and qualitative targets to be accomplished and a detailed schedule of<br />

actions and activities to be performed. The Action Plan will also detail the specific<br />

responsibilities for carrying out the tasks and key assumptions underlying the timely<br />

and effective carrying out of tasks and activities. This will be based on the surveys,<br />

reports, studies, and field visits of the Project area. The first Action Plan is due not<br />

later than two months after the mobilization of Team.<br />

Preparation of DPRs and Detailed Engineering<br />

The Consultant will update the existing Detailed Project Report prepared by the<br />

Authority. In addition, the Consultant shall prepare detailed engineering drawings of<br />

the sub-components based on necessary surveys, community consultations et cetera.<br />

for developing state of art infrastructure in Project area. The DPR will be split into<br />

Request for Proposal 34


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

independent but integral modules in a way that implementation of a module can be<br />

taken up separately which fits ultimately into the complete plan of scheme. This will<br />

be done in six months time from mobilization.<br />

Implementation of the Project<br />

In consultation with the Authority, the bidding documents for different modules be<br />

prepared and floated for procuring the services of a competent firm / company for<br />

execution of that module. The competent firm/ company be selected through<br />

transparent bidding. The work on first module should begin in four months from the<br />

date of commencement. The entire work envisaged in the DPR has to be completed<br />

in 24 months from the date of commencement.<br />

Monthly Progress Report<br />

The Consultant will submit following reports in the English language:<br />

<br />

<br />

Monthly progress reports to be prepared within two weeks of the end of each<br />

quarter and submitted to the Authority; and<br />

Project completion report within three months of physical completion of<br />

Project.<br />

Interim Report<br />

At the end of the every six months the Consultant will provide a broad view of the<br />

physical and institutional progress achieved, and make recommendations to the<br />

Authority on suitable modifications to successful implementation of the Project.<br />

Final Report<br />

A final report will be prepared and submitted to the Authority on completion of the<br />

Assignment. The detailed content and topic coverage will be determined by the<br />

Authority in consultation with other agencies concerned.<br />

5. Time and Payment Schedule<br />

Time schedule for important Deliverables of the Consultancy and the payment<br />

schedule linked to the specified Deliverables is given below:<br />

Sl.No. Description of Deliverables Month No. Payment<br />

1 Inception Report 1 5%<br />

2 Master Plan and Action Plans 2 5%<br />

3 DPRs and Detailed Engineering of all 3 10%<br />

Project components including<br />

necessary Surveys and Stakeholders<br />

consultation<br />

4 Initiation of procurement process, 4-23 70%<br />

signing of Agreements and actual<br />

execution of works/sub-components<br />

at Site – to be payable as per<br />

Statement of Expenses<br />

5 Completion of Services including<br />

submission of Final Report<br />

24 10%<br />

Request for Proposal 35


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

6. Working Arrangements<br />

The Consultant will be attached to the Authority and will be based at Project Site i.e.<br />

Agra from where the Consultant will carry out their duties. The Consultant will have<br />

frequent interactions with the field staff of different Departments and will assist and<br />

carry out on-the job training as a routine part of their activities.<br />

The Authority will provide suitable support facilities including all relevant and<br />

available reports, documents, maps, and photographs etc.. The Authority will<br />

provide suitable office space to the Consultant at Lucknow and their Site office at<br />

Agra.<br />

Consultant will be responsible to:<br />

Arranging for communication facilities (telephone, fax and internet)<br />

Arranging for refurbishment of office space, furniture, equipment etc as<br />

required for setting up and maintenance of its office;<br />

Arranging for communication, data processing, computers, printing<br />

equipments and necessary stationeries;<br />

Arranging for all transportation and travelling required for the Assignment<br />

and;<br />

Arranging for any training material, printouts, etc required for Consultancy<br />

services.<br />

Request for Proposal 36


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Schedule 2<br />

Draft Consultancy Agreement<br />

THIS AGREEMENT (“Consultancy Agreement”) is made on the ___ th day of ____, 201*<br />

at Lucknow.<br />

BETWEEN:<br />

The Governor of <strong>Uttar</strong> <strong>Pradesh</strong> through Secretary, Department of <strong>Tourism</strong>, Government of<br />

