<strong>PSN</strong> <strong><strong>Service</strong>s</strong> <strong>Service</strong> <strong>Descriptions</strong><br />

Lot4 – Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

Provision of Managed Equipment Room <strong><strong>Service</strong>s</strong>: including supply, installation, maintenance,<br />

technical architecture and system design, project management, and support as equipment, commodity<br />

and managed service. The Lot scope includes: management of equipment rooms and equipment<br />

cabinets; provision of power supplies; power monitoring equipment; cabling; equipment room<br />

infrastructure; environmental and access control; air conditioning; staffing; managed equipment rooms<br />

as a service; provision of all elements of a complete solution.<br />

• Note that locations may include List X sites<br />

• Note that connectivity does not fall within the scope of this Lot.<br />

1


<strong>PSN</strong> <strong><strong>Service</strong>s</strong> <strong>Service</strong> <strong>Descriptions</strong> .......................................................................................................... 1<br />

Lot4 – Managed Equipment Room <strong><strong>Service</strong>s</strong> ....................................................................................... 1<br />

Supplier Responses ............................................................................................................................. 3<br />

2e2 UK Ltd ...................................................................................................................................... 3<br />

Azzurri Communications Ltd ........................................................................................................ 10<br />

British Telecommunications plc ................................................................................................... 20<br />

Capita Business <strong><strong>Service</strong>s</strong> Ltd ......................................................................................................... 33<br />

Computacenter (UK) Ltd ............................................................................................................... 37<br />

Freedom Communications (UK) Ltd ............................................................................................. 40<br />

Fujitsu ........................................................................................................................................... 47<br />

Icom Holdings Ltd ......................................................................................................................... 52<br />

Logicalis UK Ltd ............................................................................................................................. 53<br />

Phoenix IT Group Limited ........................................................................................................... 197<br />

2


Supplier Responses<br />

2e2 UK Ltd<br />

1. MANAGED EQUIPMENT ROOM SERVICES<br />

1.1 Introduction<br />

2e2 has the capability and experience to provide all services required within Lot 4, namely:<br />

Provision of all relevant equipment room services, from design and build to commissioning<br />

Supply, installation of all relevant services, air conditioning, cabling, power, power monitoring /<br />

conditioning<br />

Provision and support of managed equipment including local connectivity<br />

On-going maintenance and monitoring of access control systems and advising of required<br />

upgrades as the room function increases/decreases in volume.<br />

All of these services will be carried out to meet or exceed all relevant <strong>PSN</strong> standards such as Waste<br />

Electrical and Electronic Equipment Regulations 2002/96/EC and SI 2006/1463 (the Restriction of the<br />

Use of Certain Hazardous Substances in Electrical and Electronic Equipment Regulations 2006 and<br />

2002/95/EC).<br />

2e2 has also applied all of these services within List X sites in the UK. Our staff are trained to work in<br />

this demanding environment and have relevant Security Clearance (SC, DV) allowing access to the most<br />

sensitive of areas. Clearly as these sites are List X, 2e2 cannot name specific projects or installations<br />

within this document, but site references / visits can be organised if required.<br />

1.2 Information Assurance<br />

2e2’s sites, processes and security processes and procedures have been assessed and 2e2 holds the<br />

following BSI / ISO certifications.<br />

ISO 9001:2000 – Quality Management System;<br />

ISO/IEC 20000 –1:2005 – IT <strong>Service</strong> Management System;<br />

ISO/IEC 27001:2005 – Information Security Management System; and<br />

ISO14001 – Environment Management System.<br />

In line with <strong>PSN</strong> standards, 2e2 will provide Managed Equipment Room services at a minimum level<br />

of IL2-2-4, however we can provision deliver the services up to IL4-4-4 based on customer requirements.<br />

Upon request 2e2 can provide visibility and evidence of certification and adherence to best practices<br />

in all components requested including strict observance of design to meet or exceed latest and best<br />

environmental practices, such as the EU Code of Conduct for Data Centres.<br />

2. SPECIFICATION<br />

An overview of 2e2’s services relating to Lot 4 extends to and includes all or part of the following:<br />

Design & build<br />

Project management<br />

Air conditioning/cooling<br />

3


Electrical services<br />

Equipment racks<br />

Data-voice cabling<br />

Remote monitoring<br />

Remote access<br />

On-going maintenance, alteration, upgrade service<br />

Staffing.<br />

2.1 Detailed Product / <strong>Service</strong> Description<br />

2.1.1 Design and Build<br />

2e2 provides a complete design and build service from initial concept to commissioning.<br />

This includes but is not limited to, complete build, flooring (both standard and anti-static tiling), on<br />

concrete or raised flooring. Where appropriate, ceiling voids to allow for enhanced cooling/monitoring.<br />

This service includes 3D CAD design and CFD airflow modelling which ensures that if a new<br />

equipment room is required or an existing room needs upgrading, then a relevant design and<br />

programme of works is presented, explained and would also be adjusted to suit any specific customer<br />

requirements.<br />

Through this approach and attention to detail and through the use of best equipment and practices,<br />

2e2 ensures that the on-going day-to-day running and maintenance of the room and equipment will<br />

prove reliable and cost effective.<br />

2e2 is vendor / contractor agnostic to offer customers maximum flexibility and best value for money<br />

on each specific project and whilst most of these services are delivered by in-house resources, projects<br />

can dictate that 2e2 can / would employ suitable contractors with the relevant skills and products to<br />

meet any specific design and build criteria.<br />

The use of 3D CAD design provides a model of any proposed equipment room at the outset of any<br />

project, allowing the customer to see and approve the design layout at the project outset.<br />

The CFD (Computational Fluid Dynamics) enhances the 3D CAD design model, ensuring optimum<br />

equipment layout, and ensuring the negating of hot-spots. This can also be used to project the impact on<br />

air-flow / air conditioning if there are any additional equipment / racks to be incorporated into an<br />

equipment room at a later date.<br />

As existing customers’ businesses functions evolve, the equipment room requirements may change.<br />

2e2 provides on-going evaluation of equipment room functions which we incorporate into our initial<br />

design by employing the relevant tools to provide resilience and robustness of the design element.<br />

All elements of this section, whether the customer requires a complete or only partial design and<br />

build, incorporate best practice and will meet or exceed relevant standards that would apply to any<br />

project commissioned by the customer.<br />

Where required by the customer, 2e2 can work alongside other service providers whom they may<br />

deem to be an integral part of their overall requirement, e.g. if a customer requests a certain rack<br />

manufacturer on a certain project, 2e2 will work alongside this vendor to incorporate their equipment<br />

into a bespoke design.<br />

4


2.1.2 Project Management<br />

2e2 provides a complete project management service from initial concept to commissioning and<br />

handover and has in-house project managers who are able to provide the services relevant to the<br />

project in hand, whether this is new build or alteration, or an upgrade of existing equipment room<br />

services. 2e2 provides a dedicated project manager for all works, to ensure seamless project completion<br />

and continuity of service.<br />

2e2’s project managers are highly skilled and trained to work in live environments, which is a regular<br />

occurrence as upgrades to some equipment rooms have to take place alongside current business<br />

requirements.<br />

Our project managers are fully conversant and comply with CDM regulations, also planning and<br />

building regulation constraints and requirements. They are also used to working with customer<br />

recommended third party vendors, and are trained to ensure both 2e2 and third party vendor works /<br />

equipment is fully tested and commissioned before recommending customer sign off and acceptance.<br />

2.1.3 Air Conditioning / Cooling<br />

2e2 provides a complete air conditioning / cooling system design and installation service, from initial<br />

concept to commissioning. As part of our service, 2e2 can design and install the relevant air conditioning<br />

systems for equipment rooms, ensuring the correct solution is provided by using traditional methods of<br />

calculation, taking into account the power density of the IT equipment being deployed or already in-situ.<br />

Alternatively, using CFD, we can calculate, design and specify the correct system for the equipment<br />

room.<br />

2e2 designers are fully aware that the air conditioning / cooling services in an equipment room<br />

environment under normal circumstances have the largest power consumption of any of the mechanical<br />

and electrical services and any 2e2 design / installation takes this into account and is designed so as to<br />

ensure lowest cost from both a financial and environmental point of view.<br />

2e2’s design incorporates the relevant system for the designated equipment room and provides<br />

flexibility and scalability for future requirements. This design utilises all types of relevant systems,<br />

including chilled water, fresh air, room-based or zoned and includes on-going monitoring and<br />

management systems.<br />

2e2 project managers and installation engineers are fully trained in and conversant with current<br />

building and health and safety regulations and these regulations are applied in all aspects from design to<br />

commissioning and completion.<br />

2e2 also provides a comprehensive on-going live temperature / environmental monitoring, using<br />

both local and remote software and components. This element can be utilised by the customer within<br />

our overall managed service package.<br />

2.1.4 Electrical <strong><strong>Service</strong>s</strong><br />

2e2 provides a complete electrical service from initial design and specification to testing and<br />

commissioning. 2e2 has in-house designers and electricians and provides electrical monitoring services<br />

covering all aspects of equipment room electrical requirements.<br />

2e2 designs and supplies all aspects of power requirements within the equipment room<br />

environment, including the provision of suitable electrical feeds into the equipment room, terminated<br />

5


oth as single and 3 phase as required. These can be installed as direct feeds into UPS units, or into submains<br />

distribution boards then into local UPS units serving specific IT equipment. The UPS design<br />

incorporates both local and remote monitoring, and can be used in the event of a power failure, to shut<br />

down any active equipment in an orderly and safe manner.<br />

Where required, a UPS specification and supply can be provided as part of the design phase, or<br />

alternatively designed and installed into existing equipment rooms.<br />

The comprehensive UPS design includes ensuring that the location can provide the power<br />

requirements of the UPS, and that the room / structure can support the physical weight of the unit.<br />

Where appropriate the equipment room UPS, active IT equipment and some or all of the M&E<br />

services (mechanical and electrical) can be backed up by a gas or diesel generator which can run the<br />

room indefinitely as defined initially by the customer. Where diesel generators are the only feasible<br />

option, 2e2 will ensure the unit is re-fuelled in the event of a prolonged power failure.<br />

All UPS design, generator works and fire system design /installations meet or exceed current<br />

standards and take into account local building regulations where applicable. The physical mains<br />

distribution within the room is be tailored to suit the current and potential future requirements in<br />

respect of racks.<br />

Additionally, 2e2 designs and installs all lighting and general power, as well as local earth bonding to<br />

racks, IT and M&E active and passive equipment.<br />

All 2e2 designed and installed electrical works will meet or exceed the current IEEE requirements.<br />

2e2 can include fire suppression / alarm systems as part of our electrical design, or alternatively<br />

undertake these works as a separate project where required. Whilst existing buildings tend to have a fire<br />

alarm system of one type or another in place, where appropriate or requested too, 2e2 can design a<br />

bespoke solution for any equipment room, or adjust the existing system to cater for the specific<br />

equipment room needs.<br />

All fire systems will be installed and tested and will meet or exceed relevant national and in some<br />

environments further local requirements.<br />

All disciplines listed above can be locally or remotely monitored, providing the customer with<br />

relevant safety information and projected and actual power draw. This information can then be used to<br />

create a more efficient and environmentally friendly equipment room.<br />

2.1.5 Equipment Racks<br />

2e2 provides a complete rack specification service, from initial design and specification to supply<br />

and installation, testing and commissioning. 2e2 can supply and install all types of equipment racks<br />

including, but not limited to:<br />

Free standing server or equipment racks from 600mm -800mmWide to 600mm-1200mm<br />

deep12U to 49U in height<br />

Wall mounted cabinets, again sized appropriately for both height and depth, including attention<br />

to conditions within the room to support both free standing and wall mounted units.<br />

The equipment racks can serve requirements bespoke to the customer and can include but are not<br />

limited to:<br />

Local UPS<br />

6


Local cooling<br />

Cable management<br />

Fan cooling<br />

Static and telescopic shelves<br />

Castors (both light and heavy duty)<br />

Stabilising plinths<br />

earth bonding monitored and standard PDUs<br />

Local KVM and VDU screens installation and configuration as appropriate.<br />

As part of this service, 2e2 control the logistics of the supply and delivery of the components, e.g.<br />

where the equipment room may not be on the ground floor or access may be limited. Provision of<br />

engineers with the relevant transport equipment to ensure delivery into the desired location with no<br />

disruption to normal office-building practices.<br />

These cabinets can be fitted collectively or individually with power, environmental, KVM switching<br />

and access services which can be locally or remotely monitored as part of 2e2’s management package.<br />

2.1.6 Data-Voice Cabling Infrastructure<br />

2e2 provides a complete cabling specification service, from initial design and specification, to supply<br />

and installation, testing and commissioning.<br />

2e2 can supply and install all types of cabling infrastructure including, but not limited to:<br />

Copper systems, Category 5e, Category 6, Category 7-A and voice grade 1308 where applicable<br />

Fibre Optic Cabling, Multimode OM1, OM2 and OM3 grade. Single-mode and Blown Fibre where<br />

appropriate<br />

• Armoured and loose tube.<br />

All Types of Standard Fibre Termination methods (ST,SC, LC,FC,)<br />

Fusion splicing and direct termination where required.<br />

2e2 is fully conversant with the design and installation of all of these systems, including the<br />

specification and installation of the relevant containment including trunking (both metal and plastic),<br />

cable basket, cable-tray (both overhead and under-floor), data-material direct fixing and suspension<br />

systems, blown fibre tubing, direct burial and laser and wireless links.<br />

All cabling systems are labelled either to an agreed standard, or to a bespoke design to suit<br />

customer requirements.<br />

2e2 can install, terminate and test all of the above and provide both 2e2 and manufacturers’<br />

warranties on all installed systems. 2e2’s managed service includes guaranteed response times and<br />

multi-year manufacturers’ component warranty.<br />

All 2e2 engineers are trained to install these systems to meet or exceed current standards, and are<br />

fully conversant and adhere to all building and local regulations where applicable.<br />

2.1.7 Local and Remote Monitoring<br />

2e2 provides a complete and bespoke remote monitoring service, within which we incorporate<br />

some or all of the components elements from our initial design and specification, or we can tailor this<br />

service to monitor existing equipment rooms and components where required.<br />

7


2e2 can undertake all types of equipment room remote monitoring including, but not limited to:<br />

Air conditioning / environmental control<br />

Power monitoring, including utilisation efficiency and outage alarm<br />

Remote equipment isolation services<br />

Alarm activation monitoring<br />

Security and access control from room to individual cabinet access<br />

Building management systems (CCTV, fire alarm, motion detection, life safety systems)<br />

Emergency lighting.<br />

By utilising a Local Intelligent Management Server (‘LIMS’) that will be installed within the<br />

customer’s physical and logical target network and with a connection to the customer’s Building<br />

Management System (‘BMS’), 2e2 is able to remotely monitor a computing and network room. Alerts<br />

from either the systems or environmental sensors can be monitored from 2e2’s Network Operations<br />

Centre (NOC) and those requiring intervention will be assigned to a support technician; a field engineer<br />

or third party contractor. Access to the computer or network room can be managed through strict<br />

adherence to an agreed change management procedure and the NOC can use their level of access to the<br />

BMS to provide temporary or defined-period authorisation to a customer employee who follows an<br />

agreed identification procedure and possesses the associated access device (card/token) or code. At the<br />

end of a reporting period, 2e2 can produce a report for the environmental status and physical access to<br />

the room(s) under management.<br />

2.1.8 Access Control<br />

2e2 provides a complete local and remote secure access service.<br />

This ranges from the design and installation of bespoke new services, including room access, IP<br />

camera monitoring within the rooms, local and remote controlled access down to individual rack cabinet<br />

access level.<br />

This service can also include the monitoring and control of existing access systems if customer<br />

requirements dictate that we inherit an existing system as part of an overall service described in the<br />

other sections of this document.<br />

2.1.9 On-going Maintenance, Alteration, Upgrade <strong>Service</strong><br />

2e2 provides a complete maintenance, alteration and upgrade service, which coupled with our<br />

monitoring service, provides a comprehensive preventive maintenance service, tailored to suit customer<br />

requirements and to provide maximum value for money.<br />

2e2 provides a planned maintenance schedule, (including site visits) to ensure the on-going smooth<br />

operation of the active/passive IT equipment and the M&E (mechanical and electrical) services.<br />

This maintenance service works hand in hand with 2e2’s remote monitoring service , which if the<br />

remote monitoring identifies a fault, or highlights an alarm which could result in a fault condition, the<br />

maintenance section of 2e2 is immediately notified and fix or preventative measures are undertaken.<br />

If, as part of this service, inefficient, redundant or potentially failing equipment is identified,<br />

(whether IT or M&E), 2e2 provides an alteration/upgrade service with full solution outline including<br />

costs, timescales and any business impact concerns.<br />

8


2.1.10 Staffing<br />

In parallel with our technology solutions heritage we offer flexible resourcing and managed<br />

resourcing services. Our flexible resourcing service enables organizations to bolster their project and<br />

engineering teams to help resource important projects and programmes of work or to provide back-fill<br />

for those engaged in them. We are able to fill skills and resource gaps often at short notice either by<br />

fulfilling the requirement from our nationwide teams or by identifying and evaluating external<br />

candidates and managing the selection process on behalf of the customer. Our managed resourcing<br />

services enable organisations to benefit from out-tasking on-going programme / project management,<br />

support and operational management tasks and functions and by transferring SLA accountability to 2e2.<br />

This service ensures a smooth on-going daily utilisation of the equipment room environment and<br />

reduces any unforeseen problems arising.<br />

This is a standard 2e2 service which is tried and tested and applied as a core 2e2 business model.<br />

3. ENVIRONMENTAL CONSIDERATIONS<br />

In all matters of equipment room design, installation, monitoring, 2e2 provides best environmental<br />

practices, paying particular attention to the standards in the EU Code of Conduct on Data Centre<br />

Efficiency, and PUE (power usage effectiveness) coupled with regular monitoring and preventative<br />

maintenance by its very nature leads to the most efficient use of existing equipment and applies to any<br />

and all components.<br />

In addition to ISO9001 (Quality Management), ISO20000 (IT <strong>Service</strong> Management) and ISO27001<br />

(Information Security Management), all of 2e2’s operations (including our data centres) are certified to<br />

the ISO14001 standard for Environmental Management.<br />

Our customers can be assured that this solution is delivered in accordance with best practice and<br />

our environmental management policy.<br />

2e2’s Environmental Management Policy has been formulated to prioritise actions relevant to<br />

dealing with products and services linked to our core business areas. It is directly linked to the<br />

environmental management policy set by senior management. The executive sponsor (Commercial<br />

Director) is directly responsible for ensuring that the plan includes regular documented updates so that<br />

crucial operational practices and responsibilities are formally reviewed, revised, and appropriately<br />

redeployed in the most effective and appropriate manner.<br />

2e2’s aim is to maintain a best practice Energy Management System to monitor, measure, report<br />

and reduce energy use across all 2e2 sites. 2e2 uses e-Sight energy management system to track<br />

electricity consumption every half hour, providing trends and enabling more accurate forecasts in<br />

energy usage. The system is used to establish the energy saving benefits of Environment Management<br />

Programmes/Initiatives.<br />

This enables 2e2 to meet the requirements imposed by UK <strong>Government</strong>’s Carbon Reduction<br />

Commitment (CRC) Energy Efficiency Scheme, including maintaining comprehensive evidence packs of<br />

2e2’s energy use and implementing incentivised Early Action Measures.<br />

By developing and implementing a “Carbon Reduction Strategy” 2e2 is making use of the latest and<br />

emerging technologies to deliver step change improvements to energy and greenhouse gas emission<br />

performance.<br />

9


Azzurri Communications Ltd<br />

Azzurri supply, install, maintain and support Managed Equipment Rooms (MER) and provide services<br />

that assist organisations to meet government objectives and drive increased efficiency, reliability,<br />

information security, agility, sustainability and deliver better service to citizens.<br />

Azzurri provide advice on technical architecture and system design and is a specialist in managing<br />

technology consolidation and integrating multiple services and suppliers into a single, holistic solution.<br />

Azzurri has a relationship with Scottish and Southern Energy (SSE) and Phoenix IT <strong><strong>Service</strong>s</strong> to provide<br />

Managed Equipment Rooms <strong><strong>Service</strong>s</strong> in dedicated offsite locations and bespoke on-site facilities.<br />

Azzurri is a managed service provider, blending engineering services from SSE and Phoenix IT<br />

<strong><strong>Service</strong>s</strong> with monitoring and management to provide operating environments for hardware equipment<br />

that is robust, resilient, secure and energy efficient with multiple options for communications<br />

connectivity.<br />

Our experienced engineering teams will assist with planning and specification, we have PRINCE2 and<br />

ITIL accredited project and support teams who engage in the implementation, transition and support of<br />

our Managed Equipment Room services.<br />

Azzurri has a Network Operations Centre (NOC) that provides second and third line support for<br />

incidents reported through our contact centres. The NOC operates 24x7x365. The NOC utilises a<br />

monitoring package to capture events from the Customers’ deployed <strong><strong>Service</strong>s</strong> and to respond to alerts.<br />

Following the appearance of an alarm on the monitoring platform, the alerts are logged in our <strong>Service</strong><br />

Management System and contact is made with the Customer where additional information is gathered<br />

and an action plan is agreed and put in place.<br />

Azzurri will provide the following with respect to Lot 4 Managed Equipment Room <strong><strong>Service</strong>s</strong>:<br />

1. Managed Equipment Rooms (MER) in dedicated facilities (Co-Location and Datacentre).<br />

2. Contract services for construction of onsite Managed Equipment Rooms.<br />

3. Monitoring and Management <strong><strong>Service</strong>s</strong> for Managed Equipment Room.<br />

4. Managed Equipment Room Security.<br />

1. Managed Equipment Rooms in Dedicated Facilities<br />

Azzurri, in conjunction with SSE, will provide a range of datacentre and co-location facilities across a<br />

number of UK based locations. These locations vary in design and technical specification, from Tier 1<br />

facilities offering basic, unmanned service that house equipment with monitored power, up to Tier 3<br />

locations with N+2 resiliency in power and air conditioning. Within each location engineering support is<br />

available for cabling and equipment racks.<br />

Azzurri will provide independent equipment rooms (pods) for the exclusive use of Customers within<br />

specific SSE locations. These pods are physically separate datacentre suites with access limited to<br />

authorised personnel from Azzurri and the Customer.<br />

Azzurri and SSE will adhere to PRINCE2 project management methodology in provision of services.<br />

10


▪<br />

Maintenance and Operation<br />

i. Azzurri will provide maintenance and operation services as follows:<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

Azzurri will respond to any status alerts raised by the Building Management System<br />

(BMS) covering each facility and all supporting infrastructure. Our engineers are fully<br />

qualified electrical and mechanical engineers, who in most instances will resolve<br />

issues with all central critical infrastructure utilising spares located on-site as<br />

required.<br />

Infrastructure systems are supported by manufacturer maintenance contracts.<br />

Engineers will respond to Customer incidents and deliver ‘remote hands’ services<br />

as required.<br />

Azzurri will provide a Planned Preventative Maintenance (PPM) programme.<br />

Azzurri will ensure the PPM schedule mitigates risk wherever possible.<br />

Azzurri operate a 24/7/365 NOC specifically for the monitoring of <strong><strong>Service</strong>s</strong> and<br />

applications based at Customer sites.<br />

Security is provided on a 24/7/365 basis. At our Fareham (Hampshire) facility,<br />

outside of normal hours security patrols take place every two hours, during which<br />

the patrolling guard will be in constant radio contact with the on-site Operations<br />

Bridge.<br />

Ongoing installs, moves and changes within the Customer’s environment will be<br />

managed by a dedicated on-site project manager, supported by the engineering<br />

team and under the control of the Datacentre Manager.<br />

Azzurri will provide on-site structured cabling engineers and electrical contractors.<br />

▪<br />

Technical Architecture<br />

i. Azzurri will provide technical architecture services as follows:<br />

▪<br />

▪<br />

▪<br />

Azzurri will assign a lead Mechanical and Electrical (M&E) design engineer to each<br />

project. This design engineer will be responsible for understanding all requirements<br />

for the physical, environmental (power, cooling, heating and lighting), and safety<br />

elements of each project and producing a technical design that will meet those<br />

requirements.<br />

The design engineer will be responsible for identifying all costs for the project and<br />

where required (because of scale) Azzurri will appoint a dedicated team that could<br />

comprise multiple design engineers, quantity surveyors, procurement function and<br />

computer aided design team.<br />

Azzurri will assign a project manager to manage the delivery of any new<br />

requirements or space. Supporting the project manager will be the datacentre<br />

manager and the on-site design engineers.<br />

▪<br />

System Design<br />

11


i. Azzurri will provide system design services as follows:<br />

▪<br />

Azzurri will provide system designs that will be based on a collaborative process<br />

between the Customer, Azzurri, and where applicable the technology provider.<br />

Azzurri will produce a room design that:<br />

o Provides a safe environment to work in.<br />

o Operates within the required environmental conditions (19-25 degrees Celsius<br />

and 30-70% Relative Humidity).<br />

o Has sufficient power to run the equipment.<br />

o Has air conditioning systems to provide sufficient cooling and redundancy to<br />

maintain the temperature and humidity stated above.<br />

o Has uninterruptible power supply systems to ensure resilience of power.<br />

o Has generator systems with back-up fuel where required.<br />

o Has a VESDA (Very Early Smoke Detection Apparatus).<br />

o Gaseous fire suppression system in all PODs and essential areas.<br />

o Analogue addressable fire detection system in all areas.<br />

o Carrier & Connectivity neutral with diverse entry points to separate “meet me”<br />

rooms.<br />

o 100kW PV installation with green energy.<br />

o Cold aisle containment as standard.<br />

o Modular fit out.<br />

o Low drag pipe work.<br />

o Harmonic balancing of plant.<br />

o Packing material disposal and recycling facilities.<br />

o Has a planned maintenance program.<br />

o Has operations program and manuals.<br />

o Has a training program.<br />

▪<br />

Provision of Power Supplies<br />

i. Azzurri will provide power supplies as follows:<br />

▪<br />

Azzurri will fit rooms with a power distribution infrastructure providing both an A<br />

and B metered supply metered in minimum N+1 configuration.<br />

o Power delivery will be presented via overhead infrastructure, whereupon<br />

sockets for each Customer rack are fused and monitored for power<br />

consumption and offer both single and three phase supplies.<br />

12


o The Customer’s electrical power requirement can be up to 7kW per rack in<br />

normal operation. With an average power rating of 3kW per rack. This may be<br />

increased by agreement.<br />

o The power supply can be backed up by generators in an N+1 configuration<br />

providing a minimum of 72 hours of AC power, before requiring replenishment<br />

of their diesel fuel. Generators shall be supported by two re-fuelling contracts<br />

each with an eight hour response to site.<br />

▪<br />

Power Monitoring Equipment<br />

i. Azzurri will provide power monitoring equipment as follows:<br />

▪<br />

▪<br />

Azzurri will provide Class 1 metering via the intelligent dual Mardix PDUs that feed<br />

the A and B feeds to each rack.<br />

The total kilowatt hours consumed at each rack are monitored and reported back<br />

to the Customer in a monthly report. This assists the Customer in its own capacity<br />

planning.<br />

▪<br />

Structured Cabling<br />

i. Azzurri will provide structured cabling services as follows:<br />

▪<br />

▪<br />

Azzurri will give Customers the option to utilise their own preferred structured<br />

cabling providers. In this case, Azzurri will insist on a full quality assessment of that<br />

design and implementation, to ensure minimum standards are met.<br />

For Azzurri provided connectivity, services (fibre or copper) will be delivered to<br />

dual optical distribution frames (ODF) at opposite ends of each pod.<br />

▪<br />

Access Control<br />

i. Azzurri will provide access control services as follows:<br />

▪<br />

Azzurri will manage:<br />

o All site access requests following a strict Permission to Work (PTW) process,<br />

which extends to the delivery of equipment. Azzurri will require notification of<br />

name, company, vehicle details and purpose of visit for all site visits. All visitors<br />

must bring official photo ID and only requests from Customer authorised<br />

personnel are accepted. Anyone who arrives unannounced will be refused<br />

entry.<br />

o Access to the pod is controlled by a proximity access control system. The issue<br />

of smart security cards shall be the responsibility of the Azzurri. The security<br />

system will provide real-time logging and alerts.<br />

o A minimum of two CCTV cameras will be deployed per pod for the purposes of<br />

operational management. Recorded media e.g. VT records will be kept for 60<br />

13


days prior to wiping and re-use. Azzurri will provide facilities for replays of<br />

access events reasonably required by the Customer.<br />

▪<br />

▪<br />

Air conditioning<br />

Azzurri will specify the air conditioning solution based upon the requirements given by the<br />

Customer. Factors affecting the choice of solution include power density, resilience, cost,<br />

outside environment, availability of water supply, potential for free cooling, criticality of the<br />

service being delivered from that environment, and any planning restrictions on external<br />

plant. The solution will include chillers, pump sets, pipe routes, Computer Room Air<br />

Conditioning (CRAC) sizes and CRAC redundancy.<br />

▪<br />

▪<br />

Staffing<br />

Azzurri will ensure that appropriately qualified engineering staff are available to perform<br />

emergency and planned maintenance works at all managed equipment rooms.<br />

2. <strong><strong>Service</strong>s</strong> for construction of onsite Managed Equipment Rooms<br />

Azzurri will, in conjunction with SSE engineering services, commission equipment rooms in any<br />

location to a bespoke design that conforms to regular standards for power, air conditioning and<br />

connectivity. This supports the provision of managed equipment rooms at Customer facilities that have<br />

equivalent features to dedicated facilities described above.<br />

▪<br />

Program Management<br />

i. Azzurri’s approach aligns to the PRINCE2 methodology and a 5 stage lifecycle<br />

including;<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

start up,<br />

requirement definition,<br />

design and procure,<br />

build,<br />

successful completion and final handover.<br />

▪<br />

Design<br />

i. Azzurri will provide design services as follows:<br />

▪<br />

Azzurri’s design management shall start from initial enquiry and data input through<br />

design planning. A design plan will be created to summarise the main details of the<br />

project and to manage the design process through to completion; critical activities<br />

being: Safety, health and environment to CDM (Construction (Design &<br />

Management) regulations 2007).<br />

14


▪<br />

▪<br />

o Design input – agreed specifications, technical and codes of practice and<br />

Customer requirements.<br />

o Design risk assessments – detailing any safety implications, risk and mitigation.<br />

o Design output – issued to the Customer and to include specifications, layout<br />

drawings, schematic diagrams, photographs, materials schedules, method<br />

statements, calculations, design risk assessment, conformance certificates.<br />

o Design reviews – a critical activity and to be scheduled in agreement with the<br />

Customer.<br />

o Design verification – a milestone activity that confirms the design output meets<br />

the input requirement.<br />

o Design validation – to be carried out prior to handover to the Customer.<br />

o Design change- critical in such a project given the site constraints and the likely<br />

concurrent activities, all changes are recorded in the design change log.<br />

The project manager will be involved at the tender stage and form the design team<br />

comprising mechanical design manager, electrical and high voltage design<br />

managers, building\civils contractor and design authority\assurance manager to<br />

explore where value engineering could be applied with the Customer’s agreement.<br />

Compliance with the design requirements of the Quality Management Systems<br />

standard ISO 9001:2008 and the Environmental Management System standard ISO<br />

