22.11.2014 Views

OF TDA-FZ, BELGIUM 1. Army intends to procure 70 ... - Indian Army

OF TDA-FZ, BELGIUM 1. Army intends to procure 70 ... - Indian Army

OF TDA-FZ, BELGIUM 1. Army intends to procure 70 ... - Indian Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REQUEST FOR INFORMATION : AMMUNITION FOR<br />

<strong>FZ</strong>-231 LAUNCHER (<strong>70</strong> MM) <strong>OF</strong> <strong>TDA</strong>-<strong>FZ</strong>, <strong>BELGIUM</strong><br />

<strong>1.</strong> <strong>Army</strong> <strong>intends</strong> <strong>to</strong> <strong>procure</strong> <strong>70</strong> mm rockets for its <strong>FZ</strong>-231 Launcher (Forges De Zeebrugge) (<strong>70</strong> mm<br />

rocket Launcher), of <strong>TDA</strong> <strong>FZ</strong>, Belgium.<br />

2. Information covering the undermentioned parameters may please be forwarded at the earliest.<br />

3. General Information of the Rocket.<br />

(c)<br />

(d)<br />

(a) Nomenclature.<br />

(b) Calibre.<br />

Capability of the rocket <strong>to</strong> be fired from <strong>FZ</strong>-231 <strong>70</strong>mm Rocket System of <strong>TDA</strong> <strong>FZ</strong>, and Belgium.<br />

Type of Warheads available, viz, HE, HEAT Cargo, smoke etc.<br />

(e) Resistance <strong>to</strong> humidity, physical and thermal shock and static.<br />

(f) Safety mechanisms available.<br />

4. Rocket Mo<strong>to</strong>r.<br />

(a)<br />

(b)<br />

Design.<br />

Stabilization.<br />

(c)<br />

Ability <strong>to</strong> withstand the high temperature and pressure reached during combustion process.<br />

5. Rocket Propellant.<br />

(a)<br />

(b)<br />

achieved.<br />

(c)<br />

Information on operating temperature ranges.<br />

Types of propellants for different kinds of warheads and corresponding ranges<br />

Effect of atmospheric conditions (whether prove <strong>to</strong> oxidation).<br />

(d)<br />

Physical strength properties.<br />

Coefficient of thermal expansion.<br />

Degree of inertness during operation and s<strong>to</strong>rage.<br />

Combustion characteristics (Burning Rate).<br />

Properties of exhaust gases (smoke less, non luminous etc).<br />

(j)<br />

Any other additional information.


2<br />

6. Maint and S<strong>to</strong>rage.<br />

(a)<br />

(b)<br />

(c)<br />

Shelf life.<br />

S<strong>to</strong>rage capacity of ammunition boxes.<br />

Whether any special s<strong>to</strong>rage conditions are required.<br />

7. Availability of Publication.<br />

(a)<br />

User hand book.<br />

(b) Detailed instructions on s<strong>to</strong>rage, proof, inspection, maintenance and repair.<br />

8. Availability of Trg Aids.<br />

(a)<br />

(b)<br />

Cut models.<br />

Charts.<br />

9. Indicate approximate cost of the rocket.<br />

10. Response <strong>to</strong> the RFI may be forwarded <strong>to</strong> the following address:-<br />

Direc<strong>to</strong>rate General of Weapons and Equipment (WE-9)<br />

General Staff Branch<br />

Integrated Headquarters of MoD (<strong>Army</strong>)<br />

DHQ PO, New Delhi-110011<br />

Fax : 91-11-23793274<br />

E-mail : we_dte@yahoo.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!