<strong>Uttar</strong> <strong>Pradesh</strong>, having its office at Lucknow (hereinafter referred to as “Authority”, which<br />

expression shall mean and include its successor in office) of the ONE PART<br />

AND<br />

_____________, and having its registered office at ___________(hereinafter referred to as<br />

the “Consultant”) which expression shall, unless it be repugnant to the context or<br />

meaning thereof, include its successors of the SECOND PART<br />

The Authority and the Consultant are collectively referred to as 'Parties' and individually<br />

as “Party”.<br />

WHEREAS<br />

A. The Authority intends to develop the approach roads to Taj Mahal, the infrastructure<br />

in Tajganj, development of adjoining garden (Sahjahan Garden, Taj Nature Walk<br />

and Mehtab Bagh) and landscaping of nearby river front of world class quality<br />

befitting to the World Heritage Site of the Taj (the “Project”)<br />

B. The Authority intends to hire a Consultant to prepare detailed project report, detailed<br />

engineering, detailed estimates based on necessary surveys, review and approval of<br />

existing designs and drawings, obtain the necessary approvals and clearances<br />

required for Project implementation, prepare bid documents, assist the Authority in<br />

procuring Contractors, day to day supervision, monitoring of progress and quality of<br />

construction, erection and installation work, reporting and ensuring compliance by<br />

the Contractor with the Design and Specifications during Implementation period for<br />

infrastructure development (“Consultancy”).<br />

C. Accordingly, the Authority invited proposals from various interested Applicants<br />

through a transparent and competitive selection process to assist the Authority in the<br />

Consultancy for the said Project. In response thereto, the Authority received<br />

proposals from various Applicants for the Consultancy Services. Pursuant thereto,<br />

after evaluation of all the proposals, the Authority accepted the proposal of<br />

___________ and accordingly issued a Letter of Intent bearing No.<br />

____________________, dated ________________ requesting M/s<br />

________________ to execute the Agreement, which the Consultant has<br />

acknowledged through the Letter of Acceptance dated _________________.<br />

D. M/s ____________________ is a Company engaged in providing consultancy<br />

services across diverse sectors on a commercial basis. It specializes in providing<br />

Request for Proposal 37


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

integrated and comprehensive professional services towards development of<br />

infrastructure projects and related components.<br />

E. It is deemed expedient and necessary to enter into this Agreement being these<br />

presents to record their understanding, terms, covenants and conditions of the said<br />

Agreement between the Parties.<br />

F. The following shall be a part of Consultancy Agreement<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<strong>RFP</strong> submitted by the Consultant<br />

Schedule 1: Terms of Reference<br />

Appendix-I: Form 1: Letter of Proposal<br />

Appendix-I: Form 2: Power of Attorney<br />

Appendix-I: Form 3: Particulars of the Applicant<br />

Appendix-I: Form 5: Proposed Methodology and Work Plan<br />

Appendix-I: Form 9: Particulars of Personnel to be deployed<br />

Appendix-I: Form 10: CV of Key Personnel<br />

Appendix-II: Form 1: Deployment Schedule<br />

Appendix-II: Form 2: Financial Proposal<br />

Any correspondence made with the Consultant post opening of Financial<br />

Proposal and before acceptance<br />

Now, therefore, in consideration of the premises aforesaid, the Parties hereby agree, as<br />

follows:<br />

Request for Proposal 38


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

1. ROLE OF THE CONSULTANT<br />

M/s _________________________ shall provide Consultancy Services to the<br />

Authority towards the Project and Scope of Works of Consultant and other terms and<br />

conditions to be adhered to by Consultant is more particularly set out in Schedule 1<br />

(Terms of Reference) to the <strong>RFP</strong> <strong>Document</strong>.<br />