14001:2004 will be ensured.<br />

▪<br />

Project Management<br />

i. Azzurri will project management services as follows:<br />

▪<br />

▪<br />

▪<br />

The Azzurri project manager will develop a project plan using a work breakdown<br />

structure approach and critical path planning. The plan will be base-lined at project<br />

kick-off with the team, work packages issued, accountability defined, and reporting<br />

and communication plans issued.<br />

The Azzurri project manager will issue the Project Initiation Document, including<br />

the communication plan, risk and issue registers, and change control process. Here<br />

would be highlighted any constraints and more importantly, inter-dependencies<br />

between work streams; e.g. construction and white space fit out.<br />

Azzurri acknowledges that the white space fit out, commissioning and subsequent<br />

testing along with hand-over are a considerable part of the project objective and are<br />

critical path activities. Azzurri will ensure that the project programme adequately<br />

details construction / fit out milestones that need to be achieved before the next<br />

phase of work commences. Clear milestones, and a quality certification process, will<br />

result in clean handover from one phase to another.<br />

▪<br />

Safety Management<br />

15


i. Azzurri will ensure safety is managed as follows:<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

Azzurri will ensure that a construction phase Safety Health and Environment (SHE)<br />

Plan is created, prior to work commencing, this shall include, where necessary, risk<br />

assessments, method statements, and COSHH information.<br />

The SHE Plan shall be reviewed as the project progresses to highlight the particular<br />

hazards about to be confronted and where necessary additional risk assessments,<br />

asbestos register, and method statements shall be completed. Each time the SHE<br />

documentation is revised all staff shall be briefed on the changes. Attendance of<br />

these briefings shall be recorded in the Project Site Diary.<br />

Where appropriate, Azzurri will provide welfare facilities detailed under the CDM<br />

regulations, and implement a site management regime ensuring that all facilities<br />

provided are suitable for the type of work and number of operatives engaged as set<br />

out under CDM<br />

The project manager and HSEQ (health, safety, environment and quality) site<br />

manager shall ensure that the site is set up and all personnel attending and working<br />

on site must have a full site induction, this will ensure that they are aware of all<br />

health and safety requirements on site, activities on site, hazards, risks, and<br />

prohibited areas.<br />

Risk Assessment and Method Statements will be required to be submitted in<br />

advance for all on site activities, these will be reviewed and approved by nominated,<br />

authorised personnel.<br />

Site safety audits should be carried out on projects at frequencies as detailed:<br />

o Site Manager – Weekly<br />

o Design Manager – Monthly<br />

o Project Manager – Bi-monthly<br />

▪<br />

Testing<br />

▪<br />

Azzurri recognise that to achieve success and meet the Customer’s requirements,<br />

the testing approach needs focus at the design validation stage. Azzurri’s approach<br />

is to understand the objective against requirements, and to define an appropriate<br />

testing regime.<br />

3. Monitoring and Management for Managed Equipment Rooms<br />

Azzurri, and Phoenix IT <strong><strong>Service</strong>s</strong>, will provide monitoring and management services for managed<br />

equipment rooms.<br />

▪<br />

The monitoring service will use SNMP to monitor device Management Information Bases<br />

(MIBs). Azzurri will configure the system to monitor key management data, and to trigger alarms<br />

and alerts.<br />

16


▪<br />

Where the equipment rooms have SNMP-capable systems, Azzurri will provide 24x7x365<br />

monitoring to improve service performance and ultimately availability.<br />

▪<br />

<strong>Service</strong> Capabilities<br />

Azzurri will provide the service 24hrs a day, 365 days a year. <strong><strong>Service</strong>s</strong> will be proactive or<br />

reactive depending on Customer requirement.<br />

The NOC will undertake incident diagnosis, problem management, and incident resolution<br />

remotely wherever possible. Should an on-site resource be required, this will be provided via<br />

Phoenix IT <strong><strong>Service</strong>s</strong>.<br />

The <strong>Service</strong> shall include:<br />

▪<br />

▪<br />

▪<br />

▪<br />

<strong>Service</strong> desk - 08XX local rate number/email access for reactive services, SNMP<br />

alarms and active monitoring for proactive services.<br />

Remote support - access to 24x7x365 technical support team or escalation to<br />

component suppliers or Customer facilities.<br />

Remote monitoring - 24x7x365 remote monitoring of SNMP traps.<br />

Remote management – 24x7x365 remote access to and management of SNMP<br />

MIBs.<br />

▪<br />

Security and Integrity<br />

i. Azzurri will ensure security and integrity is managed as follows:<br />

▪<br />

▪<br />

▪<br />

▪<br />

Systems are physically and logically separated to ensure that discrete Customer<br />

infrastructure and associated data is protected from unauthorised access. This<br />

includes perimeter security appliances on each dedicated link, source port routing<br />

and definition of system and user access rights.<br />

These systems will include proactive infrastructure and security management using<br />

a combination of policy-based routing, Layer 7 content switches, physical<br />

separation, address translation, firewalling, password protection, and intrusion<br />

detection and protection systems. The technology solution will be backed by threat<br />

management systems and appropriate policy and procedures to secure the<br />

infrastructure.<br />

Azzurri will also supply a detailed list of all IP addresses required for management<br />

systems and UDP/TCP ports and management protocols that will require access to<br />

Customer systems. This will ensure that only approved management traffic is<br />

enabled to traverse the infrastructure.<br />

Azzurri will provide remote access to Customer equipment room sites for remote<br />

monitoring and management of these facilities.<br />

▪<br />

Physical Security<br />

17


▪ Equipment rooms provided by Azzurri will be compliant with both ISO/IEC 20000<br />

and ISO/IEC 27001:2005 Information Security Management requirements. All<br />

Azzurri and associated subcontractor personnel will be issued clear guidelines<br />

concerning their obligation with regard security issues and confidentiality of data<br />

and the data protection legislation.<br />

▪<br />

Secure Portal<br />

▪<br />

Azzurri will provide nominated Customer users access to a secure management<br />

portal. This portal will utilise unique user sign-on to establish an SSL encrypted<br />

connection to the session. The portal will have a defined number of users, each of<br />

which will have to be specific users, as opposed to group email account. Users will<br />

use the portal to access:<br />

o Alliance v10 - Read only or read/write access to the Call Management<br />

application to view, open, track and update the status of an incident.<br />

o Matrix view – <strong>Service</strong> desk view of infrastructure status.<br />

o Topology view – Graphical view of topology and device status and associated<br />

information.<br />

o Performance reports – Historical performance reports for key systems and<br />

devices.<br />

o Availability reports – Availability statistics of each monitored object.<br />

o Change control – Access to log, track, update open change requests.<br />

o Contract Schedule – <strong>Service</strong> contract and inventory list.<br />

o Infocentre – On-line storage of related service information. i.e. maps and<br />

escalation information.<br />

▪<br />

Remote and Intelligent hands<br />

i. Azzurri will provide remote and intelligent hands services as follows:<br />

▪<br />

Azzurri will offer a range of services for Customer staffing with respect to remote<br />

hands, ranging from basic troubleshooting and analysis at Level 1 to more<br />

comprehensive on-site engineering support including detailed problem analysis and<br />

response.<br />

Extended Management Option<br />

o Azzurri will offer support, up to and including operating system and virtual<br />

operating environment. Azzurri will offer SLAs around continuous operation<br />

of applications and repair/replacement of faulty equipment.<br />

4. Managed Equipment Room Security<br />

▪ Equipment Room Access Policy<br />

18


▪<br />

▪<br />

Azzurri will provide an administration team that works alongside the monitoring system<br />

teams that will manage access control processes for Customers.<br />

Azzurri will process requests for access to either Azzurri managed Equipment Rooms or 3 rd<br />

party owned rooms in which Azzurri hosts Customer systems to which Customers require<br />

access.<br />

▪<br />

▪<br />

▪<br />

▪<br />

▪<br />

Approved access list<br />

Azzurri will use a Customer supplied access list detailing the names and levels of authority<br />

of people from various activities relating to the equipment room services. Customer<br />

employees on the list will each be given a security level 1 – 5, which will provide the<br />

individual with different levels of entitlement.<br />

This list will be reviewed and updated on a regular basis (as required by the Customer).<br />

All Customers or Customer contractors will be required to bring proof of identity to site in<br />

the form of a valid government photographic I.D. e.g. driving license or passport.<br />

The service desk will need to be informed immediately should someone on the list leave.<br />

Any visitors who arrive on site and have not been pre-authorised by someone listed on the<br />

Approved Access List will be denied access until Azzurri can verify that access should be<br />

granted.<br />

19


British Telecommunications plc<br />

The Contractor has presented the <strong>Service</strong> Description under the following headings:<br />

Functional Description<br />

Describes the Contractor’s functional capabilities<br />

Commercial Description<br />

Describes the range of commercial options under which the Contractor’s capabilities are<br />

offered<br />

<strong>Service</strong> Management Description<br />

Describes the Contractor’s service management capabilities<br />

Security Description<br />

Describes the Contractors security capabilities<br />

Partners and Suppliers<br />

Describes the ranges of partners and suppliers that the Contractor works with<br />

INTRODUCTION<br />

The Contractor works with our sub-contractor, NG Bailey who provide Building <strong><strong>Service</strong>s</strong>,<br />

Maintenance, IT Solutions and associated Managed <strong><strong>Service</strong>s</strong>, to a broad range of organisations<br />

throughout the UK. We together offer nationwide coverage through a network of regional offices.<br />

Our maintenance and management services include a range of Planned Preventative and Corrective<br />

building maintenance services. These are tailored to the specific requirements of clients. <strong><strong>Service</strong>s</strong> are<br />

aligned with ICT technology, augmenting the core Mechanical, Electrical and Engineering skills which will<br />

be deployed within the scope of Managed Equipment Room <strong>Service</strong> requirements.<br />

Our services recognise the working practices and culture employed within a business so as to effect<br />

integrated maintenance provision without disrupting the clients’ core business. Dependent upon the<br />

specific service requirements, the maintenance activities will be carried out by mobile or resident<br />

engineers in accordance with the scope of each specific client requirement for the Managed Equipment<br />

Room service.<br />

Required <strong><strong>Service</strong>s</strong><br />

Professional <strong><strong>Service</strong>s</strong> : Equipment Supply<br />

Professional <strong><strong>Service</strong>s</strong> : Installation<br />

Capability<br />

Yes<br />

Yes<br />

20


Professional <strong><strong>Service</strong>s</strong> : Maintenance<br />

Professional <strong><strong>Service</strong>s</strong> : Technical architecture<br />

and system design<br />

Professional <strong><strong>Service</strong>s</strong> : Project management<br />

Professional <strong><strong>Service</strong>s</strong> : Equipment support<br />

commodity<br />

Professional <strong><strong>Service</strong>s</strong>: Equipment support<br />

managed service.<br />

FM <strong><strong>Service</strong>s</strong> : Management of equipment rooms<br />

and equipment cabinets<br />

FM <strong><strong>Service</strong>s</strong> : Provision of power supplies<br />

FM <strong><strong>Service</strong>s</strong> : Power monitoring equipment<br />

FM <strong><strong>Service</strong>s</strong> : Cabling<br />

FM <strong><strong>Service</strong>s</strong> : Equipment room infrastructure<br />

FM <strong><strong>Service</strong>s</strong> : Environmental and access control<br />

FM <strong><strong>Service</strong>s</strong> : Air conditioning<br />

FM <strong><strong>Service</strong>s</strong> : Staffing<br />

FM <strong><strong>Service</strong>s</strong> : Managed equipment rooms as a<br />

service<br />

FM <strong><strong>Service</strong>s</strong> : Provision of all elements of a<br />

complete solution<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

FUNCTIONAL DESCRIPTION<br />

Managed Equipment Room <strong>Service</strong> Overview<br />

The Contractor provides a comprehensive range of integrated building services, which are pertinent<br />

to the Management of Equipment Rooms (including large scale Data Centres). The systems and related<br />

services available include, but are not limited to the supply, installation, testing and commissioning,<br />

21


maintenance, technical architecture and system design, project management, and support as<br />

equipment, commodity and managed service:<br />

22<br />

Building fabric – construction work including new build, building alterations and the provisions<br />

of cages.<br />

Heating and ventilation systems, including:<br />

o Ventilation (natural and forced)<br />

o Extract systems<br />

o Air conditioning<br />

o Refrigeration and cooling<br />

o Heating<br />

o Heat recovery and energy management<br />

o Steam and condensate services<br />

Fire and intruder alarms<br />

Access control and CCTV systems<br />

Building Energy Management Systems (including BREEAM assessments and consultancy)<br />

Refrigeration<br />

Lighting<br />

Small works<br />

Lifts<br />

Handyman/caretaker duties<br />

Structured Cabling<br />

Network Infrastructure Solutions and Management<br />

Unified Collaboration<br />

IT Security<br />

Domestic and Business hot and cold water services<br />

Water treatment systems<br />

Compressed air, vacuum and gas systems<br />

Electrical services, including:


o MV (11 kV) distribution systems<br />

o LV installations (BS 7671)<br />

o Emergency lighting schemes<br />

o Protection and discrimination schemes<br />

o Alternative power supplies (UPSs, generators and mains parallel systems, etc)<br />

o Fire engineering<br />

o Earthing systems (sub-stations, lightning protection etc)<br />

Managed Equipment Room services include:<br />

Room layout design and configuration to pre-agreed standards<br />

Provision and installation of Equipment cabinets and Racks (including associated copper and<br />

fibre structured cabling as part of an overall solution under Lot 10), main power supplies<br />

(including UPS) air-conditioning, chillers and associated environmental monitoring equipment<br />

Centralised Helpdesk Support during the applicable service hours, with additional 7 x 24hr<br />

facility to place calls outside of contracted maintenance periods.<br />

Standard On-site Maintenance to agreed <strong>Service</strong> Level Agreements (SLA)<br />

Equipment Room audits<br />

Optional services include:<br />

Project managed installs for Equipment Room upgrades<br />

Complete Fit-outs for new Equipment Rooms<br />

Takeover and maintenance of existing equipment<br />

Environmental Consultancy and audits<br />

Energy monitoring and management<br />

Equipment Room / Data Centre Fit-Out (New facilities or upgrades)<br />

Within the scope Equipment Rooms and Data Centres we are able to provide:<br />

23<br />

Design, supply, install, project management and maintenance of the Mechanical and Electrical<br />

elements of the Data Centre, comprising:<br />

Power supply and backup<br />

Primary distribution


Standby generation<br />

UPS<br />

Grounding<br />

Containment systems<br />

Cooling and environmental control<br />

HVAC<br />

Plumbing systems<br />

Leak detection<br />

Building Management<br />

Fire and smoke systems<br />

Physical security<br />

Intelligent Building Management<br />

All building systems integrated to common user interface, for ease of control and monitoring<br />

Planned, Preventative Maintenance<br />

On site staff as required<br />

Additionally, as part of combined (Lot 10 procurement) the Contractor can augment the above to<br />

include:<br />

Design, supply, install, project management and post installation support of Structured Cabling<br />

installation, comprising:<br />

Horizontal and Backbone cable<br />

Copper & Fibre cable<br />

Data Cabinets and racks<br />

Cabling Containment<br />

Under floor and overhead<br />

Cable Management<br />

24


Connectivity to outside networks<br />

The Contractor has a demonstrable, on-going, commitment to sustainability both in our own<br />

workplace and in the buildings we fit out and maintain for clients. Our targets and achievements against<br />

targets are published openly annually.<br />

Management of Equipment Rooms<br />

In addition to the base Implementation and Maintenance services, associated with Equipment<br />

Rooms and Data Centres, the Contractor offers facilities and configuration management services. The<br />

specific services to be provided will be agreed with the Customer on a case by case basis, and may<br />

include:<br />

Maintaining one or more equipment rooms on customer designated sites to ensure adherence<br />

to Health and Safety standards and other documented local standards<br />

Configuration management service (including Intelligent Infrastructure Management systems)<br />

Maintaining documentation, for example:<br />

Designs and equipment layout plans (including electronic update and storage)<br />

Recording of equipment in Equipment Rooms and Equipment Cabinets/Racks<br />

o<br />

o<br />

Equipment Room and Equipment Cabinet layouts, and cabinet/equipment owners;<br />

Inventories of IT equipment installed in Equipment Rooms, with sufficient information<br />

to identify equipment by Equipment Cabinet;<br />

Updating and storage of Floor plans<br />

Network circuit inventories;<br />

Cabling patching records.<br />

Planning and effecting change programmes<br />

Space management ensure optimum positioning of IT equipment and environmental efficiency<br />

Design reviews and Environmental audits of the Equipment Rooms<br />

Capacity management<br />

Co-ordinating the requirements of third parties using the Equipment Rooms for space, power, ,<br />

light, heat and racking.<br />

Dealing with free-standing cabinets out with managed equipment rooms.<br />

25


All services delivered will be in accordance with agreed and established best practices. All contracts<br />

will have a designated <strong>Service</strong> Delivery Manager operating in alignment with ITIL methodology. Project<br />

Management services are aligned with PRINCE II and LEAN.<br />

Power Supply and Power Monitoring<br />

In order to manage the supply of power to Equipment Rooms the Contractor is able to supply the<br />

following services:<br />

Provision and install of required power supply and power monitoring equipment<br />

Conducting regular environmental audits to maintain adequate and efficient use of power and<br />

environmental equipment<br />

Processing of requests for additional power supply and taking appropriate action to meet<br />

demand<br />

Managing requests to ensure that supply constraints are not exceeded<br />

Managing works required to install and maintain power supplies<br />

Environmental and Access Control<br />

In order to manage the environment within equipment rooms and the access to them the<br />

Contractor is able to provide the following services:<br />

Management of requests to ensure that environmental capacity is not exceeded, taking into<br />

account parameters such as temperature, ambient lighting and floor loading limitations<br />

Provision and Management of works to install and maintain environmental and access control<br />

equipment<br />

Maintenance of the physical security of Equipment Rooms and Equipment Cabinets<br />

Ensuring that access is controlled according to procedures agreed with the Customer<br />

Identification and reporting of breaches and attempted breaches of access controls<br />

Maintenance of an audit trail of access to equipment rooms and any works carried out<br />

We offer a range of solutions that monitor and manage the above to varying levels, according to<br />

specific client requirements. Such solutions include Physical Access Control systems managing access to<br />

Equipment Rooms and specific cabinets/racks (centrally managed from our Network Operations Centre)<br />

and CCTV monitoring.<br />

Equipment Room Infrastructure<br />

26


The Contractor is able to manage and maintain the infrastructure within the equipment room. This<br />

includes the provision and installation of cabinets and racks, copper and fibre optic cabling and<br />

associated labelling. Installation of equipment within cabinets and racks, undertaking patching and<br />

maintaining patching schedules and records. Planning and execution of Adds, Moves and Changes to<br />

equipment rooms<br />

All services delivered will be in accordance with agreed and established best practices. All contracts<br />

will have a designated <strong>Service</strong> Delivery Manager operating in alignment with ITIL methodology. Project<br />

Management services are aligned with PRINCE II and LEAN.<br />

Staffing<br />

The Contractor is able, if required, to provide on-site staffing to undertake management of<br />

equipment rooms<br />

Sustainability services<br />

Equipment rooms contribute significantly to the environmental footprint of ICT in HMG. The<br />

majority of the environmental impact of equipment rooms comes from equipment and Heating,<br />

Ventilation and Air Conditioning (HVAC).<br />

The Contractor offers a range of Sustainability <strong><strong>Service</strong>s</strong> across the lifecycle, the scope of which are<br />

agreed on a case-by-case basis to accommodate the specific requirements of the Customer under each<br />

call-off.<br />

Specification and Design<br />

The Contractor's solution and product portfolio for Lot 4 is designed to reduce carbon emissions<br />

where possible and adhere to a 'zero to landfill policy.' Products and services in the Contractor's supply<br />

chain are strictly vetted to ensure compliance to Sustainability standards and codes of practice where<br />

they apply (e.g. EPEAT, Energy Star, ISO27001). The Contractor will address the environmental footprint<br />

requirements for HVAC for new equipment rooms and refurbishments through efficient design and<br />

product selection and offers professional services to reduce the in-line footprint of existing equipment<br />

rooms. This includes consideration of options such as cooling solutions refrigerant with low Global<br />

Warming Potential and low Ozone Depletion potential, and free-cooling solutions.<br />

Inventory Carbon Footprinting: the Contractor has developed methodologies and tools to estimate<br />

the use-phase and embodied carbon emissions of equipment supplied under the contract. Reports can<br />

be provided on a periodic basis (e.g. annually) giving insights into the carbon profile of the solution over<br />

time and identifying carbon hot spots worthy of more attention. Similarly, where taking responsibility<br />

for or replacing a legacy service the Contractor may be able to offer a carbon footprint analysis of the<br />

old versus new services.<br />

Installation.<br />

On construction projects greater than £300k Site Waste Management Plans will be provided, as<br />

appropriate.<br />

27


The WRAP ‘Halving Waste To Landfill’, a construction/property related voluntary waste reduction<br />

target set by Govt, is supported by the Contractor.<br />

Project level environmental plans for implementation can also be developed to optimise<br />

consolidated deliveries and staff travel to reduce CO2 emissions and waste.<br />

Redundant Equipment Recycling <strong><strong>Service</strong>s</strong>: the Contractor is able to offer secure recycling of<br />

redundant equipment, balancing the need to minimise environmental impact with the removal of data.<br />

Where reuse is not an option due to data security issues, assets are recycled with typically 99%<br />

reconstituted into raw materials and zero landfill achieved through incineration of the remaining<br />

materials. The recycling service will comply with both the Environmental Protection Act and the Data<br />

Protection Act, along with the WEEE Directive, ISO 9001, ISO 14001 and ISO 270001.<br />

Operation.<br />

<strong>Service</strong> Carbon Footprinting: the Contractor is able to offer full service carbon footprinting, and<br />

estimate the carbon emissions associated with the use of shared network services and operational<br />

activities including planning, building, maintaining/supporting and customer services in addition to those<br />

associated with the equipment inventory.<br />

Carbon Impact Assessments / Sustainability Impact Assessments: the Contractor’s Sustainability<br />

Consultants are able to work with customers to assess their wider business operations and identify<br />

opportunities to reduce their carbon emissions and/or improve their sustainability performance through<br />

deployment of additional IT services.<br />

COMMERCIAL DESCRIPTION<br />

The Contractor will adopt a common approach to the Supply, Installation, Maintenance, Project<br />

Management and Support for Equipment for all <strong>Service</strong> Lots across all <strong>PSN</strong> services, as described below:<br />

The Contractor will offer a range of contracting options to supply Communication services including<br />

the following as appropriate to the scope of delivery:<br />

3rd Party Product Supply<br />

3rd party HW and SW sourcing and delivery.<br />

Takes advantage of the Contractors existing negotiated pricing.<br />

Professional <strong><strong>Service</strong>s</strong> (Rate Card or Fixed Price)<br />

Project Management (Prince 2) and Programme Management<br />

Solution Planning and Design and Design Assurance (TOGAF)<br />

Field Force Deployment/Customer Site Based Staff – Selection of; Basic Cleared (BC), Security<br />

Cleared (SC) and Developed Vetting (DV) personnel.<br />

28


Testing and Commissioning<br />

Customisable design, delivery and maintenance of service for bespoke solutions.<br />

Customer Support for Enterprise Bespoke Solutions (Input based pricings)<br />

Maintenance (Break and Fix) – geared to Time to Repair - Basic Cleared (BC), Security Cleared<br />

(SC) and Developed Vetting (DV)<br />

Dedicated On-site Support – performing maintenance, moves and changes, patching and reconfiguration.<br />

<strong>Service</strong> governance (ISO 20000 principles) – dedicated or shared resource model<br />

Agency Management – providing a menu of Governance Functions (Cost Plus)<br />

Bill Payment<br />

Licence management<br />

Full service/asset inventory management – including reconciliation management<br />

Supplier optimisation services<br />

<strong>Service</strong> Governance – ISO 20000 principles<br />

Managed Enterprise <strong>Service</strong> (Output and performance based pricing)<br />

End-to-end service management governed to ISO20000 principles – IL0 to IL6<br />

Customised bespoke SLA derived architecture<br />

Contractor owned Assets – typically dedicated to one customer<br />

Core elements hosted in either the Contractors or the Clients Locations.<br />

Hosted <strong><strong>Service</strong>s</strong> (Commoditised Pricing)<br />

End-to-end service management governed to ISO20000 principles – IL0, IL2, IL3 and IL4<br />

Common SLA derived architecture<br />

Contractor owned Assets – shared by 2 or more customers<br />

Core elements hosted in the Contractors Locations<br />

The table below is a summary of the commercial options apply to Lot 4<br />

29


Commercial<br />

Option ►<br />

Technical<br />

component ▼<br />

3 rd<br />

Party<br />

and<br />

Product<br />

Supply<br />

Professi<br />

onal<br />

<strong><strong>Service</strong>s</strong><br />

Custo<br />

mer<br />

Support<br />

for<br />

Enterprise<br />

Bespoke<br />

Solutions<br />

Agency<br />

Management<br />

Mana<br />

ged<br />

Enterprise<br />

<strong>Service</strong><br />

Ho<br />

sted<br />

<strong>Service</strong><br />

Management and<br />

Maintenance of<br />

Equipment Rooms<br />

Yes Yes Yes Yes Ye No<br />

Management and<br />

Maintenance of freestanding<br />

equipment<br />

cabinets<br />

Yes Yes Yes Yes Yes No<br />

Power supply and<br />

monitoring<br />

Yes Yes Yes Yes Yes No<br />

Environmental<br />

and Access Control<br />

Yes Yes Yes Yes Yes No<br />

Equipment Room<br />

Infrastructure<br />

Yes Yes Yes Yes Yes No<br />

Staffing No Yes Yes No Yes No<br />

SERVICE MANAGEMENT DESCRIPTION<br />

MIGRATION SERVICES<br />

30


We offer a range of migration services that supports a client moving from one service model to a<br />

new service model. These include both Transition and Transformation <strong><strong>Service</strong>s</strong>.<br />

Transition <strong><strong>Service</strong>s</strong> – The take-on and operation by the Contractor of an existing service model.<br />

Typically either an in-house service model or one supplied by another operator. This would<br />

include:<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

Elements of Agency Management<br />

Transfer of in scope staff (TUPE)<br />

Knowledge Transfer<br />

Processes and procedures(<strong>Service</strong>, commercial, finance)<br />

Technical and Infrastructure<br />

In-Flight Projects and <strong>Service</strong> take-on<br />

Elements of a Managed Enterprise <strong>Service</strong> Model<br />

SERVICE MANAGEMENT CAPABILITY<br />

An effective service management operation will provide the basis and the foundation that shall<br />

ensure that users are supported during the transition process to a Contractor supplied service and that<br />

they are migrated effectively into “business as usual” service operation. The Contractor provides a<br />

range of <strong>Service</strong> Management options to address the needs of customers of varying scale and<br />

complexity. The Contractor is aligned to ITIL v3 best practice.<br />

<strong>Service</strong> Desk<br />

The contractor’s service desk is able to process both incidents and operational change across the full<br />

range of contracting options. The key attributes of this capability are as follows:<br />

<strong>Service</strong> Desk access ranging from 8hr x 5days per week (i.e. 250 weekdays per year) to 24hr x<br />

365 days (366 in a leap year), depending upon the requirements of the customer. Clients are<br />

able to place service requests outside of their core contracted service periods.<br />

Multi-channel interface for raising incidents and changes and receiving updates, including by<br />

telephone, fax and online.<br />

Escalation chains for customers to use if they are unhappy with the progress of their change or<br />

incident<br />

Reporting<br />

31


We offer a range of reporting options that will be tailored to meet specific client requirements and<br />

presented electronically, or in person by the designated <strong>Service</strong> Delivery Manager This reporting is able<br />

to address:<br />

<strong>Service</strong> Performance and Major Incidents<br />

Inventory of <strong><strong>Service</strong>s</strong><br />

<strong>Service</strong> Usage<br />

<strong>Service</strong> Utilisation<br />

<strong>Service</strong> Charging<br />

PARTNERS AND SUPPLIERS<br />

The Contractor works with its sub-contractor, NG Bailey, to deliver the services under Lot 4.<br />

We have the capability to work with other service providers, for example, WAN, LAN, Telephony,<br />

Application/Desktop and Hosting providers, as well as clients’ buildings and facilities management<br />

providers, landlords and agents to ensure that business and IT services continuity is not compromised.<br />

32


Capita Business <strong><strong>Service</strong>s</strong> Ltd<br />

Detailed Description<br />

Managed Equipment Room services for rooms situated on Client Business Premises. Encompassing<br />

the management of access control polices and procedures, real time environmental monitoring and<br />

mechanical and electrical maintenance and call-out functions.<br />

Updating of room records following Installs Moves, Adds and Changes (IMACS) incorporating best<br />

practice management in line with TIA-942, IS027001 and prevailing H&S Standards.<br />

Maintenance and document control of all room designs, the utilisation of room space, and<br />

relationship management with the Client Building Facilities Management Providers to ensure the most<br />

efficient use of the rooms.<br />

Business Benefits<br />

Provision of low-cost, managed equipment room services with service level guarantees<br />

24x7x365 Mechanical and electrical call-out function<br />

24x7x365 Equipment Room Access Request process<br />

24x7x365 Real-time environmental monitoring of Managed Equipment Rooms<br />

Scope of <strong>Service</strong><br />

Managed Equipment Room <strong><strong>Service</strong>s</strong> for rooms situated on Client Business premises.<br />

Standard Hours of Operation<br />

The <strong>Service</strong> is managed continually:<br />

Monday-<br />

Friday<br />

00<br />

:00<br />

o<br />

t 24<br />

:00<br />

Saturday<br />

00<br />

:00<br />

o<br />

t 24<br />

:00<br />

Sunday<br />

00<br />

:00<br />

o<br />

t 24<br />

:00<br />

Public<br />

Holidays<br />

00<br />

:00<br />

o<br />

t 24<br />

:00<br />

Standard Hours of <strong>Service</strong><br />

33


Standard <strong>Service</strong> Desk hours are:<br />

Monday-<br />

Friday<br />

08<br />

:00<br />

o<br />

t 18<br />

:00<br />

Saturday<br />

o<br />

t<br />

Sunday<br />

o<br />

t<br />

Public<br />

Holidays<br />

o<br />

t<br />

Message is monitored 24x7 and service desk is 0800-1800 M-F standard. Public sector working days<br />

as in the <strong>PSN</strong> <strong><strong>Service</strong>s</strong> framework contract.<br />

Standard <strong>Service</strong> Components<br />

<strong>Service</strong> Desk<br />

This will include logging of incidents by phone, email or web portal; case management of the whole<br />

incident lifecycle; fixing issues at first point of contact where possible; managing interfaces with other<br />

suppliers service desks.<br />

<strong>Service</strong> Management<br />

This will include relevant processes and procedures covering the core ITIL V3 processes including<br />

Incident Management; Major Incident Management; Change Management; Event Management;<br />

Financial Management; <strong>Service</strong> Portfolio Management; Continuous <strong>Service</strong> Improvement; <strong>Service</strong> Level<br />

Management; Capacity Management; Availability Management; IT <strong>Service</strong> Continuity Management;<br />

Information Security Management; Supplier Management; Release and Deployment Management;<br />

Transition Planning and Support; <strong>Service</strong> Validation and Testing; Request Fulfilment and Access<br />

Management.<br />

<strong>Service</strong> Reporting<br />

We will provide a service report on a monthly basis to each Customer covering specific measures<br />

and agreed KPIs against the service delivered. This will be managed and owned by the <strong>Service</strong><br />

Manager.<br />

Management of Managed Equipment Rooms ensuring that they comply with TIA-942 standards,<br />

H&S policies and Access Control Polices<br />

Provide 24x7x365 remote environmental monitoring of server room environments, encompassing<br />

temperature, humidity, power, water detection as required<br />

Provide a 24x7x365 maintenance and call-out function supporting Mechanical & Electrical<br />

Infrastructure within the Managed Equipment Rooms<br />

Update Managed Equipment room plans when changes occur to ensure best optimisation of rooms<br />

