28.11.2014 Views

Stockland Shellharbour

Stockland Shellharbour

Stockland Shellharbour

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Issue 3 / March 2011<br />

<strong>Stockland</strong> <strong>Shellharbour</strong><br />

Community Redevelopment Update<br />

Holm Place<br />

From 1 April, Western access to the centre’s car parks will be<br />

P<br />

via Holm Place. This entry replaces the ramp that previously<br />

ran through the Western Car Park and will<br />

allow customers to access the existing car park near the<br />

Bus Stop and the existing multi-deck car park, from<br />

Lamerton Crescent.<br />

These are the car parks located closest the Kmart and Target<br />

entrances to the centre, previously accessed via the ramp through<br />

the Western Car Park.<br />

In addition, the new entrance works off Lake Entrance Road will<br />

be completed and operational from 1 April.<br />

Access from the Lake Entrance Road vechicle entry does not change.<br />

Centre Plan<br />

AS AT MARCH 2011<br />

Lamerton Crescent<br />

Lamerton Crescent will close between Holm Place and South Road<br />

on 1 April. This is to allow excavation works to continue before the<br />

construction of the new mall. Vehicles will still be able to use Lamerton<br />

Crescent to access Holm Place and the Council Car Park off South Road.<br />

As mentioned, the car park near the Bus Stop and the multi-deck car<br />

park will be accessible from Holm Place. The multi-deck car park, closest<br />

to the Target entrance to the centre, will still also be accessible from<br />

Benson Avenue or Lake Entrance Road.<br />

With the closure of Lamerton Crescent, best parking for the RTA, Centrelink,<br />

the Department of Housing, Mission Australia, Breast Screen, Australian<br />

Hearing, Southern City Chiropractors and CRS will be the Council Car Park<br />

accessible off South Road or Loop Road. There is both a ramp and stairs<br />

for pedestrian access.<br />

Customers are encouraged to visit the Customer Care Centre or call<br />

on 4296 8266 if our Courtesy Crew can be of assistance whilst shopping<br />

at <strong>Stockland</strong> <strong>Shellharbour</strong>. Our Courtesy Crew are available everyday.<br />

TO MULTI-DECK CAR PARK<br />

TO MULTI-DECK<br />

CAR PARK<br />

BEST PARKING FOR COLES AFTER HOURS<br />

BENSON AVENUE<br />

UP RAMP TO ROOFTOP<br />

ENTRY FROM<br />

LAKE ENTRANCE ROAD<br />

LOOP ROAD<br />

BEST PARKING FOR<br />

KMART 24 HOURS<br />

EXISITING BUS & TAXI<br />

CLOSED FOR CONSTRUCTION<br />

OF NEW MULTI-DECK CAR PARK<br />

CENTRELINK<br />

AND RTA<br />

LAMERTON<br />

HOUSE /COUNCIL<br />

NEW DEVELOPMENT<br />

AREA<br />

THIS SECTION OF LAMERTON CRESCENT CLOSES ON 1 APRIL 2011<br />

SOUTH ROAD<br />

COUNCIL CAR PARK<br />

EXISTING CAR PARK<br />

LAMERTON CRESCENT<br />

OVERFLOW CAR PARK<br />

BENSON AVENUE BENSON AVENUE<br />

HOLM PLACE<br />

CRESCENT<br />

LAMERTON<br />

LAKE ENTRANCE ROAD<br />

COMMERCIAL / RETAIL<br />

ALDI<br />

KFC<br />

COLLEGE AVENUE<br />

ROUNDABOUT<br />

COLLEGE AVENUE<br />

<strong>Stockland</strong> <strong>Shellharbour</strong>


<strong>Stockland</strong> <strong>Shellharbour</strong> Community Redevelopment Update Issue 3 / March 2011<br />

Interesting facts<br />

• We are currently 50% of the way through the excavation works.<br />

The major excavation works are on schedule to be completed<br />

within the next 6 to 8 weeks.<br />

• There are currently 15 excavators on-site, ranging from 45 tonne<br />

to 85 tonne machines.<br />

• There are currently around 100 workers on-site. By early April an<br />

additional 200 workers are due to commence. These people will<br />

be working on the construction of the Multi-Deck Car Park.<br />

Western Multi-Deck Car Park<br />

Excavation works continue for the construction of the new Western<br />

Multi-Deck Car Park, which will see 2 levels open before Christmas<br />

this year. The builders have commenced drilling and formwork will<br />

commence for the car park structure in early April.<br />

As of 1 April there shouldn’t be further changes to the fencing and<br />

traffic flow in the centre’s car parks until the first 2 levels of the new<br />

Western Multi-Deck Car Park open later this year.<br />

EARLY<br />

2011<br />

Construction Timeline<br />

• Stage 1 – Now to late 2011 – Changes to access points and construction of Multi-Deck Car Park<br />

• Stage 2 – Mid 2012 – New Coles & Kmart stores to open<br />

• Stage 3 – Early 2013 – Woolworths to open<br />

• Stage 4 – Late 2013 – Myer to open and centre completion<br />

LAKE ENTRANCE ROAD<br />

HOLM PLACE<br />

LAMERTON CRESCENT<br />

COLLEGE AVENUE<br />

SOUTH ROAD<br />

LOOP ROAD<br />

BENSON AVENUE<br />

<strong>Stockland</strong> <strong>Shellharbour</strong><br />

Lake Entrance Road, <strong>Shellharbour</strong> City Centre Tel: 4296 8266 Fax: 4296 1906 www.stockland.com.au/shellharbour<br />

SapientNitro SSHE 011 NL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!