25.12.2014 Views

2013 Budget Book - City of Greeley

2013 Budget Book - City of Greeley

2013 Budget Book - City of Greeley

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Water Replacement Trans & Distribution<br />

Project Name: #342 Instrumentation And Control Department: Water & Sewer<br />

Funding Source: Water Funded Depreciation Division: Trans and Distribution<br />

Project Class: Water Replacement Trans & Distrib Ward: 5 OUTSIDE CITY<br />

Purpose: Repair/Rehabilitation--Other Impact Zone: Not Applicable<br />

Location: 8 Outside <strong>City</strong><br />

Description:<br />

This is for the replacement and refurbishment <strong>of</strong> instrument and control systems, including SCADA (Supervisory<br />

Control and Data Acquisition). These devices are used to measure and record various chemicals and to record<br />

data required by regulation. This is an on-going project.<br />

Justification:<br />

Instrumentation and controls wear out or become obsolete over time, requiring replacement or major<br />

refurbishment. Refurbishment typically occurs at the facilities <strong>of</strong> the local supplier or manufacturer. <strong>City</strong><br />

instrumentation technicians perform the replacement projects. This account includes instruments at all water<br />

facilities and pipelines.<br />

Impact on Operating <strong>Budget</strong>:<br />

None<br />

Project Cost Summary<br />

<strong>2013</strong> 2014 2015 2016 2017 Five Year<br />

Construction $13,000 $13,000 $13,000 $13,000 $13,000 $65,000<br />

Design 45,000 49,755 54,748 59,990 65,495 274,988<br />

Pr<strong>of</strong>essional Services - - - - - -<br />

Project Management - - - - - -<br />

Capital 10,000 10,000 10,000 10,000 10,000 50,000<br />

Contingency - - - - - -<br />

Operating 24,000 24,000 24,000 24,000 24,000 120,000<br />

Miscellaneous 2,100 2,100 2,100 2,100 2,100 10,500<br />

Total Cost $95,100 $99,855 $104,848 $110,090 $115,595 $525,488<br />

<strong>City</strong> <strong>of</strong> <strong>Greeley</strong>, Colorado 341 Capital Improvements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!