34


Maintain appropriate designs and records and update as required in accordance with change control<br />

process<br />

Management of physical access control to server rooms, subject to pre-authorisation and<br />

communication as required to the client<br />

Reporting on non-compliance of agreed access control policy, incidents where access controls have<br />

been breached, and identifying remedial actions and findings from audits<br />

Relationship Management with Building Facilities Management Providers providing Risk<br />

Assessment, Method Statements and Certificates for work where required<br />

Optional <strong>Service</strong> Components<br />

Provision of any associated equipment where applicable. e.g. Cabinets, wiring inside the computer<br />

room<br />

Energy Management system, observing and reporting on power consumption in line with industry<br />

best practise e.g. Power Usage Effectiveness, PUE metrics<br />

Re-boots and power-cycling of equipment or soft reboot (performed via keyboard) when possible.<br />

Re-connecting and changing of plug-in cards and hard drives<br />

Securing cables and connections<br />

Organising and labelling cable and visually verifying connectivity<br />

Entering customer specific commands on servers and devices<br />

Handling media insert and swapping of tapes or CDs<br />

Executing pre-agreed scripted tasks, e.g. tape rotations<br />

Deliverables<br />

Maintenance and management of access control lists to rooms<br />

Monthly Environmental Monitoring Report<br />

Monthly Mechanical & Electrical Planned Preventative Maintenance (PPM) Report<br />

Monthly Mechanical & Electrical Call-out Function Report<br />

<strong>Service</strong> Exclusions<br />

Provision of power to rooms<br />

Any Building works<br />

Cabling inside and outside the equipment rooms<br />

Computer Equipment Racking<br />

Overall Security of the building (administered by the building facilities)<br />

35


Standard <strong>Service</strong> Targets/SLA<br />

Access Requests to be processed within 5 minutes<br />

24x7x365 4hr response time to mechanical and electrical callout functions<br />

Monthly Report provided within 10 working days of each month<br />

Toolsets<br />

Business service management (BSM) is a methodology for monitoring and measuring information<br />

technology services<br />

Spook used for power and environmental monitoring for server rooms<br />

AutoCAD and Microsoft Visio for computer aided design and drafting software application<br />

Amdocs for managing Incidents, Problems and Changes<br />

Terms<br />

Setup charges consisting of materials and services will be payable 30 days after completion of the<br />

work. Annual fees are payable annually and in advance<br />

Assumptions<br />

Rooms have been previously maintained and are subject to planned preventative maintenance<br />

programme already (PPM) with appropriate designs and records being maintained.<br />

The cooling infrastructure is sufficient to support the required operating temperature and not<br />

inadequate/or beyond end of life – therefore under these circumstances we would be unable to<br />

guarantee an operating temperature of no more than 5C above normal room temperature<br />

Existing designs comply with established Equipment Room Standards and prevailing Health and<br />

Safety standards<br />

36


Computacenter (UK) Ltd<br />

Computacenter is a datacentre specialist and leader in all LAN room architecture, design,<br />

implementation, support, managed service and hosting. We are the largest cabling company by volume<br />

in the UK. For niche projects and to compliment our portfolio we use Sudlows as our Building <strong><strong>Service</strong>s</strong><br />

Contractor. In line with the guidance in paragraph 5.3.6 of the ITT they provide the following range of<br />

services for Managed Equipment Rooms. Computacenter works with Sudlows in all datacentre,<br />

managed equipment rooms and LAN projects to deliver an overall solution for our customers.<br />

They hold professional membership to the HVCA , Institute of Engineering and Technology (MIET),<br />

have Incorporated Engineer (IEng) status and are accredited to the Associate Chartered Institute of<br />

Building <strong><strong>Service</strong>s</strong> Engineers (ACIBSE) and Achilles Building Confidence.<br />

We provide all types of mechanical and heating ventilation and air conditioning (HVAC) services,<br />

including:<br />

>Computational Fluid Dynamics (CFD) modelling used to illustrate and update the detailed<br />

engineering requirements of your Mechanical and Electrical project. This involves heat maps, images,<br />

revealing hotspots and restricted flows. This helps reduce the overall cost of design.<br />

>Energy Efficient Data Centre Cooling – The design, planning, installation and maintenance of<br />

cooling systems, air conditioning, air flow, cold isle containments and free air coolant.<br />

>Chilled Water & DX Systems – The design, planning, installation and maintenance of water chilled<br />

cabinets.<br />

>Medium & High Density Applications – The design, planning, installation and maintenance of<br />

cabinets and coolant solutions to maintain optimum temperatures.<br />

37


Precision & Evaporative Cooling – The design, planning, installation and maintenance of cold air<br />

solutions to remove moisture from the equipment room to avoid condensation and water based<br />

incidents.<br />

>Air Economisation – The design, planning, installation and maintenance of optimum air flow to<br />

sustain the correct operating environment and the regulated mix of CO2 and O2<br />

>Ventilation – The design, planning, installation and maintenance of all ducts, ventilation systems.<br />

This service goes hand in hand with the total solutions.<br />

>Duct Work – The design, planning, installation and maintenance of the trunking required above<br />

and below floors to provide the air conditioning and air flow.<br />

>3D design and planning – This service gives a 360 degree profile of the equipment room to ensure<br />

there are no unexpected obstacles. Our experienced CAD design team perform realistic rendering and<br />

produce a “working model” to easily overcome any misinterpretations or decision associated problems.<br />

>We deliver an assessment for Building Fabrics. This includes structural assessments, listed building<br />

consultancy, architectural design and planning.<br />

>Environmental Management is a service provided to analyse the carbon footprint of the<br />

environment. Temperature thresholds, cooling alerts and power management baselines are set<br />

according to best practice (Green Grid).<br />

>Unified physical infrastructure. This is the supply, planning, installation, attachment and reporting<br />

of the backbone cabling infrastructure including detailed schematics, diagrams and change management<br />

processes.<br />

38


Electrical standards and configuration. Our dedicated Electrical Division works to the seventeenth<br />

addition industry standard supporting all Electrical Power Distribution & Specialist Systems including;<br />

unified physical infrastructure controls such active equipment, structured cabling systems and Building<br />

Management Systems (BMS).<br />

>UPS (Uninterrupted Power Supply) – We design, select, install, test, support and maintain Tier 1, 2,<br />

3 and 4 systems in all Equipment Rooms. We calculate the power draw at regular change intervals.<br />

39


Freedom Communications (UK) Ltd<br />

Freedom Communications (UK) Ltd shall provide Managed Equipment Room <strong><strong>Service</strong>s</strong>, which shall<br />

include, but not be limited to:<br />

· Consultancy<br />

· Technical architecture and system design<br />

· Security<br />

· Project Management<br />

· Supply<br />

· Installation<br />

· Training<br />

· Maintenance including transitional services<br />

· Support for equipment, commodity and managed service.<br />

· Help Desk and incident management service services<br />

· Upgrade services<br />

We shall provide services that are capable of meeting, as a minimum, the ‘Protect’ data Business<br />

Impact Level 2-2-x and deliver the services to ‘best practice’ guidelines. We shall meet the Security<br />

policies and procedures that are agreed at the time of procurement and in accordance with our<br />

Information Security practices, accredited to ISOS27001.<br />

We shall continue to design and provide new products and services that are relevant to this Lot 4 on<br />

an ongoing basis.<br />

Within this Lot 4, we shall offer products from multiple vendors, including but not limited to Lifesize,<br />

Alcatel-Lucent, Cisco, Mitel, HP, Avaya, 3Com, Shoretel, Siemens, BT and Gamma Telecom<br />

We shall have the role of prime contractor and shall use subcontractors to provide some services.<br />

Our Operations Director and <strong><strong>Service</strong>s</strong> Managers shall closely manage our subcontractors and shall be<br />

the central points of contact with our subcontractors and suppliers.<br />

We shall have full <strong>Service</strong> Agreements in place with our premium business partners with defined<br />

SLAs for all aspects of the delivery they are responsible for.<br />

Our Account Managers and <strong>Service</strong> Managers shall be the central points of contact between<br />

ourselves and our customers.<br />

Contract management and helpdesk services shall be provided by our own dedicated in-house<br />

experts who are based in our dual resilient contact centre in Watford and Leeds.<br />

Provision of all elements of a complete solution<br />

Freedom Communications (UK) Ltd shall provide, as a minimum, all elements of Lot 4 – Managed<br />

Equipment Room <strong><strong>Service</strong>s</strong> within a complete service.<br />

40


We shall provide consultancy on how the Equipment Room is to be planned, developed and<br />

managed.<br />

We shall evaluate the size of the Equipment Room and ensure it is sufficient to handle the amount<br />

of equipment currently installed or to be installed, and also allow for the scope of the Equipment Room<br />

to grow as needs change. We shall allow for requirements of the Equipment Room to grow over time<br />

and build in the physical infrastructure to accommodate this growth.<br />

We shall ensure that all servers, power supplies and other equipment are securely placed in the<br />

racks. The racks shall provide a level of protection to the equipment in the computer room.<br />

We shall define document the policies and procedures relating to the operation of the Equipment<br />

Room, including:<br />

· Security<br />

· Safety measures and procedures<br />

· Emergency measures and procedures<br />

· Access procedures<br />

· System hosting facilities<br />

· Environmental control, reporting and maintenance<br />

· Change and configuration management<br />

SECURITY<br />

We shall introduce a range of security measures to protect employees, information and physical<br />

assets in or associated with the Equipment Room.<br />

Entry Systems and Access Policy<br />

The Security policy shall apply to all employees, contractors, vendors, consultants and externally<br />

employed people who require Equipment Room access. Access shall be securely controlled via RFID card<br />

readers, or similar, and all doors shall be fitted with sensors to detect unauthorised or prolonged<br />

opening. Staff and visitors shall not adjust or otherwise tamper with door fittings. Any suspected faults<br />

with doors, lights or any security equipment shall be reported to the Computer Room staff immediately.<br />

Unannounced/unescorted visitors shall be denied access. In the case of business critical systems and<br />

general emergencies exceptions shall be supported by a member of staff.<br />

Closed Circuit Television<br />

Closed Circuit Television (CCTV) monitoring and recording shall be in operation at all entry and exit<br />

points to the Computer Room and be centrally monitored by Security staff.<br />

41


SAFETY MEASURES AND PROCEDURES<br />

We shall operate according to the customer’s Health and Safety Policy and shall make a printed copy<br />

available on request.<br />

Signs and Information<br />

Safety signs and information shall be posted at access points to the Equipment Room. General<br />

notices shall be posted around the Equipment Room providing detailed information on first aid,<br />

emergency contacts and general Health and Safety issues.<br />

Contact Information<br />

This shall include:<br />

· Emergency and out of hours contact details<br />

· First Aid contact information.<br />

· Fire safety.<br />

Health and Safety Considerations<br />

There shall be a number of Health and Safety considerations when working in the Equipment Room,<br />

namely:<br />

· Heavy Lifting.<br />

· Working at Height.<br />

· Noise.<br />

· Lone Working.<br />

· Lasers.<br />

· Floor Tile removal.<br />

EMERGENCY MEASURES AND PROCEDURES<br />

Emergency Exits and Fire Alarm Procedures<br />

Emergency exits shall be labelled and signposted.<br />

Fire detection and Fire extinguishers<br />

42


The Equipment Room shall be fitted with a fire detection system linked to audible and visual alarms<br />

(coloured red) placed throughout the Equipment Room. If an alarm is activated, staff shall leave the<br />

room immediately at the designated exit points and exit the building.<br />

Electrical Safety<br />

PAT testing shall be is carried out by trained staff on all equipment and cables used in the<br />

Equipment Room. Records shall be maintained.<br />

ACCESS PROCEDURES<br />

Hours of Operation<br />

The Equipment Room shall operate on a continuous basis, with staff in attendance at agreed hours.<br />

Available Facilities<br />

A Staging Room shall be available to ICT staff to unpack, build and configure systems prior to use.<br />

Storage shelves and racks shall be provided to hold spares and consumables, such as patch leads<br />

and power strips.<br />

Equipment Delivery<br />

When transporting equipment, care shall be taken to keep disturbance to other building users to a<br />

minimum<br />

Control of Equipment and Spares<br />

Equipment left outside racks shall be clearly labelled with the name of the owner, a contact<br />

telephone number and a date indicating how long it is required. Unlabelled items, or any which exceed<br />

their removal date shall be removed.<br />

Console equipment (monitor, keyboard and mouse)<br />

Mobile consoles marked Equipment Room shall be provided for connection to systems for local<br />

working. Any other similar equipment shall not be used.<br />

Mobile consoles shall be returned to storage, ready for use by others.<br />

Prohibited Items<br />

The following items shall be prohibited from the Equipment Room:<br />

· Combustible materials such as paper and cardboard (except reference manuals as needed)<br />

43


· Food and drink<br />

· Tobacco products<br />

· Explosives and weapons<br />

· Hazardous materials<br />

· Alcohol, illegal drugs and other intoxicants<br />

· Electro-magnetic devices that could cause interference with Equipment and telecom equipment<br />

· Radioactive materials<br />

· Photographic or recording equipment (other than backup media)<br />

SYSTEM HOSTING FACILITIES<br />

The Equipment Room shall provide a secure, controlled environment suitable for locating rackmountable<br />

Equipment systems. Power, cooling and networking connectivity shall be provided, and UPS<br />

shall be available to protect systems from power fluctuations and short outages.<br />

Equipment Requirements<br />

All equipment hosted in the Equipment Room shall be rack-mountable, to make effective use of<br />

available room space.<br />

Advice on power and racking shall be obtained at any time from Equipment Room staff.<br />

Emergency Procedures<br />

We shall maintain an appropriately controlled environment for IT equipment to function on a 24/7<br />

basis. In the event of an emergency power or cooling outage, provisions shall be in place to help protect<br />

equipment and ensure safety:<br />

In the event of a cooling or power failure:<br />

· Equipment shall be colour coded to allow onsite staff to turn less essential items off to help reduce<br />

overall heat load, using the following coding.<br />

o<br />

o<br />

o<br />

Green - Low priority. Safe to power off in emergencies<br />

Yellow – Medium priority. Keep running if circumstances permit<br />

Red – High priority. Essential; keep running unless a total shutdown is required.<br />

· Hosted racks and equipment shall be labelled with emergency contact details to allow onsite staff<br />

to contact system owners in emergencies. All equipment shall have identifying labels, e.g. server<br />

name or IP address.<br />

· Should cooling fail, all systems shall be configured to shut down automatically if temperatures<br />

reach unacceptably high levels.<br />

44


· All in rack PDUs shall be clearly labelled with details of the under-floor commando socket used.<br />

This shall allow mains shutdown via the breakers in emergencies, where insufficient time is available<br />

to close down individual items of equipment.<br />

· Equipment such as servers and UPS units shall have the capability to send emergency alert<br />

messages. UPS email alerts shall be raised to make ICT staff aware of any power issues that may be<br />

affecting hosted equipment.<br />

ENVIRONMENT CONTROL<br />

Air Conditioning<br />

Under floor air conditioning shall be provided throughout the room. We shall ensure the Equipment<br />

Room has a dedicated air conditioning unit installed, and that it is sufficient for its calculated needs. The<br />

air conditioning unit shall be supported by an alarm system which will record the alarms and send<br />

notification of the alarms to the predetermined personnel for attention.<br />

UPS Provision<br />

All UPS units shall be rack mountable with suitable racking kits supplied.<br />

Environment Control<br />

Cooling, power and UPS provision shall be controlled centrally. Only authorised staff shall<br />

be allowed to alter settings on any such equipment.<br />

Environment monitoring<br />

Monitors shall be in place to report on issues affecting the environment, including:<br />

· Temperature alarms<br />

· Secondary temperature monitors<br />

· Leak detection system<br />

· Smoke detection system<br />

· Plant monitoring<br />

Dust prevention<br />

We shall ensure the Equipment Room remains dust free at all times, therefore packing or unpacking<br />

of equipment shall take place outside the room.<br />

Waste Disposal and Cleaning<br />

45


Cardboard and other items that can generate dust and are easily combustible shall remain outside<br />

Equipment rooms. Waste bins shall be available throughout the Equipment Room for all other items of<br />

waste. Equipment Rooms shall be cleaned weekly.<br />

Out-of-hours / Emergency Maintenance<br />

Maintenance shall be provided during normal working hours. Outside normal working hours, shift<br />

engineers shall be available to respond to issues. All environmental faults both inside and outside<br />

normal working hours shall be reported as greed to ensure they are properly recorded and handled.<br />

CHANGE AND CONFIGURATION MANAGEMENT<br />

The Change Management Process shall cover all changes on Configuration Items (CIs) included in the<br />

Configuration Management Database (CMDB). The functional areas within the scope shall include, but<br />

are not necessarily limited to:<br />

· All Equipment Room equipment and software including MIS and hosted equipment<br />

· All Equipment Room facilities equipment and software running on them including electricity, air<br />

conditioning, etc. equipment<br />

· All Network equipment (including all cabling and communications infrastructure) and related<br />

software<br />

· All voice system equipment and software<br />

· All desktop equipment and software<br />

· All licensed production software<br />

· Operational processes and documentation<br />

46


Fujitsu<br />

Overview<br />

The Contractor shall provide a range of Equipment Room <strong><strong>Service</strong>s</strong> to enable the Customer to host<br />

their servers, network equipment and workloads in a secure, reliable and managed environment. The<br />

scope of these services shall cover the management of equipment rooms, provision of data centres on a<br />

utility basis, provision of List-X facilities and the associated equipment room fabric and IT hosting<br />

infrastructure.<br />

The Managed Equipment Room <strong><strong>Service</strong>s</strong> shall include the supply, installation, maintenance and<br />

management of the facility, the associated infrastructure and full service lifecycle from requirements<br />

definition, design, build and commissioning of individual elements of an equipment room or of a<br />

complete equipment room, transition of existing equipment rooms, through to on-going operation of<br />

the <strong>Service</strong>.<br />

<strong>Service</strong> Scope<br />

The Contractor shall provide Equipment Room <strong><strong>Service</strong>s</strong> to support the IL2, IL3 and IL4 domains, with<br />

the capability to deliver these services at higher Impact Levels. The Contractor shall ensure that all<br />

services and associated infrastructure are designed to meet the required integrity and availability<br />

requirements. Additionally, the Contractor shall ensure that the Equipment Room <strong><strong>Service</strong>s</strong> and the<br />

related infrastructure, management systems, processes, personnel and procedures within the scope of<br />

the service are appropriately accredited to an Impact Level commensurate, with the maximum agreed<br />

Protective Marking of the material it will store or process.<br />

The Equipment Room <strong><strong>Service</strong>s</strong> that shall be provided by the Contractor are:<br />

· Supply, Management and monitoring of dedicated Equipment Rooms, delivering a secure,<br />

temperature-controlled environment for active and passive components relating to the provision<br />

of IT infrastructure and telephony services located on Customer premises and/or the Contractor<br />

data centre facilities. These environments shall be monitored and managed remotely or via local<br />

management as required by the Customer. Where required and applicable the Contractor shall<br />

ensure that the facility is compliant and managed to the requirements of List-X, relevant health<br />

and safety standards as defined by the policies set and agreed with the Customer<br />

· Supply and management of the mechanical and electrical elements of the Equipment Rooms<br />

The environment shall include air-conditioning, fire prevention, power, temperature / humidity<br />

and cleanliness management systems, where applicable<br />

· Environment preventative maintenance and testing of air-conditioning, fire prevention, power<br />

and UPS systems, in accordance to the relevant manufacturer’s recommended maintenance<br />

programmes. The Contractor shall provide an annual schedule of Planned Preventative<br />

Maintenance (PPM) as a guide to the planned work. When required, the Contractor shall also<br />

undertake and implement emergency repairs, planned maintenance and planned upgrade<br />

activities to maintain all business as usual activities, levels of resilience, business continuity,<br />

project deliverables and accreditations for the equipment rooms through the agreed change<br />

management process<br />

· Equipment room IT equipment capacity and space planning. The Contractor shall ensure<br />

optimum use of equipment management space with respect to the weight, power and heat<br />

distribution for the hosted equipment<br />

47


· Equipment cabinets, cabling and power provisioning and installation services for IT equipment<br />

in support of the local services. This shall include complete end systems, file and print, data<br />

storage, Wide Area Network (WAN), Local Area Network (LAN) and telephony, including servers,<br />

storage devices, routers, switches and related peripherals. These activities shall cover:<br />

· Hardware planning – delivering detailed floor plans and rack layouts<br />

· Equipment movement – accepting deliveries into data centre, ensuring compliance with<br />

policies<br />

· Equipment installation – physical rack and equipment setup, cabling and hardware<br />

installation<br />

· Equipment Room Asset and Configuration Management. The Contractor shall:<br />

· Identify control, record, report, audit and verify Equipment Room assets<br />

· Protect the integrity of assets by ensuring that only authorised changes are made<br />

· Ensure the integrity of the Customer assets by establishing and maintaining an accurate<br />

and complete Configuration Management System<br />

· Equipment room access control, covering authorisation for Customer and Contractor staff. The<br />

Contractor shall ensure that access to any room under its management is limited to authorised<br />

staff with a need for access. The Contractor shall ensure that access to Customer premises<br />

based rooms is available to an agreed list of Customer staff in addition to the Contractor’s<br />

technical staff. The Contractor shall also be responsible for ensuring that access for approved<br />

activity is made available. The Contractor shall maintain the access list in a secure Configuration<br />

Management System.<br />

Equipment Room Operational <strong><strong>Service</strong>s</strong><br />

The Equipment Room <strong><strong>Service</strong>s</strong> shall be operated under an ITIL-aligned, ISO/IEC 20000 compliant<br />

service management framework and shall be supported by the Contractor’s <strong>Service</strong> Management Centre<br />

(SMC). The operational services that shall be provided by the Contractor are:<br />

· Proactive maintenance (HVAC, PDU, UPS) and remote monitoring for system health via SNMP<br />

traps as applied to access control systems, cabinet door sensors, temperature monitors<br />

associated with the equipment room facilities<br />

· Onsite Field Maintenance services for installation, moves and changes of hardware equipment<br />

· Investigation of faults and incidents, operational and security, including those notified by the<br />

users or the Building Management Systems to the Customer provided service desk via the<br />

Contractor <strong>Service</strong> Portal and/or <strong>Service</strong> Desk<br />

· Management of third party suppliers for repairs, moves, adds and changes for the IT equipment<br />

contained in the equipment rooms. This shall operate according to the policy and process in the<br />

agreed Contractor service schedule<br />

· Management and implementation of changes via the Contractors agreed Managed <strong>Service</strong><br />

Change Procedure or as a pre-approved change via the Contractor provided service<br />

portal/catalogue and/or service desk.<br />

The SMC shall implement the agreed policies into the Equipment Management <strong><strong>Service</strong>s</strong> and any<br />

changes to the policies shall be managed through the Managed <strong>Service</strong> Change Procedure. The SMC<br />

shall also provide scheduled reports to the Customer, which shall provide management information on<br />

the Equipment Room <strong>Service</strong> including details of any security incidents, performance issues and<br />

48


trends. The specific policies and reports shall be documented in the Contractor <strong>Service</strong> Schedule<br />

associated with the framework call-off contract.<br />

The managed Equipment Room Monitoring <strong><strong>Service</strong>s</strong> shall contain the following principal elements:<br />

· Incident Management<br />

· Problem Management<br />

· Change Management<br />

· Release Management<br />

· Configuration Management<br />

· <strong>Service</strong> Level Management<br />

· Quality Management<br />

· Availability and Capacity Management<br />

· <strong>Service</strong> Continuity Management<br />

· Continuous Improvement<br />

· Third Party Management.<br />

The Contractor’s SMC shall deliver Equipment Management <strong><strong>Service</strong>s</strong> through a team of<br />

appropriately skilled and security cleared staff. Additionally, the Contractor’s Security Operations<br />

Centre (SOC) shall react to security incidents using the following approach:<br />

· Event Analysis – Upon detection, security events shall be analysed to ascertain if they need to<br />

be upgraded to a Security Incident for further action<br />

· Security Incident Categorisation – If the event is defined as a Security Incident, it shall be<br />

categorised considering the cause, priority, potential impact and the urgency of response<br />

· Security Incident Response – The security analysts, resolver groups and service management<br />

team, plus identified Customer stakeholders as defined within the overarching <strong>Service</strong> Design<br />

and communications plan, shall agree on the most appropriate course of action. When a course<br />

of action has been implemented, its effectiveness in resolving the incident shall be assessed so<br />

that if the chosen course of action is not effective, further course/s of action can be taken. The<br />

security incident shall be tracked to resolution<br />

· Post Incident Analysis - After each Security Incident, post incident analysis shall be undertaken<br />

to:<br />

· Ensure that the conduct of the investigation was appropriate<br />

· Consider lessons identified, where conduct of the investigation could be improved<br />

· Ensure that all mitigating actions have been taken<br />

· Determine if any preventative measures are required to prevent repetition of Security<br />

Incidents or events of a similar nature.<br />

Equipment Room Implementation <strong><strong>Service</strong>s</strong><br />

The Equipment Room Design and Implementation <strong>Service</strong> shall provide:<br />

· Shared Rooms – The equipment shall be located in a shared area alongside those of other<br />

Customers with a dual power feed from a shared power distribution system<br />

49


· Cages or Data Centre Halls – The equipment shall be located in a space separated from other<br />

Customers but within a shared area of the Contractors data centre. Power distribution and<br />

climate control is shared with other clients<br />

· Private Rooms – The equipment shall be located in a shared climate area but walled off from<br />

other Customer areas. Power supply and access control systems shall be dedicated exclusively to<br />

the customer’s requirements<br />

· Customer-Owned Equipment Rooms – The equipment shall be located on the Customer’s<br />

premises, and the <strong>Service</strong> may include:<br />

· Re-design and upgrade of existing Equipment Rooms<br />

· Design and Implementation of new Equipment Rooms.<br />

The Implementation <strong>Service</strong> shall design and deliver the Equipment Rooms facilities within<br />

dedicated or shared location on the Customer’s premises or within the Contractor’s data centres. It<br />

shall include room layout, rack layout, patch management, and provision of individual components of<br />

the room including any or all of racks, power supplies, power monitoring, access control, cabling, room<br />

infrastructure and environmental control. The design shall be based on requirements established with<br />

the Customer during the initial phase. New designs can be created for existing Equipment Rooms<br />

following due diligence to determine the current design and situation.<br />

Definitions Of Terms<br />

Term<br />

H&S<br />

HVAC<br />

IDBM<br />

IL<br />

IL2<br />

IL3<br />

IL4<br />

ISO<br />

LAN<br />

List-X<br />

Definition<br />

Health and Safety<br />

High Voltage Alternating Current<br />

Infrastructure Design Build Methodology<br />

Impact Level<br />

Impact Level 2-2-x for Integrity, Confidentiality and availability (PROTECT)<br />

Impact Level 3-3-x for Integrity, Confidentiality and availability (RESTRICTED)<br />

Impact Level 4-4-x for Integrity, Confidentiality and availability (CONFIDENTIAL)<br />

International Organization for Standardization – the international body<br />

responsible for setting global standards.<br />

Local Area Network – a local network within a building or a campus, normally<br />

based on Ethernet.<br />

Commercial site (non-<strong>Government</strong>) that is approved to hold government<br />

protectively marked information as CONFIDENTIAL and above;<br />

50


MoSCoW<br />

PDU<br />

PPM<br />

PRINCE2<br />

RACI<br />

RAID<br />

SNMP<br />

SOC<br />

SRO<br />

UPS<br />

WAN<br />

WIP<br />

Must, Should, Could and Won’t (Prioritisation Technique)<br />

Power Distribution Unit<br />

Planned Preventative Maintenance<br />

Generic Project Management methodology based upon a UK <strong>Government</strong><br />

standard for information systems (IT) project management<br />

Responsible, Accountable, Consulted and Informed (Responsibility Assignment<br />

Matrix)<br />

Risks, Assumptions, Issues and Dependencies<br />

Simple Network Management Protocol<br />

Security Operations Centre<br />

Senior Responsible Officer<br />

Uninterruptable Power Supply; electrical device providing temporary emergency<br />

mains power to a system should mains power fail<br />

Wide Area Network – a network that runs between different locations (buildings<br />

or campuses).<br />

Work In Progress<br />

51


Icom Holdings Ltd<br />

Icom is a long established supplier working with public and private sector clients who have<br />

requirements for a managed service for their equipment rooms. Icom have developed these services to<br />

meet the client requirement and provide a service which includes project management, supplying,<br />

installing, maintaining, and both technical architecture and system design.<br />

In addition where required Icom project manage, supply, commission and maintain equipment both<br />

as a commodity and a managed service. This can include the: management of equipment rooms and<br />

equipment cabinets, provision of power supplies, power monitoring equipment, cabling, equipment<br />

room infrastructure, environmental and access control, air conditioning;<br />

Icom supply staff on an on-site basis, remote and a planned visit basis to support specific projects or<br />

ad-hoc requirements.<br />

Icom users a recognised methodology of design, build, delivery. Our in-house design capability<br />

adheres to the following recognised BS 20000, ITIL, Prince and BSRIA standards. In addition we employ<br />

certified installers for. Cat5, 5e, 6e, 7 and all types of fibre (including splicing) and multi core copper<br />

cabling. Icom are certified installers for ADC Krone. Where appropriate Icom can supply trained<br />

personnel with the skills and qualifications needed for leading manufacturers including HP, Juniper,<br />

Cisco, Dell Fujitsu and many others.<br />

Icom have developed long-term customer relationships through strategic partnerships with all<br />

stakeholders to deliver excellence to provide support for their business, their networks and their<br />

employees. Our focus is on ensuring high levels of reliability, sharing best practice, and constant<br />

communication. Our team care deeply about meeting commitments and take pride in providing great<br />

customer service, delivered with integrity.<br />

We have become a dedicated partner for councils and suppliers to central government, in particular<br />

we have been able to continue to deliver quality whilst maintaining the highest standards and meet<br />

customers’ expectations in a changing and challenging financial climate,<br />

52


Logicalis UK Ltd<br />

Section 1<br />

Logicalis Managed Equipment Room <strong><strong>Service</strong>s</strong> Overview<br />

Logicalis has designed a range of <strong><strong>Service</strong>s</strong> that map onto the Lot 4 provision Managed Equipment<br />

Room <strong><strong>Service</strong>s</strong>, these include:<br />

1. Provision of all elements of a Complete Solution.<br />

2. Provision of Managed Equipment Room <strong><strong>Service</strong>s</strong>:<br />

management of equipment rooms and equipment cabinets;<br />

provision of power supplies; power monitoring equipment;<br />

cabling;<br />

equipment room infrastructure;<br />

environmental and access control;<br />

air conditioning;<br />

staffing;<br />

2. Supply of Equipment<br />

3. Consultancy and Professional <strong><strong>Service</strong>s</strong> including:<br />

technical architecture;<br />

system design;<br />

installation.<br />

4. Project & <strong>Service</strong> Management<br />

53


5. Training<br />

6. Support <strong><strong>Service</strong>s</strong> including:<br />

maintenance;<br />

support for equipment, commodity and managed service.<br />

Section 2<br />

Provision of all elements of a Complete Solution.<br />

Logicalis has specialised solely in the delivery of since incorporation in 2006. Our services within the<br />

industry cover a wide range of areas including:<br />

Client representation & Project Management -<br />

Feasibility Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

Building searches; including detailed due diligence and feasibility studies of potential<br />

sites/buildings – We get involved right from day one with a wide range of clients, carrying<br />

out initial building searches ensuring that the right environment at the correct cost is being<br />

progressed. We also carry out feasibility studies on the re-development of existing rooms<br />

within existing facilities that have been identified as potential managed equipment rooms.<br />

Assisting with lease negotiations – Where clients are leasing property to develop into<br />

