01.12.2014 Views

Resettlement & Rehabilitation (R&R) Policy - Ntpc

Resettlement & Rehabilitation (R&R) Policy - Ntpc

Resettlement & Rehabilitation (R&R) Policy - Ntpc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.10 Infrastructure Facilities:<br />

2.10.1 The infrastructure facilities and basic minimum amenities shall be augmented in the RCs, the<br />

project affected villages and in the vicinity of the project to ensure that the displaced<br />

population (HSOs) in the resettlement colony or the village may secure for themselves a<br />

reasonable standard of community life.<br />

2.10.2 The facilities/ amenities shall be considered in the resettlement colonies or the villages<br />

where more than 25-30 HSOs have self resettled.<br />

2.10.3 In addition community development works will also be undertaken as per need and<br />

requirement in the project affected villages, in the vicinity of the project where PAPs<br />

continue to reside even after acquisition as well as other places in the state, if need be, as per<br />

consultation with the stakeholders.<br />

2.10.4 These facilities will also be available to the host population and the neighbouring community<br />

to facilitate socio economic development of the area.<br />

2.10.5 The land, if required, shall be made available by the State Government. The location for<br />

these facilities shall be decided in consultation with the State Government and/or Panchayat.<br />

The ownership of any infrastructure facilities constructed in <strong>Resettlement</strong> Colony or<br />

otherwise will rest with the State Government /local bodies and the same will be handed over<br />

to the concerned agencies on construction for their maintenance and future use. Modalities in<br />

this regard for transfer of asset ownership should be completed in consultation with the<br />

concerned agencies. Any registration/mutation charges, if any would be borne by NTPC in<br />

this regard at the time of transfer.<br />

2.10.6 The facilities/ amenities will vary depending upon local requirements. The focus areas<br />

would be Connectivity, Drinking Water, Sanitation apart from Education and Health related<br />

infrastructure. These may include the following:<br />

i) Internal and the approach roads with proper drainage, with preference for concrete<br />

roads<br />

ii)<br />

iii)<br />

iv)<br />

One or more sources of safe drinking water like hand pump, borewells with water<br />

outlet platforms etc., as per need and requirement<br />

Tree plantation including fruit trees<br />

Community halls/ Panchayat Ghar<br />

v) Primary educational facilities<br />

vi)<br />

vii)<br />

Primary health facilities<br />

Street lighting in the <strong>Resettlement</strong> Colonies<br />

viii) Public cremation ground/ burial ground<br />

ix)<br />

Common grazing land/ small distributaries for irrigation<br />

x) Drainage<br />

xi)<br />

Sanitation<br />

-: 25 :-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!