2. ROLE OF THE AUTHORITY<br />

a. Ensure payment of fees to M/s ________________________ in accordance with<br />

this Agreement<br />

b. Provide the Consultant with, and/or give access to, all such information which is<br />

relevant for the purpose of the Project<br />

c. Subject to the Applicable Law issue all such instructions as may be necessary or<br />

appropriate for the prompt and effective implementation of the Consultancy<br />

Services.<br />

3. PAYMENT<br />

a. The Authority shall pay Consultancy Fee of Rs _________ to the Consultant<br />

according to following time and payment schedule.<br />

Sl.No. Description of Deliverables<br />

Month No. from Payment<br />

issuance of LoI<br />

1 Inception Report 1 5%<br />

2 Master Plan and Action Plans 2 5%<br />

3 DPRs and Detailed Engineering of all 3 10%<br />

Project components including<br />

necessary Surveys and Stakeholders<br />

consultation<br />

4 Initiation of procurement process, 4-23 70%<br />

signing of Agreements and actual<br />

execution of works/sub-components<br />

at Site – to be payable as per<br />

Statement of Expenses<br />

5 Completion of Services including<br />

submission of Final Report<br />

24 10%<br />

4. TERMINATION OF THE AGREEMENT<br />

a. The Authority shall have a right to terminate this Consultancy Agreement if the<br />

Consultant commits breach of any conditions by giving a written notice of 30 days<br />

to the Consultant. Breach of Agreement include, but are not limited to, the<br />

following:<br />

i. It is found that the time schedule of the Consultancy is not being adhered to.<br />

ii. The Consultant stops work for a period exceeding 30 days and such<br />

stoppage has not been authorized by the Authority.<br />

iii. In case the Consultant fails to carry out the instructions/orders issued by the<br />

Authority from time to time during the period of the Consultancy<br />

Request for Proposal 39


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Agreement and fails to comply with the laws applicable in the State of <strong>Uttar</strong><br />

<strong>Pradesh</strong>.<br />

iv. The Consultant fails to deliver any or all of the obligations within the time<br />

period(s) specified in the Consultancy Agreement, or any extension thereof<br />

granted by the Authority.<br />

v. The Consultant fails to depute required Key personnel as agreed in the <strong>RFP</strong><br />

vi. The Consultant fails to perform any other obligation(s) under the<br />

Consultancy Agreement.<br />

b. If the work on the Assignment is stopped for period of atleast 30 days, the<br />

Consultant may also terminate the Consultancy Agreement by giving a notice of 30<br />

days to the Authority.<br />

c. The Consultancy Agreement may also be terminated at any time by mutual<br />

consent.<br />

5. DISPUTE AND SETTLEMENT<br />

In case of any dispute with respect to the terms of Consultancy Agreement, the<br />

matter may be represented to Director General <strong>Tourism</strong>, Government of <strong>Uttar</strong><br />

<strong>Pradesh</strong> by the Consultant after giving a notice of 30 days. The matter shall be<br />

examined and put up to Secretary <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong> for<br />

decision. In case the dispute is not resolved at the level of the Secretary <strong>Tourism</strong>,<br />

Government of <strong>Uttar</strong> <strong>Pradesh</strong>, the matter shall be referred to the Infrastructure and<br />

Industrial Development Commissioner (IIDC). If after 30 days from the<br />

commencement of such direct negotiations at the level of IIDC, the dispute is not<br />

resolved, it shall then be settled by the sole arbitrator appointed by IIDC under the<br />

Arbitration and Conciliation Act, 1996 and his decision would be final and binding<br />

on both the parties. The Arbitration and Conciliation Act 1996 and the rules made<br />

thereunder and any statutory modification or re-enactments thereof, shall apply to<br />

the arbitration proceedings. The venue of the arbitration shall be Lucknow, <strong>Uttar</strong><br />

<strong>Pradesh</strong>. Pending the submission of and/or decision on a dispute, difference or<br />

claim or until the arbitral award is published; the Consultant shall continue to<br />

perform all its obligations under the Consultancy Agreement without prejudice of<br />

final adjustment in accordance with such award.<br />

Not withstanding anything contained in this Agreement, the aggregate liability of<br />

the Consultant in connection with the services to be performed hereunder, shall in<br />

no event exceed the contract price. The Consultant shall only be liable for the<br />

direct damages or loss arising out this<br />

6. LEGAL JURISDICTION<br />

Any legal dispute arising out of this Consultancy Agreement shall be settled at the<br />