MER’s then we carry out the negotiations on their behalf ensuring they are obtaining best<br />

value for money during this long investment.<br />

The preparation of budgets - We prepare the cost plan and budget analysis for<br />

proposed MER developments ensuring that the clients budget is being strategically<br />

managed from the offset.<br />

Detailed project programmes – In the planning stages, project programming is<br />

imperative to ensure that potential facilities are turned into operational concerns in line with<br />

business strategies. We generate meticulous project delivery programmes to ensure that<br />

all parties involved with the project have a detailed project plan to work to.<br />

Design<br />

High level Design of Managed Equipment Rooms – We carry out the high level design<br />

of MER’s, ensuring that a thorough understanding of the clients requirements has been<br />

considered and incorporated prior to progressing to a detailed design and RFQ stage. This<br />

includes all mechanical and electrical services, BMS, PMS, EMS, access control and<br />

security systems, fire suppression and detection, architectural and structural.<br />

54


Detailed Design – Following the high level design, we carry out a detailed design that<br />

incorporates all required detail to ensure that there is no ambiguity once the development<br />

progresses.<br />

Construction<br />

We carry out the Construction Management of all project sizes of data centres and<br />

MER’s from 50m2 to 7,500m2+. We have designed and built MER’s using this philosophy<br />

for a number of Blue Chip and Public Sector clients.<br />

Design and Build of all project sizes of data centres and MER’s from 50m2 to<br />

7,500m2+. We provide a thorough and detailed design and build service that relieves the<br />

client from undue risk and ensures a professional and timely delivery. We provide detailed<br />

project programmes and risk analysis to ensure that the client has full visibility of the project<br />

progress and risks. We have designed and built MER’s using this philosophy for a number<br />

of Blue Chip and Public Sector clients.<br />

Provision of Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

Logicalis has developed eight main service areas which relate to the Managed Equipment Room<br />

<strong><strong>Service</strong>s</strong> for our <strong>PSN</strong> Customers:<br />

1. Consultancy and Design <strong><strong>Service</strong>s</strong>;<br />

2. Equipment Provision<br />

3. Implementation <strong><strong>Service</strong>s</strong>;<br />

4. Managed <strong><strong>Service</strong>s</strong>.<br />

5. Unmanaged <strong><strong>Service</strong>s</strong>;<br />

6. As a <strong>Service</strong>;<br />

7. Hosted <strong><strong>Service</strong>s</strong>;<br />

8. Break/Fix <strong><strong>Service</strong>s</strong>;<br />

55


Logicalis is able to provide:<br />

pre-sales support to scope the design effort, equipment lists and estimate the<br />

installation effort – a pro bono piece of work;<br />

design;<br />

production of the detailed design document, covering the physical and logical MER<br />

a service design to support ongoing service operations;<br />

provision and implementation of MER <strong><strong>Service</strong>s</strong> equipment<br />

full monitoring and management of the new or existing systems;<br />

ongoing support for new or existing equipment;<br />

service management.<br />

Section 3.<br />

Supply of Equipment<br />

As part of the service catalogue, Logicalis provides hardware for Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

solutions which can be purchased by the Customer via the change control process. Logicalis updates the<br />

equipment pricing on a regular basis. Any additions or deletions from the <strong>Service</strong> Catalogue are<br />

managed by the <strong>Service</strong> Delivery Manager.<br />

56


Logicalis can procure an extensive range of equipment direct from the vendors and achieve<br />

significant savings, which are passed on to the Customer, based on a fixed margin model.<br />

A brief summary of the extensive range of equipment and services that can be procured and some<br />

basic specifications are as follows:<br />

management of equipment rooms and equipment cabinets;<br />

provision of power supplies; power monitoring equipment;<br />

cabling;<br />

equipment room infrastructure;<br />

environmental and access control;<br />

air conditioning;<br />

staffing;<br />

Section 4<br />

Cabling <strong><strong>Service</strong>s</strong><br />

Logicalis understands that there is a requirement for the delivery of cabling services as part of the<br />

LAN/WLAN Management service. Logicalis has over 25 years experience of providing managed cabling<br />

and passive architectural services.<br />

57


Logicalis has dedicated staff responsible for consultancy, site planning visits, architectural design and<br />

all customer-facing services. <strong><strong>Service</strong>s</strong> provided include the design, supply, installation and maintenance<br />

of structured cabling systems, covering Category 5e/6/6A/7 and fibre optic cabling.<br />

Accreditations are held with a number of equipment vendors including ADC Krone, Siemon, Panduit<br />

and Hellermann Tyton. All cabling engineers are fully trained and are competent in all installation tasks,<br />

and all hold manufacturer accreditations for installation of Cat5/6/6A/7 cables.<br />

When the cabling installations are completed, Logicalis hands over a full installation document<br />

comprised of the test results of all UTP cables using Fluke DTX1800 testers to ensure compliance with<br />

the relevant standards and test results, along with floor plans identifying each outlet positions, together<br />

with its unique identifier, cable routes and cabinet layout drawings, are all included within the handover<br />

electronic documentation at the completion of the works.<br />

Logicalis is able to provide a variety of options for cablings solutions for adhoc Moves Adds and<br />

Changes (MACs), project based cabling works or on site services. On-site service can often include<br />

possible TUPE considerations.<br />

The type of service delivery required is greatly based on the estimated volume of cabling changes<br />

required. The management of any required on-site resources would still be under the control of the<br />

Logicalis MSC and overall responsibility would be with the <strong>Service</strong> Delivery Manager (SDM).<br />

Job management and control is managed by the Logicalis <strong>Service</strong> Desk solution via the standard<br />

change management process, <strong>Service</strong>Now and therefore, remains consistent with all services<br />

(LAN/WLAN and WAN) that are provided by Logicalis.<br />

58


It should be noted that the Cabling services, whilst part of the change process, can also be applied to<br />

standard managed service options as a standalone service. This is important as for standard services<br />

there is no full change management process.<br />

Logicalis has provided such services to a range of public sector bodies, and currently services<br />

Bournemouth University using this model. The cabling services include:<br />

provision of design and consultancy services for new projects that would require cabling<br />

input, working with the Customer and Logicalis design teams;<br />

support of existing cabling infrastructure;<br />

installation of new data outlets installed to all manufacturers and the Customer standards and<br />

procedures, as part of the moves, adds & change requests;<br />

assurance that each outlet installed is fully tested and meets all the relevant test criteria for<br />

type of installation carried out;<br />

enablement of all installed outlets by way of patching through to the existing LAN/WLAN<br />

switch hardware;<br />

updating all relevant databases with the outlet designation and switch port used and inform<br />

relevant Customer IT <strong><strong>Service</strong>s</strong> team staff;<br />

assisting Customer IT <strong><strong>Service</strong>s</strong> team staff members in the resolution of cabling infrastructure<br />

faults;<br />

provision of appropriate information to enable the drawings and records to be updated for<br />

each job;<br />

working within safe operating procedures and practices;<br />

operate the change control process where appropriate.<br />

Examples of the output of these services are embedded below.<br />

59


Logicalis would separately provide the Customer with a schedule of rates for materials to be used in<br />

the rectification of faults or standard works. These would be included within the <strong>Service</strong> Catalogue.<br />

The cabling management service would sit within the overall incident and change management<br />

processes as delivered by the Managed <strong><strong>Service</strong>s</strong> Centre (MSC).<br />

IL 4-4-x Cabling <strong><strong>Service</strong>s</strong><br />

The cabling services are the same for the 2-2-x service although fibre optic cabling is used<br />

throughout.<br />

In addition, any work carried out meets CESG guidance for IL4 infrastructures meeting SDIP-29<br />

requirements on TEMPEST. Cable runs for the 4-4-x LAN infrastructure are physically separate from the<br />

2-2-x and 3-3-x infrastructures using separate racks, cabinets, and trunking. Equipment racks are<br />

TEMPEST protected when in a shared equipment environment.<br />

The 4-4-x network uses fibre cabling for access to users meeting TEMPEST requirements and aiding<br />

users in connection to the correct ports. 4-4-x user ports are clearly labelled as to their classification.<br />

Fibre optic cabling is also used between all equipment locations and between buildings.<br />

Where a fibre run between buildings is not protected i.e. it can be accessed externally or leaves an<br />

area where IL4 traffic can be contained, encryption is provided to maintain confidentiality of the data<br />

path. This is decided in conjunction with the security Accreditor as appropriately secured sites may not<br />

need such measures.<br />

60


Cable routes for 4-4-x network are physically sealed with tamper proof fastenings and regularly<br />

checked for physical intrusion.<br />

Section 5<br />

Consultancy and Design <strong><strong>Service</strong>s</strong><br />

Technical Architecture and System Design <strong><strong>Service</strong>s</strong><br />

Logicalis’ approach to Conferencing design services is that of a Systems Integrator, whereby we take<br />

a vendor agnostic approach. We have the highest partner accreditations with vendors such as Cisco and<br />

can work with a Partner to provide integration capabilities with additional manufacturer technologies,<br />

to utilise existing investments but still work towards a common call handling architecture.<br />

Logicalis intends to engage with the Customer in a consultative manner in understanding the<br />

requirements and then engaging with vendors to ensure that the best technical and commercial solution<br />

is proposed.<br />

Our design consultancy takes into consideration the existing investments to reuse any<br />

infrastructure/equipment wherever possible.<br />

This consultancy is packaged and available, via the <strong>Service</strong> Catalogue, when required by the<br />

Customer.<br />

The deliverables from this MER consultancy exercise can then be used by the Customer, or by<br />

Logicalis on behalf of the Customer.<br />

61


As part of the design service, Logicalis works with the Customer to transform an existing contact<br />

centre into an innovative, dynamic customer-driven tool, and create a platform to radically redesign<br />

business processes around the demands of customers.<br />

Logicalis approaches these projects in a consultative manner to understand the business and<br />

technical drivers. Once we have a clear understanding of requirements our Solutions Architects team<br />

works alongside the main manufacturers in the industry to design the solution.<br />

Our design process includes pre-sales customer workshops, technical solution proposal to ensure<br />

that the correct solution is specified and post-sales design workshops.<br />

Logicalis is able to design Managed Equipment Room Solutions that range from a handful of users<br />

through to many hundreds.<br />

Installation – Managed Equipment Room Implementation <strong><strong>Service</strong>s</strong><br />

Logicalis’ Implementation <strong><strong>Service</strong>s</strong>’ primary focus is to deliver technical services for projects<br />

including implementation and support to our customer base. This is achieved primarily by working in<br />

close collaboration with Logicalis’ Pre Sales, Project Management and Managed <strong>Service</strong> teams. The<br />

Implementation <strong>Service</strong> is available on a 24 x 7 basis and comprises:<br />

Engineering Team<br />

This is a home based, mobile engineering workforce located all over mainland Britain, providing the<br />

bulk of the Logicalis SLA responses for all on-site maintenance contracts and managed service support<br />

issues. These issues range in diversity from the swapping of hardware, to further information gathering<br />

62


& diagnostics, problem simulation, command line configuration, firmware & software upgrades and the<br />

testing of spares prior to use in the field.<br />

Supporting the home based force, is a team of office based engineers providing the interface<br />

between our <strong>Service</strong> Desk and the wider Field Support Team. This Technical Support Group delivers their<br />

services remotely, direct to our customers. While a high percentage of incidents are resolved by this<br />

team, their role also encompasses the gathering of additional technical data to allow further<br />

investigation by their field based colleagues if required.<br />

The hands-on skills in both teams are available across varied technology solutions, including routing,<br />

switching, unified communications, Communications, security, wireless and content. This portfolio<br />

combines hardware and software elements spanning multiple vendors, delivered to a diverse range of<br />

customer environments.<br />

A key factor in successful service delivery is the use of engineers local to their customer base. While<br />

clearly SLA compliance is important, equally so is the longer term relationship between the local<br />

engineer(s) and their customers. Part of the objective setting with each engineer, includes the<br />

establishment & maintenance of the customer relationship. This directly caters for improved customer<br />

knowledge and greater SLA management, as well as providing wider benefits which include better<br />

defined local spares holdings etc.<br />

While the focus for the Field Support Team is clearly for the benefit of our customers with existing<br />

maintenance contracts, they are also active in delivering other services. These services include but are<br />

not limited to, projects & implementations, maintenance take on audits, surveys/audits and any<br />

associated documentation.<br />

63


Solution Implementation Team<br />

The Solutions Implementation Team is a 24 x 7 service, entirely made up of home based engineers<br />

throughout mainland Britain. Their roles are focussed around the delivery of customer project &<br />

implementation based requirements, which incorporates a number of related, specific activities to<br />

guarantee success.<br />

This typically starts with a review of the documentation supplied by Pre Sales (SOW or SDD) and<br />

Project Management (Project Plan), to understand the solution and timeframes. This is carried out by a<br />

‘Lead Engineer’, who has the responsibility for leading the project from a post sales perspective. Next<br />

follows the building and configuration of any hardware & software elements in one of the Logicalis Pre<br />

Staging Labs, where any design constraints or issues can be resolved in a risk free environment. Only<br />

then is the equipment boxed up and sent out to customer site for installation.<br />

Once on-site, the kit is installed and a full connectivity, commissioning and acceptance procedure is<br />

conducted. The Lead Engineer completes any documentation requirements for the customer, as well as<br />

providing further information for Logicalis’ Contracts Admin and Field Support Team (if the installed<br />

solution is being supported by Logicalis).<br />

The hands on skills of this team are available across a variety of technology solutions, including<br />

routing, switching, unified communications, Communication, security, wireless and content. This<br />

portfolio combines hardware and software elements spanning multiple vendors, delivered to a diverse<br />

range of customer environments.<br />

While the focus of this team is delivering project based work, they are also active in delivering many<br />

other technical services. These services include maintenance contract break/fix, information gathering<br />

64


and diagnostics, problem simulation, pilot/proof of concept testing, surveys/audits customer knowledge<br />

transfer etc.<br />

Principal Engineering Team<br />

The Principal Engineering Team is a 24 x 7 service, entirely made up of home based engineers<br />

throughout mainland Britain. Their roles are entirely focussed around the service delivery of the most<br />

complex technical solutions required from the Post Sales Engineering Team.<br />

This role effectively offers direct ‘expert level’ technical support to both the Solutions<br />

Implementation and Field Support teams. Typically this means the lead of the most challenging<br />

customer project solutions, as well as the technical escalation ownership for the most complex<br />

contracted maintenance customer incidents. The various work streams required to deliver the role<br />

include working with Pre Sales to produce detailed design & configuration data, proof of concept<br />

testing, providing best practise configuration advice and templates, mentoring across all technology<br />

areas to all of the other teams etc.<br />

In addition, the Principal Engineering Team is able to carry out all of the activities described within<br />

the remit of the Field Support and Solution Implementation Teams. The highest levels of technical<br />

vendor accreditation reside within this team, and as such this technical relationship is a key focus for<br />

them all. This is particularly evident from managing the bulk of our vendor support escalations, but is<br />

also visible in the various vendor technology forums and update sessions.<br />

Project Management<br />

65


Project Management - Overview<br />

Logicalis provides the full range of skills essential to assure effective Programme and Portfolio<br />

Management. Logicalis’ Programme and Project Managers have many years of experience of working<br />

within <strong>Government</strong> programmes across a wide variety of sectors.<br />

Programmes and Projects range from major infrastructure change programmes to software<br />

development and systems implementation with budgets ranging from several thousand to multi-million<br />

pounds. Our portfolio of core programme and project management services includes:<br />

• Benefits Management;<br />

• Programme Management;<br />

• Project Management;<br />

• Project Review & Lessons Learned;<br />

• Risk Management;<br />

• Stakeholder Management.<br />

Benefits Management<br />

Benefits management aims to ensure that the desired project has been clearly defined, is<br />

measurable, and provides a case for investment. Furthermore it seeks to make sure that the proposed<br />

changes or policy outcomes are actually achieved.<br />

The benefits management team recognises that projects require a constant focus on the intended<br />

benefits if they are to deliver value and remain aligned with the Customer’s business goals.<br />

66


The delivery of value begins with defining the expected high-level outcomes and continues through<br />

the identification, profiling, tracking and embedding of the identified benefits. It also involves assessing<br />

risk against the proposed outcome.<br />

The benefits management team is experienced in the delivery of benefits management in the secure<br />

information domain.<br />

Logicalis help to identify, track and realise benefits, throughout the delivery programme and into the<br />

Operations phase, where we can also assist managers with the responsibility for service delivery to<br />

ensure that the planned benefits are both monitored and optimised.<br />

Programme Management<br />

Logicalis considers its programme managers to be holistic change agents. We believe that the role of<br />

a programme manager has evolved from that of managing multiple projects, to that of implementing<br />

business strategy. Whilst the programme manager of today requires a refined set of business and<br />

leadership skills that are vastly different from that of a project manager, we believe that an effective<br />

programme manager requires a sound understanding of project management and all its varied<br />

techniques.<br />

Logicalis’ programme managers are familiar with the culture of large Public Sector organisations and<br />

the measurement of benefits at a strategic level. We currently service an integrated portfolio of Secure<br />

Information projects, involving the management of multiple teams of professionals, as well as executivelevel<br />

stakeholders.<br />

Project Management<br />

67


Logicalis’ project managers manage and support all phases of the project lifecycle where<br />

experienced and effective security cleared PMI and PRINCE 2 qualified practitioners are needed to:<br />

• project manage a major change;<br />

• enhance and strengthen your current team;<br />

• provide an exclusive set of security cleared skills or experience on a transitory basis;<br />

• execute or accelerate a specific standard or bespoke service implementation;<br />

• build up a new business, division or team;<br />

• coach your current project managers and their teams.<br />

Logicalis’ approach to project management is experience based; we believe that most business<br />

challenges can be solved effectively with the application of the right management talent, expertise and<br />

action.<br />

Project Review and Lessons Learnt<br />

The objective of a project review is to identify how success can be assured. A Logicalis led project<br />

review ascertains the issues that need to be addressed, both positive and negative. Our project review<br />

and lessons learned service typically focuses on:<br />

• Scope<br />

68<br />

Whilst major scope changes are relatively easy to identify and manage, scope changes often<br />

occur in the form of "scope creep". Scope creep is the amalgamation of small changes that,<br />

individually, appear minor but in aggregate are significant. Logicalis understands that you cannot


effectively manage the resources, time and cost of a project unless you actively manage every<br />

element of the project scope.<br />

• Project Team<br />

A successful project manager must effectively manage all of the resources assigned to that<br />

project. This also includes managing all relevant subcontracts.<br />

• Project Planning & Control<br />

Logicalis excels at detailed project planning to assure full visibility and control of<br />

multifaceted, high value projects. Our specialist knowledge assures the review of, and warrants<br />

the production of accurate, practical and informed schedules and plans whilst ensuring they are<br />

rigorously executed and monitored.<br />

• Communication<br />

It is crucial that effective communication exists between the team members and project<br />

stakeholders. Logicalis assesses if these channels are effective and highlights where and how<br />

improvements can be made.<br />

Risk Management<br />

Logicalis’ risk management practitioners are expert in the design and implementation of risk<br />

management techniques. We help organisations to understand their business and security risks and<br />

then apply practical risk management practices to help mitigate them. Our risk practitioners are highly<br />

experienced leaders in the discipline of client-side risk assessment; most especially security vulnerability.<br />

69<br />

Our Risk Practitioners help your business to:


• understand and manage operational risk;<br />

• achieve compliant corporate governance;<br />

• display effective management of risk to stakeholders;<br />

• make practical decisions and maximise ROI;<br />

• deliver projects to agreed criteria.<br />

Stakeholder Management<br />

Logicalis recognises stakeholder management as the process by which Clients identify their key<br />

stakeholders and win their support.<br />

Whilst the value of relationships is difficult to determine, it is recognised that successful stakeholder<br />

management is a key source of competitive advantage. Understanding, forecasting and influencing what<br />

other people think about your programme or project is essential to a winning venture. We believe that<br />

the secret to this success is not just about leading the team, but also about dealing with the multitude of<br />

issues and communicating successfully around the periphery of the programme.<br />

Logicalis knows that it is crucial to recognise the key points at which stakeholders must be involved<br />

in development and decision making. It is further recognised that streamlining the approval process<br />

results in cost savings across the programme. Our team of business consultants has comprehensive<br />

experience in this diverse field.<br />

Project Management <strong>Service</strong> Offerings<br />

70


Project management services are offered either on a T&M or fixed price basis. The number of days<br />

required is estimated, based on the size and complexity of the project. Any special customer<br />

requirements (for example mandatory on-site attendance at weekly meetings) will also influence the PM<br />

estimate. It is therefore important that this is discussed with the customer prior to any quotation being<br />

prepared.<br />

The project management team is split in to three regional teams and has a supporting project<br />

management office (PMO) function. Team leaders have dual roles to include senior project and<br />

programme management as well as a managerial role for the PMs in their team:<br />

Overall the team supports 20 Project Managers and Project Coordinators.<br />

The following table identifies the various categories of PM offerings that are available and<br />

summarises for each offering the elements that are delivered as part of the service.<br />

Deliverable<br />

Project<br />

PM<br />

PM<br />

PM<br />

PM<br />

of PM<br />

Coordination<br />

2-4 days<br />

5-10<br />

11-20<br />

20+ days<br />

purchased<br />

days<br />

days<br />

Project<br />

Initiation<br />

Resource<br />

Allocation<br />

71


Process<br />

Project Risk<br />

Project Log<br />

Process<br />

(throughout<br />

project)<br />

Project<br />

Definition<br />

Email/phone as<br />

point of<br />

contact<br />

Project<br />

Initiation<br />

Meetings by<br />

conf call<br />

Project<br />

Initiation<br />

Meetings on<br />

72


Customer site<br />

PID –<br />

Project<br />

Initiation<br />

Document<br />

Plan<br />

MS Project<br />

Project<br />

Execution<br />

On-Site<br />

Project Review<br />

Meeting x1<br />

On-Site<br />

Project Review<br />

Meetings -<br />

Multiple<br />

Meetings by<br />

Audio or Video<br />

73


Conference<br />

Status<br />

Reports<br />

Risk<br />

Management<br />

Issue<br />

Resolution<br />

Project<br />

Review of<br />

documentation<br />

Project<br />

Change Control<br />

Process<br />

Arrange<br />

Equipment<br />

Delivery<br />

Handover to<br />

74


Support &<br />

Customer<br />

Manageme<br />

nt of Sub<br />

contractors<br />

Arrangemen<br />

t of Customer<br />

Training<br />

Invoicing,<br />

Stage Payments,<br />

etc<br />

Closure<br />

Project<br />

Completion<br />

of works email<br />

Final<br />

Invoicing<br />

75


Review of<br />

Issue Log<br />

Project<br />

Closure Meeting<br />

1.1.1.1<br />

1.1.1.2 Programme/Project Management <strong><strong>Service</strong>s</strong><br />

<strong>Service</strong>ID: <strong>PSN</strong> 4040<br />

Programme/Project Management <strong>Service</strong><br />

<strong>Service</strong> Specification<br />

<strong>Service</strong> Overview<br />

When a Project Manager (PM) is assigned he or<br />

she will be PRINCE2 accredited and knowledgeable in<br />

delivering projects of a similar nature.<br />

The PM divides the Project into discrete stages,<br />

ensuring that agreement is reached at each stage with<br />

the Customer which assists in the understanding of<br />

project deliverables and confirming expectations are<br />

matched throughout the project.<br />

76


Interfaces<br />

Account Manager, <strong>Service</strong> Delivery Manager and<br />

Lead Solutions Consultant.<br />

Dependencies<br />

A Scope of Works is required to identify and<br />

define an agreed requirement.<br />

Lifespan<br />

Contract term.<br />

Minimum Term<br />

Fixed project management program, as per the<br />

scope of works.<br />

Compliance<br />

<strong><strong>Service</strong>s</strong> will be compliant to the sector specific<br />

requirements as identified within the <strong>PSN</strong> Standards.<br />

Overall compliance to CoCo where applicable.<br />

Subcontractor<br />

No<br />

Termination<br />

Payments and Notice<br />

Logicalis will provide clear information as to<br />

termination notice and costs including where any<br />

termination points are within the ordered service<br />

term.<br />

<strong>Service</strong> levels<br />

As per the contract for Professional <strong><strong>Service</strong>s</strong>.<br />

Response time for<br />

2 working days<br />

77


confirmation of resource<br />

availability<br />

Initial Audit Meeting<br />

Within 10 working days (3 days for small<br />

requirement)<br />

Deliverables<br />

Project Management Package 2 – 4 days<br />

The Project Office is responsible for managing<br />

short term engagements. It is likely that a junior<br />

Project Manager will be assigned to these activities. It<br />

is also possible that the project management duties<br />

will be allocated to the lead consultant or engineer. It<br />

is unlikely that Project Managers will be engaged for<br />

less than 2 days on any project.<br />

Deliverables:<br />

Ensuring resource allocated and booked<br />

correctly;<br />

Manage equipment deliveries;<br />

Liaise deliveries and installation with customer;<br />

Assessing and reporting progress;<br />

Issue escalation & resolution;<br />

Change Management;<br />

Managing subcontractors, training, invoicing,<br />

etc.<br />

78


Project Management Package 5 to 10 days<br />

Within the agreed 5 to 10 days project<br />

management package, Logicalis provides a Project<br />

Manager to coordinate and facilitate the timely and<br />

successful delivery of the project. Generally meetings<br />

are performed by audio or video conference although<br />

for significant meetings such as the kick-off, the<br />

project manager travels to the customer site.<br />

Deliverables:<br />

Primary point of contact for service delivery;<br />

Attend initial kickoff/planning meeting;<br />

Produce minutes from the planning meeting;<br />

High level risk management and issue<br />

resolution;<br />

Produce and agree high level milestone plan;<br />

Carry out mid project review & produce<br />

minutes;<br />

Provide formal project closure and agree follow<br />

on actions;<br />

Attending ad-hoc conference calls;<br />

Project planning with MS Project;<br />

Resource planning;<br />

Assessing progress;<br />

Issue escalation & resolution;<br />

79


Change Management;<br />

Managing subcontractors, training, invoicing,<br />

etc.<br />

Project Management Package 11 to 20 days<br />

Logicalis provides a project manager to coordinate<br />

and facilitate the timely and successful delivery of the<br />

project. Generally meetings are performed by audio<br />

or video conference although for significant meetings<br />

such as the kick-off, the project manager travels to<br />

the customer site.<br />

Deliverables:<br />

Primary point of contact for service delivery;<br />

Attend planning meeting;<br />

Produce minutes from the planning meeting;<br />

Risk management and issue resolution;<br />

Produce an agreed high level milestone plan;<br />

Produce a project initiation document;<br />

Produce and maintain the project log;<br />

Produce highlight reports at agreed intervals;<br />

Attend mid project reviews & produce minutes;<br />

Provide formal project closure and agree follow<br />

on actions.<br />

Attending conference calls;<br />

80


Resource planning;<br />

Assessing progress;<br />

Issue escalation & resolution;<br />

Change Management;<br />

Managing subcontractors, training, invoicing,<br />

etc.<br />

Project Management Package >20 days<br />

Projects with >20 days of project management<br />

time are medium and large projects usually requiring<br />

a bespoke service suited to the requirements of the<br />

customer and project. In order to scope out the<br />

project management effort in these types of project it<br />

is important to understand the customer’s<br />

requirements. For example frequency of on-site<br />

attendance, specific reporting requirements,<br />

management of customer/3 rd party personnel, etc.<br />

The Project Initiation Document, produced by the<br />

Project Manager in the early stages of the project,<br />

defines the scope of the project management<br />

activities as well as the project itself.<br />

<strong>Service</strong> Credits<br />

<strong>Service</strong> Credit Regime<br />

Not applicable fixed project management.<br />

81


<strong>Service</strong> Management<br />

Included Resources<br />

Project Management<br />

Account Management<br />

Commercial Quote team<br />

Security provisions<br />

<strong><strong>Service</strong>s</strong> will be compliant to the sector specific<br />

requirements. Minimum compliance will be <strong>PSN</strong><br />

design standard.<br />

Pricing<br />

Charging Model<br />

As per <strong>Service</strong> Catalogue<br />

Price Model<br />

As per <strong>Service</strong> Catalogue<br />

Ordering Procedures<br />

Ordering will be via the Customer Portal.<br />

<strong>Service</strong> commitment<br />

Logicalis will provide the following<br />

Delivery lead time<br />

5 Days from the point of order<br />

Delivery lead time<br />

exceptions<br />

Failure of the Partner Organisation to accept the<br />

first three start dates offered.<br />

Changes to order<br />

As per the contract.<br />

82


Customer obligations<br />

Ordering<br />

The <strong>PSN</strong> Agreement Number under which the<br />

Order is being placed;<br />

The Site where the services are required (full<br />

postal address or addresses);<br />

On site contact (including email address and<br />

phone number) and Authorised Officer.<br />

Transition<br />

Transition<br />

As per ISO standards<br />

Methodology<br />

Compliance<br />

<strong><strong>Service</strong>s</strong> will be compliant to the sector specific<br />

requirements as identified within the <strong>PSN</strong> LAN<br />

Standard. Minimum compliance will be to technical<br />

compliance to CoCo.<br />

Subcontractor<br />

No<br />

<strong>Service</strong> Management<br />

At Logicalis we deliver service design through to out-tasked/outsourced service operations against<br />

the ISO 20000 standard.<br />

83


Our accredited portfolio of core functions includes:<br />

<strong>Service</strong> Design<br />

<strong>Service</strong> Architecture<br />

Logicalis service architects work with our customers to gain a complete understanding of their<br />

requirement. They define the technical aspects of the service and produce the blueprint solution;<br />

explaining the different support strategies we can offer and their viability with respect to the customer’s<br />

business needs.<br />

Logicalis designed solutions are underpinned by robust service models that support the client’s<br />

business processes. This approach both informs stakeholders and assists maintainers, by assuring a fully<br />

managed programme for all service functions, throughout the life of the contract.<br />

84


The service architect manages the service design team to ensure that the service we provide meets<br />

the customer’s current and future requirements.<br />

<strong>Service</strong> Design<br />

The service design team takes the preliminary service scope and works closely with the customer to<br />

tailor the in-service support procedures such that they are aligned with their service requirement.<br />

<strong>Service</strong> Design is delivered through the following functions:<br />

Solution Design<br />

The team expands on the service architect’s output to produce a high-level technical solution.<br />

Process Design<br />

The team designs the in-service support procedures that are specific to the customer’s service<br />

requirement.<br />

Measurement Systems, Methods and Metrics Design<br />

The team defines the service reporting process by agreeing what data is to be captured, how that<br />

data is to be captured, and how that data is presented. The data is used to underpin the continual<br />

service improvement activity that is delivered throughout our partnership with the customer.<br />

Management Systems Design<br />

At the system design stage, our team ensures that the service management systems, tools and<br />

human resources are in place. The team works closely with our service managers to refine the<br />

85


customer’s requirements. This ensures that, as the service evolves to meet changing business needs, the<br />

support we offer is always comprehensive.<br />

Integrated Logistics Support (ILS)<br />

ILS analysts take the service model, processes and technical architecture and then plan availability,<br />

reliability and maintainability so as to capture the complete service envelope.<br />

<strong>Service</strong> Transition<br />

<strong>Service</strong> Transition Management<br />

Logicalis <strong>Service</strong> Transition Managers manage the overall service integration (transition from design<br />

to operations). The transition manager interfaces directly with the customer to ensure project risks,<br />

issues and escalations are managed in alignment.<br />

Logicalis understands the challenges and risks facing organisations as they implement complex<br />

service solutions. Our expertise enables us to support both the full and partial integration of <strong>Service</strong><br />

capability.<br />

<strong>Service</strong> Transition is delivered through the following processes:<br />

