SUBTASK/REVISION NO.: 55<br />
WFF <strong>Aircraft</strong> <strong>Configuration</strong> Management/<strong>Engineering</strong> <strong>Support</strong><br />
PERFORMANCE SPECIFICATION<br />
1. AATS-14 Installation on N426<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the AATS-14<br />
instrument installation onboard N426. Installation will be by the Government. Access to<br />
the aircraft shall be under Government escort only. Specific requirements <strong>and</strong> schedule<br />
of deliverables are enclosed in this task order item document file. Final acceptance by<br />
the Government shall be upon issuance of the mission safety of flight release.<br />
2. SSFR Installation on N426<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the SSFR instrument<br />
installation onboard N426. Installation will be by the Government. Access to the aircraft<br />
shall be under Government escort only. Specific requirements <strong>and</strong> schedule of<br />
deliverables are enclosed in this task order item document file. Final acceptance by the<br />
Government shall be upon issuance of the mission safety of flight release.<br />
3. GIFS Installation on N426<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the GIFS instrument<br />
installation onboard N426. Installation will be by the Government. Access to the aircraft<br />
shall be under Government escort only. Specific requirements <strong>and</strong> schedule of<br />
deliverables are enclosed in this task order item document file. Final acceptance by the<br />
Government shall be upon issuance of the mission safety of flight release.<br />
4. BBR Installation<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the BBR instrument<br />
installation onboard N426. Installation will be by the Government. Access to the aircraft<br />
shall be under Government escort only. Specific requirements <strong>and</strong> schedule of<br />
deliverables are enclosed in this task order item document file. Final acceptance by the<br />
Government shall be upon issuance of the mission safety of flight release.<br />
5. HIGEAR Installation<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the HIGEAR<br />
instrument installation onboard N426. Installation will be by the Government. Access to<br />
the aircraft shall be under Government escort only. Specific requirements <strong>and</strong> schedule<br />
of deliverables are enclosed in this task order item document file. Final acceptance by<br />
the Government shall be upon issuance of the mission safety of flight release.<br />
6. REVEAL Installation<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the REVEAL<br />
instrument installation onboard N426. Installation will be by the Government. Access to<br />
the aircraft shall be under Government escort only. Specific requirements <strong>and</strong> schedule<br />
of deliverables are enclosed in this task order item document file. Final acceptance by<br />
the Government shall be upon issuance of the mission safety of flight release.
7. Cargo Baggage Bin<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the Cargo Baggage<br />
Bin installation onboard N426. Installation will be by the Government. Access to the<br />
aircraft shall be under Government escort only. Specific requirements <strong>and</strong> schedule of<br />
deliverables are enclosed in this task order item document file. Final acceptance by the<br />
Government shall be upon issuance of the mission safety of flight release.<br />
8. Additional Requirements for ARCTAS Mission<br />
1. Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the<br />
AATS Rainhat installation onboard N426. Installation will be by the<br />
Government. Access to the aircraft shall be under Government escort<br />
only. Specific requirements <strong>and</strong> schedule of deliverables are enclosed in<br />
this task order item document file. Final acceptance by the Government<br />
shall be upon issuance of the mission safety of flight release.<br />
2. Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the<br />
Radiometer blank-off plates onboard N426. Installation will be by the<br />
Government. Access to the aircraft shall be under Government escort<br />
only. Specific requirements <strong>and</strong> schedule of deliverables are enclosed in<br />
this task order item document file. Final acceptance by the Government<br />
shall be upon issuance of the mission safety of flight release.<br />
3. Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the<br />
changes directed by the PI for the HIGEAR nozzle <strong>and</strong> probe angle of<br />
attack. Installation will be by the Government. Access to the aircraft shall<br />
be under Government escort only. Specific requirements <strong>and</strong> schedule of<br />
deliverables are enclosed in this task order item document file. Final<br />
acceptance by the Government shall be upon issuance of the mission<br />
safety of flight release.<br />
9. Twin Otter Rack Installation<br />
Perform all design, drafting, analysis <strong>and</strong> fabrication in support of the Twin Otter rack<br />
installation on board N426. Installation will be by NASA P-3 maintenance personnel.<br />
Access to the aircraft shall be under Government escort only. Specific requirements <strong>and</strong><br />
schedule of deliverables are enclosed in this task order item document file. Final<br />
acceptance by the Government shall be upon issuance of the mission safety of flight<br />
release. Government request a detailed milestone schedule of how vendor proposes to<br />
complete on or before required due date.<br />
Schedule<br />
Period of Performance: October 1, 2007 through September 30, 2009.