Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Biogas</strong> <strong>Plant</strong> <strong>SÖHNergy</strong><br />
<strong>SÖHNergy</strong> GmbH & Co. KG • Daimlerstraße 13 • D-74193 Schwaigern • T: +49 (0) 71 38 22 0 • F: +49 (0) 71 38 22 22 7<br />
<strong>UTS</strong> <strong>Biogas</strong>technik GmbH • Zeppelinstraße 8 • D-85399 Hallbergmoos<br />
T: +49 (0) 811 99884-0 • F: +49 (0) 811 99884-450 • info@uts-biogas.com • www.uts-biogas.com
Reception<br />
tank<br />
Secondary fermenter with gas storage<br />
Digestate storage tank with gas storage<br />
Reception<br />
tank<br />
Office<br />
Silage<br />
leachate<br />
pit<br />
Reception tank<br />
Fermenter II, concrete roof<br />
Fermenter I, concrete roof<br />
Secondary fermenter,<br />
tensile fabric roof, gas storage<br />
Digestate storage tank,<br />
tensile fabric roof, gas storage<br />
Submersible mixer with Service-Box<br />
Pump room<br />
Combined heat and power plant (CHP)<br />
Control system<br />
Emergency cooling<br />
Gas storage<br />
Feeder box<br />
Gas cooling system<br />
<strong>Biogas</strong> burner<br />
Separator<br />
Secondary fermenter with gas storage<br />
Digestate storage tank with gas storage<br />
Office<br />
Reception<br />
tank<br />
Mixers / Service-Box<br />
Pumps<br />
Gas pipes<br />
Pressure pipes DN 150<br />
Feed pipes DN 300<br />
Heating<br />
Electricity<br />
Entrance / Exit<br />
Installed CHP:<br />
Electrical Power:<br />
Thermal Output:<br />
1x 1166 kWel<br />
Reception tank<br />
Fermenter II, concrete roof<br />
Fermenter I, concrete roof<br />
Secondary fermenter,<br />
tensile fabric roof, gas storage<br />
Digestate storage tank,<br />
tensile fabric roof, gas storage<br />
Submersible mixer with Service-Box<br />
Pump room<br />
Combined heat and power plant (CHP)<br />
Control system<br />
Emergency cooling<br />
Gas storage<br />
Pumps<br />
Feeder box Gas pipes<br />
Gas cooling system<br />
Mixers / Service-Box<br />
Pressure pipes DN 150<br />
Feed pipes DN 300<br />
<strong>Biogas</strong> burner<br />
Heating<br />
Electricity<br />
Separator<br />
Entrance / Exit<br />
per day 27 MWh<br />
per year 9200 MWh<br />
per day 25 MWh<br />
per year 8500 MWh<br />
Reception tank<br />
Fermenter II, concrete roof<br />
Fermenter I, concrete roof<br />
Secondary fermenter,<br />
tensile fabric roof, gas storage<br />
Digestate storage tank,<br />
tensile fabric roof, gas storage<br />
Submersible mixer with Service-Box<br />
Pump room<br />
Combined heat and power plant (CHP)<br />
Control system<br />
Emergency cooling<br />
Gas storage<br />
Feeder box<br />
Gas cooling system<br />
<strong>Biogas</strong> burner<br />
Separator<br />
Input per day:<br />
CO2 reduction per year:<br />
Office<br />
38 t Corn silage<br />
8 t Whole crop silage<br />
ca. 6000 t<br />
Silage<br />
leachate<br />
pit<br />
This biogas plant could supply about 2100 households with<br />
electricity and about 300 households with heat.