Transition Support Plan Development<br />

We produce a plan and schedule detailing the resources that are used to ensure the smooth<br />

transition from service design to live operations.<br />

Organisation & <strong>Service</strong> Change Coordination<br />

86


Customer and Logicalis resources, identified in the service transition plan, are put in place to provide<br />

support for the service in live operation.<br />

Testing and Delivering the <strong>Service</strong><br />

Final checks and configuration are rigorously performed to ensure smooth transition into live<br />

operation.<br />

Logicalis is committed to providing a service transition phase that is consistent, controlled, and<br />

creates minimum disturbance to day-to-day operations. We assure this control through the use of our<br />

service introduction approach which ensures that:<br />

• All processes, descriptions and work instructions required to support the service are<br />

considered;<br />

• Particular attention is paid to both environment and domain when defining support<br />

processes that are fit for purpose across the totality of the customer’s operational envelope;<br />

• <strong><strong>Service</strong>s</strong> are flowed into the live environment following a structured approach,<br />

delivered against a tailored project management background.<br />

1.1.1.2.1 <strong>Service</strong> Management <strong><strong>Service</strong>s</strong><br />

<strong>Service</strong>ID: <strong>PSN</strong> 4041<br />

<strong>Service</strong> Management <strong><strong>Service</strong>s</strong><br />

<strong>Service</strong> Specification<br />

87


<strong>Service</strong> Overview<br />

Logicalis service architects work with our<br />

customers to gain a complete understanding of<br />

their requirement. They define the technical<br />

aspects of the service and produce the blueprint<br />

solution; explaining the different support<br />

strategies we can offer and their viability with<br />

respect to the customer’s business need.<br />

The service architect manages the service<br />

design team to ensure that the service meets the<br />

customer’s current and future requirements.<br />

Interfaces<br />

Account Manager, <strong>Service</strong> Delivery<br />

Manager, Lead Solutions Consultant, Project<br />

Manager.<br />

Dependencies<br />

‘Scope of Works’ is required which identifies<br />

and defines the agreed requirement.<br />

<strong>Service</strong><br />

thresholds/capacities<br />

<strong><strong>Service</strong>s</strong> are delivered based on fixed<br />

consultancy program.<br />

Lifespan<br />

Contract life.<br />

Minimum Term<br />

Fixed service management program, as per<br />

the scope of works.<br />

88


Compliance<br />

<strong><strong>Service</strong>s</strong> will be compliant to the sector<br />

specific requirements as identified within the <strong>PSN</strong><br />

Standards.<br />

Overall compliance to CoCo where<br />

applicable.<br />

Subcontractor<br />

No<br />

<strong>Service</strong> term<br />

As agreed<br />

Termination<br />

Logicalis will provide details with Order.<br />

Payments and Notice<br />

<strong>Service</strong> levels<br />

As per the contract for Professional <strong><strong>Service</strong>s</strong>.<br />

Response time for<br />

2 working days<br />

confirmation of resource<br />

availability<br />

Initial Audit Meeting<br />

Within 10 working days (3 days for small<br />

requirement)<br />

Deliverables<br />

Logicalis service architects work with our<br />

customers to gain a complete understanding of<br />

their capability requirement. The deliverables<br />

89


are the following high level headlines which are<br />

agreed with the scope of works.<br />

<strong>Service</strong> Design:<br />

<strong>Service</strong> Architecture;<br />

<strong>Service</strong> Design;<br />

Solution Design;<br />

Processes Design;<br />

Measurement Systems, Methods and<br />

Metrics Design;<br />

Management Systems Design;<br />

Integrated Logistics Support (ILS).<br />

<strong>Service</strong> Transition<br />

<strong>Service</strong> Transition Management;<br />

Transition Support Plan Development;<br />

Organisation & <strong>Service</strong> Change<br />

Coordination;<br />

Testing and Delivering the <strong>Service</strong>;<br />

Training.<br />

Change<br />

Managed through change control process.<br />

<strong>Service</strong> Credits<br />

<strong>Service</strong> Credit Regime<br />

Not applicable.<br />

<strong>Service</strong> Management<br />

Included Resources<br />

Resources included:<br />

<strong>Service</strong> Management<br />

90


Transition Management<br />

Account Management<br />

Commercial Quote team<br />

Security provisions<br />

<strong><strong>Service</strong>s</strong> will be compliant to the sector<br />

specific requirements. Minimum compliance will<br />

be <strong>PSN</strong> design standard.<br />

Pricing<br />

Charging Model<br />

As per <strong>Service</strong> Catalogue<br />

Price Model<br />

As per <strong>Service</strong> Catalogue<br />

Ordering Procedures<br />

Ordering will be via the Customer<br />

Portal.<br />

Contractor’s <strong>Service</strong> commitment<br />

Logicalis will provide the following<br />

Delivery lead time<br />

As agreed on order<br />

Changes to order<br />

As per the contract.<br />

Customer obligations<br />

91


Ordering<br />

Via the customer portal and the service desk.<br />

Logicalis will define the minimum required<br />

information for the Order to be made including:<br />

The <strong>PSN</strong> Agreement Number under which<br />

this Order is being placed<br />

The Site where the services are required (full<br />

postal address or addresses)<br />

On site contact (including email address and<br />

phone number) and Authorised Officer<br />

Testing<br />

As per the agreed scope of works.<br />

Transition<br />

Transition<br />

As per ISO standards<br />

Methodology<br />

Compliance<br />

<strong><strong>Service</strong>s</strong> will be compliant to the sector<br />

specific requirements as identified within the <strong>PSN</strong><br />

LAN Standard. Minimum compliance will be to<br />

technical compliance to CoCo.<br />

Subcontractor<br />

No<br />

92


Section 6<br />

Training<br />

Logicalis has proven experience in the provision of user and maintainer systems training.<br />

We are able to tailor our training offering to meet the customer’s support requirements, throughout<br />

the life of the <strong>Service</strong>.<br />

We offer a diverse range of innovative training solutions that includes bespoke solutions and<br />

freestanding courseware design and delivery.<br />

Section 7<br />

Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

Logicalis provide CCTV and Physical Security Monitoring Provision Infrastructures which include both<br />

traditional and IP based solutions. These solutions are designed for Customers, to their specific user<br />

requirements and can include;<br />

access control;<br />

remote door opening;<br />

automated gates and barriers;<br />

image recording and archiving;<br />

image recognition applications;<br />

alarms and security monitoring;<br />

93<br />

supply of software; management tools;


test and analysis tools;<br />

security and provision of associated products;<br />

Managed Equipment Room <strong><strong>Service</strong>s</strong> Provision at below 2-2-x<br />

Logicalis can provide Customer’s with solutions at a range of IL levels and can provide on site<br />

solutions.<br />

Managed Equipment Room <strong><strong>Service</strong>s</strong> Provision at 2-2-x<br />

Where IL 2 solutions are required, Logicalis can provision with from within the <strong>PSN</strong> security<br />

boundary attached to our PSAS architecture. This provides Gateway <strong><strong>Service</strong>s</strong> to the outside world should<br />

unsecure interaction be required by our Customers.<br />

Managed Equipment Room <strong><strong>Service</strong>s</strong> Provision at 3-3-x<br />

LAN Provision<br />

For IP based MER, the underlying LAN service functionality for 3-3-x networks must be provisioned<br />

and the traffic encrypted.<br />

The 2-2-x and 3-3-x networks on a site do not share the same active equipment and are provided<br />

with physically separate LAN infrastructure. Although it is technically possible to share equipment, any<br />

94


cost savings gained by so doing are more than offset by the additional management complication and<br />

security risk in doing so.<br />

Managed Equipment Room <strong><strong>Service</strong>s</strong> Provision at 4-4-x<br />

Logicalis does not propose to provision <strong><strong>Service</strong>s</strong> at this Level.<br />

How the relevant Impact Levels are to be achieved and the services accredited<br />

Logicalis’ approach to meeting the needs of any client is based on a sound technology solution. The<br />

full definition of this solution has to be both practical and cost effective.<br />

This can only be achieved through the employment of skilled CLAS consultants to advise Logicalis on<br />

the design and through working with the Accreditor to understand the risk profile and appetite within<br />

the customer to accept and manage risk through non-technical mechanisms. Logicalis uses the retained<br />

services of a third party CLAS consultant. This brings outside expertise with exposure to a range of<br />

options to bear, and balancing the pressures with their wider credibility in the closed world of CLAS<br />

consultants, ensures the solution is done in the correct manner for both the customer and the supplier.<br />

The process to achieve the relevant impact levels is a standard approach:<br />

Design with a security standpoint in mind;<br />

Use products with appropriate accreditation where-ever possible;<br />

Consider all aspects around secure design;<br />

Undertake an IS1 risk assessment;<br />

Construct the RMADS;<br />

95


Agree with the Accreditor the components of the security solution that require mitigating<br />

action or some form of waiver;<br />

Submit for accreditation;<br />

Annual review of RMADS with Accreditor.<br />

At each stage the Accreditor will be engaged to offer advice as early in the design exercise as<br />

possible.<br />

Section 8<br />

Hosted Managed Equipment Room<br />

Logicalis can provide Managed Equipment Room <strong><strong>Service</strong>s</strong> Infrastructures, either as an on-site,<br />

hosted or ‘as a <strong>Service</strong>’ delivering a highly secure, available, virtual, and sophisticated customer<br />

interaction management solution.<br />

access control;<br />

remote door opening;<br />

automated gates and barriers;<br />

image recording and archiving;<br />

image recognition applications;<br />

alarms and security monitoring;<br />

supply of software; management tools;<br />

test and analysis tools;<br />

96<br />

security and provision of associated products;


Hosted Managed Equipment Room<br />

Logicalis provides hosting services in accordance with the following:<br />

Logicalis will:<br />

• Provide the Hosting <strong><strong>Service</strong>s</strong> 24 hours per day every day of the week;<br />

• Provide the Support <strong><strong>Service</strong>s</strong> during Normal Working Hours;<br />

• Provide the Remote Hands <strong><strong>Service</strong>s</strong> [during Normal Working Hours] [24 hours per day<br />

every day of the week];<br />

• Use all reasonable endeavours to maintain the temperature within the Customer<br />

Designated Area within the parameters described in Hosting <strong><strong>Service</strong>s</strong> and <strong>Service</strong><br />

Details;<br />

• Provide the Remote Hands <strong>Service</strong>.<br />

The Customer is entitled to locate and use the hosting equipment in the customer designated area<br />

subject to and upon the terms of the final Agreement.<br />

The Customer is entitled to allow Users to have access to the customer designated area and the<br />

Logicalis Data Centre or to use the hosting services, subject to having obtained Logicalis’ prior written<br />

consent, following the Permit to Work Procedure and completing the Permit to Work Form.<br />

Logicalis will permit the Customer upon giving reasonable notice:<br />

97


• to enter the Logicalis Data Centre during Normal Working Hours for the purpose of<br />

inspecting the Hosting Equipment and allowing the Customer’s potential clients to inspect the<br />

facilities provided by the Contractor; and<br />

• to enter the Logicalis Data Centre at all times, 24 hours a day 7 days a week, for the<br />

purpose of carrying out any necessary services, maintenance and/or repair to the Hosting<br />

Equipment. In cases where emergency maintenance and/or repair work is necessary, the<br />

Customer will give Logicalis a minimum of one hours notice.<br />

Customer Obligations<br />

The hosting equipment and additional hosting equipment will be at the customer’s risk at all times<br />

and the customer will be responsible for insuring the hosting equipment and any additional hosting<br />

equipment against all risks. The Customer will, in addition to the Charges, be responsible for all costs<br />

(including costs reasonably incurred by the Contractor) associated with installing installation of the<br />

hosting equipment, cables and other material and any additional hosting equipment at the Logicalis<br />

Data Centre is out of scope.<br />

The Customer will comply with the Data Centre Installation Standards set out in the Data Centre<br />

Installation Standards in respect of all hosting equipment and additional hosting equipment.<br />

Customers will not make any alteration or modification to the Logicalis Data Centre, or any of the<br />

racks, storage facilities, fixtures and fittings or any other facilities provided by Logicalis.<br />

98


The Customer will keep the Customer Designated Area clean and tidy and free from rubbish and<br />

other debris and refrain from obstructing any doors or access to that space at all times.<br />

The Customer will comply with the Acceptable Use Policy.<br />

The Customer will not load the rack(s) in which the hosting equipment is installed in excess of the<br />

manufacturer’s recommended maximum loading.<br />

Use of Electrical Power<br />

Pricing includes a charge for the usage of electrical power up to the maximum amount stated in Colocation<br />

<strong><strong>Service</strong>s</strong> and <strong>Service</strong> Details.<br />

Logicalis may also make an additional charge for, or grant a rebate against the charge for, the<br />

Customer’s actual usage of electrical power at the end of each quarter.<br />

The Customer acknowledges that should it wish to install additional hosting equipment, Logicalis<br />

cannot guarantee to provide electrical power in excess of the electrical power provision.<br />

<strong>Service</strong> Level<br />

Logicalis will perform the Hosting <strong><strong>Service</strong>s</strong> in accordance with the service level requirements set out<br />

in Co-location SLA.<br />

99


Relocation of Hosting Equipment<br />

Logicalis may, having given the Customer as much notice as is reasonably possible in the<br />

circumstances, relocate the hosting equipment to another area within the Logicalis Data Centre, which<br />

will upon moving to it, become the customer designated area. Logicalis will arrange and pay for the<br />

relocation of the hosting equipment to the new customer designated area and will provide the hosting<br />

services at the new customer designated area.<br />

Removal of Hosting Equipment<br />

On expiry, or termination of the service, the Customer will be solely responsible for the removal of<br />

the hosting equipment from the customer designated area within fourteen (14) days of the date of<br />

termination or expiry.<br />

Logicalis may disconnect, switch off or remove any of the hosting equipment at any time without<br />

the prior approval of the Customer if it is necessary to take such action immediately in order to protect<br />

health and safety or to prevent damage to the customer designated area, or the Logicalis Data Centre.<br />

Disaster Recovery<br />

Any disaster recovery requirements will be subject to a separate quotation and a specific contract<br />

for such purposes between Logicalis and the customer. Unless specifically listed in the service schedule,<br />

Logicalis does not provide any disaster recovery services as part of the standard co-location agreement.<br />

100


System and Security Requirements<br />

Logicalis will be responsible for providing physical and electronic security systems for the Logicalis<br />

Data Centre perimeter and common areas leading up to the customer designated area. Logicalis will<br />

provide physical access and security controls will comply with the Security Policy applicable to the<br />

customer designated area.<br />

Reporting and Reviews<br />

Logicalis will, on a quarterly basis, provide the reports relating to the hosting services as set out in<br />

the hosting SLA.<br />

Logicalis and the Customer will meet regularly at mutually determined times and intervals to discuss<br />

and review reports that Logicalis will present regarding any incidents that may have occurred and the<br />

general state of the Logicalis Data Centre.<br />

Hosting SLA<br />

<strong>Service</strong> Level Requirements<br />

Logicalis will perform the Hosting <strong><strong>Service</strong>s</strong> in accordance with the service level requirements set out<br />

below and if Logicalis fails to perform, the Customer will be entitled to receive the service credits set out<br />

below. If one failure or incident leads to two or more service credits being payable only the higher or<br />

highest service credit will apply.<br />

101


Power<br />

y<br />

Categor<br />

Description<br />

Level<br />

<strong>Service</strong><br />

Measure<br />

ment Period<br />

<strong>Service</strong> Credit<br />

Power<br />

Simultaneous<br />

100%<br />

Quarterly<br />


location Fee;<br />


credit of quarterly Colocation<br />

Fee;<br />


• description of problem;<br />

• estimated time of resolution.<br />

The following steps will be taken when the Customer reports an incident:<br />

Sev<br />

Description<br />

Cove<br />

Resp<br />

Resolu<br />

Work<br />

Custo<br />

Time<br />

erity<br />

rage<br />

onse<br />

tion Time<br />

Effort<br />

mer<br />

-based<br />

Level<br />

Time<br />

Status<br />

note<br />

Updates<br />

S1<br />

Customer’s<br />

24x7 15<br />

1 hour 24<br />

Every<br />

15<br />

<strong>Service</strong> is not<br />

minutes<br />

hours per<br />

hour<br />

minutes:<br />

operational and<br />

day until<br />

the<br />

no workaround<br />

resolution<br />

Logicalis<br />

is possible<br />

or change<br />

<strong>Service</strong><br />

of<br />

Desk<br />

severity<br />

2<br />

hours:<br />

Logic<br />

alis Data<br />

105


Centre<br />

Manager<br />

4<br />

hours:<br />

Servi<br />

ces<br />

Director<br />

S2<br />

Customer’s<br />

24x7 1<br />

2<br />

16<br />

Every<br />

1<br />

<strong>Service</strong> is<br />

hour<br />

hours<br />

hours per<br />

2 hours<br />

hour: the<br />

operational but<br />

day until<br />

Logicalis<br />

performance is<br />

resolution<br />

<strong>Service</strong><br />

seriously<br />

or change<br />

Desk<br />

degraded. If a<br />

of<br />

workaround<br />

severity<br />

has been<br />

4<br />

provided, the<br />

hours:<br />

loss of<br />

Logic<br />

performance<br />

alis Data<br />

can only be<br />

Centre<br />

sustained for a<br />

Manager<br />

106


few Working<br />

Days.<br />

1<br />

Working<br />

Day:<br />

Servi<br />

ces<br />

Director<br />

S3<br />

Customer’s<br />

24x7 2<br />

4<br />

Stand<br />

Every<br />

1<br />

<strong>Service</strong> is<br />

hours<br />

hours<br />

ard<br />

4 hours<br />

Working<br />

operational.<br />

Working<br />

Day: the<br />

However a<br />

Day<br />

Logicalis<br />

problem has<br />

<strong>Service</strong><br />

been identified<br />

Desk<br />

that causes<br />

slight<br />

degradation in<br />

2<br />

performance. A<br />

Working<br />

workaround is<br />

Days:<br />

available.<br />

Logic<br />

alis Data<br />

Centre<br />

107


Manager<br />

5<br />

Working<br />

Days:<br />

ces<br />

Servi<br />

Director<br />

Scheduled Maintenance<br />

follows:<br />

Logicalis will notify the Customer regarding maintenance of the Logicalis Data Centre as<br />

Type of Maintenance Description Notification Period<br />

Routine maintenance<br />

with no likely affect on RICS<br />

Routine<br />

Designated Area; and<br />

maintenance which is part of<br />

the Contractor’s PPM<br />

No notification required<br />

Standard Routine maintenance 14 day advance<br />

108


and repair which the<br />

notification<br />

Contractor believe may<br />

involve an outage<br />

Urgent<br />

Repair needed urgently<br />

1 hour advance<br />

notification<br />

Emergency<br />

Repair or other action<br />

needed on health and safety<br />

or security grounds.<br />

No advance notification<br />

required but the Contractor<br />

will notify Customer as soon<br />

as is reasonably practicable<br />

Reporting<br />

Logicalis will provide the following reports and documents within ten (10) Working Days of each<br />

month end:<br />

• Power Distribution Unit (PDU) meter readings in Amps (A) of electrical load for each<br />

PDU, both primary and redundant, together with the previous months’ readings.<br />

• Monthly details of temperature within the customer designated area recorded.<br />

• Access register for the customer designated area together with all requests for access by<br />

both the Customer and Non-Customer personnel including those where access may<br />

have been due to an emergency situation.<br />

• Log and/or register of all remote hands services requests.<br />

109


Business Continuity and Disaster Recovery<br />

Logicalis will have in place a business continuity and disaster recovery plan which it will make<br />

available to the Customer for review. The business continuity plan / disaster recovery plan will:<br />

• address all critical functions and operations of the services used by Customer;<br />

• specify recovery time frames for each critical function and operation used by<br />

Customer;<br />

• be thoroughly tested at least annually; be regularly updated to the extent necessary.<br />

Remote Hands <strong><strong>Service</strong>s</strong><br />

Logicalis will provide the remote hands services consisting of technical support for basic operational<br />

functions, and diagnostic and repair activity for hosting equipment, facilities, spares and other materials<br />

owned or leased by the Customer.<br />

Logicalis will charge for the remote hands services in accordance with the rates in the <strong>Service</strong><br />

Catalogue.<br />

Logicalis will be contactable 24 hours a day, 7 days a week and will provide remote hands services<br />

24 hours a day, 7 days a week if required.<br />

Logicalis will relay on request and on receipt of instructions from the Customer:<br />

• the visual status of hosting equipment to assist in remote troubleshooting;<br />

110


• undertake basic remedial tasks on hosting equipment;<br />

• power cycle hosting equipment when and should the need arise; unload/load data tapes<br />

at the Customer tape library equipment.<br />

Logicalis will conduct physical layer testing and test and confirm that all cross-connects are<br />

functioning normally to the patch panel in the Logicalis Data Centre.<br />

Logicalis will install and maintain cabling at additional charges in respect of the following:<br />

• install copper patch cords between devices in the customer designated area;<br />

• install fibre patch cords between devices in the customer designated area;<br />

• source and provide copper and fibre replacement patch leads and cables at the<br />

Customer’s request;<br />

• install or patch copper or fibre patch cords at the Customer’s request;<br />

• troubleshoot physical layer issues with fibre and copper.<br />

The Customer may elect to have Customer materials such as data tapes delivered to, configured at,<br />

installed at, stored at, maintained at, serviced at, and/or shipped from the Logicalis Data Centre.<br />

Logicalis Hosting and aaS Security<br />

Logicalis can locate our Data Centre within the Security Boundary of the <strong>PSN</strong> and can therefore<br />

provide Hosting and aaS at IL2-2-x and IL 3-3-x in accordance with:<br />

111


HMG CESG/CPNI Guidance<br />

NIST Guidelines<br />

Industry best practice<br />

In order of preference and where available.<br />

Section 9<br />

Provision of Managed Equipment Room <strong><strong>Service</strong>s</strong> as a <strong>Service</strong><br />

Logicalis provides the following services as a <strong>Service</strong> through our PSAS platform.<br />

Day to Day Operation & <strong>Service</strong> Management<br />

As defined within the Managed <strong><strong>Service</strong>s</strong>.<br />

Information assurance – Impact Level (IL) at which the G-Cloud <strong>Service</strong> is accredited to hold and<br />

process information<br />

Logicalis does not formally hold accreditations for this service, however the security architecture<br />

under which the Cloud operates has been modelled on the Welsh PSBA architecture which has been<br />

accredited up to IL3.Our expectation is that CESG would have no issue with accrediting Logicalis’<br />

Cooperative Cloud.<br />

Having been awarded G-Cloud status, Logicalis is working towards this accreditation.<br />

112


As a <strong>Service</strong> SLA<br />

This section defines the <strong>Service</strong> Level Agreement (SLA) between the Customer and Logicalis for the<br />

delivery of the <strong><strong>Service</strong>s</strong>.<br />

This SLA identifies and defines the <strong>Service</strong> Levels to be provided by Logicalis to the Customer in<br />

respect of the monitoring, maintenance, management and provision of the <strong><strong>Service</strong>s</strong>. Logicalis will be<br />

responsible for the provision of the <strong><strong>Service</strong>s</strong> in accordance with this SLA.<br />

Availability Definition and <strong>Service</strong> Levels<br />

Definition: The following formula will be used to calculate Availability for each individual <strong>Service</strong> for<br />

the measurement period expressed as a percentage:<br />

where:<br />

c = number of hours of service during the measurement period (e.g. 31 days per month, 24 hours<br />

per day = 744)<br />

f = duration (measured in hours) within the measurement period during which an individual <strong>Service</strong><br />

was not available (i.e. did not respond to a poll)<br />

k = duration (measured in hours) within the measurement period during which an individual <strong>Service</strong> was<br />

unavailable due to circumstances beyond Logicalis’ control.<br />

Availability metrics for the <strong><strong>Service</strong>s</strong> are detailed below:<br />

113


<strong>Service</strong> Component<br />

Availability Metric<br />

MER as a <strong>Service</strong> 99.99%<br />

Should more than one SLA metric be applicable to any one element of the <strong>Service</strong>, only the lowest<br />

SLA metric will apply to that element of the <strong>Service</strong>.<br />

Should the failure of a <strong>Service</strong> be caused by the failure of an Enabling <strong>Service</strong>, only the failure of the<br />

Enabling <strong>Service</strong> will be applicable for <strong>Service</strong> Credits<br />

<strong>Service</strong> Interruptions<br />

Planned maintenance of the hosting equipment, facility, software or other aspects of the services<br />

that may require interruption of the service will not be performed during normal working hours.<br />

Logicalis may however, interrupt the services outside of normal working hours for planned<br />

maintenance, provided that it has given the Customer at least three days' notice. Any maintenance<br />

events which occur during normal working hours, and which were not requested by the Customer, will<br />

be considered downtime for the purpose of service availability measurement. Logicalis will at all times<br />

endeavour to keep any service interruptions to a minimum.<br />

<strong>Service</strong> Reports<br />

114


Logicalis will provide the following monthly reports:<br />

MER as a <strong>Service</strong><br />

<strong>Service</strong> reporting:<br />

<strong>Service</strong> availability for the month;<br />

Summary of Incidents in the month (total Incidents, % within SLA);<br />

Contract Management<br />

<strong>Service</strong> reporting:<br />

Number of MACS implemented in the month;<br />

Number of additional MACS purchased in the month;<br />

Number of unused MACS carried forward to next month;<br />

<strong>Service</strong> Credits payable.<br />

<strong>Service</strong> Credits<br />

To be agreed with Customer.<br />

<strong>Service</strong> Management<br />

<strong>Service</strong> Management will be in line with the processes defined within our Support <strong><strong>Service</strong>s</strong>.<br />

115


Logicalis Hosting and aaS Security<br />

Logicalis can locate our Data Centre within the Security Boundary of the <strong>PSN</strong> and can therefore<br />

provide Hosting and aaS at IL2-2-x and IL 3-3-x in accordance with:<br />

HMG CESG/CPNI Guidance<br />

NIST Guidelines<br />

Industry best practice<br />

In order of preference and where available.<br />

Section 10<br />

Support <strong><strong>Service</strong>s</strong><br />

Logicalis is able to provide differing levels of support services for MER solutions, including all<br />

network, CCTV, data centre and storage fabric elements and interfaces to other systems – firewalls etc.<br />

Support services include Break/Fix Maintenance and Fully Managed <strong><strong>Service</strong>s</strong>.<br />

Customers are offered the flexibility to mix and match these services within their estate.<br />

Break/Fix Maintenance<br />

1.1.2 Parts Replacement & Reactive Break/Fix<br />

Logicalis offers customers the ability to maintain their estate through a reactive support contract<br />

providing either a ‘parts replacement’ service or a ‘break/fix’ service where Logicalis provides<br />

replacement parts and an engineer to correct any faults.<br />

116


These services are modular and can be tailored to meet exact fix time requirements based on each<br />

unit of hardware covered, depending on the business critical nature of that piece of hardware and the<br />

SLA required.<br />

1.1.3 Support of Legacy Equipment<br />

Where Logicalis is assuming support for legacy equipment, Logicalis audits the estate. The audit<br />

provides us with a base inventory to work from.<br />

On completion of the audit, the equipment list is analysed to identify those with a simple cost<br />

effective support route, normally with a vendor involvement for software and third line<br />

support. Products which are more difficult to support will require analysis to ensure the best support<br />

service such as using legacy spares holdings or replacement with new, on failure.<br />

1.1.4 Take-on of Existing Equipment<br />

The first stage of the take on of existing environments is to ensure the current standards actually<br />

fulfil service to a best practice standard. This is important to understand the potential costs of the setup<br />

of a service and also allows analysis of the gap between the standard and the current solutions that are<br />

in place.<br />

Should a full refresh be required this is undertaken through a consultancy process and charged in<br />

accordance with the rate card included in the <strong>Service</strong> Catalogue. Consultants used for this exercise are<br />

qualified with vendor accreditations for the equipment specified.<br />

1.1.5 <strong>Service</strong> Levels<br />

Hours of cover can be split across three different services levels:<br />

117


24x7;<br />

8 am to 6 pm (in hours operation);<br />

6 pm to 8 am (out of hours operation).<br />

1.1.6 Fault Reporting and Diagnosis<br />

In the event of the Customer detecting any fault in the maintained equipment the Customer will<br />

notify Logicalis’ <strong>Service</strong> Desk during cover hours specifying the maintained equipment concerned, the<br />

serial number(s) and site address and whatever information is available regarding the fault, including<br />

any results of any the Customer-performed diagnostics.<br />

Following the reporting of a fault by the Customer (or the detection of a fault by Logicalis through<br />

monitoring of the Equipment where this service is provided) Logicalis will raise an incident on the<br />

Incident Management System (IMS).<br />

The <strong>Service</strong> Desk will assess the nature of the fault giving rise to the incident and attempt to provide<br />

a resolution.<br />

Initially, the <strong>Service</strong> Desk and the Customer may if necessary conduct a discussion over the<br />

telephone, or an exchange of emails, to attempt to carry out diagnosis and resolution of the fault in<br />

question.<br />

The <strong>Service</strong> Desk may also use remote access to carry out diagnosis of faults; subject always to<br />

complying with pre agreed security controls.<br />

Logicalis will be responsible for notifying the Customer of the incident reference number, entering<br />

updates on the IMS regarding the status of the Incident, resolving the fault remotely and or dispatching<br />

an engineer and/or replacement parts to Site.<br />

118


Following resolution of the fault giving rise to an Incident, the <strong>Service</strong> Desk will be responsible for<br />

obtaining the Customer’s agreement that the fault has been resolved to the Customer’s<br />

satisfaction. Logicalis will record who, at the Customer, agreed that the fault had been resolved in the<br />

call log comments. The log will then be closed.<br />

If Logicalis diagnoses that the problem lies with equipment that is not Maintained Equipment it will<br />

confirm this with the Customer to update and close the Incident.<br />

1.1.7 On Site <strong><strong>Service</strong>s</strong><br />

Any part of the Maintained Equipment which develops a fault will at Logicalis’ option either:<br />

Be repaired; or<br />

Be replaced by parts with equivalent functionality on an exchange basis, whereby the removed part<br />

will become the property of Logicalis and the replacing part will become the property of the Customer<br />

(if the Customer does not to allow the removed part to be taken by Logicalis then Logicalis reserves the<br />

right to charge the Customer for the replacing part); or<br />

Be replaced by parts with equivalent functionality on a loan basis, whereby Logicalis will continue to<br />

own the replacing part and will repair and reinstall the original part as soon as is reasonably possible.<br />

The services include the replacement of disk drives subject to the <strong>Service</strong> Exceptions and provided<br />

that the fault is not caused by the use of storage media not recommended by Logicalis. Should a<br />

replacement disk be required, Logicalis will, at the request of the Customer, reinstall the operating<br />

system.<br />

If a service call is made and Logicalis is unable to gain access to the Maintained Equipment, Logicalis<br />

reserves the right to charge for any call-out at Logicalis’ then standard time and materials rates.<br />

119


1.1.8 Advance Hardware Replacement<br />

Logicalis will supply replacement parts to the Customer to replace the Customer’s faulty Maintained<br />

Equipment before, or at the same time as the Customer returns the faulty equipment to Logicalis.<br />

Logicalis retains the right to charge the Customer for the replacement part or an equivalent piece of<br />

equipment with similar specification should the Maintained Equipment in question not be returned to<br />

Logicalis within five (5) working days of delivery of the replacement part.<br />

The Customer will retain all packaging for the replacement part provided in accordance with this<br />

paragraph and re-utilise the same, or provide packaging of similar performance for the return of<br />

Maintained Equipment. The Customer will take all due care to pack the faulty Maintained Equipment in<br />

such a way as to protect it from damage during transit.<br />

Logicalis will pass to the Customer so far as it is legally able to do so, any warranty provision<br />

applicable to the replacement part and provided by the original manufacturer of the replacement part.<br />