Court of Law located at Lucknow.<br />

7. GOVERNING LAW<br />

This Agreement shall be governed by and constructed in accordance with the laws<br />

of India. Neither the Authority nor the Consultant shall have the right to transfer or<br />

assign their responsibilities resulting from this Agreement<br />

Request for Proposal 40


8. AMENDMENTS AND MODIFICATIONS<br />

Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

This Agreement constitutes the entire understanding between both the parties<br />

relating to the Consultancy and it shall not be amended or modified except as agreed<br />

in writing by both the Parties<br />

9. NOTICE<br />

Any notice or other communications required to be given pursuant to this<br />

Consultancy Agreement shall be in writing and shall be sufficiently given or served<br />

if delivered by hand or courier with acknowledgement or faxed at the numbers given<br />

below or sent by registered post to the representative persons at the address given<br />

below:<br />

Director General <strong>Tourism</strong><br />

Paryatan Bhavan<br />

C-13, Vipin Khand<br />

Gomti Nagar, Lucknow 226 010<br />

Phone: 0522 – 2307074<br />

Fax: 0522 – 2308937<br />

10. PERIOD<br />

The Consultant shall be expected to have completed the entire process of<br />

consultancy services completed by the end of 24 months from the date of execution<br />

of this Agreement which period may be extended by 12 months on the same terms<br />

and conditions as given in this Consultancy Agreement.<br />

IN WITNESS WHEREOF, the Parties have caused this Agreement to be signed in their<br />

respective names as of the day and year first above written<br />

SIGNED SEALED AND DELIVERED<br />

For and on behalf of Governor of <strong>Uttar</strong><br />

<strong>Pradesh</strong><br />

Authorized Signatory<br />

SIGNED SEALED AND DELIVERED<br />

For and on behalf of<br />

M/s ___________________________<br />

Authorized Representative<br />

Name<br />

Designation<br />

Witnesses ( name and address)<br />

Name<br />

Designation<br />

Witnesses ( name and address)<br />

1 1<br />

2 2<br />

Request for Proposal 41


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Appendices<br />

Appendix-I: Technical Proposal<br />

Request for Proposal 42


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 1<br />

(On Applicant’s Letterhead)<br />

Dated:<br />

Director General, Department of <strong>Tourism</strong><br />

Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Paryatan Bhawan, C-13, Vipin Khand, Gomti Nagar<br />

Lucknow: 226 010<br />

Sub: Selection of Project Management Consultant for Integrated Infrastructure<br />

Development around Taj<br />

Dear Sir,<br />

1. With reference to your <strong>RFP</strong> document dated ________, I/we, having examined all<br />

relevant documents and understood their contents, hereby submit our Proposal for<br />

selection as Project Management Consultant (Consultants) for Integrated<br />

Infrastructure Development around Taj.<br />

2. The Proposal is unconditional and unqualified.<br />

3. All information provided in the Proposal and in the Appendices is true and<br />

correct.<br />

4. This statement is made for the express purpose of appointment as the Consultant<br />

for the aforesaid Project.<br />

5. I/We shall make available to the Authority any additional information it may find<br />

necessary or require to supplement or authenticate the Proposal.<br />

6. I/We acknowledge the right of the Authority to reject our Proposal without<br />

assigning any reason or otherwise and hereby waive our right to challenge the<br />

same on any account whatsoever.<br />

7. We certify that in the last three years, we have neither failed to perform on any<br />

contract, as evidenced by imposition of a penalty or a judicial pronouncement or<br />

arbitration award, nor been expelled from any project or contract nor have had<br />

any contract terminated for breach on our part.<br />

8. I/ We declare that:<br />

<br />

<br />

I/ We have examined and have no reservations to the <strong>RFP</strong> <strong>Document</strong>s,<br />

including any Addendum issued by the Authority.<br />

I/ We do not have any conflict of interest in accordance with Clause 2.3 of<br />

the <strong>RFP</strong> document;<br />

Request for Proposal 43


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

<br />

<br />

I/We have not directly or indirectly or through an agent engaged or<br />

indulged in any corrupt practice, fraudulent practice, coercive practice,<br />

undesirable practice or restrictive practice, as defined in Section 4 of the<br />

