2.3.3.2 For the Category-I the RG will vary depending upon the type of PAP as per Category-B to H.<br />

The implementation process has been delineated in para-3.9.4.<br />

2.3.3.3 Varying <strong>Rehabilitation</strong> grant<br />

The RG however, could also be suitably fixed on varying basis say on per acre of land loss<br />

basis, slab basis etc., in consultation with the stakeholders, as per need at any specific project.<br />

2.3.3.4 Alternately RG could be finalized as a percentage of basic compensation paid based on the<br />

discussions and consultation in VDAC, state specific policy requirement etc.<br />

2.3.4 Annuity<br />

2.3.4.1 RG could be in a form of Annuity purchased thru some financial institution. The annuity<br />

amounts could be suitably fixed as per extant policies and practices or in mutual consultation<br />

with the stakeholders based on land yield, yearly income from the land etc. and may vary<br />

from state to state.<br />

2.3.4.2 In case of Annuity being decided in lieu of employment or any other rehabilitation option,<br />

NTPC would purchase / bear the onetime cost of Annuity from any financial institution,<br />

preferably from LIC. The financial institution would then be responsible for disbursing the<br />

annuity amount to the annuitant on a regular basis as per the scheme finalized. However, in<br />

case of provision of employment at a later date, the annuity shall be discontinued.<br />

2.3.4.3 Annuity could also be worked out with a linkage with peaceful construction of the project, as<br />

per need and requirement. A certain component of the annuity could be linked to the<br />

construction activity and could be non payable in case of obstruction/ agitation faced by the<br />

project due to local issues. Modalities could be prescribed in due course, if such a scheme is<br />

envisaged.<br />

2.3.5 Lump sum Cash<br />

Lump sum cash in lieu of employment would be considered in case the stakeholders are not<br />

agreeing for Annuity policy in lieu of employment. <strong>Rehabilitation</strong> amount in form of cash<br />

grant would be considered for payment on submission of an affidavit by the PAP in support<br />

of intent for purchase of some asset and such amount would be paid as a onetime final<br />

settlement for rehabilitation on signing of a tripartite agreement by the PAP, NTPC and the<br />

district administration.<br />

2.4 <strong>Resettlement</strong> Package: <strong>Resettlement</strong> benefits shall be extended to each nuclear family.<br />

2.4.1 Self-resettlement<br />

2.4.1.1 HSOs / PAPs of Category-A and willing to resettle on their own or shift to some alternate<br />

location will be encouraged for self resettlement. Financial assistance for self-resettlement/<br />

cash in lieu of plot shall be provided generally at the rate of 5 (five) times of the basic<br />

compensation payable for the house, excluding solatium and interest, under Land<br />

Acquisition Act subject to a minimum of ` 0.78 lakh and a maximum of ` 1.55 lakh in each<br />

case (Based on AICPI index as on 01.01.10 subject to upward revision).<br />

-: 16 :-