1.1.9 <strong>Service</strong> Exceptions<br />

Logicalis will not be obliged to provide <strong><strong>Service</strong>s</strong> to remedy faults in the Maintained Equipment<br />

caused by:<br />

1. Installation or repair of the Maintained Equipment (including electrical work) by someone other<br />

than Logicalis;<br />

2. Failure to comply with the conditions of use of the Maintained Equipment or (save where the<br />

Maintained Equipment is also Co-location Equipment) environmental conditions as set out in the<br />

manufacturer’s documentation;<br />

3. Accident, fire or water damage, neglect, misuse or abuse of the Maintained Equipment other than<br />

by Logicalis;<br />

4. The relocation, modification or addition to any of the Maintained Equipment without the approval<br />

of Logicalis or a defect caused by equipment not supported by Logicalis or by any other service not<br />

performed by Logicalis;<br />

120


5. Use or connection of the Maintained Equipment to or with software or equipment not suitable for<br />

such use or connection or which interferes with the proper functioning thereof, other than by<br />

Logicalis;<br />

6. Maintained Equipment is End of Life. Logicalis will use reasonable endeavours and in accordance<br />

with the original manufacturers recommendations advise the Customer when Maintained<br />

Equipment is coming towards its end of life to give the Customer an opportunity to bring the<br />

Maintained Equipment up-to-date;<br />

7. The Customer failing to implement Quality of <strong>Service</strong> on its data network as required to operate a<br />

Voice <strong>Service</strong>.<br />

The <strong><strong>Service</strong>s</strong> do not include:<br />

Supply of consumables;<br />

Replacement of impact or inkjet print heads;<br />

Replacement of laser printer fuser units or transfer/pick up rollers;<br />

Replacement of flat screens, displays or liquid crystal displays;<br />

Repair or replacement of additional items installed in PCs or servers unless the item is listed<br />

on the Equipment Schedule or fitted as standard by the manufacturer;<br />

Failures caused by faulty media.<br />

If on investigation Logicalis reasonably determines that a fault is as a result of any of the matters<br />

referred to in the Exceptions then the Customer will pay Logicalis for all time and materials reasonably<br />

expended by Logicalis in investigating the same.<br />

Logicalis will not be obliged to provide <strong><strong>Service</strong>s</strong> at any Site if Logicalis reasonably considers that the<br />

conditions at the Site represent a risk to the health or safety of any Logicalis personnel.<br />

1.1.10 Access to the Sites<br />

Where Logicalis requires access to the sites in order to remedy a fault or suspected fault in the<br />

Maintained Equipment it will arrange such access via the Customer. The Customer will provide Logicalis’<br />

<strong>Service</strong> Desk with all necessary information to enable Logicalis’ representative to gain access to the<br />

relevant Site, including site rules and security arrangements, the name and telephone number of a<br />

contact at the Site, parking arrangements, specific access requirements for the Site and any out of hours<br />

access arrangements which apply.<br />

121


Logicalis will abide by such health and safety, site access and security procedures of the Customer as<br />

are made known to Logicalis in advance.<br />

1.1.11 Escalation<br />

Logicalis has a published escalation procedure and will implement this escalation procedure in<br />

agreement with the Customer.<br />

1.1.12 Additions and Deletions<br />

The Customer may add Equipment to or delete Equipment from this Agreement in accordance with<br />

the Additions and Deletions of the main contract.<br />

1.1.13 Contractor Items<br />

Logicalis Items remain the exclusive property of Logicalis. The Customer may use such Logicalis<br />

Items only for activities related to the <strong><strong>Service</strong>s</strong> and may not modify, remove or transfer Logicalis Items<br />

or make them, or any resultant diagnostic or system management data, available to other parties<br />

without Logicalis’ written consent. Upon termination of this Agreement the Customer will, at Logicalis’<br />

option, destroy or return all Logicalis Items in its possession.<br />

1.2 Fully Managed <strong><strong>Service</strong>s</strong><br />

This service provides pro-active life-cycle management of the Customer’s infrastructure and is<br />

delivered to compliment the work of the ICT department. It takes away their day-to-day operational<br />

tasks and is serviced by front-line MSC staff providing first and second line support services backed up<br />

by a third line support team and 4th line going backed off to the equipment vendor or manufacturer.<br />

122


The service is typically provided remotely, but can be enhanced by the deployment of on-site<br />

resource which may involve TUPE considerations.<br />

The remote and on-site resources operate the same toolsets and processes across the infrastructure<br />

management service, utilising Logicalis’ Enterprise Class Management platforms including CA’s Spectrum<br />

Infrastructure Manager and eHealth Performance Manager.<br />

Logicalis provides a front-line Single Point of Contact (SPOC) for the infrastructure which can include<br />

the management of third party resolution agencies. This ensures consistent and effective service<br />

management.<br />

The Fully Managed <strong>Service</strong> includes the following:<br />

equipment procurement;<br />

implementation services;<br />

comprehensive 24 x 7 monitoring service;<br />

incident monitoring and notification;<br />

liaison with 3rd party resolution agencies such as carriers for line faults etc;<br />

hardware break/fix service;<br />

configuration backup and archival ;<br />

standard or enhanced <strong>Service</strong> Management – <strong>Service</strong> Delivery Manager (SDM);<br />

o regular service reviews<br />

o service review reports;<br />

o incident management visibility;<br />

o performance reports through portal<br />

additional Enhanced Level <strong><strong>Service</strong>s</strong>;<br />

full incident and problem management;<br />

managed change control;<br />

o configuration management;<br />

o moves, adds and changes;<br />

o patch and release management advice;<br />

123


service:<br />

The following <strong>Service</strong> Matrix summarises the service components that are provided as part of this<br />

<strong>Service</strong> Component<br />

MER<br />

<strong>Service</strong> Delivery Management<br />

<strong>Service</strong> Desk<br />

Incident Management<br />

Problem Management<br />

Maintenance<br />

Proactive Monitoring<br />

Change Management<br />

Configuration Management<br />

Capacity Management<br />

Release Management<br />

Supplier Management<br />

<strong>Service</strong> Reviews & Reporting<br />

124


Continuity Management<br />

Equipment Reporting<br />

<strong>Service</strong> Credits<br />

Continuous <strong>Service</strong> Improvement<br />

Escalation Management<br />

Performance Standards<br />

Logicalis will provide the <strong><strong>Service</strong>s</strong> in accordance with the performance standards as set out in this<br />

section and in the Maintenance <strong><strong>Service</strong>s</strong> section. Where applicable, Logicalis’ failure to meet a <strong>Service</strong><br />

Level will entitle the Customer to receive the financial credits.<br />

<strong>Service</strong> Desk<br />

<strong>Service</strong> Responsibilities<br />

A service desk facility will be provided within the MSC that will act as the focal point for the<br />

management and delivery of the <strong><strong>Service</strong>s</strong>.<br />

The service desk will co-ordinate the actions of the support staff, both on the Customer’s site and its<br />

own site, in the delivery of the <strong><strong>Service</strong>s</strong>.<br />

125


The service desk will interface with the Customer’s own service desk facility and not directly with<br />

the Customer’s end users.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

<strong>Service</strong> Desk availability 24 per day 7 per week<br />

<strong>Service</strong> Level Targets<br />

The service desk will be staffed by appropriately qualified personnel.<br />

the Customer Responsibilities<br />

the Customer will provide its own service desk facility that will be the first line of support for<br />

its end users.<br />

1.2.1 Incident Management<br />

The Logicalis Incident Management process for <strong>PSN</strong> is owned and operated by the MSC and <strong>Service</strong><br />

Desk. The MSC and <strong>Service</strong> Desk have a defined Disaster Recovery plan, so that in the event of a disaster<br />

service delivery and support functions can be moved to an alternate location, or otherwise switched<br />

across to another <strong>Service</strong> Centre.<br />

126


Logicalis acts as a seamless extension of the existing service management regime, interfacing with<br />

the Customer through clearly defined demarcations of responsibility, informational exchanges and –<br />

where relevant - common process workflows.<br />

127


Logicalis’ standard service operating model is to provide a 2nd line <strong>Service</strong> Desk that integrates into<br />

a customer’s internal 1st line IT <strong>Service</strong> Desk (in this case the Customer). As such, we are experienced in<br />

understanding how to construct (or integrate into) common end-to-end service delivery and support<br />

processes that involve multiple parties taking part in multiple workflows, and the importance of<br />

demarcations of responsibility, handover regimes, and stop clock procedures. This involves providing an<br />

integrated peer-to-peer support environment (as can be seen from the diagram above) based on robust<br />

<strong>Service</strong> Desk processes and a <strong>Service</strong> Delivery Management and governance overlay.<br />

Logicalis utilises our standard ITIL based processes and systems to manage faults and incidents as<br />

required. Using our service management system Logicalis manages incident notification, the stopping<br />

and starting of support clocks and any escalations required (both internally and with the Customer). The<br />

system is also used to manage any Operating Level Agreements with the Customer. Monthly service<br />

reviews present the opportunity to identify, review and address any issues related to the operational<br />

interface between Logicalis and the Customer.<br />

The referential integrity of incident ticket data will be maintained between Logicalis and the<br />

Customer, with incident references from the respective <strong>Service</strong> Management systems being recorded<br />

for any given incident.<br />

As described earlier, integration of the Logicalis and the Customer’s service management systems<br />

(for incident ticketing) is possible, either by API, scripting, automated e-mailing of incident event data, or<br />

otherwise manual entry. Further dialogue is required to determine the most appropriate and effective<br />

mechanism to achieve timely population of the respective systems with information relating to any<br />

given incident, and ensuring referential integrity between the two.<br />

128


During the transition phase, a <strong>Service</strong> Definition Document and ‘Run Book’ is compiled, which<br />

defines all the operational touch points between Logicalis, the Customer, the processes for exchange of<br />

information and data, and any process or procedural anomalies that need to be taken into account with<br />

this particular <strong>Service</strong>. It is during this phase that requirements such as support scripts is captured and<br />

defined to assist the Customer with identification, triage and classification of issues at the 1 st line.<br />

A flexible approach is also taken to report generation, allowing specific metrics to be reported on<br />

directly to the Customer. The <strong>Service</strong> Delivery Manager is as the operational liaison between Logicalis<br />

and the Customer for matters of process, governance and escalation.<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will provide, manage and support an incident management service through the service<br />

desk that will be the focal point for managing the resolution of incidents in accordance with service<br />

levels agreed between the Customer and Logicalis.<br />

The incident management service will be available on a 24 x 7 x 365 basis for incidents to be raised<br />

by authorised Customer staff, the Customer’s 3rd party staff and Logicalis’ own support teams.<br />

The following methods of raising incidents within Logicalis’ incident management service will be<br />

provided:<br />

By telephone call to Logicalis’ service desk;<br />

By email to Logicalis’ service desk;<br />

By raising an incident in the Customer’s service desk;<br />

By capturing an alert from Logicalis’ management platform.<br />

129


Logicalis’ service desk will proactively update the relevant the Customer teams of the progress of<br />

incident resolution at the agreed intervals.<br />

Logicalis’ service desk will be responsible for obtaining agreement from the Customer’s incident<br />

owner that the fault has been resolved to their satisfaction. Only once confirmation has been received<br />

will the incident be marked as “closed”.<br />

Where any incident is discovered in software forming part of the Equipment which cannot be fixed<br />

by replacing any units or parts of the Equipment, Logicalis will use its reasonable endeavours to provide<br />

a work-around and to obtain a permanent solution from the Equipment manufacturer.<br />

Connectivity <strong><strong>Service</strong>s</strong><br />

It will be the responsibility of the Customer to arrange the provision, installation and maintenance<br />

of the network services and associated termination equipment necessary to connect the infrastructure<br />

in Logicalis’ Data Centre to the Customer locations. Payment for all such works and services will be the<br />

responsibility of the Customer.<br />

The Customer and/or their nominated network service provider will liaise with Logicalis to ensure<br />

such network services conform to the standards required by Logicalis for performance of the <strong><strong>Service</strong>s</strong>.<br />

The performance of such network services will not be the responsibility of Logicalis, nor will Logicalis<br />

be liable for any service credits for the non-performance of such services.<br />

If Logicalis determines that an incident relates to equipment or services which are maintained or<br />

provided by the Network <strong><strong>Service</strong>s</strong> Provider, or otherwise that an Incident requires intervention from the<br />

130


Network <strong><strong>Service</strong>s</strong> Provider for it to be resolved, Logicalis will, subject to the Customer’s Responsibilities,<br />

liaise with the Network <strong><strong>Service</strong>s</strong> Provider to assist in resolution.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

Management of Incidents 24 per day 7 per week<br />

<strong>Service</strong> Levels, Hardware<br />

The following service levels will apply for incident management of the hardware, service & remote<br />

management hardware and DC LAN switching hardware, where:<br />

Target Remote Response Time is the time for an engineer to begin investigation of an<br />

Incident;<br />

Target Resolution Time is inclusive of Target Remote Response Time;<br />

Target Resolution Time includes any requirement for attendance to site.<br />

131


Priority<br />

Level<br />

Definition<br />

Target<br />

Remote<br />

Response<br />

Time<br />

Target<br />

Resolution<br />

Time<br />

P1<br />

Serious business impact affecting<br />

30<br />

3 hours<br />

-or-<br />

Critical<br />

production systems and cash flow is<br />

affected.<br />

Example: complete system<br />

minutes<br />

(24 x 7)<br />

(24 x 7)<br />

failure, network down, total or major loss of<br />

functionality, one or more server outage,<br />

major business affecting problem where<br />

production is severely affected (for instance;<br />

loss of site, line or equipment).<br />

P2<br />

Significant business impact on<br />

1 hour<br />

6 hours<br />

-or-<br />

production or cash flow is affected.<br />

(24 x 7)<br />

(24 x 7)<br />

Major<br />

Example: Extremely slow system<br />

performance, an element of functionality is<br />

down or has a bug. Partial outage - Severe<br />

limitation to customer operations caused by<br />

a degraded network or server. Production is<br />

capable but business is affected.<br />

132


Priority<br />

Level<br />

Definition<br />

Target<br />

Remote<br />

Response<br />

Time<br />

Target<br />

Resolution<br />

Time<br />

P3<br />

Serious impact affecting a single<br />

5 hours<br />

10 hours<br />

-or-<br />

customer or group.<br />

(Normal<br />

(Normal<br />

m<br />

Mediu<br />

Example: Extremely slow system<br />

performance, a piece of functionality is<br />

down or has a bug. Component failure,<br />

Office Hours)<br />

Office Hours)<br />

infrastructure problem or functional loss<br />

resulting in limitations to customer<br />

operations.<br />

P4<br />

Impact on single customer or isolated<br />

10 hours<br />

24 hours<br />

-or-<br />

device.<br />

(Normal<br />

(Normal<br />

Minor<br />

Example: Problem or incident where<br />

single users can operate some of the system<br />

Office Hours)<br />

Office Hours)<br />

activities normally, but a definite problem is<br />

identified. Assistance is required to aid in<br />

troubleshooting.<br />

133


The service levels specified above will not apply to equipment that is obsolete and/or not eligible for<br />

active support from the corresponding Vendor; in which case all support will be provided on a<br />

reasonable endeavours basis.<br />

KPI, <strong>Service</strong> Levels, Reporting<br />

include:<br />

Metrics used to evaluate the effectiveness and efficiency of the service model integration will<br />

Percentage of incidents resolved/reclassified by the Customer’s Help Desk through use of<br />

support scripts<br />

Number of incident ticket reference codes incorrectly logged<br />

Number of staff suggestions, requests for transfer, disputes etc.<br />

The following KPIs will apply for incident management of the hardware, service & remote<br />

management hardware and DC LAN switching hardware:<br />

134


Priority<br />

Level<br />

Definition<br />

Target<br />

Diagnostic<br />

Time<br />

Customer<br />

updates<br />

P1<br />

Serious business impact affecting<br />

1 hour<br />

Every 30<br />

-or-<br />

production systems and cash flow is<br />

affected.<br />

(24 x 7)<br />

minutes or on<br />

status change<br />

Critical<br />

Example: complete system<br />

failure, network down, total or major loss of<br />

functionality, one or more server outage,<br />

major business affecting problem where<br />

production is severely affected (for instance;<br />

loss of site, line or equipment).<br />

P2<br />

Significant business impact on<br />

2 hours<br />

Every 30<br />

-or-<br />

production or cash flow is affected.<br />

(24 x 7)<br />

minutes or on<br />

Major<br />

Example: Extremely slow system<br />

performance, an element of functionality is<br />

status change<br />

down or has a bug. Partial outage - Severe<br />

limitation to customer operations caused by<br />

a degraded network or server. Production is<br />

capable but business is affected.<br />

P3 Serious impact affecting a single 6 hours<br />

Every hour<br />

135


Priority<br />

Level<br />

Definition<br />

Target<br />

Diagnostic<br />

Time<br />

Customer<br />

updates<br />

-or-<br />

customer or group.<br />

(Normal<br />

or on status<br />

Mediu<br />

Example: Extremely slow system<br />

Office Hours)<br />

change<br />

m<br />

performance, a piece of functionality is<br />

down or has a bug. infrastructure<br />

component failure, network problem or<br />

functional loss resulting in limitations to<br />

customer operations.<br />

P4<br />

Impact on single customer or isolated<br />

12 hours<br />

On status<br />

-or-<br />

device.<br />

(Normal<br />

change<br />

Minor<br />

Example: Problem or incident where<br />

single users can operate some of the system<br />

Office Hours)<br />

activities normally, but a definite problem is<br />

identified.<br />

<strong>Service</strong> Levels, IP Recording and Quality Monitoring Hardware<br />

The following service level targets will apply for Incident Management of the IP Recording and<br />

Quality Monitoring hardware:<br />

136


Fault<br />

Category of Impact<br />

Target<br />

Target<br />

Severity<br />

Response<br />

Resolution<br />

Time<br />

Time<br />

P1<br />

Major impact to system; e.g., lines not<br />

Up to 6<br />

5 days<br />

-or-<br />

being recorded<br />

Hours<br />

Critical<br />

P2<br />

Some impact to system; e.g., recording<br />

Up to 10<br />

20 days<br />

-<br />

okay but no playback available or quality<br />

Hours<br />

or-<br />

very poor<br />

Major<br />

P3<br />

Some impact to system; e.g., Recording<br />

Up to<br />

40 days<br />

-or-<br />

and playback working, but other features not<br />

Hour 48<br />

working<br />

Mediu<br />

m<br />

P4<br />

No functionality loss - recorder works<br />

Up to<br />

40 days<br />

-or-<br />

with no degradation of service but a minor<br />

Hour 48<br />

fault or query<br />

137


Fault<br />

Category of Impact<br />

Target<br />

Target<br />

Severity<br />

Response<br />

Resolution<br />

Time<br />

Time<br />

Minor<br />

Resolution<br />

Following the diagnosis of the cause of a fault in the Equipment Logicalis will either:<br />

1. Where Logicalis considers that the fault can be remedied remotely Logicalis will use remote access<br />

to the Equipment to attempt to remedy the fault, subject always to Logicalis complying with preagreed<br />

security controls; or<br />

2. Where Logicalis considers that the resolution of the fault requires on site attendance and Logicalis<br />

has contracted to provide on-site break/fix maintenance to the Customer then Logicalis will initiate<br />

a response in accordance with the Maintenance service;<br />

3. Where Logicalis considers that the resolution of the fault requires on-site attendance and Logicalis<br />

has not contracted to provide on-site break/fix maintenance to the Customer then Logicalis will<br />

either inform the Customer or contact the relevant third party resolver group as previously agreed<br />

with the Customer.<br />

Customer Responsibilities<br />

The Customer will provide its own incident management process and function into which Logicalis<br />

will interface;<br />

The Customer will procure that the Network <strong><strong>Service</strong>s</strong> Provider will accept fault calls from Logicalis<br />

and will provide Logicalis with such management information as Logicalis reasonably requests in order<br />

to fulfil its obligations.<br />

138


1.2.2 Problem Management<br />

below.<br />

The problem management process which Logicalis operates is shown in the workflow diagrams<br />

Problems are defined as the unknown underlying cause of one of more incidents, and a problem is a<br />

Known Error when the root cause is known and a temporary or a permanent alternative has been<br />

identified. As such, Logicalis employs Problem Management to minimise the effect on users of defects in<br />

services and within the infrastructure.<br />

The problem management process is instigated in all cases of recurring incidents, and in cases<br />

where a temporary work-around has been applied to close an incident and a permanent fix is required.<br />

Ownership of any particular problem depends on the nature and origin of the problem.<br />

The objective of Logicalis’ problem management process is to ensure that any problem is captured,<br />

properly identified, effectively resolved and its root causes established, so as to prevent recurrence,<br />

interruption to, or degradation of the service.<br />

139


In many cases a problem will have been identified through two or more incidents having been<br />

recorded and identified in the incident management database. However, this does not preclude anyone<br />

identifying a potential problem and escalating it to the Problem Management Forum.<br />

The problem reporter ensures that the problem is registered and sufficient information is recorded<br />

in the problem management database. If the problem reporter does not have direct access, the problem<br />

should be reported via the MSC <strong>Service</strong> Desk. Once the problem is recorded it is escalated via priority e-<br />

mail, with the subject ‘Problem Alert No. XXX’, to the group address ‘Problem Management Forum’.<br />

Upon receipt of a ‘Problem Alert’ e-mail, the leader of the problem management forum will convene<br />

a ‘Virtual’ meeting to address the problem.<br />

The Problem Manager will feed back to the forum when the problem is believed to be resolved. At<br />

the earliest opportunity the forum will review the records for each problem and agree closure. The<br />

Known Error Database is updated.<br />

140


Where a Problem has created an adverse situation between Logicalis and its Client, this is managed<br />

through the Critical Accounts Process. Action is taken by the Forum to minimise the risk of recurrence<br />

and to decide on any system or process improvements.<br />

The Forum regularly convenes on a monthly basis to discuss:<br />

Trend and Pattern Analysis - Analysis of reports from the Known Error Database, to ascertain if<br />

there are high level Problem patterns which require a broader approach. Where a higher-level<br />

technical change is deemed appropriate, and has not been covered during Problem resolution, a<br />

change request may be a submitted by a person nominated by the forum, and submitted in<br />

accordance with the Change Control Procedure.<br />

Continuous Improvement - Analysis of any non-technical, process, system or organisational<br />

issues identified during the problem management process. Where potential improvements are<br />

identified these are agreed with the relevant department or team manager and recorded in the<br />

Continual <strong>Service</strong> Improvement Plan (CSIP) for action.<br />

Captured incidents are reviewed for similarities and the root causes identified. If this activity fails,<br />

the problem is reviewed and - if necessary - escalated in order to categorise the incident and apply<br />

appropriate resolution activities. <strong>Service</strong> Desk systems enable agents to translate incidents into problem<br />

records and as a result, helping in the tracking, notification, escalation, allocation and resolution of<br />

future incidents.<br />

In the case of major problems, a major problem review is undertaken after each occurrence, and<br />

reported upon at the next scheduled service review meeting, to ensure the Customer is aware of the<br />

steps taken and the plans put in place to avoid recurrence of the problem.<br />

141


Problem Management<br />

Logicalis also maintains a knowledge base of Problem data in the form of a Known Error Database,<br />

for referral to by service desk agents to allow quicker diagnosis and resolution if problems re-occur.<br />

142


KPI, <strong>Service</strong> Levels, Reporting<br />

include:<br />

Metrics used to evaluate the effectiveness and efficiency of the problem management process will<br />

Percentage of incidents defined as problems<br />

Number of problems logged<br />

Number of problems fixed<br />

The number of Major Problem Reviews completed successfully<br />

Number of problems outstanding.<br />

<strong>Service</strong> Responsibilities<br />

Where service is restored but an underlying fault still remains the Customer will invoke the<br />

Customer’s problem management process.<br />

Remedial action for hardware faults: Logicalis will manage the resolution of the fault through its<br />

own resources or through 3rd party suppliers as appropriate.<br />

Remedial Action for software faults: Logicalis will take appropriate remedial action to modify,<br />

restore or upgrade the device configuration, or provide a software work around, working with 3rd party<br />

suppliers and manufacturers as required.<br />

Logicalis will undertake all reasonable appropriate remedial action to diagnose and resolve<br />

problems that have been reported to the Customer’s <strong>Service</strong> Desk and assigned to Logicalis.<br />

Hours of Cover<br />

143


The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

Problem management availability<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

Implementation of a change to resolve<br />

the problem<br />

24 per day 7 per week<br />

<strong>Service</strong> Level Targets<br />

There are no specific metrics governing the delivery of this service element.<br />

Customer Responsibilities<br />

The Customer will provide its own change management process and function into which Logicalis<br />

will interface.<br />

1.2.3 Escalation<br />

Using standard processes Logicalis will ensure that the correct level of management visibility of<br />

incidents is maintained at all times to ensure a swift response to service problems when they arise.<br />

144


The Logicalis MSC will perform initial incident diagnosis, triage, classification and initial resolution<br />

attempts. Where Level 2 support is required, incidents are escalated to the appropriate Logicalis<br />

Engineering Support Group, where skilled and experienced engineering staff investigates incidents<br />

further.<br />

If required, highly skilled technical resources (typically at CCIE level for Cisco equipment) will provide<br />

Level 3 support and if necessary escalate to the corresponding vendor for Level 4 support.<br />

Whilst this is the internal, technical escalation route associated with incident management, there is<br />

a comparable customer-driven escalation route that keeps the Customer notified of incident progress,<br />

allowing decisions to be made on the setting of priorities and the allocation of additional resources<br />

when required.<br />

Out of hours, escalation is to the Customer’s <strong>Service</strong> Duty Manager or an appropriate contact in a<br />

recipient organisation.<br />

145


1.2.4 Escalation Management<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will operate an escalation management process in order to promote the rapid resolution of<br />

incidents. The escalation management process will be documented and will include as a minimum:<br />

4. Clear indication of the escalation path to be followed at specific incident resolution status points.<br />

5. Escalation contacts within Logicalis (fixed line telephone numbers, mobile telephone numbers,<br />

email addresses).<br />

6. Escalation contacts within the Customer (fixed line telephone numbers, mobile telephone numbers,<br />

email addresses).<br />

Logicalis will ensure that the escalation management process document is regularly updated to<br />

ensure that changes to personnel in both the Customer and Logicalis’ organisation are captured.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

Escalation management availability 24 per day 7 per week<br />

Key Performance Indicators<br />

Logicalis will adhere to the following table for escalations within normal office hours.<br />

146


Normal<br />

Office<br />

Severity 1 Severity 2<br />

Hours<br />

The<br />

E<br />

Client<br />

The<br />

Client<br />

lapsed Time<br />

Contractor<br />

Contractor<br />

0% of SLA<br />

MSC Team<br />

Leader<br />

5<br />

MSC Team<br />

Leader<br />

5% of SLA<br />

MSC<br />

Manager<br />

7<br />

MSC<br />

Manager<br />

0% of SLA<br />

Head of<br />

Managed<br />

<strong><strong>Service</strong>s</strong><br />

9<br />

Head of<br />

Managed<br />

<strong><strong>Service</strong>s</strong><br />

00% of SLA<br />

<strong><strong>Service</strong>s</strong><br />

Director<br />

1<br />

<strong><strong>Service</strong>s</strong><br />

Director<br />

Logicalis will adhere to the following table for escalations outside of normal office hours.<br />

Out of<br />

Hours<br />

Severity 1 Severity 2<br />

147


The<br />

E<br />

Client<br />

The<br />

Client<br />

lapsed Time<br />

Contractor<br />

Contractor<br />

0% of SLA<br />

MSC shift<br />

Engineer<br />

5<br />

MSC shift<br />

Engineer<br />

5% of SLA<br />

MSC Senior<br />

Shift Engineer<br />

7<br />

MSC Senior<br />

Shift Engineer<br />

00% of SLA<br />

Duty<br />

Manager<br />

1<br />

Duty<br />

Manager<br />

Customer Responsibilities<br />

The Customer will provide contact details of the functions, or individuals, which comprise the<br />

escalation matrix and timely notification of any changes thereto.<br />

1.2.5 Proactive Monitoring Interfacing to Incident Management<br />

Proactive monitoring forms an input into the incident management process, which Logicalis will<br />

provide from our <strong>Service</strong> Desk.<br />

The <strong>Service</strong> Desk provides the Customer’s 1 st line staff or nominated contacts with a centralised<br />

Single Point of Contact for service management. It is staffed with agents with a high degree of business<br />

148


and technical knowledge, for the purpose of resolving the maximum number of service requests<br />

remotely and during first call.<br />

Agents receive and record calls, handle inquiries and complaints, monitor event data from the<br />

proactive monitoring systems, perform initial fault diagnostics and resolution attempts, transfer<br />

incidents to on-site resources, field engineers or the 2 nd line support of the MSC or 3 rd line support from<br />

the advanced technical resolver groups as required. They also manage SLA-based escalation, and<br />

communicate the progress and status of service requests to the Customer’s IT staff.<br />

Logicalis utilises field engineer resources, in those cases where incidents require on-site remediation<br />

and/or part replacement. Logicalis generally gain remote access and perform remote 2 nd line diagnosis<br />

prior to dispatching field or on-site resources. Where local attendance is required, then Logicalis’ field<br />

engineers are deployed.<br />

In addition, Logicalis manages all third parties under our contracted management, and provides<br />

cross-boundary communication where necessary.<br />

Logicalis is responsible for notifying the Customer of the incident reference number, and entering<br />

updates on the Logicalis service management system regarding the status of the incident.<br />

Following resolution of the fault giving rise to an incident, the Logicalis <strong>Service</strong> Desk is responsible<br />

for obtaining the Customer’s confirmation of service restoration. Logicalis records who, at the<br />

Customer, agreed that the fault had been resolved, in the call log comments. The log is then closed.<br />

If Logicalis diagnoses that an incident relates to equipment that is not managed or supported by<br />

Logicalis, we either inform the Customer, or manage with the problem through the relevant third party<br />

resolver group (where contractually agreed as part of the scope of the <strong>Service</strong>).<br />

149


1.2.6 Proactive Monitoring<br />

Logicalis operates the incident management process shown in the workflow diagrams below.<br />

For the purposes of proactive identification of incidents and degradations in service, Logicalis<br />

provides 24 x 7 proactive fault monitoring of the infrastructure. Logicalis monitors the Equipment and<br />

identifies service-affecting events or thresholds that have been exceeded in accordance with the<br />

parameters agreed with the Customer.<br />

Proactive Monitoring is delivered from our MSC on a 24x7 basis, via secure IP connectivity into the<br />

<strong>PSN</strong> network, utilising automated exception management to detect and notify any device or service<br />

availability or operational anomalies.<br />

All identified alerts are recorded in the Logicalis service management system and managed in<br />

accordance with the SLA.<br />

150


151<br />

Incident Management Part 1


152<br />

Incident Management Part 2


Proactive Monitoring comprises two core components:<br />

1. monitoring the on-going availability and health of the infrastructure and CPE devices;<br />

2. monitoring the on-going availability and capacity of the infrastructure.<br />

The availability, performance and health of equipment are monitored as part of the proactive<br />

monitoring service. Monitored metrics and threshold alerts are highly configurable and are agreed with<br />

our customers during consultation, but can include:<br />

Bandwidth<br />

Circuit status<br />

Connectivity status<br />

Discards<br />

Fan Notification<br />

IP packet throughput<br />

Latency<br />

Link connection status<br />

Module Up /Down<br />

Physical port status<br />

Redundant Supply Notification<br />

Temperature<br />

Buffer status<br />

Cisco Traps<br />

CPU<br />

Errors<br />

Interface up/down traps<br />

ISDN Dial Backup<br />

Link congestion<br />

Memory<br />

Packet loss rate<br />

Quality of <strong>Service</strong><br />

Shutdown Triggers<br />

Up/Down Status<br />

Utilisation<br />

All identified alerts are recorded in the Logicalis <strong>Service</strong> Management system, and managed in<br />

accordance with the SLA.<br />

153


All equipment and services, provided by Logicalis, are monitored and supported utilising a<br />

standardised platform. Logicalis utilises an integrated toolset consisting of CA Spectrum and CA eHealth:<br />