<strong>RFP</strong> document, in respect of any tender or request for proposal issued by<br />

or any agreement entered into with the Authority or any other public<br />

sector enterprise or any Government, Central or State; and<br />

I/ We hereby certify that we have taken steps to ensure that in conformity<br />

with the provisions of Section 4 of the <strong>RFP</strong> <strong>Document</strong>, no person acting<br />

for us or on our behalf has engaged or will engage in any corrupt practice,<br />

fraudulent practice, coercive practice, undesirable practice or restrictive<br />

practice.<br />

9. I/ We understand that you may cancel the Selection Process at any time and that<br />

you are neither bound to accept any Proposal that you may receive nor to select<br />

the Consultant, without incurring any liability to the Applicants, in accordance<br />

with Clause 2.8 of the <strong>RFP</strong> document.<br />

10. I/ We declare that we are not a Member of any other Applicant submitting a<br />

Proposal for the Project.<br />

11. I/ We certify that in regard to matters other than security and integrity of the<br />

country, we have not been convicted by a Court of Law or indicted or adverse<br />

orders passed by a regulatory authority which could cast a doubt on our ability to<br />

undertake the Project or which relates to a grave offence that outrages the moral<br />

sense of the community.<br />

12. I/ We further certify that in regard to matters relating to security and integrity of<br />

the country, we have not been charge-sheeted by any agency of the Government<br />

or convicted by a Court of Law for any offence committed by us or by any of our<br />

Members.<br />

13. I/ We further certify that no investigation by a regulatory authority is pending<br />

either against us or against our CEO or any of our Directors/ Managers/<br />

employees.<br />

14. I/ We undertake that in case due to any change in facts or circumstances during<br />

the Selection Process, we are attracted by the provisions of disqualification in<br />

terms of the guidelines referred to above, we shall intimate the Authority of the<br />

same immediately.<br />

15. I/We hereby irrevocably waive any right which we may have at any stage at law<br />

or howsoever otherwise arising to challenge or question any decision taken by the<br />

Authority in connection with the selection of Consultant, or in connection with<br />

the Selection Process itself, in respect of the above mentioned Project.<br />

16. In the event of my/ our being declared as the Successful Applicant, I/We agree to<br />

enter into an Agreement provided by the Authority.<br />

Request for Proposal 44


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

17. I/We have studied all the <strong>RFP</strong> <strong>Document</strong>s carefully and also surveyed the Project<br />

Site. We understand that except to the extent as expressly set forth in the <strong>RFP</strong><br />

<strong>Document</strong>, we shall have no claim, right or title arising out of any documents or<br />

information provided to us by the Authority or in respect of any matter arising out<br />

of or concerning or relating to the Selection Process including the award of<br />

Assignment.<br />

18. The Bid Security of Rs. 1,00,000 (Rupees One Lakhs) only in the form of a<br />

Demand Draft is attached, in accordance with the <strong>RFP</strong> <strong>Document</strong>,<br />

19. The Consultancy Fee has been quoted by me/us after taking into consideration all<br />

the terms and conditions stated in the <strong>RFP</strong> <strong>Document</strong>.<br />

20. I/We agree to keep this offer valid for 180 (one hundred and eighty) days from<br />

the date of opening of Financial Proposal.<br />

21. I/We agree and understand that the Proposal is subject to the provisions of the<br />

<strong>RFP</strong> <strong>Document</strong>. In no case, shall I/we have any claim or right of whatsoever<br />

nature if the Consultancy for the Project is not awarded to me/us or our Proposal<br />

is not opened or rejected.<br />

22. I/We agree and undertake to abide by all the terms and conditions of the <strong>RFP</strong><br />

<strong>Document</strong>. In witness thereof, I/we submit this Proposal under and in accordance<br />

with the terms of the <strong>RFP</strong> <strong>Document</strong>.<br />

In witness thereof, I/we submit this Proposal under and in accordance with the terms of<br />

the <strong>RFP</strong> document.<br />

Yours faithfully,<br />

(Signature of the Authorised Representative)<br />

(Name and designation of the of the Authorised Representative)<br />

Name and seal of Applicant<br />

Date:<br />

Place:<br />

Request for Proposal 45


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 2<br />

Power of Attorney for signing of Proposal<br />

Know all men by these presents, We, ____________ (name of the firm and address of<br />

the registered office) do hereby irrevocably constitute, nominate, appoint and authorise<br />

Mr. /Ms (Name), son/daughter/wife of___________ and presently residing at<br />

______________, who is [presently employed with us/ holding the position of<br />

___________], as our true and lawful attorney (hereinafter referred to as the “Attorney”)<br />

to do in our name and on our behalf, all such acts, deeds and things as are necessary or<br />

required in connection with or incidental to submission of our Proposal for the<br />

