Name of work: Replacement of Class B & B+ C Surge Protection Devices in First Floor at TE<br />
MM Nagar.<br />
intention of the document and his decision shall be final and binding on the contractor.<br />
B S N L EW - 8<br />
7.3 Any error in description, quantity or rate in Schedule of Quantities or any omission there<br />
from shall not vitiate the Contract or release the contractor from the execution of the whole or<br />
any part of the works comprised therein according to drawings and specifications or from any<br />
of his obligations under the contract.<br />
8.0 In case of NIT for individual work there will be no split up of work and the entire<br />
quantity will be awarded to the lowest tenderer, if the firm has quoted as per terms and<br />
conditions of the NIT.<br />
Signing of Contract<br />
9. The successful tenderer/contractor, on acceptance of his tender by the Accepting Authority,<br />
shall, within 15 days from the stipulated date of start of the work, sign the contract consisting<br />
of the notice inviting tender, all the documents including drawings, if any, forming the tender<br />
as issued at the time of invitation of tender and acceptance thereof together with any<br />
correspondence leading thereto.<br />
10. The agreement to be signed on non-judicial stamp paper and the cost to be decided as per<br />
the prevailing local bye-laws or zonal head of the circle.<br />
CLAUSE – 1. Performance Guarantee<br />
CLAUSES OF CONTRACT<br />
1.1 i) The contractor is required to furnish performance guarantee for an amount equal to<br />
5% of the contract value in the form of bank guaranty/ CDR/FDR/DD (of a<br />
nationalized / Scheduled Bank in a standard form within two weeks from the date of<br />
-------------------<br />
This will be followed by Standard EW 8 booklet (Printed form) Page no.16 onwards at<br />
the time of framing the agreement.<br />
Contractor Internet Downloaded copy Executive Engineer (E)<br />
Page 26 of 40