• CA Spectrum: Spectrum is the primary fault management tool employed by the MSC and<br />

provides status monitoring and a root cause analysis engine. Spectrum monitors the infrastructure by<br />

polling with SNMP. In addition to polling, it can process SNMP Traps to assist in the detection of<br />

faults.<br />

All alarms are automatically correlated, have a ‘root cause’ highlighted and ‘probable cause’<br />

determined. This inherent functionality enables Logicalis to quickly identify faults on a Customer’s<br />

infrastructure and to quickly identify, resolve and prevent potential problems before they happen –<br />

to maximise system availability and efficiency.<br />

All event and alert data related to the performance and availability of the infrastructure is<br />

presented to Logicalis’ MSC agents via the Spectrum interface, so that Spectrum provides a central<br />

view of all fault event data across the whole <strong>PSN</strong> estate.<br />

• CA eHealth: In addition to the Spectrum Fault Monitoring platform, Logicalis also utilises<br />

the eHealth (Live Health) performance monitoring platform, in order to provide integrated fault and<br />

performance monitoring.<br />

eHealth integrates performance management across the most complex multivendor and multitechnology<br />

— encompassing IPv4, IPv6 and mixed dual stack IPv4/IPv6 environments — and presents<br />

it in a single, consolidated, actionable view.<br />

eHealth collects performance data, evaluates it for threshold violations and issues early warnings<br />

in real-time so Logicalis can address problems before they become critical. The data is stored in a<br />

historical database and used for a wide variety of out-of-the box reports to understand the<br />

availability and performance of IT infrastructure components.<br />

154


Reports are role-based to meet the specific needs of IT and business management, operations<br />

staff, administrators, engineers and capacity planners. Developing bottlenecks and impending<br />

failures can be spotted, and the need for repair, reconfiguration or additional capacity documented.<br />

Conversely, under-utilised assets can be identified.<br />

eHealth includes granular service level management for defining different classes of service and<br />

assigning goals, core thresholds and other performance metrics to them.<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will monitor the Equipment during hours of cover and will perform the following specific<br />

activities:<br />

1. Logicalis will monitor the Equipment and identify service-affecting events or thresholds that have<br />

been exceeded in accordance with the parameters agreed with the Customer.<br />

2. Logicalis will liaise with the appropriate Customer contact to ensure that appropriate fault handling<br />

is initiated.<br />

3. Where Logicalis is responsible for remedying a fault in the Equipment it will raise an incident on<br />

Logicalis’ incident management system.<br />

4. If, due to equipment or circuit failure, Logicalis is unable to monitor the Equipment it will continue<br />

to provide all other aspects of the services that are not dependent on the monitoring of the<br />

Equipment. Logicalis will maintain the inventory of monitored Equipment by the:<br />

addition of new equipment to be monitored;<br />

removal of deleted equipment from monitoring;<br />

amendment of equipment configurations to facilitate monitoring.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

155


<strong>Service</strong> Element Hours Days<br />

Monitoring of Equipment 24 per day 7 per week<br />

<strong>Service</strong> Level Targets<br />

Logicalis will adhere to the service levels as detailed within the following table:<br />

Description<br />

Metric<br />

Performance data collection<br />

intervals<br />

Every 5 minutes nominal<br />

LAN monitoring alerts,<br />

notification to relevant the<br />

Within 15 minutes<br />

Customer teams<br />

Updates for Severity 1 in<br />

NOH<br />

30 minutes or status change<br />

OOH<br />

Updates for Severity 1 in<br />

30 minutes or status change<br />

Customer Responsibilities<br />

None applicable.<br />

156


Change Management<br />

Logicalis assumes responsibility for the Logicalis-side change control process (i.e. where Logicalis<br />

make changes for supportability reasons) for the environment, and manages change requests from the<br />

Customer for infrastructure managed by us.<br />

For the avoidance of doubt, Logicalis assumes that the Customer retains responsibility for user-side<br />

change requests (i.e. interacting directly with end users), and Logicalis takes responsibility for<br />

infrastructure-side change requests from the Customer.<br />

Change Requests are accepted 24 hours a day, but the approval process only takes place during<br />

normal office hours, with relevant CABs being held on a weekly basis. Both Logicalis and the Customer<br />

can generate change request documents.<br />

The Logicalis MSC acts as a single point of contact for the receipt, acknowledgement and<br />

progression of changes raised and ensures that they are actioned in accordance with the SLA.<br />

Implementation of remote, simple or template, changes is done under defined change management<br />

and performed remotely from the Logicalis MSC.<br />

Implementation of changes requiring on-site work, and major changes (i.e. those requiring elements<br />

of technical design work) is treated as chargeable works or projects.<br />

Logicalis ensures that all changes are carried out in a planned and authorised manner. To this end<br />

Logicalis has categorised changes and change requests as shown in the table below.<br />

157


Logicalis is at any time entitled to re-classify the description of a change following submission. This is<br />

subject to justification by Logicalis and agreement with the Customer.<br />

All changes are subject to resource availability, with an implementation date being confirmed by<br />

Logicalis.<br />

Tasks carried out during the ‘authorisation window’ include ensuring that there is a business reason<br />

behind each change, identifying the specific configuration items and IT services affected by the change,<br />

planning the change and having a back-out plan should the change result in an unexpected state of the<br />

configuration items. For medium changes and above, this information is presented to the weekly CAB<br />

for authorisation. The ‘change window’ is the actual time within which Logicalis staff undertakes the<br />

authorised change.<br />

Logicalis will ensure that all changes are carried out in a planned and authorised manner. To this end<br />

changes and change requests will be classified as follows:<br />

Categ<br />

Change type<br />

Authorisation<br />

Chang<br />

ory<br />

window<br />

e window<br />

Day to day minor<br />

Routin<br />

changes that require<br />

minimal authorisation, have<br />

Changes done within 24-48<br />

hours (may be longer if MSC is<br />

e<br />

no design element with no<br />

service impact and require<br />

no system downtime. These<br />

dealing with an exceptionally high<br />

level of severity 1 faults)<br />

158


can typically be undertaken<br />

with no pre-planning and<br />

within short timescales (less<br />

than 2 hours) during normal<br />

service operation.<br />

Template changes that<br />

have pre-agreed processes<br />

but require management<br />

Minor<br />

authorisation. These are<br />

likely to be more<br />

CAB Weekly<br />

4<br />

Hours<br />

complicated changes and<br />

may be implemented out of<br />

hours.<br />

These changes are<br />

complicated, service<br />

effecting and therefore<br />

Major<br />

require design validation<br />

and planning (typically less<br />

than a day’s effort). These<br />

Weekly<br />

CAB/Senior CAB<br />

8 hours<br />

are complicated changes<br />

and will be implemented out<br />

of hours<br />

159


Large scale projects<br />

typically involving additional<br />

t<br />

Projec<br />

equipment or system redesign<br />

that need to be<br />

Weekly<br />

CAB/Senior CAB<br />

TBA<br />

scoped and costed<br />

accordingly.<br />

ency<br />

Emerg<br />

Urgent request typically<br />

as a result of a serious<br />

service affecting incident.<br />

Retrospective<br />

Within<br />

4 hours<br />

Logicalis’ objective is to provide a simple, efficient and effective change management service for<br />

routine, non-service affecting changes, with a minimal approval overhead and time delay; such changes<br />

are typically authorised within the Logicalis MSC and/or by the SDM, and implemented at the earliest<br />

opportunity.<br />

In order to de-risk more complicated changes (i.e. those classified as ‘Minor’) a templated approach<br />

is used. This involves design agreement with the Technical Design Authority and technical team, where<br />

an agreed template is created to simplify requests for change and limit the possibilities of errors. These<br />

changes are approved at the weekly CAB meeting.<br />

Requests that fall into the ‘Major’ and ‘Project’ categories might require additional input from other<br />

areas. For these changes, a risk analysis of the potential impact of a change on existing live services is<br />

160


carried out, a suitable schedule for the change is defined, and an implementation and fallback plan is<br />

agreed. Such changes are reviewed at a CAB, commensurate with the associated risk and implications.<br />

The following flow chart indicates the processes for Emergency, Major and Minor changes:<br />

Emergency Changes<br />

161


162<br />

Major Changes


Minor Changes<br />

1.2.7<br />

<strong>Service</strong> Responsibilities<br />

163


Logicalis will be responsible for the Contractor-side change control process (i.e. where Logicalis<br />

makes changes for supportability reasons) for the environment, and will manage change requests from<br />

the Customer for infrastructure managed by Logicalis.<br />

For the avoidance of doubt, Logicalis assumes that the Customer retains responsibility for user-side<br />

change requests (i.e. interacting directly with end users), and Logicalis takes responsibility for<br />

infrastructure-side change requests from the Customer.<br />

Change Requests will be accepted 24 hours a day, but the approval process will only take place<br />

during normal office hours, with relevant Change Authorisation Boards (CABs) being held on a weekly<br />

basis. Both Logicalis and the Customer can generate change request documents.<br />

Logicalis’ MSC will act as the single point of contact for the receipt, acknowledgement and<br />

progression of changes raised and will ensure that they are actioned in accordance with the SLA.<br />

Implementation of remote, simple or template, changes will be under defined change management<br />

and performed remotely from Logicalis’ MSC.<br />

Implementation of changes requiring on-site work, and major changes (i.e. those requiring elements<br />

of technical design work) will be treated as chargeable works or projects.<br />

All changes will be subject to resource availability, with an implementation date being confirmed by<br />

Logicalis’ resource management function.<br />

Tasks carried out during the ‘authorisation window’ will include ensuring that there is a business<br />

reason behind each change, identifying the specific configuration items and IT services affected by the<br />

164


change, planning the change and having a back-out plan should the change result in an unexpected state<br />

of the configuration items.<br />

For minor changes and above, this information will be presented to the weekly CAB for<br />

authorisation. The ‘change window’ is the actual time within which staff will undertake the authorised<br />

change.<br />

Logicalis is at any time entitled to re-classify the description of a change following submission. This<br />

will be subject to justification by Logicalis and agreement with the Customer.<br />

An agreed number of remote routine or minor changes per annum will be included within the<br />

service charge, where requests for such are received during the working day. The following categories of<br />

changes will be chargeable:<br />

Any remote routine or minor changes above the agreed allowance;<br />

Changes requiring attendance on site;<br />

Major changes (including changes requiring technical design work);<br />

Project changes;<br />

Any changes completed out of hours.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

Change management process<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

165


<strong>Service</strong> Element Hours Days<br />

Change Implementation<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

<strong>Service</strong> Level Targets<br />

Logicalis will adhere to the following service levels targets:<br />

Description<br />

Metric<br />

updates<br />

Configuration documentation<br />

3 working days from change<br />

completion<br />

Notification to the customer<br />

of planned down time<br />

14 working days prior to start<br />

of down time<br />

Customer Responsibilities<br />

The Customer will provide the following:<br />

its own change management process and function into which Logicalis will interface.<br />

the relevant resources for participation in any required change authorisation and CAB process.<br />

166


1.2.8 Availability Management<br />

Logicalis will employ availability management targets to sustain service availability to support the<br />

Customer’s business requirements at a justifiable cost. Associated high-level activities will include:<br />

realise availability requirements;<br />

compile availability plan;<br />

monitor availability;<br />

monitor maintenance obligations.<br />

Availability management is used to address the ability of the infrastructure components to perform<br />

at an agreed level over a period of time, and Logicalis will use this as a key process in measuring and<br />

controlling the level of service availability for use in the monthly service reviews with the Customer.<br />

In order to measure overall service availability Logicalis produces and agrees an availability plan,<br />

including:<br />

Agreement statistics –what measurement statistics are included within the agreed service;<br />

Availability – agreed service times, response times, etc;<br />

<strong>Service</strong> desk calls – number of incidents raised, response times, resolution times;<br />

Contingency – agreed contingency details, location of documentation, Third Party<br />

involvement, etc;<br />

Capacity – performance timings for online transactions, report production, numbers of users,<br />

etc.<br />

Availability is typically calculated based on a model involving an availability ratio. Typically the<br />

calculation of this ratio includes the following elements:<br />

<strong>Service</strong>ability –the expected availability of a component;<br />

Reliability – the time for which a component can be expected to perform under specific<br />

conditions without failure;<br />

Recoverability – the time it takes to restore a component back to its operational state after a<br />

failure;<br />

167


Maintainability – the ease with which a component can be maintained, which can be both<br />

remedial and preventative;<br />

Resilience – the ability to withstand failure;<br />

Security – the ability of components to withstand breaches of security.<br />

Once agreed, the ratio metric is measured using the management tools to gather and alert on<br />

relevant elements, and reported on through the monthly service reviews.<br />

KPI, <strong>Service</strong> Levels, Reporting<br />

include:<br />

Metrics used to evaluate the effectiveness and efficiency of the availability management process will<br />

Agreed service hours, per service;<br />

Total down time per service;<br />

Response times per incident;<br />

Time taken to repair per incident;<br />

Actual versus contracted availability;<br />

Availability Ratio.<br />

Capacity/Performance Management<br />

Logicalis will utilise capacity and performance management to ensure that the availability of service<br />

resources meets the needs of <strong>PSN</strong> users. In order to keep the infrastructures running efficiently,<br />

Logicalis utilises predictive capacity planning to obtain real-life data related to the current status of<br />

168


esources, identify congestion and trouble spots before they affect users, and plan capacity effectively<br />

for the future.<br />

Capacity planning is used to ensure current resources are being used efficiently, evaluate trends in<br />

demand, and project future resource needs, achieving the following:<br />

Reduce costs through the reduction or elimination of under-used resources;<br />

Improve performance though identification of both over-used and under-used elements, and the<br />

re-balancing of capacity with demand;<br />

Reduce <strong>Service</strong> and downtime by anticipating overloads before they occur, and ensuring adequate<br />

capacity is in place;<br />

Improve budget predictability by tracking trends and modelling the effects of new services or<br />

infrastructure, avoiding unnecessary emergency purchases and ensuring an optimum profile of<br />

additional charges.<br />

Performance reporting will utilise CA eHealth Performance Manager to combine historical and realtime<br />

metrics with intelligent analysis, to generate role-based views that is used to rapidly pinpoint and<br />

correct developing performance degradations before service quality is jeopardised.<br />

The following reports are used to provide a high level of granularity related to trend analysis and<br />

capacity planning.<br />

AT-A-GLANCE REPORTS - provide a comprehensive view of the availability and performance of a<br />

particular resource, displaying the key statistics over a specified time interval. By automatically<br />

capturing performance data and presenting it uniformly, these reports can significantly reduce the<br />

time spent troubleshooting.<br />

HEALTH REPORTS - evaluate the health of groups of components by comparing current<br />

performance to historical performance over the course of a day, week or month. The report<br />

provides a list of situations to watch and identifies errors, unusual utilisation rates, or volume shifts<br />

that warrant investigation. The overall status of a component is measured by its Health Index, a<br />

performance metric based on multiple variables.<br />

TREND REPORTS - track the value of one or more performance variables over a period of time.<br />

Trend Reports is used to reveal traffic patterns over time, and relationships between components<br />

169


and variables. Components that Logicalis can track this way include: CPUs, disks, LANs, WANs,<br />

processes, process sets and more.<br />

TOP N REPORTS - sorts the elements that meet user-defined criteria. Logicalis typically use Top N<br />

Reports to find the best, worst, fastest, slowest or least-utilised circuits or devices. Top N Reports<br />

can be scheduled to run automatically at specified intervals, and also make a useful on-demand tool.<br />

Logicalis agrees a set of these reports that is regularly generated and made available through the<br />

web portal. Further ad-hoc reporting can be provided when required and is managed through the<br />

service delivery process.<br />

Output recommendations from the above are fed into the Continual <strong>Service</strong> Improvement<br />

Programme (CSIP). The goal of this process is to ensure that customers are realising the greatest return<br />

on investment from the service, and have a clear understanding of where further investments will lead.<br />

This programme is based on three key enablers - firstly our experience and application of ITIL, secondly<br />

our experience in managing complex services on behalf of our customers, and thirdly the Logicalis<br />

consulting capabilities that have been developed and proven over many years of operation.<br />

170


The CSIP is delivered through the appointed Logicalis SDM, who is the primary point of contact for<br />

all management issues related to the service, and in turn chairs the monthly service review and<br />

performance meetings. One of the key aspects of these meetings is to provide a forum for the planning<br />

or review of activities related to the agreed CSIP, as well as the opportunity to discuss new initiatives<br />

(which may have been identified in the course of incident, problem or service delivery management, and<br />

could be undertaken to address known service defects or implement potential service enhancements<br />

and improvements).<br />

KPI, <strong>Service</strong> Levels, Reporting<br />

Metrics used to evaluate the effectiveness and efficiency of the capacity management process is<br />

agreed during transition but will typically include:<br />

utilisation statistics;<br />

capacity summary;<br />

device performance summary;<br />

device performance detail;<br />

performance summary;<br />

performance detail.<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will produce a Capacity Plan covering the infrastructure. This is to include:<br />

171


1. Reporting of utilisation and performance statistics within the infrastructure and recommendations<br />

to relieve degradation of performance beyond agreed thresholds, specifically the production of:<br />

at-a-glance reports<br />

health<br />

trend reports<br />

top N reports<br />

2. Interpretation of forecasted demand (obtained from liaison with the Customer) for services, versus<br />

the available capacity in those services, and the making of appropriate recommendations.<br />

3. Interpretation of trends and changes to the Customer’s business requirements. Logicalis will<br />

recommend changes required to meet future capacity demand to ensure that the agreed service<br />

levels are met.<br />

4. Provision of recommendations for replacement of infrastructure components, should this be<br />

required to maintain service at the appropriate level.<br />

Hours of Cover<br />

The following table details the Hours of Cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days Exclusions<br />

Capacity<br />

Management<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

Holidays<br />

<strong>Service</strong> Level Targets<br />

Logicalis will produce the capacity plan twice a year.<br />

Customer Responsibilities<br />

The Customer will:<br />

172


provide forecast demand data related to capacity requirements on a quarterly basis.<br />

provide its own capacity management process and function into which Logicalis will interface.<br />

1.2.9 Release Management<br />

Logicalis will maintain software and firmware revisions within to an agreed minimum level. Logicalis<br />

offers access to features offered in later revisions of code if required to support the <strong>PSN</strong> service.<br />

Logicalis will provide recommendations (including risk analyses) as to software updates and patches<br />

within the service, together with an allocated amount of inclusive resource towards the implementation<br />

of such releases. Access to features offered in higher releases should be raised to Logicalis for us to<br />

prepare an analysis and recommendation for discussion at a CAB, so that the risks, implications, benefits<br />

and costs can be properly considered. Implementation of such releases - if agreed - is chargeable.<br />

Where a software fault is reported, Logicalis will work closely with the Customer, and the hardware<br />

vendor, to establish the impact to users, and from there agree a course of action. If necessary Logicalis<br />

will provide a workaround to establish business continuity, provided it is possible to do so technically.<br />

Any additional equipment required for a workaround may be charged at Logicalis’ discretion or loaned<br />

on a temporary basis. Subsequent patching or configuration changes required to resolve the fault is<br />

provided as part of the service.<br />

Through the service delivery process, Logicalis provides releases and version update<br />

recommendations for all supported devices. This is a consultative exercise, led by Logicalis, and carried<br />

out in conjunction with best practice principles and relevant 'Safe Harbour' recommendations from the<br />

Vendor(s), with Customer interaction and an understanding of future requirements. Any subsequent<br />

upgrades are treated as a project in order to minimise risk to the business and to ensure that the<br />

173


implications of the upgrade, on the original design principles, do not unduly affect infrastructure<br />

stability.<br />

When agreed, minor patching within software versions and remote engineering to carry out this<br />

work (which requires a break in normal service to implement) is included in the service.<br />

1.2.9.1 KPI, <strong>Service</strong> Levels, Reporting<br />

Metrics used to evaluate the effectiveness and efficiency of the release management process will<br />

include:<br />

the number of successful software updates;<br />

percentage of installations performed to time;<br />

number of failed or backed out implementations;<br />

number of unauthorised software versions detected within the environment.<br />

1.2.9.2 <strong>Service</strong> Responsibilities<br />

Where a software fault is reported, Logicalis will work closely with the Customer, and the associated<br />

hardware vendor, to establish the impact to the Customer, and from there will agree a course of action.<br />

If necessary Logicalis will use reasonable endeavours to provide a workaround to establish business<br />

continuity, provided it is possible to do so technically.<br />

Any additional equipment required for a workaround may be charged at Logicalis’ discretion or<br />

loaned on a temporary basis. Subsequent patching or configuration changes required to resolve the<br />

problem will be provided as part of the service.<br />

174


On a bi-annual basis, Logicalis will provide release and version update recommendations for all<br />

supported devices. Any subsequent updates will be treated as a chargeable project in order to minimise<br />

risk to the business and to ensure that the implications of the update on the original design principles do<br />

not unduly affect stability.<br />

When agreed with Logicalis in advance, minor patching within software versions of software and<br />

remote engineering to carry out this work (which will require a break in normal service to implement)<br />

may be included in the provision of the service. However, lab testing, additional memory or any other<br />

hardware parts are not included, and therefore Logicalis reserves the right to make additional charges<br />

for them.<br />

Version upgrades (i.e non-maintenance or supportability-driven requirements) will be treated as a<br />

chargeable project.<br />

1.2.9.3 Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days Exclusions<br />

Release Management<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

Holidays<br />

1.2.9.4 <strong>Service</strong> Level Targets<br />

175


High priority notifications will be evaluated when received. Lower priority notifications will be<br />

evaluated once every 6 months.<br />

1.2.9.5 Customer Responsibilities<br />

The Customer will provide:<br />

project funding where required to implement patches to supported devices uncovered by<br />

support agreements;<br />

facilitation of the required down time for the supported devices to enable the installation of<br />

patches.<br />

1.2.10 Configuration Management<br />

Logicalis is responsible for ensuring that all relevant element configurations and data are managed,<br />

controlled, current and up to date, and provides the Customer with electronic updates of all such<br />

information quarterly, or as otherwise agreed. Logicalis also provides details of all hardware and<br />

software under our management.<br />

The configuration management process monitors, deploys, manages and controls Configuration<br />

Items (CI) related to the infrastructure, in turn storing all CI data within a central Configuration<br />

Management Database (CMDb), which will act as a repository for information related to the authorised<br />

configurations of all elements within the <strong>PSN</strong> network.<br />

Configuration management activities are operated in-line with the prevailing change control<br />

procedures, with input and authorisation from the Logicalis SDM and, where relevant, the Project<br />

Manager. All scheduled engineering will take place outside normal working hours and in a mutually<br />

agreed time slot that is dependent on the affected infrastructure and the resultant impact on service.<br />

176


For configuration management, Logicalis has standardised on the use of CA SPECTRUM<br />

Configuration Manager (NCM). This platform integrates with our overall management architecture and<br />

automates the management of critical device configurations, giving us the tools to capture, modify, load<br />

and verify configurations for hundreds of devices from leading equipment vendors. Each configuration is<br />

time-stamped and identified by the revision number and, with automatically scheduled configuration<br />

comparisons, delivers immediate notification of unauthorised changes.<br />

As part of the configuration management process Logicalis will undertake configuration changes as<br />

required using NCM, with all configuration changes being delivered remotely. In addition Logicalis is<br />

responsible for ensuring that all managed elements are backed up at agreed intervals, and before and<br />

after any change.<br />

Logicalis MSC staff will use NCM to correlate appropriate or inappropriate configuration changes<br />

against availability and performance failures of critical services, comparing configurations or viewing the<br />

configuration history of any selected device within the infrastructure.<br />

Further to this, configuration items, their versions and their changes are audited periodically by<br />

Logicalis to ensure their validity and accuracy.<br />

The MSC will perform the following tasks as part of configuration management:<br />

177<br />

manage configurations for supported devices;<br />

capture device configurations and store them in the NCM database;<br />

check running versus start-up configurations;<br />

export, backup and restore configurations;<br />

load/merge configurations to one or more devices of the same family type;<br />

verify that the correct configuration is running on a device;<br />

set up a schedule of automatic captures and policies to ensure reliable device configurations;<br />

detect performance problems by verifying device configurations;<br />

maintain a history of device configurations for comparison and reconfiguration purposes;<br />

provide automated software updates;


create policies to monitor content in configurations and verify that device content is<br />

compliant.<br />

1.2.10.1 KPI, <strong>Service</strong> Levels, Reporting<br />

Metrics used to evaluate the effectiveness and efficiency of the configuration management process<br />

will include:<br />

the number of successful configuration changes;<br />

the number of correct device configuration verifications;<br />

the number of successful configuration/CMDb audits;<br />

frequency and number of CMDb errors;<br />

number and severity of breaches in SLA caused by inaccurate CMDb information.<br />

1.2.10.2 <strong>Service</strong> Responsibilities<br />

Management of device configurations: All devices within the scope of the services are to be<br />

managed in accordance with best industry practice, in order that service level agreements are adhered<br />

to. Logicalis will be responsible for supplying, supporting and maintaining any management platforms<br />

required to deliver this service.<br />

Backup & Recovery: The configurations of all managed devices will be backed-up on a regular basis<br />

and, specifically, after changes to the device configuration have been made.<br />

Logicalis will be responsible for ensuring that all relevant configuration documentation in respect of<br />

equipment is current and up to date, and will provide the Customer with electronic updates of all such<br />

documentation annually or as otherwise agreed.<br />

178


Logicalis will deploy and manage configurations of the equipment where required. This will be done<br />

remotely from Logicalis’ <strong>Service</strong> Desk.<br />

The above activities will be operated in-line with agreed change control procedures, with input and<br />

authorisation from the SDM and project manager. All scheduled remote engineering will take place<br />

during a mutually agreed time slot that will be dependent on the affected infrastructure and the<br />

expected resultant impact on service.<br />

1.2.10.3 Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

Configuration management 24 per day 7 per week<br />

1.2.10.4 <strong>Service</strong> Level Targets<br />

Logicalis will adhere to the following SLA for configuration management actions:<br />

Description<br />

Metric<br />

Backup of Configuration Files and<br />

Access Control Lists<br />

In accordance with<br />

agreed Backup policy<br />

Restoration of Configuration Files<br />

following Device Incident, Failure or<br />

In accordance with<br />

179


Description<br />

Metric<br />

Replacement<br />

<strong>Service</strong> Levels<br />

Device Configuration Backups To<br />

Management System<br />

1 Working Day<br />

Management System Backup<br />

Monthly<br />

Restoration & Testing of<br />

Configuration Files<br />

Quarterly<br />

1.2.10.5 Customer Responsibilities<br />

None applicable.<br />

1.2.11 <strong>Service</strong> Delivery Management<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will provide the services of a <strong>Service</strong> Delivery Manager (SDM).<br />

The SDM’s duties are to manage the <strong><strong>Service</strong>s</strong>, ensuring that adequate resources are made available<br />

by Logicalis so that Logicalis meets the <strong>Service</strong> Levels and that any new services introduced meet agreed<br />

service levels.<br />

The SDM will act as the Customer’s primary focal point for operations and support services during<br />

normal working hours.<br />

180


The SDM will hold regular reviews with the Customer, co-coordinating and delivering service and<br />

performance report information.<br />

Hours of Cover<br />

To be agreed for each contract.<br />

<strong>Service</strong> Level Targets<br />

Logicalis will provide interim SDM services in order to cover for holiday and sickness.<br />

Customer Responsibilities<br />

The Customer will provide a business interface role through which the SDM may liaise and escalate<br />

service management issues as required.<br />

1.2.12 Supplier Management<br />

<strong>Service</strong> Responsibilities<br />

The Supplier will manage the commercial and operational relationship with its own 3rd party<br />

suppliers.<br />

181


Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

3 rd party supplier management 24 per day 7 per week<br />

<strong>Service</strong> Level Targets<br />

None<br />

Customer Responsibilities<br />

None<br />

1.2.13 Reporting<br />

Regular service review meetings between Logicalis and the Customer are an important control<br />

mechanism, to ensure that any potential issues can be identified before they become problems, and can<br />

be managed accordingly.<br />

182


Such meetings present the opportunity for both parties to ensure the direction that the service is<br />

taking is the right one, and also provide a forum to ensure the development of the service is in line with<br />

expectations.<br />

Logicalis propose the following meetings be scheduled:<br />

monthly service review meetings;<br />

quarterly service review meetings;<br />

annual strategic review meeting.<br />

The agenda and attendees of the above meetings are agreed between Logicalis and Customers,<br />

during the transition period, and reviewed as required at each meeting.<br />

<strong>Service</strong> Responsibilities<br />

<strong>Service</strong> Reporting: Logicalis will produce regular performance reports as shown below:<br />

Monthly <strong>Service</strong> Review Meeting<br />

Logicalis produces a report prior to the monthly service review meetings, and distributes this report<br />

to the agreed list of attendees for that meeting.<br />

The report summarises the service performance (against the contracted service levels) in text and<br />

graphical formats in the ‘Reporting Period’, and forms the basis of discussion at the monthly service<br />

review meeting.<br />

183


The monthly service review meeting will follow the following agenda:<br />

Continuous <strong>Service</strong> Improvement Plan;<br />

Performance against service level targets;<br />

Performance against service levels;<br />

<strong>Service</strong> performance summary;<br />

Commercial summary;<br />

Complaints summary;<br />

Change control summary;<br />

Updated service risk register;<br />

Integration of future projects and analysis of their impact on the operational environment.<br />

Quarterly <strong>Service</strong> Review Meeting<br />

The focus of the quarterly service review meetings is medium to long term, and is structured to<br />

focus on ongoing service provision and development of the service. The agenda comprises the following:<br />

184<br />

Minutes of last meeting;<br />

Outstanding action points;<br />

<strong>Service</strong> level reports;<br />

Performance reports<br />

<strong>Service</strong> failures, service credits;<br />

Escalations;<br />

Feedback on customer performance;


Considerations for continuous improvement;<br />

New business;<br />

AOB<br />

Date of next meeting.<br />

Annual <strong>Service</strong> Review Meeting<br />

An annual service review meeting is held at least one month prior to each anniversary of the full<br />

service date.<br />

The focus of an annual review meeting is long term and strategic, and designed to focus on a review<br />

of performance over the period, including strategic development of the service and a detailed price<br />

review.<br />

The agenda comprises the following:<br />

185<br />

Minutes of last meeting;<br />

Outstanding action points;<br />

Review of service issues;<br />

Review of service failures, service credits;<br />

Review of escalations;<br />

Technology developments;<br />

Strategic opportunities for new business and service development;<br />

Considerations for continuous improvement;<br />

Review of new products and services;<br />

AOB;


Date of next meeting.<br />

Web-based Portal - A web-based secure customer portal provides account-controlled access to<br />

reports including device availability, and performance from a summary and detail perspective. Portal<br />

reports include:<br />

Availability;<br />

Availability Detail<br />

Device Performance Summary<br />

Device Performance Detail;<br />

Performance Summary;<br />

Performance Detail.<br />

These reports are scheduled and available on a daily, weekly and monthly basis, and are<br />

retrospectively available for a rolling 12-month period. Data can be archived for longer periods if<br />

required.<br />

A documentation tab is also provided on the portal, which can be used as a depository for key<br />

project documentation; this is often used for storage of monthly service reports.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days Exclusions<br />

186


<strong>Service</strong> Element Hours Days Exclusions<br />

<strong>Service</strong> Reviews and Reporting<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

English public<br />

holidays<br />

<strong>Service</strong> Level Targets<br />

Description<br />

Metric<br />

Issue of Monthly service report<br />

Within 10 working days of month end<br />

Report<br />

Issue of Annual <strong>Service</strong> Level<br />

No later than 4 weeks after the end of the<br />

annual period.<br />

Customer Responsibilities<br />

The Customer will ensure that representatives from its service management organisation attend the<br />

agreed service review meetings.<br />

1.2.14 Equipment Reporting<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will maintain a document record of the equipment under their management (the<br />

