3.0 Instrumentation and Data Processing<br />
This section describes the instrumentation setup used to collect the acceleration data,<br />
and the methods of data processing used to obtain transient displacements from the<br />
recorded accelerations.<br />
3.1 Instrumentation<br />
Horizontal acceleration will be measured in the direction of shaking using<br />
accelerometers mounted on the roof of the structure and on the base shaker<br />
(Fig. 3-1).<br />
⎛ Δ<br />
Roof<br />
− Δ<br />
Floor<br />
⎞<br />
EDP1<br />
= max⎜<br />
⎟<br />
H<br />
⎝<br />
⎠<br />
EDP2<br />
= max RoofAcceleration<br />
Figure 3-1: Schematic of instrumentation layout and measured engineering demand<br />
parameters for structure without base isolation.<br />
Undergraduate <strong>Seismic</strong> <strong>Design</strong> <strong>Competition</strong> 14