Stockland Shellharbour
Stockland Shellharbour
Stockland Shellharbour
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Issue 3 / March 2011<br />
<strong>Stockland</strong> <strong>Shellharbour</strong><br />
Community Redevelopment Update<br />
Holm Place<br />
From 1 April, Western access to the centre’s car parks will be<br />
P<br />
via Holm Place. This entry replaces the ramp that previously<br />
ran through the Western Car Park and will<br />
allow customers to access the existing car park near the<br />
Bus Stop and the existing multi-deck car park, from<br />
Lamerton Crescent.<br />
These are the car parks located closest the Kmart and Target<br />
entrances to the centre, previously accessed via the ramp through<br />
the Western Car Park.<br />
In addition, the new entrance works off Lake Entrance Road will<br />
be completed and operational from 1 April.<br />
Access from the Lake Entrance Road vechicle entry does not change.<br />
Centre Plan<br />
AS AT MARCH 2011<br />
Lamerton Crescent<br />
Lamerton Crescent will close between Holm Place and South Road<br />
on 1 April. This is to allow excavation works to continue before the<br />
construction of the new mall. Vehicles will still be able to use Lamerton<br />
Crescent to access Holm Place and the Council Car Park off South Road.<br />
As mentioned, the car park near the Bus Stop and the multi-deck car<br />
park will be accessible from Holm Place. The multi-deck car park, closest<br />
to the Target entrance to the centre, will still also be accessible from<br />
Benson Avenue or Lake Entrance Road.<br />
With the closure of Lamerton Crescent, best parking for the RTA, Centrelink,<br />
the Department of Housing, Mission Australia, Breast Screen, Australian<br />
Hearing, Southern City Chiropractors and CRS will be the Council Car Park<br />
accessible off South Road or Loop Road. There is both a ramp and stairs<br />
for pedestrian access.<br />
Customers are encouraged to visit the Customer Care Centre or call<br />
on 4296 8266 if our Courtesy Crew can be of assistance whilst shopping<br />
at <strong>Stockland</strong> <strong>Shellharbour</strong>. Our Courtesy Crew are available everyday.<br />
TO MULTI-DECK CAR PARK<br />
TO MULTI-DECK<br />
CAR PARK<br />
BEST PARKING FOR COLES AFTER HOURS<br />
BENSON AVENUE<br />
UP RAMP TO ROOFTOP<br />
ENTRY FROM<br />
LAKE ENTRANCE ROAD<br />
LOOP ROAD<br />
BEST PARKING FOR<br />
KMART 24 HOURS<br />
EXISITING BUS & TAXI<br />
CLOSED FOR CONSTRUCTION<br />
OF NEW MULTI-DECK CAR PARK<br />
CENTRELINK<br />
AND RTA<br />
LAMERTON<br />
HOUSE /COUNCIL<br />
NEW DEVELOPMENT<br />
AREA<br />
THIS SECTION OF LAMERTON CRESCENT CLOSES ON 1 APRIL 2011<br />
SOUTH ROAD<br />
COUNCIL CAR PARK<br />
EXISTING CAR PARK<br />
LAMERTON CRESCENT<br />
OVERFLOW CAR PARK<br />
BENSON AVENUE BENSON AVENUE<br />
HOLM PLACE<br />
CRESCENT<br />
LAMERTON<br />
LAKE ENTRANCE ROAD<br />
COMMERCIAL / RETAIL<br />
ALDI<br />
KFC<br />
COLLEGE AVENUE<br />
ROUNDABOUT<br />
COLLEGE AVENUE<br />
<strong>Stockland</strong> <strong>Shellharbour</strong>
<strong>Stockland</strong> <strong>Shellharbour</strong> Community Redevelopment Update Issue 3 / March 2011<br />
Interesting facts<br />
• We are currently 50% of the way through the excavation works.<br />
The major excavation works are on schedule to be completed<br />
within the next 6 to 8 weeks.<br />
• There are currently 15 excavators on-site, ranging from 45 tonne<br />
to 85 tonne machines.<br />
• There are currently around 100 workers on-site. By early April an<br />
additional 200 workers are due to commence. These people will<br />
be working on the construction of the Multi-Deck Car Park.<br />
Western Multi-Deck Car Park<br />
Excavation works continue for the construction of the new Western<br />
Multi-Deck Car Park, which will see 2 levels open before Christmas<br />
this year. The builders have commenced drilling and formwork will<br />
commence for the car park structure in early April.<br />
As of 1 April there shouldn’t be further changes to the fencing and<br />
traffic flow in the centre’s car parks until the first 2 levels of the new<br />
Western Multi-Deck Car Park open later this year.<br />
EARLY<br />
2011<br />
Construction Timeline<br />
• Stage 1 – Now to late 2011 – Changes to access points and construction of Multi-Deck Car Park<br />
• Stage 2 – Mid 2012 – New Coles & Kmart stores to open<br />
• Stage 3 – Early 2013 – Woolworths to open<br />
• Stage 4 – Late 2013 – Myer to open and centre completion<br />
LAKE ENTRANCE ROAD<br />
HOLM PLACE<br />
LAMERTON CRESCENT<br />
COLLEGE AVENUE<br />
SOUTH ROAD<br />
LOOP ROAD<br />
BENSON AVENUE<br />
<strong>Stockland</strong> <strong>Shellharbour</strong><br />
Lake Entrance Road, <strong>Shellharbour</strong> City Centre Tel: 4296 8266 Fax: 4296 1906 www.stockland.com.au/shellharbour<br />
SapientNitro SSHE 011 NL