Equipment List).<br />

187


The Equipment List will consist of a list of equipment under management by Logicalis, including part<br />

numbers, quantities and locations.<br />

Logicalis will provide the Customer with an electronic copy of the Equipment List upon request and<br />

at 3 working days notice.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days Exclusions<br />

Equipment Reporting<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

Holidays<br />

<strong>Service</strong> Level Targets<br />

None<br />

Customer Responsibilities<br />

None<br />

188


1.2.15 Continuity Management<br />

<strong>Service</strong> Responsibilities<br />

Logicalis will support the Customer’s business continuity planning process by attendance at the<br />

relevant planning meetings.<br />

Support of failover testing will be provided as required, as a chargeable activity.<br />

Logicalis will provide details of its own business continuity plan as relates to its service delivery<br />

activities for the Customer.<br />

Logicalis’ business continuity plan will be tested at least once per annum.<br />

Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days<br />

Business continuity planning and testing<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

Business continuity invocation 24 per day 7 per week<br />

<strong>Service</strong> Level Targets<br />

189


Logicalis will resolve all issues arising from business continuity testing within the timescales agreed<br />

with the Customer’s Project Manager.<br />

Logicalis’ Business Continuity Plan will be tested at least once per annum.<br />

Customer Responsibilities<br />

The Customer will develop and maintain a business continuity plan.<br />

1.2.16 Continuous <strong>Service</strong> Improvement<br />

<strong>Service</strong> Responsibilities<br />

The Contractor will operate a process of Continuous <strong>Service</strong> Improvement, through which<br />

improvement initiatives to the managed services can be initiated, captured and managed through to<br />

implementation.<br />

<strong>Service</strong> improvements will be managed by means of a <strong>Service</strong> Improvement Plan (SIP). The SIP will<br />

be used to manage and log improvement initiatives triggered by Continual <strong>Service</strong> Improvement.<br />

The <strong>Service</strong> Improvement Plan will include:<br />

The process or service concerned;<br />

The person in charge of the process (Process Owner) or service (<strong>Service</strong> Owner);<br />

The initiative owner, description of the initiative;<br />

The source of the measure (e.g. service review, process audit).<br />

The implementation schedule and status including target date, current status.<br />

190


Hours of Cover<br />

The following table details the hours of cover for the above service elements:<br />

<strong>Service</strong> Element Hours Days Exclusions<br />

Continual service<br />

improvement<br />

09.00 –<br />

17.00<br />

Monday -<br />

Friday<br />

English public holidays<br />

<strong>Service</strong> Level Targets<br />

None<br />

Customer Responsibilities<br />

The Customer will review and approve the SIP within a reasonable timescale in order that<br />

improvements may be implemented promptly.<br />

1.2.17 Additions and Deletions<br />

1.2.18 Additions<br />

Subject to the environmental considerations below, the Customer may at any time add Equipment<br />

to the service by giving Logicalis at least 30 days notice in writing and providing Logicalis with such<br />

information concerning the Equipment as Logicalis may reasonably require, including but not limited to:<br />

191


the make and model of the equipment;<br />

the serial number of the equipment;<br />

the location of the equipment;<br />

any available service records relating to the equipment<br />

Logicalis may make a pro-rata additional charge for the added Equipment from the date that it is<br />

added to the service.<br />

Logicalis reserves the right not to add new equipment if thirty or more days have passed since the<br />

expiration of the original warranty period or the expiration of a previous maintenance agreement<br />

covering the Equipment, until the Equipment has been inspected by Logicalis to determine whether the<br />

Equipment is still in good condition. All time and materials required to place the Equipment in good<br />

operating condition will be charged at Logicalis’ current rates. Required repairs must be made prior to<br />

the beginning of cover under the service.<br />

1.2.19 Deletions<br />

No equipment may be deleted during the first <strong>Service</strong> Year. Thereafter the Customer may at any<br />

time delete equipment by giving Logicalis not less than 90 days notice in writing. Logicalis will make a<br />

pro rata adjustment to the Charges for the period from the date the equipment has been removed to<br />

the end of the term but reserves the right (i) to re-calculate its charges based on the amount of<br />

Equipment then supported under the Agreement and taking account of any volume discounts that are<br />

no longer applicable due to the reduced volume of Equipment being supported; and (ii) to make a<br />

reasonable administration charge; and (iii) to recover from the Customer the balance of any third party<br />

support charges incurred by Logicalis in respect of the Equipment and not previously charged to the<br />

Customer. Any refund then due to the Customer will be credited to the Customer once the deletion has<br />

been processed by Logicalis.<br />

192


1.2.20 <strong>Service</strong> Catalogue<br />

To facilitate the efficient and timely change management of frequently required, non-complex<br />

change requests, Logicalis will provide a <strong>Service</strong> Catalogue (SC). The service catalogue is typically a<br />

catalogue of charges for additional fixed price products and services. The SC both simplifies the ordering<br />

process (as the requestor orders a single SC item rather than all the component parts it contains), and<br />

assists the requestor with budgeting, as each SC item is fixed in price (within constraints).<br />

Each SC item can contain a mix of capital and recurring costs; in some cases (for example when a<br />

Smoothed Pricing model is being used for the main contract), SC items are priced on a recurring charge<br />

only, where that recurring charge typically includes the cost of any equipment (amortised over the<br />

Term), any associated professional services, bandwidth charges, maintenance and managed services.<br />

item.<br />

SC charges are inclusive of all components of cost related to the provision and support of each SC<br />

The specification of each SC item is fixed (i.e. the equipment and services configuration for each<br />

item are fixed, and defined in a Bill of Materials); this means that SC items are by their nature nonconfigurable.<br />

For this reason, only items that are fixed-content (and frequently ordered) are included in<br />

a SC. For requirements that are configurable, the prevailing quotation process is used. Typical SC items<br />

are professional services (rate card services), consumables, licenses and non-configurable equipment.<br />

If it becomes clear that any existing SC items are unlikely to be ordered, or conversely that there are<br />

fixed products & services which are frequently required, then SC items can be added and removed as<br />

needed - usually following an annual review.<br />

193


1.2.20.1 KPI, <strong>Service</strong> Levels, Reporting<br />

None<br />

1.2.21 Environmental Considerations<br />

Infrastructure<br />

This section describes the conditions that the Customer must ensure are in place for the effective<br />

operation of the equipment at each site:<br />

mains electrical supply as required;<br />

sufficient 13A power outlets;<br />

sufficient 32A or 16A “commando” power outlets;<br />

space for 19” equipment racking of sufficient size with front and rear access, where required.<br />

Air Conditioning<br />

The temperature in the equipment rooms must be maintained below agreed temperatures (typically<br />

24°C) as required by the equipment specifications.<br />

Customer’s Obligations<br />

The Customer will:<br />

194<br />

Provide access to the sites during hours of cover to facilitate Logicalis’ provision of the<br />

services;<br />

Maintain in good condition the accommodation of the equipment, the cables and fittings<br />

associated therewith and the electricity supply thereto;<br />

Ensure that the equipment is operated by competent staff;<br />

Advise Logicalis in writing of any modification to the equipment;


Keep and operate the equipment in accordance with the manufacturer's operating<br />

instructions, ensuring that the external surfaces of the equipment are kept clean and in good<br />

condition, including, where appropriate, changing the air filters;<br />

Notify Logicalis if the equipment is to be moved from its installed sites, specifying the date<br />

and thereafter to comply with any reasonable instructions from Logicalis in relation to such<br />

equipment stipulated prior to such relocation. <strong><strong>Service</strong>s</strong> in relation to equipment moved from its<br />

original sites will be provided at Logicalis’ discretion and may be subject to additional charges to<br />

be agreed between the parties. Logicalis’ provision of services will not be unreasonably<br />

withheld;<br />

Bring to the attention of Logicalis the Customer’s policies and procedures in respect of<br />

security and health and safety and notify Logicalis of any potential health or safety risks that<br />

may exist at any site;<br />

Provide Logicalis with full, safe access to and adequate working space in the sites for the<br />

purposes of Logicalis’ provision of the services;<br />

Make available to Logicalis free of charge all facilities and services reasonably requested by<br />

Logicalis to facilitate Logicalis’ performance of the <strong><strong>Service</strong>s</strong>;<br />

Provide remote access facilities and procure that such facilities can be used without restriction<br />

or fee by Logicalis to gain remote access to the maintained equipment;<br />

Enable Quality of <strong>Service</strong> on its data network.<br />

The Customer must provide Logicalis with 5 Working Days notice of all planned power downs.<br />

Logicalis provides, at the request of the Customer, staff with the appropriate expertise and<br />

experience to attend Sites to ensure that the Systems are taken out of service and restored to full<br />

operation in an orderly fashion as and when required as a result of power supply testing, planned mains<br />

power outage and other building and works maintenance activities.<br />

Notes:<br />

195<br />

A standard power down service will include the following:<br />

o Attendance at site to power down the System (maximum 3 hours on site visit);<br />

o Software back up prior to re-load;<br />

o Revisit to site to power up switch;<br />

o Post power up check and acceptance test to include all supplied peripherals (maximum 3<br />

hours on site visit);<br />

On site peripherals such as screen based consoles, management terminals etc. are not<br />

included in the power down activities and any data back up of these peripherals is the<br />

responsibility of the Customer.


1.2.22 Site Documentation<br />

Logicalis amends the relevant documentation for Systems, to reflect any maintenance activities<br />

carried out on the systems.<br />

Logicalis updates the system documentation, following completion of the modification that<br />

necessitated the amendment.<br />

made.<br />

Logicalis ensures that all site documentation is updated within 5 Working Days of any changes being<br />

1.2.23 Boundary of Responsibility<br />

The boundary of responsibility for the equipment will be the “Entry/Exit Point” where the cables or<br />

fibres to equipment not covered by the Agreement are connected: these cables or fibres themselves are<br />

not covered.<br />

Where the equipment is connected to any other equipment both managed and maintained by<br />

Logicalis (whether under this or some other extant agreement), then the monitoring extends to the<br />

cables or fibres between the two items of equipment.<br />

196


Phoenix IT Group Limited<br />

Contractual and bidding compliance<br />

Having reviewed the set of Compliance Codes and requirements which are summarised in the<br />

Authority’s excel document encompassing Governance, Technical<br />

Interoperability, <strong>Service</strong> Management and Customer Information Assurance, Phoenix confirms that all<br />

Managed Equipment Room <strong><strong>Service</strong>s</strong> will be provided in accordance and compliance with these Codes<br />

and requirements wherever they apply.<br />

Phoenix has carefully written this document to take into account the guidance in paragraph 5.3.6 of<br />

the ITT and believes that the following <strong>Service</strong> <strong>Descriptions</strong> are fully compliant with that guidance.<br />

Furthermore, Phoenix confirm that it will be willing to ‘tighten up’ any part of this service description if<br />

required by the Framework Authority bid assessment team. In addition, where a Customer requests a<br />

particular service this will be added to the service description for other Customers to purchase.<br />

Introduction<br />

Phoenix will provide the following Managed Equipment Room <strong><strong>Service</strong>s</strong> for Lot 4:<br />

1. Professional <strong><strong>Service</strong>s</strong><br />

2. Equipment Room Installation <strong><strong>Service</strong>s</strong><br />

3. Monitoring and Management for Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

4. Equipment Room Maintenance<br />

5. Managed Equipment Room Security<br />

1 Professional <strong><strong>Service</strong>s</strong><br />

197


Phoenix Professional <strong><strong>Service</strong>s</strong> will offer consultancy to provide requirements capture and solution<br />

design and project delivery to project manage and carry out the installation and deployment of the<br />

agreed solution.<br />

With specific regard to Lot 4 this will include:<br />

Design & Engineering – Detailed engineering design as required.<br />

Drawings and design – drawings submittal.<br />

Construction Design Management (CDM) – All necessary CDM regulations will be adhered to<br />

including the production of a Health & Safety plan, Risk Analysis and Method Statements and<br />

Health & Safety file.<br />

Project Management – There will likely always be a Phoenix Project Manager on site managing<br />

both the site and various trades. He will also liaise with the Customer project team.<br />

Site Progress Meetings – Continued communication is the key to a successful project hence<br />

fortnightly meetings have been allowed for with a report prepared by Phoenix prior to the<br />

meeting.<br />

Integrated Testing & Commissioning – Whilst each item will be commissioned individually it is<br />

important whole systems are tested as one complete system under load.<br />

Operation & Maintenance Manuals – 1 set of Manuals will be supplied both as hard copy and in<br />

electronic versions. The Health & Safety file is also to be provided.<br />

Awareness Training – Upon handover of the project full training will be given to key onsite staff<br />

regarding the operation of all systems.<br />

Building Regulations – Phoenix project work shall comply with prevailing building regulations. If<br />

requested Phoenix will liaise with Building Regulations Officers to ensure the proposed<br />

installation conforms with the requirements of the regulations.<br />

If required by a <strong>PSN</strong> Customer the Phoenix consultant team will also provide equipment<br />

benchmarking and procurement services to help drive down costs.<br />

1.1 Transition<br />

Most Managed Equipment Room <strong><strong>Service</strong>s</strong> will be transitioned by Phoenix from the Customer’s<br />

existing services provider. Over the past number of years, Phoenix has developed a comprehensive<br />

procedure to ensure a successful transition from the Customer’s previous service arrangements and on-<br />

198


going delivery of service. This process is of paramount importance to Phoenix and will be offered to <strong>PSN</strong><br />

Customers for Managed Equipment <strong><strong>Service</strong>s</strong> and is referred to as ‘Business Take On’ or ‘BTO’.<br />

The BTO process will focus on a number of key elements that need to be addressed by Phoenix and<br />

the Customer. They include:<br />

What services are to be transitioned<br />

How are the services being delivered today<br />

Who provides the services today<br />

The agreement of working practise procedures<br />

The <strong>Service</strong> Level Agreement<br />

Any special operational processes such as health and safety or security clearance<br />

Provision of existing documentation<br />

Project delivery time scales<br />

These are all agreed during the project set up phase and then revisited weekly throughout the<br />

migration.<br />

2 Equipment Room Installation <strong><strong>Service</strong>s</strong><br />

2.1 Design and installation<br />

Design and installation services provided by Phoenix will depend on the Customer’s preferred<br />

approach to Managed Equipment Room installation. For example:<br />

1. Customer requests Managed Equipment Room with output or outcome specifications. Phoenix<br />

designs the Equipment Room, procures all components and installs, tests and transitions all<br />

elements to operations.<br />

2. Customer requests a Managed Equipment Room with its own design specifications. Phoenix<br />

procures all components and installs, tests and transitions all elements to operations.<br />

3. Customer requests a Managed Equipment Room with its own design specifications and sources<br />

all or some components. Phoenix procures any components required but not procured by the<br />

Customer and installs, tests and transitions all elements to operations.<br />

199


Phoenix will provide design and installation services to support these and any other<br />

design/installation scenarios presented by, and agreed with, the Customer for Managed Equipment<br />

Rooms.<br />

3 Monitoring and Management for Managed Equipment Room <strong><strong>Service</strong>s</strong><br />

3.1 Onestream<br />

Phoenix has developed a monitoring system which is at the core of the Phoenix Onestream<br />

Monitoring and Management service. The Monitoring system is based on industry recognised network<br />

management applications, databases and middleware software. By developing the system in-house<br />

Phoenix provides a system with a high degree of flexibility and manageability particularly with regard to<br />

Customer bespoking. Phoenix will therefore offer equipment room monitoring and management<br />

services based upon this Onestream service. Onestream is supported by a number of SQL databases that<br />

provide extensive reporting capabilities.<br />

The monitoring service will use SNMP to monitor device Management Information Bases (MIB’s). By<br />

configuring the system Phoenix will tune it to monitor key management data and to trigger alarms and<br />

alerts.<br />

Assuming that the Equipment Rooms have SNMP-capable systems, Phoenix will provide 24 x 7 x 365<br />

monitoring to improve service performance and ultimately availability. Where Phoenix is involved in<br />

designing new Equipment Rooms Phoenix will ensure that the systems are capable of being remotely<br />

monitored. Where a device is capable of being monitored it is also often capable of being remotely<br />

managed and this will form part of Phoenix Managed Equipment Room service.<br />

200


The main applications behind Onestream and available to Phoenix <strong>PSN</strong> Customers for Managed<br />

Equipment Room <strong><strong>Service</strong>s</strong> are:<br />

3.1.1 Castle Rock – SNMPc 7.1 Monitoring and Management Software<br />

SNMPc is a secure distributed network management system that enables Phoenix to visualize,<br />

monitor, and manage entire network infrastructures. Integrated within SNMPc is full support for SNMP<br />

v3 which will provide extensive monitoring capabilities for both SME and Corporate network.<br />

SNMPc will support multi-level hierarchical maps at both topology and physical levels. Each<br />

hierarchy map can represent a city, building, or logical IP subnetworks.<br />

SNMPc facilitates imported bitmaps of geographic maps/floor plans, along with manual or<br />

automatic network placement; this enables Phoenix to create customised topology maps that closely<br />

matches the actual network end-user environment. Each map network can be represented as a tree,<br />

ring, or snaked-bus topology. This feature will be delivered as part of the Phoenix service offered to <strong>PSN</strong><br />

Customers as part of Lot 4.<br />

3.1.2 SQL<br />

SQL is a programming language designed for managing data in relational database management<br />

systems (RDBMS). Phoenix has developed exceptional SQL programming skills over the past eight years<br />

that has enabled Phoenix to produce complex “middleware software” solutions. The use of this<br />

middleware software has generated detailed reporting capabilities that are tailored to exact Customer<br />

requirements and will be offered as part of the Phoenix <strong>PSN</strong> Managed Equipment Room <strong><strong>Service</strong>s</strong>.<br />

Flexibility of data manipulation and root cause analysis are typical areas of expertise that Phoenix will<br />

provide via the use of SQL programming.<br />

201


3.2 Onestream <strong>Service</strong> Capabilities<br />

Phoenix will provide the Onestream service 24hrs a day, 365 days a year. <strong><strong>Service</strong>s</strong> will be proactive<br />

or reactive (depending on scenario) and all incidents will be processed by the Phoenix Network<br />

Operation Centres (NOC) based at Technology House, Northampton and Eagle House, High Wycombe.<br />

The NOC will undertake incident diagnosis, problem management and incident resolution remotely<br />

wherever possible. Should an onsite resource be required, this will be provided via Phoenix specialist<br />

field engineer or contracted component supplier.<br />

Base <strong>Service</strong> Line:<br />

<strong>Service</strong> Desk - 08XX local rate number/email access for reactive services, SNMP alarms and<br />

active monitoring for proactive services.<br />

Remote Support - access to 24x7x365 Technical support team or escalation to component<br />

suppliers or Customer facilities.<br />

Remote Monitoring - 24x7x365 remote monitoring of SNMP traps.<br />

Remote Management – 24x7x365 remote access to and management of SNMP Management<br />

Information Base.<br />

3.2.1 Onestream Security and Integrity<br />

The infrastructure behind Onestream has been developed to ensure data and system integrity. All<br />

control centre staff and systems are vetted to meet a range of industry and business requirements.<br />

These include authorisations and clearances to operate MOD, HMG, Emergency <strong><strong>Service</strong>s</strong> and Financial<br />

accreditations. Phoenix has an assigned Security Officer whose primary function is to manage these<br />

specific requirements.<br />

Proactive Systems are physically and logically separated to ensure that discrete Customer<br />

infrastructure and associated data is protected from unauthorised access. This includes perimeter<br />

202


security appliances on each dedicated link, source port routing and definition of system and user access<br />

rights.<br />

These systems also include proactive infrastructure and security management using a combination<br />

of policy-based routing, Layer 7 content switches, physical separation, address translation, firewalling,<br />

password protection and intrusion detection and protection systems. The technology solution is backed<br />

by threat management systems and appropriate policy and procedures to secure the infrastructure.<br />

Phoenix will also supply a detailed list of all IP addresses required for management systems and<br />

UDP/TCP ports and management protocols that will require access to Customer systems. This will<br />

ensure that only approved management traffic is enabled to traverse the infrastructure.<br />

Phoenix will utilise a range of connectivity options to provide remote monitoring solutions.<br />

The preferred method of connection will be via a standard point to point GRE tunnel over IPSEC VPN<br />

connection, using 3Des encryption, terminating on existing Customer equipment. This tunnel will be<br />

utilised to collect device and system based performance statistics and incident based information.<br />

Phoenix will also utilise point to point leased lines, frame-relay links or more regularly are connected<br />

directly to the Customer’s core MPLS infrastructure. This will provide access to <strong>PSN</strong> Customer<br />

equipment room sites for remote monitoring and management of these facilities.<br />

3.2.2 Physical Security<br />

Phoenix has achieved both ISO/IEC 20000 and ISO/IEC 27001:2005 Information security<br />

management and process certification. All Phoenix personnel will be issued clear guidelines concerning<br />

their obligation with regard security issues and confidentiality of data and the data protection<br />

legislation.<br />

203


3.2.2.1 ISO/IEC 27001 requires that for Customers Phoenix will:<br />

Systematically examine the Customer’s information security risks, taking account of the threats,<br />

vulnerabilities and impacts;<br />

Design and implement a coherent and comprehensive suite of information security controls<br />

and/or other forms of risk treatment (such as risk avoidance or risk transfer) to address those<br />

risks that are deemed unacceptable; and<br />

Adopt an overarching management process to ensure that the information security controls<br />

continue to meet the Customer’s information security needs on an ongoing basis.<br />

Phoenix will work with <strong>PSN</strong> Customers to identify and understand any security requirements as part<br />

of scoping the <strong>Service</strong> requirements and to implement them as part of service transition.<br />

3.2.2.2 <strong>Service</strong> Security<br />

Dual Control centres will provide technical support to the Phoenix customer community. In the<br />

event of issues with access to a given site all systems can be fully supported from the secondary site.<br />

The infrastructure will be constructed using a secure MPLS infrastructure between sites to provide<br />

resilient connectivity and system access.<br />

All systems will be backed up to local storage and then to the secondary control centre. In the event<br />

of a local incident involving hardware failures or environmental issues, the critical systems will be<br />

restored within four working hours utilising the most recent backup and “warm” backup hardware.<br />

In the event of a major incident (for example, substantial fire damage/building condemned), key<br />

systems will be restored to a secondary site within five working days.<br />

3.3 Incident and Problem Management for Managed Equipment Rooms<br />

Incident and Problem management are key components to the delivery of the management<br />

solution. Phoenix will investigate and resolve issues as they occur, whether automatically detected of<br />

notified by the <strong>PSN</strong> Customer or Phoenix own support teams on site. This service will be provided by<br />

Phoenix in full compliance with all <strong>PSN</strong> incident management Codes, for example:<br />

204


INC.5 =<br />

“Minimum <strong>Service</strong> Level: Review Incidents allocated to them, measured from the time<br />

the Incident is received to the time it is accepted or rejected (with justification), within<br />

30 minutes for 90% of all Incidents received in any one hour during the Agreed <strong>Service</strong><br />

Time.”<br />

INC.6 =<br />

“Minimum <strong>Service</strong> Level: Inform the <strong>PSN</strong> <strong>Service</strong> Bridge of all Major Incidents within<br />

30 minutes of the Incident being recorded during the Agreed <strong>Service</strong> Time.”<br />

INC.11 = “Minimum <strong>Service</strong> Level: Inform the <strong>PSN</strong> Customer of the affected service when an<br />

Incident is raised or when the status of an Incident changes, within 30 minutes from<br />

the time the Incident is raised or its status changes during the Agreed <strong>Service</strong> Time.”<br />

Incident Management will focus on the initial engagement of an issue and liaison with the Customer.<br />

The Phoenix service team will provide the initial diagnostic based on known issues that occur within the<br />

infrastructure, usually to address minor issues and will minimize disruption to the business by restoring<br />

service operation to agreed levels (including agreed response and resolution times)..<br />

If escalation for a non-standard fault is required, this will be passed to the Problem Management<br />

Team whose primary role is to utilise product and technology specific skills to establish the root cause of<br />

an issue and resolve the incident.<br />

A response would then be initiated in line with the SLA that has been defined and agreed for each<br />

<strong>PSN</strong> Customer.<br />

Monitored alarms will automatically log an incident on Phoenix Management System Alliance v10<br />

which ensures that alarms will be actioned and reported on.<br />

205


The SLA will define the Incident resolution process and associated timescales beyond the minimum<br />

service levels defined by the relevant <strong>PSN</strong> incident management Codes.<br />

SLAs for monitoring and management services tend to vary significantly dependant on the criticality<br />

and the functionality of the supported systems, however while monitoring will be carried out 24 x 7,<br />

365, management can be provided; to match the Customer’s hours of business, 24 x 7, 365 or any<br />

variation in between. Phoenix will accommodate this, even for example if this is required for different<br />

segments of a Managed Equipment Room.<br />

3.3.1 Key Performance Matrices<br />

In relation to the achievement of improved response and fix times from point of call, Phoenix will<br />

report on the number of Incidents and how the SLA and the end-to-end support processes can be<br />

further improved as well as technical support calls and project activity.<br />

Phoenix will also agree regular service review reports and meetings to clearly communicate<br />

performance against SLA’s. In support of this Lot for Managed Equipment Room <strong><strong>Service</strong>s</strong> Phoenix will<br />

provide Monthly review meetings as the standard base offering.<br />

3.4 Secure Portal<br />

Phoenix will provide nominated Customer and Authority users access to a secure management<br />

Portal. This portal will utilise unique user sign-on to establish an SSL encrypted connection to the<br />

session. The portal will have a defined number of users, each of which will have to be specific users, as<br />

opposed to group email accounts.<br />

206


As defined and approved with each <strong>PSN</strong> Customer, Phoenix will provide access to the secure portal<br />

to a defined number of users (as opposed to group email accounts). These users will use the portal to<br />

access :<br />

Alliance v10 - Read Only or Read/Write access to the Phoenix Call Management application to<br />

view, open, track and update the status of an incident.<br />

Matrix View – <strong>Service</strong> Desk View of Infrastructure Status<br />

Topology View – Graphical view of Topology and device status and associated information<br />

Performance Reports – Historical Performance reports for key systems and devices<br />

Availability Reports – Availability statistics of each monitored object.<br />

Change Control – Access to log, track, update open change requests<br />

Contract Schedule – <strong>Service</strong> contract and inventory list<br />

Infocentre – Online storage of related service information. i.e. Maps and escalation information.<br />

The portal has been developed to share information between Phoenix and our customers. This will<br />

enable all authorised users to access critical, accurate information when it is required, thus helping the<br />

overall <strong>Service</strong> Management approach within the scope of service.<br />

3.5 <strong>Service</strong> Desk Support<br />

Phoenix will provide a 24 x 7 x 365 <strong>Service</strong> Desk to receive and log calls from the Customer <strong>Service</strong><br />

Desk by telephone via a dedicated phone number with a customised greeting and/or email via a<br />

dedicated email address. Calls to the <strong>Service</strong> Desk will be logged immediately and users will<br />

automatically receive confirmation via email that the call has been logged and are notified as to who will<br />

be handling the call. Phoenix will also offer an option to log calls via Web or Electronic Data Interchange<br />

(EDI) from the Customer’s own <strong>Service</strong> Desk system.<br />

The Phoenix <strong>Service</strong> Desk will provide the following functions:<br />

Primary Point of Contact<br />

o Single point of contact for users either via dedicated phone number or dedicated e-mail<br />

account<br />

207


Incident Management<br />

o Detection and Recording of an incident including assignment of unique reference<br />

number<br />

o Classification of the incident using remote tools and knowledge base<br />

o Prioritisation of the incident to agreed service levels<br />

o Management of Investigation and diagnosis phase<br />

o Management of Resolution and recovery phase<br />

o Closure<br />

Request Management<br />

o Recording of a service request including assignment of unique reference number<br />

o Management of Fulfilment<br />

o Closure<br />

Problem Management<br />

o Trend analysis of monthly problems<br />

o Assistance with the handling of major incidents<br />

Escalation of Outstanding Incidents / Problems and resolution management<br />

<strong>Service</strong> Reporting & Management Information<br />

o Monthly reporting<br />

o Call Statistics<br />

o Recommendations<br />

Component Supplier Coordination<br />

o Pass incidents to component suppliers<br />

o Retain incident ownership<br />

o Ensure correct closure and user satisfaction<br />

A number of activities listed above, such as those relating to incident, problem and event<br />

management, will be provided by Phoenix to at least the minimum service levels defined by relevant<br />

<strong>PSN</strong> Codes.<br />

A dedicated number will be offered which allows the analyst to personalise the initial greeting,<br />

enabling the offer of a previously agreed bespoke response to the call. Options that will be made<br />

available include:<br />

208<br />

Dedicated 0870# access to Phoenix <strong>Service</strong> Desk agents (other numbers including 0800 are also<br />

available)<br />

Ability for Phoenix <strong>PSN</strong> Customers to setup their own internal 4-digit extension to the Phoenix<br />

<strong>Service</strong> Desk.


4 Managed Equipment Room Access Control Process<br />

As part of the Network Operations Centre <strong>Service</strong> Desk in High Wycombe, Phoenix has an<br />

Administration team that works alongside the Monitoring System teams that will manage Access Control<br />

processes for <strong>PSN</strong> Customers. This proximity allows for a close working relationship between the teams<br />

to ensure incidents will be handled quickly and efficiently and in line with the <strong>PSN</strong> Authorities and<br />

Customer requirements.<br />

The Administration team will support requests for access to Phoenix Equipment Rooms and 3 rd party<br />

owned rooms (where Phoenix has leased space) in which Phoenix hosts Customer systems to which<br />

Customers require access. This process will be extended to incorporate Customer requests using either<br />

Phoenix process and procedures or if required, those of the Customer.<br />

Phoenix Access Management process will help to protect the confidentiality and integrity of<br />

Customer Equipment Rooms by ensuring that only authorised users are able to access them.<br />

4.1 Approved Access List<br />

Phoenix will use an Approved Access List detailing the names and levels of authority of people from<br />

various activities relating to the equipment room services. Customer employees on the list will each be<br />

given a security level 1 – 5, which will provide the individual with different levels of entitlement, as<br />

below<br />

Definitions :<br />

Level 1<br />

Super User level, can request anything, including updating the user list.<br />

209


Level 2<br />

Change Requestor level, can request changes to the infrastructure or<br />

services provided by Phoenix.<br />

Remote Hands level, can request remote assistance such as reboots, tape<br />

Level 3<br />

changes, troubleshooting tasks, as well as request technical information on the<br />

Customer infrastructure.<br />

Level 4<br />

Access Requestor level, can request access for themselves or others to<br />

Phoenix data centres.<br />

Level 5<br />

Fault Logger level, can log faults/incidents<br />

Please note that access levels 1 – 5 cannot be mixed. If a person is assigned<br />

Comments:<br />

to an access level e.g. Change Control then he will automatically have any access<br />

rights that fall below it i.e. Fault logger, Remote hands and Access Requestor<br />

The completed approved access list will then be sent via email to the Phoenix <strong>Service</strong> Desk to keep<br />

on file. This list will be reviewed and updated on a regular basis (as required by the Customer).<br />

This policy places a clear responsibility on the Customer to advise Phoenix of changes to the list<br />

promptly, to ensure that staff who are no longer employed or engaged by the Customer, cannot gain<br />

access to the equipment room.<br />

All Customers or Customer contractors will be required to bring proof of identity to site in the form<br />

of a valid government photographic I.D. e.g. driving license or passport.<br />

210


The <strong>Service</strong> Desk will need to be informed immediately should someone on the list leave. Any<br />

visitors who arrive on site and have not been pre-authorised by someone listed on the Approved Access<br />

List will be denied access until Phoenix can verify that access should be granted.<br />

211