“Selection of Project Management Consultant for Integrated Infrastructure<br />

Development around Taj” by the Director General, Department of <strong>Tourism</strong>,<br />

Government of <strong>Uttar</strong> <strong>Pradesh</strong> (the “Authority”) including but not limited to signing and<br />

submission of all Applications, Proposal and other documents and writings, participate in<br />

pre-bid and other conferences and providing information /responses to the Authority,<br />

representing us in all matters before the Authority, signing and execution of all contracts<br />

including the Agreement and undertakings consequent to acceptance of our Proposal, and<br />

generally dealing with the Authority in all matters in connection with or relating to or<br />

arising out of our Proposal for the said Project and/or upon award thereof to us and/or till<br />

the entering into of the Agreement with the Authority.<br />

AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts,<br />

deeds and things lawfully done or caused to be done by our said Attorney pursuant to<br />

and in exercise of the powers conferred by this Power of Attorney and that all acts, deeds<br />

and things done by our said Attorney in exercise of the powers hereby conferred shall<br />

and shall always be deemed to have been done by us.<br />

IN WITNESS WHEREOF WE, ____________, THE ABOVE NAMED PRINCIPAL<br />

HAVE EXECUTED THIS POWER OF ATTORNEY ON THIS _____________DAY<br />

OF _________, 2012.<br />

Request for Proposal 46


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

For __________________<br />

(Signature)<br />

Witnesses:<br />

(Name, Title and Address)<br />

1.<br />

2.<br />

Accepted [Notarised]<br />

(Signature)<br />

(Name, Title and Address of the Attorney)<br />

Notes:<br />

<br />

<br />

<br />

The mode of execution of the Power of Attorney should be in accordance with the<br />

procedure, if any, laid down by the applicable law and the charter documents of<br />

the executants (s) and when it is so required, the same should be under common<br />

seal affixed in accordance with the required procedure.<br />

Also, wherever required, the Applicant should submit for verification the extract<br />

of the charter documents and documents such as a resolution/power of attorney<br />

in favour of the person executing this Power of Attorney for the delegation of<br />

power hereunder on behalf of the Applicant.<br />

For a Power of Attorney executed and issued overseas, the document will also<br />

have to be legalised by the Indian Embassy and notarised in the jurisdiction<br />

where the Power of Attorney is being issued.<br />

Request for Proposal 47


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 3<br />

S. N. Particulars Details<br />

a) Name of the Firm/Company<br />

b) Country of incorporation<br />

c) Date of incorporation and/ or<br />

commencement of business<br />

d) Address of the corporate<br />

headquarters and its branch<br />

office(s), if any, in India<br />

1. Brief description of the Company<br />

including details of its main lines of<br />

business.<br />

2. Details of individual (s) who will<br />

serve as the point of<br />

contact/communication within the<br />

Company:<br />

(a) Name<br />

(b) Designation<br />

(c) Address<br />

(d) Telephone Number<br />

(e) E-Mail Address<br />

(f) Fax Number<br />

Note:<br />

<br />

Please furnish a copy of Certificate of Incorporation, Memorandum of<br />

Association, Articles of Association, Copies of latest Income Tax return, Service<br />

Tax Registration No. with details of PAN/TIN etc<br />

Signature ___________________<br />

Name ___________________<br />

Designation ___________________<br />

Company ___________________<br />

Company seal<br />

Date ___________________<br />

Request for Proposal 48


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 4<br />

Financial Summary Data<br />

All figures in Rs Crore<br />

Financial Year<br />

Annual Turnover<br />

2011 – 2012<br />

2010 – 2011<br />

2009 - 2010<br />

Note:<br />

To be certified by the Statutory Auditor/Chartered Accountant. Turn Over not certified<br />

by Statutory Auditor/Chartered Accountant shall not be considered for evaluation.<br />

Signature ___________________<br />

Name ___________________<br />

Designation ___________________<br />

Company ___________________<br />

Company seal<br />

Date ___________________<br />

Request for Proposal 49


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 5<br />

The proposed methodology and work plan shall be described as follows:<br />

Understanding of TOR (not more than two pages)<br />

The Applicant shall clearly state its understanding of the TOR and also highlight its<br />

important aspects. The Applicant may supplement various requirements of the TOR and<br />

also make precise suggestions if it considers this would bring more clarity and assist in<br />

achieving the Objectives laid down in the TOR.<br />

Methodology and Work Plan (not more than three pages)<br />

The Applicant will submit its methodology for carrying out this Assignment, outlining its<br />

approach toward achieving the Objectives laid down in the TOR. The Applicant will<br />

submit a brief write up on its proposed team and organisation of personnel explaining<br />

how different areas of expertise needed for this Assignment have been fully covered by<br />

its proposal. The Applicant should specify the sequence and locations of important<br />

activities, and provide a quality assurance plan for carrying out the Consultancy Services.<br />

Request for Proposal 50


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 6<br />

Abstract of Eligible Assignments of the Applicant<br />

Sl.No. Name of the Project Name of the<br />

Client<br />

Estimated<br />

Capital Cost of<br />

the Project (in<br />

Rs Crore)<br />

Payment of the<br />

Professional<br />

Fees received<br />

by the<br />

Applicant (in<br />

Rs Crore)<br />

<br />

<br />

The names and chronology of Eligible Projects included here should conform to<br />

the project wise details submitted in Form-7 of Appendix-I<br />

Please attach Certificates from the Client<br />

Request for Proposal 51


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 7<br />

Details of Eligible Assignments of the Applicant<br />

Project name<br />

Location within country:<br />

Name of Client with Address<br />

Start date (month/year):<br />

Sub Consultants, Joint venture partner, if<br />

any:<br />

Approx. value of the Consultancy Fee<br />

(in current Rs):<br />

Duration of assignment (months):<br />

Total No of person months of the<br />

assignment:<br />

Completion date (month/year):<br />

No. of professional person months<br />

provided by the Joint venture partners/<br />

Sub-consultants<br />

Narrative description of Project<br />

Description of actual services provided in the Project<br />

Current Status of the Project<br />

<br />

<br />

<br />

Use separate sheet for each Eligible Project.<br />

Submit Relevant Certificate to support the Claim<br />

In case the Project cost is not set out in the certificate from the client, the<br />

Applicants can submit a certificate from Statutory Auditor indicating the same<br />

Request for Proposal 52


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 8<br />

Experience in Consultancy in preparation of DPR/Detailed Engineering for other<br />

similar work in the infrastructure sectors<br />

Project name<br />

Location within country:<br />

Name of Client with Address<br />

Start date (month/year):<br />

Sub Consultants, Joint venture partner, if<br />

any:<br />

Approx. value of the Consultancy Fee<br />

(in current Rs):<br />

Duration of assignment (months):<br />

Total No of person months of the<br />

assignment:<br />

Completion date (month/year):<br />

No. of professional person months<br />

provided by the Joint venture partners/<br />

Sub-consultants<br />

Narrative description of Project<br />

Description of actual services provided in the Project<br />

Current Status of the Project<br />

<br />

<br />

<br />

Use separate sheet for each Eligible Project.<br />

The experience claimed under Form 7 (Eligible Experience) should not appear in<br />

this Form<br />

Submit Relevant Certificate to support the Claim<br />

Request for Proposal 53


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 9<br />

Particulars of Personnel to be deployed<br />

Sl.No. Personnel Name Educational<br />

Qualification<br />

Key Personnel<br />

Length of<br />

Experience<br />

Details of<br />

Eligible<br />

Assignments<br />

Support Personnel<br />

Request for Proposal 54


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 10<br />

Format of Curriculum Vitae (CV) for Key Personnel<br />

1. Proposed Position:<br />

2. Name of Firm:<br />

3. Name of Staff:<br />

4. Profession:<br />

5. Date of Birth:<br />

6. Years with Firm/Entity:<br />

7. Nationality:<br />

8. Membership in Professional Societies:<br />

9. Detailed Tasks Assigned<br />

10. Key Qualifications:<br />

[Give an outline of staff member s experience and training most pertinent to tasks on<br />

assignment. Describe degree of responsibility held by staff member on relevant previous<br />

assignments and give dates and locations.]<br />

11. Education:<br />

[Summarize college/university and other specialized education of staff member, giving<br />

names of schools, dates attended, and degrees obtained.]<br />

12. Employment Record:<br />

[Starting with present position, list in reverse order every employment held. List all<br />

positions held by staff member since graduation, giving dates, names of employing<br />

organizations, titles of positions held, and locations of assignments. For experience in<br />

last ten years, also give types of activities performed and client references, where<br />

appropriate.]<br />

13. Languages:<br />

[For each language indicate proficiency: excellent, good, fair, or poor; in speaking,<br />

reading, and writing]<br />

14. Certification:<br />

I am willing to work on the Project and I will be available for entire duration of the<br />

Project assignment as required.<br />

I, the undersigned, certify that to the best of my knowledge and belief, these data<br />

correctly describe me, my qualifications, and my experience.<br />

Date:<br />

[Actual Signature of Key Personnel] (no scanned signature)<br />

Full name of Key Personnel: ______________________________________<br />

Full name of Authorized representative: __________<br />

Signature of Authorized Representative:<br />

Request for Proposal 55


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Appendix-II: Financial Proposal<br />

Request for Proposal 56


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 1<br />

Deployment Schedule<br />

Sl.No. Designation Name Man days<br />

Rate<br />

Proposed<br />

Man days<br />

Estimated<br />

Billing<br />

Site Away<br />

from<br />

Site<br />

Site Away<br />

from<br />

Site<br />

1 2 3 4 5 6 7 (4*6)+(5*7)<br />

Key Personnel<br />

Support Personnel<br />

Sub-Consultant if any<br />

Please justify:<br />

The provision of Support Personnel for the Assignment<br />

Man days requirement for the Site and away from the Site<br />

Request for Proposal 57


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Form 2<br />

(On the Letter head of the Applicant)<br />

Date:<br />

Director General<br />

Department of <strong>Tourism</strong><br />

Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

Paryatan Bhawan<br />

C-13, Vipin Khand, Gomti Nagar<br />

Lucknow: 226 010<br />

Sub: Financial Proposal for Selection of Project Management Consultant for<br />

Integrated Infrastructure Development around Taj.<br />

Sir,<br />

1. Having gone through this <strong>RFP</strong> document and having fully understood the scope<br />

of work for the Project as set out in this <strong>RFP</strong> document, we are pleased to quote<br />

the following Estimated Total Billing Amount for the Assignment:<br />

Sl.No. Description of Items Amount in Rs.<br />

1 Manpower Cost<br />

(as obtained from Deployment Schedule, Form – 1)<br />

2 Office Consumables like stationery, communication<br />

etc<br />

3 Office Furniture and Equipment (Rental)<br />

4 Reports and <strong>Document</strong> Printing<br />

5 Surveys & Investigations<br />

6 Local conveyance and other Travel<br />

7 Miscellaneous Expenses<br />

8 Sub-Total<br />

9 Overhead cost (% of 8)<br />

10 Service Tax<br />

11 TOTAL (including taxes)<br />

This amount shall be considered for evaluation for<br />

Selection of Consultant<br />

In Indian Rupees in figures in words<br />

<br />

<br />

Miscellaneous Expenses in Item 7 shall not exceed 15% (fifteen per cent) of the<br />

total amount in 8<br />

All costs shall be reimbursed on production of a Statement of Expenses, duly<br />

certified by the Authorised Representative. However, no details of expenditures<br />

Request for Proposal 58


Department of <strong>Tourism</strong>, Government of <strong>Uttar</strong> <strong>Pradesh</strong><br />

<br />

<br />

<br />

<br />

<br />

would be sought for overhead expenses, which will be reimbursed in proportion to<br />

the total expenses under Item 10.<br />

For the purposes hereof “Statement of Expenses” means a statement of the<br />

expenses incurred on each of the heads indicated in the Financial Proposal;<br />

provided that in relation to expenses on Personnel, the Statement of Expenses shall<br />

be accompanied by the particulars of Personnel and the mandays spent on the<br />

Consultancy.<br />

The reimbursement of expenses shall be limited to the amounts indicated above<br />

No escalation on any account will be payable on the above amounts.<br />

All other charges not shown here and all insurance premia are considered included<br />

in the man day rate/ overhead/ miscellaneous expenses<br />

All payments shall be made in Indian Rupees and shall be subject to applicable<br />

Indian laws withholding taxes if any<br />

Yours faithfully,<br />

_______________<br />

(Signature of Authorised Representative)<br />

(Name, Title, Address, Date)<br />

Request for Proposal 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!